To amend the Herger-Feinstein Quincy Library Group Forest Recovery Act to extend and expand the scope of th...
Do you support it?
Want to know if it passes?
We'll email you when HR 3685 moves — a committee vote, a floor vote, or a signature. Nothing else.
Free forever · unsubscribe in one click.
Your answer was recorded either way.
Which district are you in?
Your ZIP is all we need to match you to your own representatives — so we can tell you how they voted on HR 3685.
You're tracking HR 3685
We'll email you the moment it moves.
HR 3685 — To amend the Herger-Feinstein Quincy Library Group Forest Recovery Act to extend and expand the scope of the pilot forest management project required by that Act.
Last action — Placed on the Union Calendar, Calendar No. 372.
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
Died in session
This bill died with 112th Congress. It reached “Introduced” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.
Summary
Amends the Herger-Feinstein Quincy Library Group Forest Recovery Act (the Act) to extend the term of the pilot forest management project for the Plumas, Lassen, and Tahoe National Forests in California. Requires that when the Regional Forester for Region 5 initiates the process of amending or revising such plans for the pilot project area (the federal lands within the Plumas and Lassen National Forests and the Sierraville Ranger District of Tahoe National Forest designated as available for group selection) the process include the preparation of at least one alternative that incorporates the pilot project and area designations, the resource management activities, and other aspects of the Quincy Library Group Community Stability Proposal. Authorizes the Secretary of Agriculture (USDA) to expand the pilot project area to include all of the National Forest System lands in California or Nevada that lie within the Sierra Nevada and Cascade Province, Lake Tahoe Basin Management Unit, and Humboldt-Toiyabe and Inyo National Forests. Deems those areas that are designated as deferred under the Act, but located in Tehama County, south and west of Lassen Peak, as being designated as available for group selection.
Bill Text
We don't have the full text on file for this bill yet.
Read HR 3685 on the official United States source →Action History
-
Placed on the Union Calendar, Calendar No. 372.
-
Committee on Agriculture discharged.
-
Reported (Amended) by the Committee on Natural Resources. H. Rept. 112-524, Part I.
-
Ordered to be Reported (Amended) by the Yeas and Nays: 21 - 16.
-
Committee Consideration and Mark-up Session Held.
-
Subcommittee on National Parks, Forests and Public Lands Discharged.
-
Subcommittee Hearings Held.
-
Referred to the Subcommittee on Conservation, Energy, and Forestry.
-
Referred to the Subcommittee on National Parks, Forests and Public Lands.
-
Referred to House Agriculture
-
Referred to House Natural Resources
-
Referred to the Committee on Natural Resources, and in addition to the Committee on Agriculture, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
Sponsors
- Wally Herger · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 546 not signed on
Sponsors (1)
Co-sponsors (0)
None.
Not signed on (546)
546 members have not signed on to this bill.
Show all 546 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Subjects
Frequently asked questions
- What does HR 3685 do?
- Amends the Herger-Feinstein Quincy Library Group Forest Recovery Act (the Act) to extend the term of the pilot forest management project for the Plumas, Lassen, and Tahoe National Forests in California. Requires that when the Regional Forester for Region 5 initiates the process of amending or revising such plans for the pilot project area (the federal lands within the Plumas and Lassen National Forests and the Sierraville Ranger District of Tahoe National Forest designated as available for group selection) the process include the preparation of at least one alternative that incorporates the pilot project and area designations, the resource management activities, and other aspects of the Quincy Library Group Community Stability Proposal. Authorizes the Secretary of Agriculture (USDA) to expand the pilot project area to include all of the National Forest System lands in California or Nevada that lie within the Sierra Nevada and Cascade Province, Lake Tahoe Basin Management Unit, and Humboldt-Toiyabe and Inyo National Forests. Deems those areas that are designated as deferred under the Act, but located in Tehama County, south and west of Lassen Peak, as being designated as available for group selection.
- Who sponsors HR 3685?
- HR 3685 is sponsored by Wally Herger (R).
- What is the current status of HR 3685?
- This bill died with 112th Congress. It reached “Introduced” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
- Where can I track HR 3685?
- Track HR 3685 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on HR 3685
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of HR 3685
Last checked for changes about 8 hours ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →