Hydropower Regulatory Efficiency Act of 2011
Do you support it?
Want to know if it passes?
We'll email you when HR 3680 moves — a committee vote, a floor vote, or a signature. Nothing else.
Free forever · unsubscribe in one click.
Your answer was recorded either way.
Which district are you in?
Your ZIP is all we need to match you to your own representatives — so we can tell you how they voted on HR 3680.
You're tracking HR 3680
We'll email you the moment it moves.
HR 3680 — Hydropower Regulatory Efficiency Act of 2011
Last action — Referred to the Subcommittee on Water and Power.
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
✓In Committee
-
Died in session
This bill died with 112th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.
Summary
Hydropower Regulatory Efficiency Act of 2011 - Amends the Public Utility Regulatory Policies Act of 1978 (PURPA) to increase from 5,000 to 10,000 kilowatts the size of small hydroelectric power projects which the Federal Energy Regulatory Commission (FERC) may exempt from its license requirements. Amends the Federal Power Act to revise the limitation on the maximum installation capacity of conduit hydroelectric facilities that are eligible for an exemption from licensing requirements. Waives license requirements for any conduit hydroelectric facility that: (1) uses only the hydroelectric potential of a non-federally owned conduit, (2) has an installed capacity that does not exceed 5 megawatts, and (3) is not currently licensed or exempted from license requirements. Redefines "conduit" to specify any tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity. Authorizes FERC to: (1) grant an exemption from license requirements only to conduit hydroelectric facilities on non-federal land that have an installed capacity not exceeding 40 megawatts, and (2) extend the term of a preliminary permit once for up to 2 additional years if it finds that the permittee has carried out activities in good faith and with reasonable diligence. Directs FERC to: (1) investigate the feasibility of the issuance of a license for hydropower development at nonpowered dams and closed loop pumped storage projects during a two-year period, and (2) hold workshops and develop hydropower pilot projects. Directs the Secretary of Energy (DOE) to study: (1) the potential megawatts of hydropower that may be obtained from U.S. conduits; and (2) land well-suited for pumped storage sites and located near existing or potential sites of intermittent renewable resource development, such as wind farms. Directs the President to report to certain congressional committees on actions taken by DOE to implement the memorandum of understanding on hydropower entered into on March 24, 2010.
Bill Text
We don't have the full text on file for this bill yet.
Read HR 3680 on the official United States source →Action History
-
Referred to the Subcommittee on Water and Power.
-
Referred to the Subcommittee on Energy and Environment.
-
Referred to the Subcommittee on Highways and Transit.
-
Referred to the Subcommittee on Energy and Power.
-
Referred to House Science, Space, and Technology
-
Referred to House Natural Resources
-
Referred to House Transportation and Infrastructure
-
Referred to House Energy and Commerce
-
Referred to the Committee on Energy and Commerce, and in addition to the Committees on Transportation and Infrastructure, Natural Resources, and Science, Space, and Technology, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
Sponsors
- Cathy McMorris Rodgers · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 546 not signed on
Sponsors (1)
Co-sponsors (0)
None.
Not signed on (546)
546 members have not signed on to this bill.
Show all 546 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Subjects
Frequently asked questions
- What does HR 3680 do?
- Hydropower Regulatory Efficiency Act of 2011 - Amends the Public Utility Regulatory Policies Act of 1978 (PURPA) to increase from 5,000 to 10,000 kilowatts the size of small hydroelectric power projects which the Federal Energy Regulatory Commission (FERC) may exempt from its license requirements. Amends the Federal Power Act to revise the limitation on the maximum installation capacity of conduit hydroelectric facilities that are eligible for an exemption from licensing requirements. Waives license requirements for any conduit hydroelectric facility that: (1) uses only the hydroelectric potential of a non-federally owned conduit, (2) has an installed capacity that does not exceed 5 megawatts, and (3) is not currently licensed or exempted from license requirements. Redefines "conduit" to specify any tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity. Authorizes FERC to: (1) grant an exemption from license requirements only to conduit hydroelectric facilities on non-federal land that have an installed capacity not exceeding 40 megawatts, and (2) extend the term of a preliminary permit once for up to 2 additional years if it finds that the permittee has carried out activities in good faith and with reasonable diligence. Directs FERC to: (1) investigate the feasibility of the issuance of a license for hydropower development at nonpowered dams and closed loop pumped storage projects during a two-year period, and (2) hold workshops and develop hydropower pilot projects. Directs the Secretary of Energy (DOE) to study: (1) the potential megawatts of hydropower that may be obtained from U.S. conduits; and (2) land well-suited for pumped storage sites and located near existing or potential sites of intermittent renewable resource development, such as wind farms. Directs the President to report to certain congressional committees on actions taken by DOE to implement the memorandum of understanding on hydropower entered into on March 24, 2010.
- Who sponsors HR 3680?
- HR 3680 is sponsored by Cathy McMorris Rodgers (R).
- What is the current status of HR 3680?
- This bill died with 112th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
- Where can I track HR 3680?
- Track HR 3680 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on HR 3680
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of HR 3680
Last checked for changes about 10 hours ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →