Pennsylvania 2025_0 Regular Session Status: In Committee 3 R cosponsors

SB 1469 — An Act amending Title 66 (Public Utilities) of the Pennsylvania Consolidated Statutes, in rates and distribution systems, providing for large load hyperscale data center tariffs.

Last action — Referred to CONSUMER PROTECTION AND PROFESSIONAL LICENSURE, Sept. 24, 2026

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. 2
    In Committee
  3. 3
    Passed Senate
  4. 4
    Passed House
  5. 5
    To Executive
  6. 6
    Enacted

This bill is in committee in the Senate. Introduced September 24, 2026. It must pass committee before a floor vote.

Next likely step: a committee vote, then a floor vote in the Senate.

In plain language

This bill establishes tariffs for large load hyperscale data centers in Pennsylvania.

The bill mandates the creation of a specific tariff structure for hyperscale data centers by electric distribution companies in Pennsylvania. This tariff will ensure that such centers cover their full service costs without shifting expenses to other ratepayers.

What this means for you
  • Small Business: This may impact small businesses by potentially changing electricity rates or availability due to the tariffs imposed on large data centers.

Summary

Data Center Accountability and Community Protection Package

Bill Text

How this bill changes current law

10 changes Share ↗

AI-generated reading aid from the bill's amendatory text — verify against the official bill.

This bill creates a new section in the Pennsylvania Consolidated Statutes to establish regulations for large load hyperscale data center tariffs.

  • Title 66

    § 1302.1. Large load hyperscale data center tariffs.

    This establishes a new section specifically addressing tariffs for large load hyperscale data centers.

  • Title 66 § 1302.1

    (a) Development of tariffs.--The commission shall promulgate regulations to develop a large load tariff for hyperscale data centers and require each electric distribution company subject to the commission's jurisdiction to institute the large load tariff for hyperscale data centers. The large load tariff for hyperscale data centers shall adhere to cost-causation and at a minimum shall:

    This requires the commission to create regulations for tariffs specifically for hyperscale data centers.

  • Title 66 § 1302.1

    (1) Establish a separate rate class for hyperscale data centers.

    This mandates the establishment of a distinct rate class for hyperscale data centers.

  • Title 66 § 1302.1

    (2) Account for full costs of service and ensure that the cost is not shifted to the general body of ratepayers, including connection, transmission and any other infrastructure costs.

    This ensures that costs associated with servicing hyperscale data centers do not burden other ratepayers.

  • Title 66 § 1302.1

    (3) Account for operations and maintenance expenses.

    This requires inclusion of operations and maintenance costs in the tariff calculation for these data centers.

  • Title 66 § 1302.1

    (4) Account for other costs required to serve a hyperscale data center customer.

    This adds a provision for considering additional costs related to serving hyperscale data centers.

  • Title 66 § 1302.1

    (b) Definitions.--As used in this section, the following words and phrases shall have the meanings given to them in this subsection unless the context clearly indicates otherwise:

    This introduces a definitions section to clarify terms used in the context of hyperscale data centers.

  • Title 66 § 1302.1

    "Data center." A facility or group of facilities, including an ancillary use or associated structure located on the same tract or parcel of land, that: (1) is predominantly used to house working servers or similar data storage systems; and (2) has an uninterruptible energy supply or generator backup power, or both, cooling systems, towers and other temperature control infrastructure.

    This defines what constitutes a data center for the purposes of this tariff regulation.

  • Title 66 § 1302.1

    "Hyperscale data center." A data center that has a peak load equal to or above 25 megawatts individually or 50 megawatts in the aggregate.

    This defines a hyperscale data center based on its energy load requirements.

  • Title 66

    Section 2. This act shall take effect immediately.

    This establishes the effective date of the new regulations as immediate.

Action History

  1. Referred to CONSUMER PROTECTION AND PROFESSIONAL LICENSURE, Sept. 24, 2026

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 2 co-sponsors · 250 not signed on

Sponsors (1)

Co-sponsors (2)

Not signed on (250)

250 members have not signed on to this bill.

Show all 250 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does SB 1469 do?
Data Center Accountability and Community Protection Package
Who sponsors SB 1469?
SB 1469 is sponsored by Lynda Schlegel Culver (Republican), Elder A. Vogel (Republican), and Tracy Pennycuick (Republican).
What is the current status of SB 1469?
This bill is in committee in the Senate. Introduced September 24, 2026. It must pass committee before a floor vote.
Where can I track SB 1469?
Track SB 1469 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 1469

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 1469

Last checked for changes 21 days ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →