District of Columbia Council Period 24 Status: Enacted

PR 24-0780 — Modification Nos. 1, 2, and 6 to Contract No. DCAM-21-CS-IFB-0001 with Fort Myers Construction Corporation Approval and Payment Authorization Emergency Declaration Resolution of 2022

Last action — Resolution R24-0483, Effective from Jun 07, 2022 Published in DC Register Page 007058

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. ✓
    Passed Council
  4. ✓
    To Executive
  5. 5
    Enacted

This bill has been enacted into law. Introduced May 31, 2022. Enacted.

Prognosis

Likely to advance 70% · moderate confidence

Where this bill stands today.

Odds of enactment

High

How often bills like it became law.

  • Enacted

    Current position in the legislative process.

  • 1 sponsor

    1 primary, 0 co-sponsors signed on.

  • Cleared a recorded vote

    Passed 1 recorded vote so far.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Bill Text

What changed in the latest version

50 added · 77 removed

50 line(s) added, 77 removed.

→
Previous
Latest
MURMAYORWSER May3,202 TheHonorabilMendelson CunioftheititofColumbia JohnA.Wilsuldng 1350enylanaAvenue,NWuie504 Washington,DC 20004 DarChairmaedeso:
ENROLLED ORIGINAL A RESOLUTION 24-483 IN THE COUNCIL OF THE DISTRICT OF COLUMBIA June 7, 2022 To declare the existence of an emergency with respect to the need to approve Modification Nos.
EclsedorosieatonadaprvalytheoucilfteDititofColumbsan eerencyil,heMdiictonNs.1,2nd6toonrctN.DCAM-21-CS-IFB-0ithw 222”andnaccmpnyngemrgncydcartonesltonrztinEmergencctf TheeiltonwllppoveodfcainNo.
1, 2, and 6 to Contract No.
,2and,andlowFrtMyerostutin CrprtintoomleethenrstutreiprveensforecnSret,E,amjorfotin terdeelpmntoft.lzaehsEstCmps.
DCAM-21-CS-IFB-0001 between the Department of General Services and Fort Myers Construction Corporation, increasing the aggregate amount of the Contract by $1,401,624.90 from $9,976,624.90 to $11,378,319.55, and to authorize payment to Fort Myers Construction Corporation for services received and to be received under these modifications.
Iyouaveayqusiosreadigtisatr,pesefelretootatKeth.Andrsn, teDpatmntsDietr,oreogeG.Lws,teDearmetsC hofiotrcsand Pocreentt(02)27280.
RESOLVED, BY THE COUNCIL OF THE DISTRICT OF COLUMBIA, That this resolution may be cited as “Modification Nos.
Turge the Council totake prompt and favorable action on the enclosed legislation.
1, 2, and 6 to Contract No.
Sneel, flsr n Wi Bowel u ttereustftheMayor n a d r o S A PROPOSED RESOLUTION ll IN THE COUNCIL OF THE DISTRICT OF COLUMBIA.
DCAM-21- CS-IFB-0001 with Fort Myers Construction Corporation Approval and Payment Authorization Emergency Declaration Resolution of 2022”.
ToelNs.1,,nd6tootrctN.DCAM-21-CS-IFB-0eteenheeprtmnt ofenral rvcs ndFotMyers ntrcton rprtin, craigthe agegte amounfthe otact y 140,2490 rom 996,2490 o $137,3955,ndtouhoiepamettoFrtMyerontrcionopoaton frsriesrcivdandobercivduderheemdfiaios.
RESOLVED, BY THE COUNCIL OF THE DISTRICTOF COLatBIA, T hsrsluinmaybeiedasMdiictonNs.1,,ad6toCntatNo,DCAM-21- S-FB0001 ih Frt Myersosrutin orortin Aprval nd Payment uhoiztonEmergenccartonRsouionf222.
Sc..()Theeeitsanmmditenedtoppoveodfcaionos.,2,nd 6oCotrctDCAM-21-CS-IFB-0Cntat)beteenheDeatmntofGneal eriesadFotMyersostutinCopraion“onrcor),whichwoulcese he greae amountf he otact y 1,0,6490, rm $,96,9.65 o $11,378,319.55, and to authorize payment to the Contractor for construction services received and tobe received under these modifications.
() Th Cotac,whihwas eeutdon Jne2,201 i teamuntof $9,7664.5wasprvoul aprvdbythConclasC24012.ModfiaioNo.
1exeuedonAugst30 221 iceae teConrctamuntby$83,90 fom t ude$1milo;tu,Conclaprvawas $9,7669.5to1078,8465anamun notrqirdModfcaioNo.2exeuedonNvembr5,221inceseth Cnrat amoutby$7,436,fro$1070,8465t$1,8882.9.Theagrgteaoutof Modfiaio Ns.1an 2is$8,13.4,a aoun ude$1milin tu,Conil apovlwa ntrqird MdiiatonNs.34,ad5wer$0adinsrtiecntat atos PopseMoifcainNo6woulinresthConrctaoutby$5949.2, fom$1,8882.2 t$1137,4749thu,MoiictonNo 6woudinces te ay agegt aoutofMoifctinNo.1,2an 6t$1,0,6490anamontovr$1 mlin ()Sic teagrgteaoun oMoifcainNo.1,2an6isiexcso$1 mlioduina12-onhpeio,Cunilapovlireqiedpruattsecin41of teDsrcofCoumiaHom RleAtappoveDecmbe24,173(7Stt80;DC.
OfcaCode§120.5)adthreuieenofscton22othePocreenPratcs RfomActof210efecieAri8,211(DC.La 1831;DC.OfcilCde§2- 3202.
()Conclappoalo Mdfiato Ns.12,an 6inecsartoalowte cninaioofesniacosrutoseriefothredveopenofS.EizbthEat ‘amusadtocmpnsteteCotacorfrsriespovddandtbepovdeundr these modifications.
2.
(a) There exists an immediate need to approve Modification Nos.
1, 2, and to Contract DCAM-21-CS-IFB-0001 (“Contract”) between the Department of General Services and Fort Myers Construction Corporation (“Contractor”), which would increase the aggregate amount of the Contract by $1,401,624.90, from $9,976,694.65 to $11,378,319.55, and to authorize payment to the Contractor for construction services received and to be received under these modifications.
(b) The Contract, which was executed on June 2, 2021, in the amount of $9,976,694.65, was previously approved by the Council as CA24-0127.
Modification No.
1, executed on August 30, 2021, increased the Contract amount by $803,690, from $9,976,694.65 to $10,780,384.65, an amount under $1 million;
thus, Council approval was not required.
Modification No.
2, executed on November 5, 2021, increased the Contract amount by $78,443.64, from $10,780,384.65 to $10,858,828.29.
The aggregate amount of Modification Nos.
1 and 2 is $882,133.64, an amount under $1 million;
thus, Council approval was not required.
Modification Nos.
3, 4, and 5 were $0 administrative contract actions.
Proposed Modification No.
6 would increase the Contract amount by $519,491.26, from $10,858,828.29 to $11,378,247.49;
thus, Modification No.
6 would increase the aggregate amount of Modification Nos.
1, 2, and 6 to $1,401,624.90, an amount over $1 million.
ENROLLED ORIGINAL (c) As the aggregate amount of Modification Nos.
1, 2, and 6 is in excess of $1 million during a 12-month period, Council approval is required pursuant to section 451 of the District of Columbia Home Rule Act, approved December 24, 1973 (87 Stat.
803;
D.C.
Official Code § 1-204.51).
(d) Council approval of Modification Nos.
1, 2, and 6 is necessary to allow the continuation of essential construction services for the redevelopment of St.
Elizabeths East Campus and to compensate the Contractor for services provided and to be provided under these modifications.
Show all 44 changed rows (4 more)
Previous
Latest
Sec.
The Council ofthe DistrictofColumbia determines thatthe circumstances enumerated in Section 2 constitute emergency circumstances making itnecessary thatthe “Modification Nos.
The Council of the District of Columbia determines that the circumstances enumerated in section 2 constitute emergency circumstances making it necessary that the Modification Nos.
1,2, and 6 to ContractNo.
1, 2, and 6 to Contract No.
DCAM-21-CS-IFB-0001 with Fort Myers Constructionorationrovalndaymentuthorizationgencytof2022” beadoptetrasigeredig.
DCAM-21-CS-IFB-0001 with Fort Myers Construction Corporation Approval and Payment Authorization Emergency Act of 2022 be adopted after a single reading.
View plain text versions (2)

Action History

  1. Resolution R24-0483, Effective from Jun 07, 2022 Published in DC Register Page 007058

  2. Approved with Resolution Number R24-0483

  3. Final Reading, CC

  4. Retained by the Council with comments from the Committee on Government Operations and Facilities

  5. PR24-0780 Introduced by Chairman Mendelson at Office of the Secretary

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 13 not signed on

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Final Reading, CC

Passed 13 Yea · 0 Nay
Party YeaNayPresentNot Voting
Unaffiliated 13000
Total 13000
% of votes cast 100%0%0%0%
How each member voted (13)
Member Party Vote
Anita Bonds — Yea
Brianne K. Nadeau — Yea
Brooke Pinto — Yea
Charles Allen — Yea
Christina Henderson — Yea
Elissa Silverman — Yea
Janeese Lewis George — Yea
Kenyan R. McDuffie — Yea
Mary Cheh — Yea
Phil Mendelson — Yea
Robert C. White, Jr. — Yea
Trayon White, Sr. — Yea
Vincent Gray — Yea

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors PR 24-0780?
PR 24-0780 is sponsored by Phil Mendelson.
What is the current status of PR 24-0780?
This bill has been enacted into law. Introduced May 31, 2022. Enacted.
Where can I track PR 24-0780?
Track PR 24-0780 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on PR 24-0780

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of PR 24-0780

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →