PR 23-0836 — Contract No. DCAM-20-CS-RFP-0005 with GCS-SIGAL|GRUNLEY Joint Venture Approval and Payment Authorization Emergency Declaration Resolution of 2020

Last action — Resolution R23-0437, Effective from Jul 07, 2020 Published in DC Register Vol 67 and Page 8994

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. ✓
    Passed Council
  4. Died in session

This bill died with Council Period 23. It reached “Passed Council” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Bill Text

What changed in the latest version

37 added · 70 removed

37 line(s) added, 70 removed.

→
Previous
Latest
MURIELBOWSER ‘MAYOR June 19,2020 The Honorable Phil Mendelson Council of the DistrictofColumbia John A.
ENROLLED ORIGINAL A RESOLUTION 23-437 IN THE COUNCIL OF THE DISTRICT OF COLUMBIA July 7, 2020 To declare the existence of an emergency with respect to the need to approve Contract No.
WilsonBuilding 1350PennsylvaniaAvenue,NW Suite504 Washington,DC 20004 Serics Refrece:
DCAM-20-CS-RFP-0005 between the Department of General Services and GCS- SIGAL|GRUNLEY Joint Venture, increasing the amount of the Contract to $25 million, and to authorize payment to GCS-SIGAL|GRUNLEY Joint Venture for design-build services received and to be received under the contract.
LttrConratandPropsedDeig-BildAgeemetforReeveopmet otheS.ElzaetsEatCampus-Parel6Pakin Grage CntrctNumer:
RESOLVED, BY THE COUNCIL OF THE DISTRICT OF COLUMBIA, That this resolution may be cited as the “Contract No.
~CAM-0-CS-FP-005 Cntrator:
DCAM-20-CS-RFP-0005 with GCS- SIGAL|GRUNLEY Joint Venture Approval and Payment Authorization Emergency Declaration Resolution of 2020”.
GCS-IGALIGRUNLEY JinVentue DearChairman Mendelson:
Eclse frcosieatonbyth CunilofteDisrcofColubiaispopse emrgecy legsain,"onratNo DCM-20-S-RF-0005wihGCS-SIGALGRUNLEYJontVntre Apprva adPaymntAuhoiztinEmegenyActof02",adthaccopaningdclrtin resltin t aproe teproosd Dsin-uid Areeentfo Reeveopentofth St EiabthEas Cmpus-Pare 6PakigGarge(DCA-20-S-RF-000) (h "onrct) wit GCS-SIG ALIGRUNJLiYVentre(deig-bilseriesrceveandt0brecivd audetheLttrCntacandthproosdrCnrat TeDeprtmntofenralSrvceseesConclappovlfothprooseConrattoiceae teiiilLetrCotrc aoun o$95,00.0toano-t-ecedamuntof2500,0000 einrasdConrat aounof$2500,00.0.rhascrtfe ta fndngisaaialefoth InadditiontotheLetterContractandproposedCr:()acontractsummai);
( afsalcertification;orandand/orrtificationsalfficiency;)a Clean HandsCertificationfortheContractor.
Ifyuhavanyqustonregrdn timate,peaefelfetocotc,tftsanProcreent at(02727280.tr,oGeoreG.LeistheDpatmntsC h oiCe Sncrly, Mufiel Bdwser Enc-osures airmailMendelson atheeqetofheMayor A PROPOSED RESOLUTION IN THE COUNCIL OF THE DISTRICT OF COLUMBIA Tdelaeteeiseceoaneerenewitrepcttthnedtoapov CnratN.
DAM-0-C-RF-005,bVnur,inrasneteamoutoftheCotacSt $5,0,00.0EanJauhriig pymntto GS-SIGL|GRUNEY Jon VntrefrdsgnbilsevcereeieandtbereeveunerteCntat RESLVED,BY TECOUNCILOFTHEDISTRCTOFCOLUMBIA ta tirsouinmayb ctdath“CotacNo.DAM-2-CSRFP0005wthGS- SGAL|GRNLEYJonVenurAppovlanPaymntAthrzainEmegecy Dcarto Rsluino 200” Sc 2()ThreeitanimedatneetoaprveteDeig-uid AremetfoRedveopenofheStElzaehEasCamps—Prcl6Parin Garage(DCAM-20-P-0005heCntat”)betweheDepartmofeerl evieste“Department”)andGCS-SIGAL|GontVentute( Cntato”)andouhoiepaymennanggeateamoun$25,000,000r00f eig-uldsriesrcivdandobeeciedundeheotrc.
b)OnMay8,02,teDepartmentuedaLteronrctinheamount $5,00.0 ThvaleofeteCotrcwaslesha$1milo;tusidinot rqureoucilppoal.Theamounfhepopsedonrctwuldiceaeby $2,5000.0,fom$90,0000o$2,0000.0.
©)TheamounfheroosdCotat,icusveftemergedterCnrat, isnecesof1milinduiga12-onhpeid;heeoe,Cucilppovlof prpoedCntatisnoweuieduruattoetin41ofheDstitofColumbia HomeRueAc,aproedDecember 97387Sa.83;DC.OfcalCode - 20.1).
d)nadiin,Cunilppovlofhepopsedonrctiseesayto auhrietecotnutonfesgnbuldsricsfrteS.Elzbehsaringarge andocopesae heonratrfrdein-uldsriespovdd ndtoeprvded i unerteprpoedCnrc.
Sc..
TheunilofheitictfColumbiaemieshathe icustnesenmeatdinecin 2osiuteemergencymsanesmaking eesay htte“CnratNo.DCAM-20-CS-RFP-0005CS- 1S SIGAL|GRUNLEYntenureppovl ndPaymenthriatonEmergency 2020”bedotedferainleedig.
2.(a) There exists an immediate need to approve the Design-Build Agreement for Redevelopment of the St.
Elizabeths East Campus – Parcel 6 Parking Garage (DCAM-20-CS- RFP-0005) (“Contract”) between the Department of General Services (“Department”) and GCS- SIGAL|GRUNLEY Joint Venture (“Contractor”) and to authorize payment in an aggregate amount of $25 million for design-build services received and to be received under the Contract.
(b) On May 8, 2020, the Department executed a letter contract in the amount of $950,000.
The value of letter contract was less than $1 million;
thus, it did not require Council approval.
The amount of the proposed contract would increase by $ 24.05 million from $950,000 to $ 25 million.
(c) The amount of the proposed Contract, inclusive of the merged letter contract, is in excess of $1 million during a 12-month period;
therefore, Council approval of the Contract is now required pursuant to section 451 of the District of Columbia Home Rule Act, approved December 24, 1973 (87 Stat.
803;
D.C.
Official Code § 1-204.51).
(d) Council approval of the Contract is necessary to authorize the continuation of design- build services for the St.
Elizabeths Parking Garage and to compensate the Contractor for design- build services provided and to be provided under the Contract.
Sec.
3.
The Council of the District of Columbia determines that the circumstances enumerated in section 2 constitute emergency circumstances making it necessary that the Contract No.
DCAM-20-CS-RFP-0005 with.
GCS-SIGAL|GRUNLEY Joint Venture Approval and Payment Authorization Emergency Act of 2020 be adopted after a single reading.
ENROLLED ORIGINAL Sec.
This resolution shalltake effectimmediately.
This resolution shall take effect immediately.
View plain text versions (2)

Action History

  1. Resolution R23-0437, Effective from Jul 07, 2020 Published in DC Register Vol 67 and Page 8994

  2. Approved with Resolution Number R23-0437

  3. Final Reading, CC

  4. Retained by the Council with comments from the Committee on Facilities and Procurement

  5. PR23-0836 Introduced by Chairman Mendelson at Office of the Secretary

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 13 not signed on

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors PR 23-0836?
PR 23-0836 is sponsored by Phil Mendelson.
What is the current status of PR 23-0836?
This bill died with Council Period 23. It reached “Passed Council” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track PR 23-0836?
Track PR 23-0836 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on PR 23-0836

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of PR 23-0836

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →