California 2023-2024 Regular Session Status: In Committee Bipartisan · 1 D · 1 R cosponsors

AB 65 — Energy: nuclear generation facilities.

Last action — From committee: Filed with the Chief Clerk pursuant to Joint Rule 56.

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. 2
    In Committee
  3. 3
    Passed Assembly
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill died with 2023-2024 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Summary

Existing law prohibits the State Energy Resources Conservation and Development Commission (Energy Commission) from certifying a nuclear fission thermal powerplant, except for specified powerplants, and provides that a nuclear fission thermal powerplant, except those specified powerplants, is not a permitted land use in California, unless certain conditions are met regarding the existence of technology for the construction and operation of nuclear fuel rod processing plants and of demonstrated technology or means for the disposal of high-level nuclear waste, as specified. This bill would exempt small modular reactors, as defined, from those provisions. Existing law vests the Public Utilities Commission (PUC) with regulatory authority over electrical corporations and gas corporations. Under existing law, it is the policy of the state that eligible renewable energy resources and zero-carbon resources supply 100% of all retail sales of electricity to California end-use customers and 100% of electricity procured to serve all state agencies by December 31, 2045. Existing law requires the PUC, the Energy Commission, and all other state agencies to incorporate that policy into all relevant planning. This bill would require the PUC, on or before January 1, 2026, to adopt a plan to increase the procurement of electricity generated from nuclear facilities and to phase out the procurement of electricity generated from natural gas facilities.

Bill Text

Action History

  1. From committee: Filed with the Chief Clerk pursuant to Joint Rule 56.

  2. Died pursuant to Art. IV, Sec. 10(c) of the Constitution.

  3. In committee: Set, second hearing. Failed passage. Reconsideration granted.

  4. In committee: Set, first hearing. Hearing canceled at the request of author.

  5. Re-referred to Com. on NAT. RES.

  6. From committee chair, with author's amendments: Amend, and re-refer to Com. on NAT. RES. Read second time and amended.

  7. Referred to Coms. on NAT. RES. and U. & E.

  8. Read first time.

  9. From printer. May be heard in committee January 6.

  10. Introduced. To print.

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 2 co-sponsors · 119 not signed on

Sponsors (1)

  • Mathis

Co-sponsors (2)

Not signed on (119)

119 members have not signed on to this bill.

Show all 119 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does AB 65 do?
Existing law prohibits the State Energy Resources Conservation and Development Commission (Energy Commission) from certifying a nuclear fission thermal powerplant, except for specified powerplants, and provides that a nuclear fission thermal powerplant, except those specified powerplants, is not a permitted land use in California, unless certain conditions are met regarding the existence of technology for the construction and operation of nuclear fuel rod processing plants and of demonstrated technology or means for the disposal of high-level nuclear waste, as specified. This bill would exempt small modular reactors, as defined, from those provisions. Existing law vests the Public Utilities Commission (PUC) with regulatory authority over electrical corporations and gas corporations. Under existing law, it is the policy of the state that eligible renewable energy resources and zero-carbon resources supply 100% of all retail sales of electricity to California end-use customers and 100% of electricity procured to serve all state agencies by December 31, 2045. Existing law requires the PUC, the Energy Commission, and all other state agencies to incorporate that policy into all relevant planning. This bill would require the PUC, on or before January 1, 2026, to adopt a plan to increase the procurement of electricity generated from nuclear facilities and to phase out the procurement of electricity generated from natural gas facilities.
Who sponsors AB 65?
AB 65 is sponsored by Mathis, Arambula, Joaquin (Democratic), and Hoover, Josh (Republican).
What is the current status of AB 65?
This bill died with 2023-2024 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track AB 65?
Track AB 65 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on AB 65

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of AB 65

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →