United States 115th Congress Status: In Committee 1 R cosponsors

S 2160 — Protect Collaboration for Healthier Forests Act

Last action — By Senator Murkowski from Committee on Energy and Natural Resources filed written report. Report No. 115-429. Minority views filed.

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. 2
    In Committee
  3. 3
    Passed Senate
  4. 4
    Passed House
  5. 5
    To Executive
  6. 6
    Enacted

This bill died with 115th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Bill Text

What changed in the latest version

438 added · 119 removed

Plain-language change summary

The amended version of the bill S. 2160 removes the short title and the section outlining the establishment of an arbitration pilot program within a specific region. The changes also eliminate specific definitions and the requirement that the Secretary of Agriculture must set up the pilot program within 180 days of enactment. This means that the bill no longer specifies a regional focus for the pilot program or includes a timeline for its implementation.

→
Previous
Latest
2160 Introduced in Senate (IS)] <DOC> 115th CONGRESS 1st Session S.
2160 Reported in Senate (RS)] <DOC> Calendar No.
720 115th CONGRESS 2d Session S.
which was read twice and referred to the Committee on Energy and Natural Resources _______________________________________________________________________ A BILL To establish a pilot program under which the Chief of the Forest Service may use alternative dispute resolution in lieu of judicial review for certain projects.
which was read twice and referred to the Committee on Energy and Natural Resources December 5, 2018 Reported by Ms.
Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled, SECTION 1.
Murkowski, with an amendment [Strike out all after the enacting clause and insert the part printed in italic] _______________________________________________________________________ A BILL To establish a pilot program under which the Chief of the Forest Service may use alternative dispute resolution in lieu of judicial review for certain projects.
Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled, <DELETED>SECTION 1.
SHORT TITLE.</DELETED> <DELETED> This Act may be cited as the ``Protect Collaboration for Healthier Forests Act''.</DELETED> <DELETED>SEC.
2.
ALTERNATIVE DISPUTE RESOLUTION PILOT PROGRAM.</DELETED> <DELETED> (a) Definitions.--In this Act:</DELETED> <DELETED> (1) Participant.--The term ``participant'' means an individual or entity that files an objection or scoping comments on a draft environmental document with respect to a project that is subject to an objection at the project level under part 218 of title 36, Code of Federal Regulations (or successor regulations).</DELETED> <DELETED> (2) Pilot program.--The term ``pilot program'' means the pilot program established under subsection (b).</DELETED> <DELETED> (3) Project.--The term ``project'' means a project described in subsection (c).</DELETED> <DELETED> (4) Secretary.--The term ``Secretary'' means the Secretary of Agriculture, acting through the Chief of the Forest Service.</DELETED> <DELETED> (b) Arbitration Pilot Program.--Not later than 180 days after the date of enactment of this Act, the Secretary shall establish within Region 1 of the Forest Service an arbitration pilot program as an alternative dispute resolution process in lieu of judicial review for projects described in subsection (c).</DELETED> <DELETED> (c) Description of Projects.--</DELETED> <DELETED> (1) In general.--The Secretary, at the sole discretion of the Secretary, may designate for arbitration projects that--</DELETED> <DELETED> (A)(i) are developed through a collaborative process (within the meaning of section 603(b)(1)(C) of the Healthy Forest Restoration Act of (16 U.S.C.
6591b(b)(1)(C)));</DELETED> <DELETED> (ii) are carried out under the Collaborative Forest Landscape Restoration Program established under section 4003 of the Omnibus Public Land Management Act of 2009 (16 U.S.C.
7303);
or</DELETED> <DELETED> (iii) are identified in a community wildfire protection plan (as defined in section 101 of the Healthy Forests Restoration Act of 2003 (16 U.S.C.
6511));</DELETED> <DELETED> (B) have as a purpose--</DELETED> <DELETED> (i) hazardous fuels reduction;
or</DELETED> <DELETED> (ii) mitigation of insect or disease infestation;
and</DELETED> <DELETED> (C) are located, in whole or in part, in a wildland-urban interface (as defined in section 101 of the Healthy Forests Restoration Act of 2003 (16 U.S.C.
6511)).</DELETED> <DELETED> (2) Inclusion.--In designating projects for arbitration, the Secretary may include projects that receive categorical exclusions for purposes of the National Environmental Policy Act of 1969 (42 U.S.C.
4321 et seq.).</DELETED> <DELETED> (d) Limitation on Number of Projects.--The Secretary may not designate for arbitration under the pilot program more than 2 projects per calendar year.</DELETED> <DELETED> (e) Arbitrators.--</DELETED> <DELETED> (1) Appointment.--The Secretary shall develop and publish a list of not fewer than 15 individuals eligible to serve as arbitrators for the pilot program.</DELETED> <DELETED> (2) Qualifications.--To be eligible to serve as an arbitrator under this subsection, an individual shall be-- </DELETED> <DELETED> (A) certified by--</DELETED> <DELETED> (i) the American Arbitration Association;
or</DELETED> <DELETED> (ii) a State arbitration program;
or</DELETED> <DELETED> (B) a fully retired Federal or State judge.</DELETED> <DELETED> (f) Initiation of Arbitration.--</DELETED> <DELETED> (1) In general.--Not later than 7 days after the date on which the Secretary issues the final decision with respect to a project, the Secretary shall--</DELETED> <DELETED> (A) notify each applicable participant and the Clerk of the United States District Court for the district in which the project is located that the project has been designated for arbitration in accordance with this Act;
and</DELETED> <DELETED> (B) include in the decision document a statement that the project has been designated for arbitration.</DELETED> <DELETED> (2) Initiation.--</DELETED> <DELETED> (A) In general.--A participant may initiate arbitration regarding a project that has been designated for arbitration under this Act in accordance with--</DELETED> <DELETED> (i) sections 571 through 584 of title 5, United States Code;
and</DELETED> <DELETED> (ii) this paragraph.</DELETED> <DELETED> (B) Requirements.--A request to initiate arbitration under subparagraph (A) shall--</DELETED> <DELETED> (i) be filed not later than the date that is 30 days after the date of the notification by the Secretary under paragraph (1);
and</DELETED> <DELETED> (ii) include an alternative proposal for the applicable project that describes each modification sought by the participant with respect to the project.</DELETED> <DELETED> (C) No judicial review.--A project for which arbitration is initiated under subparagraph (A) shall not be subject to judicial review.</DELETED> <DELETED> (3) Compelled arbitration.--</DELETED> <DELETED> (A) Motion to compel arbitration.-- </DELETED> <DELETED> (i) In general.--If a participant seeks judicial review of a final decision with respect to a project, the Secretary may file in the applicable court a motion to compel arbitration in accordance with this Act.</DELETED> <DELETED> (ii) Fees and costs.--For any motion described in clause (i) for which the Secretary is the prevailing party, the applicable court shall award to the Secretary-- </DELETED> <DELETED> (I) court costs;
and</DELETED> <DELETED> (II) attorney's fees.</DELETED> <DELETED> (B) Arbitration compelled by court.--If a participant seeks judicial review of a project, the applicable court shall compel arbitration in accordance with this Act.</DELETED> <DELETED> (g) Selection of Arbitrator.--For each arbitration commenced under this Act--</DELETED> <DELETED> (1) the Secretary shall propose 3 arbitrators from the list published under subsection (e)(1);
and</DELETED> <DELETED> (2) the applicable participant shall select 1 arbitrator from the list of arbitrators proposed under paragraph (1).</DELETED> <DELETED> (h) Responsibilities of Arbitrator.--</DELETED> <DELETED> (1) In general.--An arbitrator selected under subsection (e)--</DELETED> <DELETED> (A) shall address all claims of each party seeking arbitration with respect to a project under this Act;
but</DELETED> <DELETED> (B) may consolidate into a single arbitration all requests to initiate arbitration by all participants with respect to a project.</DELETED> <DELETED> (2) Selection of proposals.--An arbitrator shall make a decision with respect to each applicable request for initiation of arbitration under this Act by--</DELETED> <DELETED> (A) selecting the project, as approved by the Secretary;</DELETED> <DELETED> (B) selecting an alternative proposal submitted by the applicable participant;
or</DELETED> <DELETED> (C) rejecting both projects described in subparagraphs (A) and (B).</DELETED> <DELETED> (3) Limitations.--</DELETED> <DELETED> (A) Administrative record.--The evidence before an arbitrator under this subsection shall be limited solely to the administrative record for the project.</DELETED> <DELETED> (B) No modifications to proposals.--An arbitrator may not modify any proposal contained in a request for initiation of arbitration of a participant under this Act.</DELETED> <DELETED> (i) Intervention.--A party may intervene in an arbitration under this Act if, with respect to the project to which the arbitration relates, the party--</DELETED> <DELETED> (1) meets the requirements of Rule 24(a) of the Federal Rules of Civil Procedure (or a successor rule);
or</DELETED> <DELETED> (2) participated in the applicable collaborative process referred to in clause (i) or (ii) of subsection (c)(1)(A).</DELETED> <DELETED> (j) Scope of Review.--In carrying out arbitration for a project, the arbitrator shall set aside the agency action, findings, and conclusions found to be arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law, within the meaning of section 706(2)(A) of title 5, United States Code.</DELETED> <DELETED> (k) Deadline for Completion of Arbitration.--Not later than 90 days after the date on which a request to initiate arbitration is filed under subsection (f)(2), the arbitrator shall make a decision with respect to the request to initiate arbitration.</DELETED> <DELETED> (l) Effect of Arbitration Decision.--A decision of an arbitrator under this Act--</DELETED> <DELETED> (1) shall not be considered to be a major Federal action;</DELETED> <DELETED> (2) shall be binding;
and</DELETED> <DELETED> (3) shall not be subject to judicial review, except as provided in section 10(a) of title 9, United States Code.</DELETED> <DELETED> (m) Administrative Costs.--</DELETED> <DELETED> (1) In general.--The Secretary shall--</DELETED> <DELETED> (A) be solely responsible for the professional fees of arbitrators participating in the pilot program;
and</DELETED> <DELETED> (B) use funds made available to the Secretary and not otherwise obligated to carry out subparagraph (A).</DELETED> <DELETED> (2) Attorney's fees.--No arbitrator may award attorney's fees in any arbitration brought under this Act.</DELETED> <DELETED> (n) Reports.--</DELETED> <DELETED> (1) In general.--Not later than 1 year after the date on which the pilot program is established, and annually thereafter, the Secretary shall submit to the Committee on Agriculture, Nutrition, and Forestry and the Committee on Energy and Natural Resources of the Senate and the Committee on Natural Resources of the House of Representatives, and publish on the website of Region 1 of the Forest Service, a report of not longer than 10 pages describing the implementation of the pilot program for the applicable year, including--</DELETED> <DELETED> (A) the reasons for selecting certain projects for arbitration;</DELETED> <DELETED> (B) an evaluation of the arbitration process, including any recommendations for improvements to the process;</DELETED> <DELETED> (C) a description of the outcome of each arbitration;
and</DELETED> <DELETED> (D) a summary of the impacts of each outcome described in subparagraph (C) on the timeline for implementation and completion of the applicable project.</DELETED> <DELETED> (2) GAO reviews and reports.--</DELETED> <DELETED> (A) Initial review.--Not later than 2 years after the date on which the pilot program is established, the Comptroller General of the United States shall review the implementation by the Secretary of the pilot program.</DELETED> <DELETED> (B) Review on termination.--On termination of the pilot program under subsection (o), the Comptroller General of the United States shall review the implementation by the Secretary of the pilot program.</DELETED> <DELETED> (C) Report.--On completion of the review described in subparagraph (A) or (B), the Comptroller General of the United States shall submit to the Committee on Agriculture, Nutrition, and Forestry and the Committee on Energy and Natural Resources of the Senate and the Committee on Natural Resources of the House of Representatives a report describing the results of the applicable review.</DELETED> <DELETED> (o) Termination.--The pilot program shall terminate on the date that is 5 years after the date.</DELETED> <DELETED> (p) Effect.--Nothing in this Act affects the responsibility of the Secretary to comply with--</DELETED> <DELETED> (1) the Endangered Species Act of 1973 (16 U.S.C.
et seq.);
or</DELETED> <DELETED> (2) the National Environmental Policy Act of 1969 (42 U.S.C.
4321 et seq.).</DELETED> SECTION 1.
(1) Participant.--The term ``participant'' means an individual or entity that files an objection or scoping comments on a draft environmental document with respect to a project that is subject to an objection at the project level under part 218 of title 36, Code of Federal Regulations (or successor regulations).
(1) Arbitrator.--The term ``arbitrator'' means a person-- (A) selected by the Secretary under subsection (d)(1);
(2) Pilot program.--The term ``pilot program'' means the pilot program established under subsection (b).
and (B) that meets the qualifications under subsection (d)(2).
(3) Project.--The term ``project'' means a project described in subsection (c).
(2) Land and resource management plan.--The term ``land and resource management plan'' means a plan developed under section of the Forest and Rangeland Renewable Resources Planning Act of 1974 (16 U.S.C.
(4) Secretary.--The term ``Secretary'' means the Secretary of Agriculture, acting through the Chief of the Forest Service.
1604).
(b) Arbitration Pilot Program.--Not later than 180 days after the date of enactment of this Act, the Secretary shall establish within Region 1 of the Forest Service an arbitration pilot program as an alternative dispute resolution process in lieu of judicial review for projects described in subsection (c).
(3) Participant.--The term ``participant'' means an individual or entity that, with respect to a project-- (A) has exhausted the administrative review process under part 218 of title 36, Code of Federal Regulations (or successor regulations);
or (B) in the case of a project that is categorically excluded for purposes of the National Environmental Policy Act of 1969 (42 U.S.C.
4321 et seq.), has participated in a collaborative process under clause (i) or (ii) of subsection (c)(1)(A).
(4) Pilot program.--The term ``pilot program'' means the pilot program implemented under subsection (b)(1).
Show all 102 changed rows (62 more)
Previous
Latest
(5) Project.--The term ``project'' means a project described in subsection (c).
(6) Secretary.--The term ``Secretary'' means the Secretary of Agriculture, acting through the Chief of the Forest Service.
(b) Arbitration Pilot Program.-- (1) In general.--Not later than 2 years after the date of enactment of this Act, the Secretary shall issue a final rule to implement an arbitration pilot program, to be carried out in the States of Idaho, Montana, and Wyoming, as an alternative dispute resolution in lieu of judicial review for projects described in subsection (c).
(2) Limitation on number of projects.-- (A) In general.--The Secretary may not designate for arbitration under the pilot program more than 2 projects per calendar year.
(B) Exception.--If the Secretary designates a project for arbitration under the pilot program, and no participant initiates arbitration under subsection (e)(2), that project shall not count against the limitation on the number of projects under subparagraph (A).
(3) Applicable process.--Except as otherwise provided in this Act, the pilot program shall be carried out in accordance with subchapter IV of chapter 5 of title 5, United States Code.
(4) Exclusive means of review.--The alternative dispute resolution process under the pilot program for a project designated for arbitration under the pilot program shall be the exclusive means of review for the project.
(5) No judicial review.--A project that the Secretary has designated for arbitration under the pilot program shall not be subject to judicial review.
(B) have as a purpose-- (i) hazardous fuels reduction;
(B) have as a purpose-- (i) reducing hazardous fuels;
or (ii) mitigation of insect or disease infestation;
or (ii) reducing the risk of, or mitigating, insect or disease infestation;
(2) Inclusion.--In designating projects for arbitration, the Secretary may include projects that receive categorical exclusions for purposes of the National Environmental Policy Act of 1969 (42 U.S.C.
(2) Inclusion.--In designating projects for arbitration, the Secretary may include projects that are categorically excluded for purposes of the National Environmental Policy Act of 1969 (42 U.S.C.
(d) Limitation on Number of Projects.--The Secretary may not designate for arbitration under the pilot program more than 2 projects per calendar year.
(d) Arbitrators.-- (1) In general.--The Secretary shall develop and publish a list of not fewer than 15 individuals eligible to serve as arbitrators for the pilot program.
(e) Arbitrators.-- (1) Appointment.--The Secretary shall develop and publish a list of not fewer than 15 individuals eligible to serve as arbitrators for the pilot program.
(2) Qualifications.--To be eligible to serve as an arbitrator under this subsection, an individual shall be-- (A) recognized by-- (i) the American Arbitration Association;
(2) Qualifications.--To be eligible to serve as an arbitrator under this subsection, an individual shall be-- (A) certified by-- (i) the American Arbitration Association;
(f) Initiation of Arbitration.-- (1) In general.--Not later than 7 days after the date on which the Secretary issues the final decision with respect to a project, the Secretary shall-- (A) notify each applicable participant and the Clerk of the United States District Court for the district in which the project is located that the project has been designated for arbitration in accordance with this Act;
(e) Initiation of Arbitration.-- (1) In general.--Not later than 7 days after the date on which the Secretary issues the applicable decision notice or decision memo with respect to a project, the Secretary shall-- (A) notify each applicable participant and the Clerk of the United States District Court for the district in which the project is located that the project has been designated for arbitration under the pilot program;
and (B) include in the decision document a statement that the project has been designated for arbitration.
and (B) include in the applicable decision notice or decision memo a statement that the project has been designated for arbitration.
(2) Initiation.-- (A) In general.--A participant may initiate arbitration regarding a project that has been designated for arbitration under this Act in accordance with-- (i) sections 571 through 584 of title 5, United States Code;
(2) Initiation.-- (A) In general.--A participant that has received a notification under paragraph (1) and is seeking to initiate arbitration for the applicable project under the pilot program shall file a request for arbitration with the Secretary not later than 30 days after the date of receipt of the notification.
and (ii) this paragraph.
(B) Requirement.--The request under subparagraph (A) shall include an alternative proposal for the applicable project that-- (i) describes each modification sought by the participant with respect to the project;
(B) Requirements.--A request to initiate arbitration under subparagraph (A) shall-- (i) be filed not later than the date that is 30 days after the date of the notification by the Secretary under paragraph (1);
and (ii) is consistent with the goals and objectives of the applicable land and resource management plan, all applicable laws, regulations, legal precedent and policy directives, and the purpose and need for the project.
and (ii) include an alternative proposal for the applicable project that describes each modification sought by the participant with respect to the project.
(C) Failure to meet requirements.--A participant who fails to meet the requirements of subparagraphs (A) and (B) shall be considered to have forfeited their standing to initiate arbitration under this paragraph.
(C) No judicial review.--A project for which arbitration is initiated under subparagraph (A) shall not be subject to judicial review.
(3) Compelled arbitration.-- (A) In general.--For any request for judicial review with respect to a project that the Secretary has designated for arbitration under the pilot program-- (i) the Secretary shall file in the applicable court a motion to compel arbitration in accordance with this Act;
(3) Compelled arbitration.-- (A) Motion to compel arbitration.-- (i) In general.--If a participant seeks judicial review of a final decision with respect to a project, the Secretary may file in the applicable court a motion to compel arbitration in accordance with this Act.
and (ii) the applicable court shall compel arbitration in accordance with this Act.
(ii) Fees and costs.--For any motion described in clause (i) for which the Secretary is the prevailing party, the applicable court shall award to the Secretary-- (I) court costs;
(B) Fees and costs.--For any motion described in subparagraph (A) for which the Secretary is the prevailing party, the applicable court shall award to the Secretary-- (i) full or partial court costs;
and (II) attorney's fees.
and (ii) full or partial attorney's fees.
(B) Arbitration compelled by court.--If a participant seeks judicial review of a project, the applicable court shall compel arbitration in accordance with this Act.
(f) Selection of Arbitrator.--For each arbitration initiated under this Act-- (1) each applicable participant shall propose 2 arbitrators;
(g) Selection of Arbitrator.--For each arbitration commenced under this Act-- (1) the Secretary shall propose 3 arbitrators from the list published under subsection (e)(1);
and (2) the Secretary shall select 1 arbitrator from the list of arbitrators proposed under paragraph (1).
and (2) the applicable participant shall select 1 arbitrator from the list of arbitrators proposed under paragraph (1).
(g) Responsibilities of Arbitrator.-- (1) In general.--An arbitrator-- (A) shall address all claims or modifications sought by each party seeking arbitration with respect to a project under this Act;
(h) Responsibilities of Arbitrator.-- (1) In general.--An arbitrator selected under subsection (e)-- (A) shall address all claims of each party seeking arbitration with respect to a project under this Act;
(2) Selection of proposals.--An arbitrator shall make a decision with respect to each applicable request for initiation of arbitration under this Act by-- (A) selecting the project, as approved by the Secretary;
(2) Consideration of proposed projects and decision.--For each project for which arbitration has been initiated under this Act, the arbitrator shall make a decision with respect to the project by-- (A) selecting the project, as approved by the Secretary;
(B) selecting an alternative proposal submitted by the applicable participant;
(B) selecting the alternative proposal submitted by the applicable participant in the request for initiation of arbitration for the project filed under subsection (e)(2)(A);
or (C) rejecting both projects described in subparagraphs (A) and (B).
or (C) rejecting both options described in subparagraphs (A) and (B).
(3) Limitations.-- (A) Administrative record.--The evidence before an arbitrator under this subsection shall be limited solely to the administrative record for the project.
(3) Convene hearings.--In carrying out paragraph (2), the arbitrator may convene the Secretary and the participant, including by telephone conference or other electronic means to consider-- (A) the administrative record;
(B) No modifications to proposals.--An arbitrator may not modify any proposal contained in a request for initiation of arbitration of a participant under this Act.
(B) arguments and evidence submitted by the Secretary and the participant;
(i) Intervention.--A party may intervene in an arbitration under this Act if, with respect to the project to which the arbitration relates, the party-- (1) meets the requirements of Rule 24(a) of the Federal Rules of Civil Procedure (or a successor rule);
(C) the project, as approved by the Secretary;
and (D) the alternative proposal submitted by the applicable participant in the request for initiation of arbitration for the project filed under subsection (e)(2)(A).
(4) Limitations.--An arbitrator may not modify any project or alternative proposal contained in a request for initiation of arbitration of a participant under this Act.
(h) Intervention.--A party may intervene in an arbitration under this Act if, with respect to the project to which the arbitration relates, the party-- (1) meets the requirements of Rule 24(a) of the Federal Rules of Civil Procedure (or a successor rule);
(j) Scope of Review.--In carrying out arbitration for a project, the arbitrator shall set aside the agency action, findings, and conclusions found to be arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law, within the meaning of section 706(2)(A) of title 5, United States Code.
(i) Scope of Review.--In carrying out arbitration for a project, the arbitrator shall set aside the agency action, findings, and conclusions found to be arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law, within the meaning of section 706(2)(A) of title 5, United States Code.
(k) Deadline for Completion of Arbitration.--Not later than 90 days after the date on which a request to initiate arbitration is filed under subsection (f)(2), the arbitrator shall make a decision with respect to the request to initiate arbitration.
(j) Deadline for Completion of Arbitration.--Not later than 90 days after the date on which arbitration is initiated for a project under the pilot program, the arbitrator shall make a decision with respect to all claims or modifications sought by the participant that initiated the arbitration.
(l) Effect of Arbitration Decision.--A decision of an arbitrator under this Act-- (1) shall not be considered to be a major Federal action;
(k) Effect of Arbitration Decision.--A decision of an arbitrator under this Act-- (1) shall not be considered to be a major Federal action;
(m) Administrative Costs.-- (1) In general.--The Secretary shall-- (A) be solely responsible for the professional fees of arbitrators participating in the pilot program;
(l) Administrative Costs.-- (1) In general.--The Secretary shall-- (A) be solely responsible for the professional fees of arbitrators participating in the pilot program;
(2) Attorney's fees.--No arbitrator may award attorney's fees in any arbitration brought under this Act.
(2) Travel costs.--The Secretary-- (A) shall be solely responsible for reasonable travel costs associated with the participation of an arbitrator in any meeting conducted under subsection (g)(3);
(n) Reports.-- (1) In general.--Not later than 1 year after the date on which the pilot program is established, and annually thereafter, the Secretary shall submit to the Committee on Agriculture, Nutrition, and Forestry and the Committee on Energy and Natural Resources of the Senate and the Committee on Natural Resources of the House of Representatives, and publish on the website of Region 1 of the Forest Service, a report of not longer than 10 pages describing the implementation of the pilot program for the applicable year, including-- (A) the reasons for selecting certain projects for arbitration;
and (B) shall not be responsible for the travel costs of a participant under subsection (g)(3).
(3) Attorney's fees.--No arbitrator may award attorney's fees in any arbitration brought under this Act.
(m) Reports.-- (1) In general.--Not later than 2 years after the date on which the Secretary issues a final rule to implement the pilot program under subsection (b)(1), the Secretary shall submit to the Committee on Agriculture, Nutrition, and Forestry and the Committee on Energy and Natural Resources of the Senate and the Committee on Natural Resources of the House of Representatives, and publish on the website of the Forest Service, a report describing the implementation of the pilot program, including-- (A) the reasons for selecting certain projects for arbitration;
(2) GAO reviews and reports.-- (A) Initial review.--Not later than 2 years after the date on which the pilot program is established, the Comptroller General of the United States shall review the implementation by the Secretary of the pilot program.
(2) GAO reviews and reports.-- (A) Review on termination.--On termination of the pilot program under subsection (n), the Comptroller General of the United States shall review the implementation by the Secretary of the pilot program, including-- (i) the reasons for selecting certain projects for arbitration under the pilot program;
(B) Review on termination.--On termination of the pilot program under subsection (o), the Comptroller General of the United States shall review the implementation by the Secretary of the pilot program.
(ii) the location and types of projects that were arbitrated under the pilot program;
(C) Report.--On completion of the review described in subparagraph (A) or (B), the Comptroller General of the United States shall submit to the Committee on Agriculture, Nutrition, and Forestry and the Committee on Energy and Natural Resources of the Senate and the Committee on Natural Resources of the House of Representatives a report describing the results of the applicable review.
(iii) a description of the outcomes of the projects that were arbitrated under the pilot program;
(o) Termination.--The pilot program shall terminate on the date that is 5 years after the date.
(iv) a description of the participants who initiated arbitration under the pilot program;
(p) Effect.--Nothing in this Act affects the responsibility of the Secretary to comply with-- (1) the Endangered Species Act of 1973 (16 U.S.C.
(v) a description and survey of the arbitrators who participated in the pilot program;
(vi) the type and outcome of any requests for judicial review with respect to a project that the Secretary designated for arbitration under the pilot program;
and (vii) any other items the Comptroller General of the United States may find applicable for evaluating the pilot program.
(B) Report.--After completion of the review described in subparagraph (A) and not later than 1 year after termination of the pilot program under subsection (n), the Comptroller General of the United States shall submit to the Committee on Agriculture, Nutrition, and Forestry and the Committee on Energy and Natural Resources of the Senate and the Committee on Natural Resources of the House of Representatives a report, describing the results of the applicable review.
(n) Termination.--The Secretary may not designate a project for arbitration under the pilot program on or after the date that is 5 years after the date on which the Secretary issues a final rule to implement the pilot program under subsection (b)(1).
(o) Effect.--Nothing in this Act affects the responsibility of the Secretary to comply with-- (1) the Endangered Species Act of 1973 (16 U.S.C.
or (2) the National Environmental Policy Act of 1969 (42 U.S.C.
(2) the National Environmental Policy Act of 1969 (42 U.S.C.
4321 et seq.).
4321 et seq.);
<all>
or (3) other applicable laws.
Calendar No.
720 115th CONGRESS 2d Session S.
2160 _______________________________________________________________________ A BILL To establish a pilot program under which the Chief of the Forest Service may use alternative dispute resolution in lieu of judicial review for certain projects.
_______________________________________________________________________ December 5, 2018 Reported with an amendment
View plain text versions (2)

Action History

  1. By Senator Murkowski from Committee on Energy and Natural Resources filed written report. Report No. 115-429. Minority views filed.

  2. By Senator Murkowski from Committee on Energy and Natural Resources filed written report. Report No. 115-429. Minority views filed.

  3. Committee on Energy and Natural Resources. Reported by Senator Murkowski with an amendment in the nature of a substitute. Without written report.

  4. Committee on Energy and Natural Resources. Reported by Senator Murkowski with an amendment in the nature of a substitute. Without written report.

  5. Placed on Senate Legislative Calendar under General Orders. Calendar No. 720.

  6. Committee on Energy and Natural Resources. Ordered to be reported with an amendment in the nature of a substitute favorably.

  7. Committee on Energy and Natural Resources Subcommittee on Public Lands, Forests, and Mining. Hearings held. With printed Hearing: S.Hrg. 115-528.

  8. Introduced in Senate

  9. Read twice and referred to the Committee on Energy and Natural Resources.

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 546 not signed on

Sponsors (1)

Co-sponsors (0)

None.

Not signed on (546)

546 members have not signed on to this bill.

Show all 546 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors S 2160?
S 2160 is sponsored by Daines, Steve (Republican).
What is the current status of S 2160?
This bill died with 115th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track S 2160?
Track S 2160 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on S 2160

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of S 2160

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →