United States 118th Congress Status: Died 3 R cosponsors

HR 6107 — Urban Canal Modernization Act

Last action — Placed on the Union Calendar, Calendar No. 619.

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. Died in session

This bill died with 118th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Summary

To amend the Omnibus Public Land Management Act of 2009 to authorize certain extraordinary operation and maintenance work for urban canals of concern.

Bill Text

What changed in the latest version

28 added · 29 removed

Plain-language change summary

The amendment to HR 6107 reorganizes the structure of certain paragraphs and clarifies the criteria for determining when a canal reach is classified as an urban canal reach. Importantly, it specifies that the failure of an urban canal reach would be significant if it could lead to the loss of life for more than 100 individuals in the area. This change focuses the bill on public safety and streamlines the criteria for assessing risks associated with canal failures.

→
Previous
Latest
6107 Introduced in House (IH)] <DOC> 118th CONGRESS 1st Session H.
6107 Reported in House (RH)] <DOC> Union Calendar No.
619 118th CONGRESS 2d Session H.
6107 To amend the Omnibus Public Land Management Act of 2009 to authorize certain extraordinary operation and maintenance work for urban canals of concern.
6107 [Report No.
118-734] To amend the Omnibus Public Land Management Act of 2009 to authorize certain extraordinary operation and maintenance work for urban canals of concern.
which was referred to the Committee on Natural Resources _______________________________________________________________________ A BILL To amend the Omnibus Public Land Management Act of 2009 to authorize certain extraordinary operation and maintenance work for urban canals of concern.
which was referred to the Committee on Natural Resources November 14, 2024 Reported with an amendment, committed to the Committee of the Whole House on the State of the Union, and ordered to be printed [Strike out all after the enacting clause and insert the part printed in italic] [For text of introduced bill, see copy of bill as introduced on October 26, 2023] _______________________________________________________________________ A BILL To amend the Omnibus Public Land Management Act of 2009 to authorize certain extraordinary operation and maintenance work for urban canals of concern.
(2) in paragraph (3) (as so redesignated), by striking ``et seq.)'' and inserting ``et seq.))'';
(2) by moving paragraph (1) (as so redesignated) to appear before paragraph (2) (as so redesignated);
(3) in paragraph (4) (as so redesignated), by striking ``mean'' and inserting ``means'';
(3) in paragraph (3) (as so redesignated), by striking ``et seq.)'' and inserting ``et seq.))'';
and (4) by adding at the end the following:
(4) in paragraph (4) (as so redesignated), by striking ``mean'' and inserting ``means'';
``(8) Urban canal of concern.--The term `urban canal of concern' means a transferred works or segment of a transferred works-- ``(A) that is-- ``(i) a canal reach, the failure of which would result in-- ``(I) an estimated at-risk population of more than 100 individuals;
and (5) by adding at the end the following:
or ``(II) an estimated property damage of more than $5,000,000;
``(8) Urban canal of concern.--The term `urban canal of concern' means a transferred works or segment of a transferred works that is classified as an urban canal reach, the failure of which the Secretary determines would result in loss of life in the vicinity of the failed transferred works or segment of transferred works with an estimated at-risk population of more than 100 individuals.''.
or ``(ii) a canal reach determined by the responsible Bureau of Reclamation regional or area office to be classified as an urban canal reach;
and ``(B) with respect to which the Secretary determines, pursuant to the guidelines and criteria developed under section 9602(a), that if a failure were to occur, the failure would result in loss of life and property in the vicinity of the failed transferred works or segment of transferred works.''.
``(2) Funding.--In the case of extraordinary operation and maintenance work on an urban canal of concern authorized under paragraph (1), or if the Secretary determines that a project facility inspected and maintained pursuant to the guidelines and criteria set forth in section 9602(a) requires extraordinary operation and maintenance work pursuant to paragraph (1), the Secretary shall provide Federal funds on a nonreimbursable basis sufficient to cover 35 percent of the portion of total cost of the extraordinary operation and maintenance work allocable to the transferred works operating entity that is needed to carry out the extraordinary operation and maintenance work on the urban canal of concern, with the remaining share of any additional Federal funds advanced by the Secretary for the extraordinary operation and maintenance work to be repaid under subsection (b).
``(2) Funding.--In the case of extraordinary operation and maintenance work on an urban canal of concern authorized under paragraph (1), or if the Secretary determines that a project facility inspected and maintained pursuant to the guidelines and criteria set forth in section 9602(a) requires extraordinary operation and maintenance work pursuant to paragraph (1), the Secretary shall provide Federal funds on a nonreimbursable basis sufficient to cover 35 percent of the portion of total cost of the extraordinary operation and maintenance work allocable to the transferred works operating entity that is needed to carry out the extraordinary operation and maintenance work on the urban canal of concern, with the remaining share of any additional Federal funds advanced by the Secretary for the extraordinary operation and maintenance work to be repaid under subsection (b).''.
``(f) Reimbursable Funds.--Any reimbursable funds provided under this section shall be considered to be a non-Federal source of funds for purposes of any cost-sharing requirement for a Federal grant.''.
Union Calendar No.
<all>
619 118th CONGRESS 2d Session H.
R.
6107 [Report No.
118-734] _______________________________________________________________________ A BILL To amend the Omnibus Public Land Management Act of 2009 to authorize certain extraordinary operation and maintenance work for urban canals of concern.
_______________________________________________________________________ November 14, 2024 Reported with an amendment, committed to the Committee of the Whole House on the State of the Union, and ordered to be printed
View plain text versions (2)

What Congress says this changes

H. Rept. 118-734

Published by the reporting committee Not generated — this is the committee's own “Changes in Existing Law Made by the Bill, as Reported”.

Text to be removed appears in [brackets]. Newly inserted text is italicised in the official report and cannot be marked in this plain-text rendition — read the official PDF ↗ for the authoritative formatting.

changes in existing law made by 
the bill, as reported, are shown as follows (existing law 
proposed to be omitted is enclosed in black brackets, new 
matter is printed in italics, and existing law in which no 
change is proposed is shown in roman):

 OMNIBUS PUBLIC LAND MANAGEMENT ACT OF 2009

 * * * * * * *
 Subtitle G--Aging Infrastructure

SEC. 9601. DEFINITIONS

 In this subtitle:
 [(7)] (1) Extraordinary operation and maintenance 
 work.--The term ``extraordinary operation and 
 maintenance work'' means major, nonrecurring 
 maintenance to Reclamation-owned or operated 
 facilities, or facility components, that is--
 (A) intended to ensure the continued safe, 
 dependable, and reliable delivery of authorized 
 project benefits; and
 (B) greater than 10 percent of the 
 contractor's or the transferred works operating 
 entity's annual operation and maintenance 
 budget for the facility, or greater than 
 $100,000.
 [(1)] (2) Inspection.--The term ``inspection'' means 
 an inspection of a project facility carried out by the 
 Secretary--
 (A) to assess and determine the general 
 condition of the project facility; and
 (B) to estimate the value of property, and 
 the size of the population, that would be at 
 risk if the project facility fails, is 
 breached, or otherwise allows flooding to 
 occur.
 [(2)] (3) Project facility.--The term ``project 
 facility'' means any part or incidental feature of a 
 project, excluding high- and significant-hazard dams, 
 constructed under the Federal reclamation law (the Act 
 of June 17, 1902 (32 Stat. 388, chapter 1093), and Acts 
 supplemental to and amendatory of that Act (43 U.S.C. 
 371[et seq.)] et seq.)).
 [(3)] (4) Reserved works.--The term ``reserved 
 works'' [mean] means any project facility at which the 
 Secretary carries out the operation and maintenance of 
 the project facility.
 [(4)] (5) Secretary.--The term ``Secretary'' means 
 the Secretary of the Interior, acting through the 
 Commissioner of Reclamation.
 [(5)] (6) Transferred works.--The term ``transferred 
 works'' means a project facility, the operation and 
 maintenance of which is carried out by a non-Federal 
 entity, under the provisions of a formal operation and 
 maintenance transfer contract.
 [(6)] (7) Transferred works operating entity.--The 
 term ``transferred works operating entity'' means the 
 organization which is contractually responsible for 
 operation and maintenance of transferred works.
 (8) Urban canal of concern.--The term ``urban canal 
 of concern'' means a transferred works or segment of a 
 transferred works that is classified as an urban canal 
 reach, the failure of which the Secretary determines 
 would result in loss of life in the vicinity of the 
 failed transferred works or segment of transferred 
 works with an estimated at-risk population of more than 
 100 individuals.

 * * * * * * *

SEC. 9603. EXTRAORDINARY OPERATION AND MAINTENANCE WORK PERFORMED BY 
 THE SECRETARY

 (a) In general.--The Secretary or the transferred works 
operating entity may carry out, in accordance with subsection 
(b) and consistent with existing transfer contracts, any 
extraordinary operation and maintenance work on a project 
facility that the Secretary determines to be reasonably 
required to preserve the structural safety of the project 
facility.
 (b) Reimbursement of Costs Arising From Extraordinary 
Operation and Maintenance Work.--
 (1) Treatment of costs.--For reserved works, costs 
 incurred by the Secretary in conducting extraordinary 
 operation and maintenance work will be allocated to the 
 authorized reimbursable purposes of the project and 
 shall be repaid within 50 years, with interest, from 
 the year in which work undertaken pursuant to this 
 subtitle is substantially complete.
 (2) Authority of secretary.--For transferred works, 
 the Secretary is authorized to advance the costs 
 incurred by the transferred works operating entity in 
 conducting extraordinary operation and maintenance work 
 and negotiate appropriate 50-year repayment contracts 
 with project beneficiaries providing for the return of 
 reimbursable costs, with interest, under this 
 subsection: Provided, however, That no contract entered 
 into pursuant to this subtitle shall be deemed to be a 
 new or amended contract for the purposes of section 
 203(a) of the Reclamation Reform Act of 1982 (43 U.S.C. 
 390cc(a)).
 (3) Determination of interest rate.--The interest 
 rate used for computing interest on work in progress 
 and interest on the unpaid balance of the reimbursable 
 costs of extraordinary operation and maintenance work 
 authorized by this subtitle shall be determined by the 
 Secretary of the Treasury, as of the beginning of the 
 fiscal year in which extraordinary operation and 
 maintenance work is commenced, on the basis of average 
 market yields on outstanding marketable obligations of 
 the United States with the remaining periods of 
 maturity comparable to the applicable reimbursement 
 period of the project, adjusted to the nearest \1/8\ of 
 1 percent on the unamortized balance of any portion of 
 the loan.
 (c) Emergency Extraordinary Operation and Maintenance Work.--
 (1) In general.--The Secretary or the transferred 
 works operating entity shall carry out any emergency 
 extraordinary operation and maintenance work on a 
 project facility that the Secretary determines to be 
 necessary to minimize the risk of imminent harm to 
 public health or safety, or property.
 (2) Reimbursement.--The Secretary may advance funds 
 for emergency extraordinary operation and maintenance 
 work and shall seek reimbursement from the transferred 
 works operating entity or benefitting entity upon 
 receiving a written assurance from the governing body 
 of such entity that it will negotiate a contract 
 pursuant to section 9603 for repayment of costs 
 incurred by the Secretary in undertaking such work.
 (3) Funding.--If the Secretary determines that a 
 project facility inspected and maintained pursuant to 
 the guidelines and criteria set forth in section 
 9602(a) requires extraordinary operation and 
 maintenance pursuant to paragraph (1), the Secretary 
 may provide Federal funds on a nonreimbursable basis 
 sufficient to cover 35 percent of the cost of the 
 extraordinary operation and maintenance allocable to 
 the transferred works operating entity, which is needed 
 to minimize the risk of imminent harm. The remaining 
 share of the Federal funds advanced by the Secretary 
 for such work shall be repaid under subsection (b).
 (d) Aging Infrastructure Account.--
 (1) Establishment.--There is established in the 
 general fund of the Treasury a special account, to be 
 known as the ``Aging Infrastructure Account'' (referred 
 to in this subsection as the ``Account''), to provide 
 funds to, and provide for the extended repayment of the 
 funds by, a transferred works operating entity or 
 project beneficiary responsible for repayment of 
 reimbursable costs for the conduct of extraordinary 
 operation and maintenance work at a project facility, 
 which shall consist of--
 (A) any amounts that are specifically 
 appropriated to the Account under section 9605; 
 and
 (B) any amounts deposited in the Account 
 under paragraph (3)(B).
 (2) Expenditures.--Subject to paragraphs (3) and (6), 
 the Secretary may expend amounts in the Account to fund 
 and provide for extended repayment of the funds for 
 eligible projects identified in a report submitted 
 under paragraph (5)(B).
 (3) Repayment contract.--
 (A) In general.--The Secretary may not expend 
 amounts under paragraph (2) with respect to an 
 eligible project described in that paragraph 
 unless the transferred works operating entity 
 or project beneficiary responsible for 
 repayment of reimbursable costs has entered 
 into a contract to repay the amounts under 
 subsection (b)(2).
 (B) Deposit of repaid funds.--Amounts repaid 
 by a transferred works operating entity or 
 project beneficiary responsible for repayment 
 of reimbursable costs receiving funds under a 
 repayment contract entered into under this 
 subsection shall be deposited in the Account 
 and shall be available to the Secretary for 
 expenditure, subject to paragraph (6), in 
 accordance with this subsection, and without 
 further appropriation.
 (4) Application for funding.--
 (A) In general.--Beginning with fiscal year 
 2022, not less than once per fiscal year, the 
 Secretary shall accept, during an application 
 period established by the Secretary, 
 applications from transferred works operating 
 entities or project beneficiaries responsible 
 for payment of reimbursable costs for funds and 
 extended repayment for eligible projects.
 (B) Eligible project.--A project eligible for 
 funding and extended repayment under this 
 subsection is a project that--
 (i) qualifies as an extraordinary 
 operation and maintenance work under 
 this section;
 (ii) is for the major, non-recurring 
 maintenance of a mission-critical 
 asset; and
 (iii) is not eligible to be carried 
 out or funded under the repayment 
 provisions of section 4(c) of the 
 Reclamation Safety of Dams Act of 1978 
 (43 U.S.C. 508(c)).
 (C) Guidelines for applications.--Not later 
 than 60 days after the date of enactment of 
 this subsection, the Secretary shall issue 
 guidelines describing the information required 
 to be provided in an application for funds and 
 extended repayment under this subsection that 
 require, at a minimum--
 (i) a description of the project for 
 which the funds are requested;
 (ii) the amount of funds requested;
 (iii) the repayment period requested 
 by the transferred works operating 
 entity or project beneficiary 
 responsible for repayment of 
 reimbursable costs;
 (iv) alternative non-Federal funding 
 options that have been evaluated;
 (v) the financial justification for 
 requesting an extended repayment 
 period; and
 (vi) the financial records of the 
 transferred works operating entity or 
 project beneficiary responsible for 
 repayment of reimbursable costs.
 (D) Review by the secretary.--The Secretary 
 shall review each application submitted under 
 subparagraph (A)--
 (i) to determine whether the project 
 is eligible for funds and an extended 
 repayment period under this subsection;
 (ii) to determine if the project has 
 been identified by the Bureau of 
 Reclamation as part of the major 
 rehabilitation and replacement of a 
 project facility; and
 (iii) to conduct a financial analysis 
 of--
 (I) the project; and
 (II) repayment capability of 
 the transferred works operating 
 entity or project beneficiary 
 responsible for repayment of 
 reimbursable costs.
 (5) Report.--Not later than 90 days after the date on 
 which an application period closes under paragraph 
 (4)(A), the Secretary shall submit to the Committees on 
 Energy and Natural Resources and Appropriations of the 
 Senate and the Committees on Natural Resources and 
 Appropriations of the House of Representatives a report 
 that--
 (A) describes the results of the Secretary's 
 review of each application under paragraph 
 (4)(D), including a determination of whether 
 the project is eligible;
 (B) identifies each project eligible for 
 funds and extended repayment under this 
 subsection;
 (C) with respect to each eligible project 
 identified under subparagraph (B), includes--
 (i) a description of--
 (I) the eligible project;
 (II) the anticipated cost and 
 duration of the eligible 
 project;
 (III) any remaining 
 engineering or environmental 
 compliance that is required 
 before the eligible project 
 commences;
 (IV) any recommendations the 
 Secretary may have concerning 
 the plan or design of the 
 project; and
 (V) any conditions the 
 Secretary may require for 
 construction of the project;
 (ii) an analysis of--
 (I) the repayment period 
 proposed in the application; 
 and
 (II) if the Secretary 
 recommends a minimum necessary 
 repayment period that is 
 different than the repayment 
 period proposed in the 
 application, the minimum 
 necessary repayment period 
 recommended by the Secretary; 
 and
 (iii) an analysis of alternative non-
 Federal funding options;
 (D) describes the allocation of funds from 
 deposits into the Account under paragraph 
 (3)(B); and
 (E) describes the balance of funds in the 
 Account as of the date of the report.
 (6) Alternative allocation.--
 (A) In general.--Appropriations Acts may 
 provide for alternate allocation of amounts 
 reported pursuant to paragraph (5)(D) that are 
 made available under this subsection.
 (B) Allocation by secretary.--
 (i) No alternate allocations.--If 
 Congress has not enacted legislation 
 establishing alternate allocations by 
 the date on which the Act making full-
 year appropriations for energy and 
 water development and related agencies 
 for the applicable fiscal year is 
 enacted into law, amounts made 
 available under paragraph (1) shall be 
 allocated by the Secretary.
 (ii) Insufficient alternate 
 allocations.--If Congress enacts 
 legislation establishing alternate 
 allocations for amounts made available 
 under paragraph (1) that are less than 
 the full amount appropriated under that 
 paragraph, the difference between the 
 amount appropriated and the alternate 
 allocation shall be allocated by the 
 Secretary.
 (7) Effect of subsection.--Nothing in this subsection 
 affects--
 (A) any funding provided, or contracts 
 entered into, under subsection (a) before the 
 date of enactment of this subsection; or
 (B) the use of funds otherwise made available 
 to the Secretary to carry out subsection (a).
 (e) Extraordinary Operation and Maintenance Work on Urban 
Canals of Concern.--
 (1) In general.--The Secretary or the transferred 
 works operating entity shall carry out any 
 extraordinary operation and maintenance work on an 
 urban canal of concern that the transferred works 
 operating entity, with the concurrence of the 
 Secretary, determines to be necessary.
 (2) Funding.--In the case of extraordinary operation 
 and maintenance work on an urban canal of concern 
 authorized under paragraph (1), or if the Secretary 
 determines that a project facility inspected and 
 maintained pursuant to the guidelines and criteria set 
 forth in section 9602(a) requires extraordinary 
 operation and maintenance work pursuant to paragraph 
 (1), the Secretary shall provide Federal funds on a 
 nonreimbursable basis sufficient to cover 35 percent of 
 the portion of total cost of the extraordinary 
 operation and maintenance work allocable to the 
 transferred works operating entity that is needed to 
 carry out the extraordinary operation and maintenance 
 work on the urban canal of concern, with the remaining 
 share of any additional Federal funds advanced by the 
 Secretary for the extraordinary operation and 
 maintenance work to be repaid under subsection (b).

 * * * * * * *

Source: H. Rept. 118-734 · govinfo

Sections of law this bill changes

2 sections in 1 law

From the bill's own amending language, matched to the official United States Code (current through Public Law 119-124).

Reclamation and irrigation of lands by federal government · 43 U.S.C. ch. 12 2 sections
  • § 510 Definitions Amends

    43 U.S.C. § 510

    The law today

    In this subchapter: (1) Inspection The term “inspection” means an inspection of a project facility carried out by the Secretary— (A) to assess and determine the general condition of the project facility; and (B) to estimate the value of property, and the size of the population, that would be at risk if the project facility fails, is breached, or otherwise allows flooding to occur. (2) Project facility The term “project facility” means any part or incidental feature of a project, excluding high- and significant-hazard dams, constructed under the Federal reclamation law (the Act of June 17, 1902 (32 Stat. 388, chapter 1093), and Acts supplemental to and amendatory of that Act (43 U.S.C. 371 et seq.) 1. (3) Reserved works The term “reserved works” mean 2 any project facility at which the Secretary carries out the operation and maintenance of the project facility. (4) Secretary The term “Secretary” means the Secretary of the Interior, acting through the Commissioner of Reclamation. (5) Transferred works The term “transferred works” means a project facility, the operation and maintenance of which is carried out by a non-Federal entity, under the provisions of a formal operation and maintenance transfer contract. (6) Transferred works operating entity The term “transferred works operating entity” means the organization which is contractually responsible for operation and maintenance of transferred works. (7) Extraordinary operation and maintenance work The term “extraordinary operation and maintenance work” means major, nonrecurring maintenance to Reclamation-owned or operated facilities, or facility components, that is— (A) intended to ensure the continued safe, dependable, and reliable delivery of authorized project benefits; and (B) greater than 10 percent of the contractor’s or the transferred works operating entity’s annual operation and maintenance budget for the facility, or greater than $100,000.

    8 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

  • § 510b Extraordinary operation and maintenance work performed by the Secretary Amends

    43 U.S.C. § 510b

    The law today

    (a) In general The Secretary or the transferred works operating entity may carry out, in accordance with subsection (b) and consistent with existing transfer contracts, any extraordinary operation and maintenance work on a project facility that the Secretary determines to be reasonably required to preserve the structural safety of the project facility. (b) Reimbursement of costs arising from extraordinary operation and maintenance work (1) Treatment of costs For reserved works, costs incurred by the Secretary in conducting extraordinary operation and maintenance work will be allocated to the authorized reimbursable purposes of the project and shall be repaid within 50 years, with interest, from the year in which work undertaken pursuant to this subchapter is substantially complete. (2) Authority of Secretary For transferred works, the Secretary is authorized to advance the costs incurred by the transferred works operating entity in conducting extraordinary operation and maintenance work and negotiate appropriate 50-year repayment contracts with project beneficiaries providing for the return of reimbursable costs, with interest, under this subsection: Provided, however, That no contract entered into pursuant to this subchapter shall be deemed to be a new or amended contract for the purposes of section 390cc(a) of this title. (3) Determination of interest rate The interest rate used for computing interest on work in progress and interest on the unpaid balance of the reimbursable costs of extraordinary operation and maintenance work authorized by this subchapter shall be determined by the Secretary of the Treasury, as of the beginning of the fiscal year in which extraordinary operation and maintenance work is commenced, on the basis of average market yields on outstanding marketable obligations of the United States with the remaining periods of maturity comparable to the applicable reimbursement period of the project, adjusted to the nearest ⅛ of 1 percent on the unamortized balance of any portion of the loan. (c) Emergency extraordinary operation and maintenance work (1) In general The Secretary or the transferred works operating entity shall carry out any emergency extraordinary operation and maintenance work on a project facility that the Secretary determines to be necessary to minimize the risk of imminent harm to public health or safety, or property. (2) Reimbursement The Secretary may advance funds for emergency extraordinary operation and maintenance work and shall seek reimbursement from the transferred works operating entity or benefitting entity upon receiving a written assurance from the governing body of such entity that it will negotiate a contract pursuant to this section for repayment of costs incurred by the Secretary in undertaking such work. (3) Funding If the Secretary determines that a project facility inspected and maintained pursuant to the guidelines and criteria set forth in section 510a(a) of this title requires extraordinary operation and maintenance pursuant to paragraph (1), the Secretary may provide Federal funds on a nonreimbursable basis sufficient to cover 35 percent of the cost of the extraordinary operation and maintenance allocable to the transferred works operating entity, which is needed to minimize the risk of imminent harm. The remaining share of the Federal funds advanced by the Secretary for such work shall be repaid under subsection (b). (d) Aging Infrastructure Account (1) Establishment There is established in the general fund of the Treasury a special account, to be known as the “Aging Infrastructure Account” (referred to in this subsection as the “Account”), to provide funds to, and provide for the extended repayment of the funds by, a transferred works operating entity or project beneficiary responsible for repayment of reimbursable costs for the conduct of extraordinary operation and maintenance work at a project facility, which shall consist of— (A) any amounts that are specifica...

    12 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

How this bill changes current law

14 changes Share ↗

Compared against current U.S. Code AI-generated reading aid — verify against the official bill.

The bill amends the definitions and provisions related to extraordinary operation and maintenance work to include urban canals of concern.

  • 43 U.S.C. 510

    InspectionThe term “inspection” means an inspection of a project facility carried out by the Secretary— → InspectionThe term “inspection” means an inspection of a project facility carried out by the Secretary—

    The term 'inspection' remains defined, but is now followed by redefined terms.

  • 43 U.S.C. 510

    (1) → (2)

    Paragraphs have been renumbered to accommodate the addition of a new definition.

  • 43 U.S.C. 510

    (2) → (3)

    Paragraphs have been renumbered to accommodate the addition of a new definition.

  • 43 U.S.C. 510

    (3) → (4)

    Paragraphs have been renumbered to accommodate the addition of a new definition.

  • 43 U.S.C. 510

    (4) → (5)

    Paragraphs have been renumbered to accommodate the addition of a new definition.

  • 43 U.S.C. 510

    (5) → (6)

    Paragraphs have been renumbered to accommodate the addition of a new definition.

  • 43 U.S.C. 510

    (6) → (7)

    Paragraphs have been renumbered to accommodate the addition of a new definition.

  • 43 U.S.C. 510

    (7) → (1)

    Paragraphs have been renumbered to accommodate the addition of a new definition.

  • 43 U.S.C. 510

    et seq.) → et seq.))

    There is a correction in punctuation in the existing text.

  • 43 U.S.C. 510

    mean → means

    There is a correction in the grammar of the existing text.

  • 43 U.S.C. 510

    (8) Urban canal of concern.--The term `urban canal of concern' means a transferred works or segment of a transferred works that is classified as an urban canal reach, the failure of which the Secretary determines would result in loss of life in the vicinity of the failed transferred works or segment of transferred works with an estimated at-risk population of more than 100 individuals.

    A new definition for 'urban canal of concern' is added.

  • 43 U.S.C. 510b

    (e) Extraordinary Operation and Maintenance Work on Urban Canals of Concern.--

    New provisions on extraordinary operation and maintenance work specifically for urban canals of concern are added.

  • 43 U.S.C. 510b

    (1) In general.--The Secretary or the transferred works operating entity shall carry out any extraordinary operation and maintenance work on an urban canal of concern that the transferred works operating entity, with the concurrence of the Secretary, determines to be necessary.

    It is established that both the Secretary and the transferred works operating entity can perform necessary work on urban canals of concern.

  • 43 U.S.C. 510b

    (2) Funding.--In the case of extraordinary operation and maintenance work on an urban canal of concern authorized under paragraph (1), or if the Secretary determines that a project facility inspected and maintained pursuant to the guidelines and criteria set forth in section 9602(a) requires extraordinary operation and maintenance work pursuant to paragraph (1), the Secretary shall provide Federal funds on a nonreimbursable basis sufficient to cover 35 percent of the portion of total cost of the extraordinary operation and maintenance work allocable to the transferred works operating entity that is needed to carry out the extraordinary operation and maintenance work on the urban canal of concern, with the remaining share of any additional Federal funds advanced by the Secretary for the extraordinary operation and maintenance work to be repaid under subsection (b).

    It establishes funding provisions for extraordinary operation and maintenance work on urban canals of concern.

Action History

  1. Reported (Amended) by the Committee on Natural Resources. H. Rept. 118-734.

  2. Reported (Amended) by the Committee on Natural Resources. H. Rept. 118-734.

  3. Placed on the Union Calendar, Calendar No. 619.

  4. Subcommittee on Water, Wildlife, and Fisheries Discharged

  5. Committee Consideration and Mark-up Session Held

  6. Ordered to be Reported (Amended) by Unanimous Consent.

  7. Subcommittee Hearings Held

  8. Referred to the Subcommittee on Water, Wildlife, and Fisheries.

  9. Introduced in House

  10. Introduced in House

  11. Referred to the House Committee on Natural Resources.

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 2 co-sponsors · 544 not signed on

Sponsors (1)

Co-sponsors (2)

Not signed on (544)

544 members have not signed on to this bill.

Show all 544 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does HR 6107 do?
To amend the Omnibus Public Land Management Act of 2009 to authorize certain extraordinary operation and maintenance work for urban canals of concern.
Who sponsors HR 6107?
HR 6107 is sponsored by Simpson, Michael K. (Republican), Fulcher, Russ (Republican), and Newhouse, Dan (Republican).
What is the current status of HR 6107?
This bill died with 118th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track HR 6107?
Track HR 6107 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HR 6107

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HR 6107

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →