United States 115th Congress Status: In Committee 1 R cosponsors

S 930 — Western Area Power Administration Transparency Act

Last action — By Senator Murkowski from Committee on Energy and Natural Resources filed written report. Report No. 115-309.

  1. ✓
    Introduced
  2. 2
    In Committee
  3. 3
    Passed Senate
  4. 4
    Passed House
  5. 5
    To Executive
  6. 6
    Enacted

This bill died with 115th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there are no live odds of enactment. It would have to be reintroduced in the current session to move again.

Bill Text

What changed in the latest version

202 added · 48 removed

Plain-language change summary

The amended version of the bill removes several reporting requirements related to the Western Area Power Administration, specifically the need to account for direct charges, direct allocations, the number of contract staff, and costs for independent consultants, among other details. This change simplifies the reporting obligations for the Administration, focusing on fewer financial and operational metrics. The practical effect is a reduction in the amount of detailed data the Administration must compile and report, potentially leading to less administrative burden.

→
Previous
Latest
930 Introduced in Senate (IS)] <DOC> 115th CONGRESS 1st Session S.
930 Reported in Senate (RS)] <DOC> Calendar No.
534 115th CONGRESS 2d Session S.
which was read twice and referred to the Committee on Energy and Natural Resources _______________________________________________________________________ A BILL To require the Administrator of the Western Area Power Administration to establish a pilot project to provide increased transparency for customers, and for other purposes.
which was read twice and referred to the Committee on Energy and Natural Resources July 30, 2018 Reported by Ms.
Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled, SECTION 1.
Murkowski, with an amendment [Strike out all after the enacting clause and insert the part printed in italic] _______________________________________________________________________ A BILL To require the Administrator of the Western Area Power Administration to establish a pilot project to provide increased transparency for customers, and for other purposes.
Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled, <DELETED>SECTION 1.
SHORT TITLE.</DELETED> <DELETED> This Act may be cited as the ``Western Area Power Administration Transparency Act''.</DELETED> <DELETED>SEC.
2.
WESTERN AREA POWER ADMINISTRATION PILOT PROJECT.</DELETED> <DELETED> (a) In General.--Not later than 120 days after the date of enactment of this Act, the Administrator of the Western Area Power Administration (referred to in this section as the ``Administrator'') shall establish a pilot project, as part of the continuous process improvement program and to provide increased transparency for customers, to publish on a publicly available website of the Western Area Power Administration, a database of the following information, beginning with fiscal year 2008, relating to the Western Area Power Administration:</DELETED> <DELETED> (1) By power system and in a consistent format, rates charged to customers for power and transmission service.</DELETED> <DELETED> (2) By power system, the amount of capacity or energy sold.</DELETED> <DELETED> (3) By region, a detailed accounting, at the functional level and the budget activity level, of all expenditures, capital costs, and staffing costs, including-- </DELETED> <DELETED> (A) indirect costs, including overhead costs;</DELETED> <DELETED> (B) direct charges and direct allocations;</DELETED> <DELETED> (C) the number of contract staff;</DELETED> <DELETED> (D) costs related to independent consultants;</DELETED> <DELETED> (E) the number of full-time equivalents;
and</DELETED> <DELETED> (F) charges to the region from the headquarters office of the Western Area Power Administration for all annual and capital costs.</DELETED> <DELETED> (4) For the headquarters office of the Western Area Power Administration, a detailed accounting at the functional level and the budget activity level, of all expenditures and capital costs, including--</DELETED> <DELETED> (A) indirect costs, including overhead costs;</DELETED> <DELETED> (B) direct charges and direct allocations;</DELETED> <DELETED> (C) the number of contract staff;</DELETED> <DELETED> (D) costs related to independent consultants;</DELETED> <DELETED> (E) the number of full-time equivalents;</DELETED> <DELETED> (F) a summary of any expenditures described in this paragraph, with the total amount paid by each region and power system;
and</DELETED> <DELETED> (G) expenses incurred on behalf of other Federal agencies or programs or third parties for the administration of programs not related to the marketing, transmission, or wheeling of Federal hydropower resources, including--</DELETED> <DELETED> (i) indirect costs, including overhead costs;</DELETED> <DELETED> (ii) direct charges and allocations;</DELETED> <DELETED> (iii) the number of contract staff;
and</DELETED> <DELETED> (iv) the number of full-time equivalents.</DELETED> <DELETED> (5) Capital expenditures, including--</DELETED> <DELETED> (A) capital investments delineated by the year in which each investment is placed into service;
and</DELETED> <DELETED> (B) the sources of capital for each investment.</DELETED> <DELETED> (b) Annual Summary.--</DELETED> <DELETED> (1) In general.--Not later than 120 days after the end of each fiscal year in which the pilot project is being carried out under this section, the Administrator shall make available on a publicly available website--</DELETED> <DELETED> (A) updates to documents made available on the date of the initial publication of the information on the website under subsection (a);</DELETED> <DELETED> (B) an identification of the magnitude of annual changes in the information published on the website under subsection (a);</DELETED> <DELETED> (C) a description of the reasons for the changes identified under subparagraph (B);</DELETED> <DELETED> (D) subject to paragraph (2), the total amount of the unobligated balances retained by the Western Area Power Administration at the end of the prior fiscal year within each marketing area and headquarters by--</DELETED> <DELETED> (i) purpose or function;</DELETED> <DELETED> (ii) source of funding;</DELETED> <DELETED> (iii) anticipated program allotment;
and</DELETED> <DELETED> (iv) underlying authority for each source of funding;
and</DELETED> <DELETED> (E) the anticipated level of unobligated balances that the Western Area Power Administration expects to retain at the end of the fiscal year in which the annual summary is published, as delineated by each of the categories described in clauses (i) through (iv) of subparagraph (D).</DELETED> <DELETED> (2) Limitation.--Amounts in the Upper Colorado River Basin Fund established by section 5(a) of the Act of April 11, 1956 (commonly known as the ``Colorado River Storage Project Act'') (43 U.S.C.
620d(a)), shall not be considered an unobligated balance retained by the Western Area Power Administration for purposes of paragraph (1)(D).</DELETED> <DELETED> (c) Termination.--The pilot project under this section shall terminate on the date that is 7 years after the date of enactment of this Act.</DELETED> SECTION 1.
(a) In General.--Not later than 120 days after the date of enactment of this Act, the Administrator of the Western Area Power Administration (referred to in this section as the ``Administrator'') shall establish a pilot project, as part of the continuous process improvement program and to provide increased transparency for customers, to publish on a publicly available website of the Western Area Power Administration, a database of the following information, beginning with fiscal year 2008, relating to the Western Area Power Administration:
(a) In General.--Not later than 120 days after the date of enactment of this Act, the Administrator of the Western Area Power Administration (referred to in this section as the ``Administrator'') shall-- (1) establish a pilot project, as part of the continuous process improvement program and to provide increased transparency for customers-- (A) to make available a database of information relating to the Western Area Power Administration in accordance with paragraph (2);
(1) By power system and in a consistent format, rates charged to customers for power and transmission service.
and (B) to provide annual updates to the database in accordance with subsection (b);
(2) By power system, the amount of capacity or energy sold.
and (2) publish on a publicly available website of the Western Area Power Administration, a database of the following information, beginning with fiscal year 2008, relating to the Western Area Power Administration:
(3) By region, a detailed accounting, at the functional level and the budget activity level, of all expenditures, capital costs, and staffing costs, including-- (A) indirect costs, including overhead costs;
(A) By power system and in a consistent format, rates charged to customers for power and transmission service.
(B) direct charges and direct allocations;
(B) By power system, the amount of capacity or energy sold.
(C) the number of contract staff;
(C) By region, an accounting, at the task level, budget activity level, organizational code level, and object class level, of all expenditures, including-- (i) indirect costs, including overhead costs;
(D) costs related to independent consultants;
(ii) direct charges and direct allocations;
(E) the number of full-time equivalents;
(iii) costs related to contract staff;
and (F) charges to the region from the headquarters office of the Western Area Power Administration for all annual and capital costs.
(iv) costs related to independent consultants;
(4) For the headquarters office of the Western Area Power Administration, a detailed accounting at the functional level and the budget activity level, of all expenditures and capital costs, including-- (A) indirect costs, including overhead costs;
(v) the number of full-time equivalents;
(B) direct charges and direct allocations;
(vi) charges to the region from the headquarters office of the Western Area Power Administration for all annual and capital costs;
(C) the number of contract staff;
and (vii) expenses incurred on behalf of other Federal agencies or programs or third parties for the administration of programs not related to the marketing, transmission, or wheeling of Federal hydropower resources within the Western Area Power Administration marketing area, including-- (I) indirect costs, including overhead costs;
(D) costs related to independent consultants;
(II) direct charges and allocations;
(E) the number of full-time equivalents;
(III) costs related to contract staff;
(F) a summary of any expenditures described in this paragraph, with the total amount paid by each region and power system;
and (IV) the number of full-time equivalents.
and (G) expenses incurred on behalf of other Federal agencies or programs or third parties for the administration of programs not related to the marketing, transmission, or wheeling of Federal hydropower resources, including-- (i) indirect costs, including overhead costs;
(D) For the headquarters office of the Western Area Power Administration, an accounting, at the task level, budget activity level, organizational code level, and object class level, of all expenditures, including-- (i) indirect costs, including overhead costs;
(ii) direct charges and allocations;
(ii) direct charges and direct allocations;
(iii) the number of contract staff;
(iii) costs related to contract staff;
and (iv) the number of full-time equivalents.
(iv) costs related to independent consultants;
(5) Capital expenditures, including-- (A) capital investments delineated by the year in which each investment is placed into service;
(v) the number of full-time equivalents;
and (B) the sources of capital for each investment.
(vi) a summary of any expenditures described in this paragraph, with the total amount paid by each region and power system;
(b) Annual Summary.-- (1) In general.--Not later than 120 days after the end of each fiscal year in which the pilot project is being carried out under this section, the Administrator shall make available on a publicly available website-- (A) updates to documents made available on the date of the initial publication of the information on the website under subsection (a);
and (vii) expenses incurred on behalf of other Federal agencies or programs or third parties for the administration of programs not related to the marketing, transmission, or wheeling of Federal hydropower resources within the Western Area Power Administration marketing area, including-- (I) indirect costs, including overhead costs;
(B) an identification of the magnitude of annual changes in the information published on the website under subsection (a);
(II) direct charges and allocations;
(C) a description of the reasons for the changes identified under subparagraph (B);
(III) costs related to contract staff;
(D) subject to paragraph (2), the total amount of the unobligated balances retained by the Western Area Power Administration at the end of the prior fiscal year within each marketing area and headquarters by-- (i) purpose or function;
and (IV) the number of full-time equivalents.
Show all 51 changed rows (11 more)
Previous
Latest
(E) Capital expenditures for each project, including-- (i) capital investments delineated by the year in which each investment is placed into service;
and (ii) the sources of capital for each investment.
(b) Annual Summary.-- (1) In general.--Not later than 120 days after the end of each fiscal year in which the pilot project is being carried out under this section, the Administrator shall make available on a publicly available website-- (A) updates to documents made available on the date of the initial publication of the information on the website under subsection (a)(2);
(B) an identification of the annual changes in the information published on the website under subsection (a)(2);
(C) the reasons for the changes identified under subparagraph (B);
(D) subject to paragraph (2), the total amount of the unobligated balances retained by the Western Area Power Administration at the end of the prior fiscal year within each project and headquarters by-- (i) purpose or function;
620d(a)), shall not be considered an unobligated balance retained by the Western Area Power Administration for purposes of paragraph (1)(D).
620d(a)), shall not considered to be an unobligated balance retained by the Western Area Power Administration for purposes of paragraph (1)(D).
<all>
Calendar No.
534 115th CONGRESS 2d Session S.
930 _______________________________________________________________________ A BILL To require the Administrator of the Western Area Power Administration to establish a pilot project to provide increased transparency for customers, and for other purposes.
_______________________________________________________________________ July 30, 2018 Reported with an amendment
View plain text versions (2)

Action History

  1. Introduced in Senate

  2. Read twice and referred to the Committee on Energy and Natural Resources.

  3. Committee on Energy and Natural Resources Subcommittee on Water and Power. Hearings held. With printed Hearing: S.Hrg. 115-38.

  4. Committee on Energy and Natural Resources. Ordered to be reported with an amendment in the nature of a substitute favorably.

  5. Committee on Energy and Natural Resources. Reported by Senator Murkowski with an amendment in the nature of a substitute. Without written report.

  6. Committee on Energy and Natural Resources. Reported by Senator Murkowski with an amendment in the nature of a substitute. Without written report.

  7. Placed on Senate Legislative Calendar under General Orders. Calendar No. 534.

  8. By Senator Murkowski from Committee on Energy and Natural Resources filed written report. Report No. 115-309.

  9. By Senator Murkowski from Committee on Energy and Natural Resources filed written report. Report No. 115-309.

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 546 not signed on

Sponsors (1)

Co-sponsors (0)

None.

Not signed on (546)

546 members have not signed on to this bill.

Show all 546 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors S 930?
S 930 is sponsored by Flake, Jeff (Republican).
What is the current status of S 930?
This bill died with 115th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track S 930?
Track S 930 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on S 930

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.