United States 115th Congress Status: In Committee 2 R cosponsors

HR 2104 — Morley Nelson Snake River Birds of Prey National Conservation Area Boundary Modification Act of 2017

Last action — Referred to the Subcommittee on Water, Power and Oceans.

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. 2
    In Committee
  3. 3
    Passed House
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill died with 115th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Summary

Morley Nelson Snake River Birds of Prey National Conservation Area Boundary Modification Act of 2017 This bill modifies the boundary of the Morley Nelson Snake River Birds of Prey National Conservation Area in Idaho to: (1) include specified Bureau of Land Management (BLM) administered land and certain Bureau of Reclamation administered land, and (2) exclude specified lands identified as the Segment 8 Revised Proposed Route and as the Segment 9 Revised Proposed Route. The Department of the Interior shall issue to Gateway West (a high-voltage transmission line project in Idaho and Wyoming) a right-of-way for such proposed routes, which is to be used for the construction and maintenance of transmission lines and for access roads and activities related to fire prevention and suppression, subject to construction mitigation and conservation requirements. Interior shall: (1) administer the BLM and Reclamation administered lands as part of the National Landscape Conservation System, and (2) continue to administer the proposed route lands but as lands that are not included in the conservation area. The bill transfers from Reclamation to the BLM administrative jurisdiction over the Reclamation administered lands. Interior shall amend the management plan for the conservation area in order to address the long-term management of the BLM and Reclamation administered lands, including for livestock grazing, hunting, fishing, and motorized access. Specified federal land in the Cotterel Wind Power Project area may not be used for producing electricity from wind.

Bill Text

Sections of law this bill changes

From the bill's own amending language, matched to the official United States Code (current through Public Law 119-121).

Also cites: 43 U.S.C. § 1765

Action History

  1. Referred to the Subcommittee on Federal Lands.

  2. Referred to the Subcommittee on Water, Power and Oceans.

  3. Introduced in House

  4. Introduced in House

  5. Referred to the House Committee on Natural Resources.

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 1 co-sponsors · 545 not signed on

Sponsors (1)

Co-sponsors (1)

Not signed on (545)

545 members have not signed on to this bill.

Show all 545 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does HR 2104 do?
Morley Nelson Snake River Birds of Prey National Conservation Area Boundary Modification Act of 2017 This bill modifies the boundary of the Morley Nelson Snake River Birds of Prey National Conservation Area in Idaho to: (1) include specified Bureau of Land Management (BLM) administered land and certain Bureau of Reclamation administered land, and (2) exclude specified lands identified as the Segment 8 Revised Proposed Route and as the Segment 9 Revised Proposed Route. The Department of the Interior shall issue to Gateway West (a high-voltage transmission line project in Idaho and Wyoming) a right-of-way for such proposed routes, which is to be used for the construction and maintenance of transmission lines and for access roads and activities related to fire prevention and suppression, subject to construction mitigation and conservation requirements. Interior shall: (1) administer the BLM and Reclamation administered lands as part of the National Landscape Conservation System, and (2) continue to administer the proposed route lands but as lands that are not included in the conservation area. The bill transfers from Reclamation to the BLM administrative jurisdiction over the Reclamation administered lands. Interior shall amend the management plan for the conservation area in order to address the long-term management of the BLM and Reclamation administered lands, including for livestock grazing, hunting, fishing, and motorized access. Specified federal land in the Cotterel Wind Power Project area may not be used for producing electricity from wind.
Who sponsors HR 2104?
HR 2104 is sponsored by Labrador, Raul R. (Republican) and Simpson, Michael K. (Republican).
What is the current status of HR 2104?
This bill died with 115th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track HR 2104?
Track HR 2104 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HR 2104

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HR 2104

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →