North Carolina 2021-2022 Session Status: Passed House Bipartisan · 24 R · 5 D cosponsors

HB 947 — The Growing Rural Economies with Access to Technology (G.R.E.A.T.) Broadband Expansion Act.

Last action — Special Message Received From House

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. 3
    Passed House
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill died with 2021-2022 Session. It reached “Passed House” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Bill Text

What changed in the latest version

540 added · 576 removed

Plain-language change summary

The amendments to House Bill 947 clarify eligibility criteria for broadband funding by specifying that counties can collaborate with the Broadband Infrastructure Office to define project areas for funding, rather than just relying on areas that didn't receive funding in the last grant cycle. This change helps ensure that counties remain involved in the planning and selection process, which could lead to better-targeted and more effective broadband projects in underserved areas. Overall, these updates aim to enhance how resources are allocated for improving internet access in rural regions.

→
Previous
Latest
GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2021 H 2 HOUSE BILL 947 Committee Substitute Favorable 5/20/21 Short Title:
GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2021 H 1 HOUSE BILL 947 Short Title:
Representatives Arp, Lambeth, Saine, and Johnson (Primary Sponsors).
For a complete list of sponsors, refer to the North Carolina General Assembly web site.
May 12, 2021 A BILL TO BE ENTITLED AN ACT TO ESTABLISH THE COMPLETING ACCESS TO BROADBAND PROGRAM, TO CREATE A PROCESS TO ADMINISTER A GROWING RURAL ECONOMIES WITH ACCESS TO TECHNOLOGY (G.R.E.A.T.) PROGRAM UTILIZING FEDERAL AMERICAN RESCUE PLAN ACT FUNDS, AND TO MAKE VARIOUS CHANGES TO THE G.R.E.A.T.
Energy and Public Utilities, if favorable, Appropriations, if favorable, Rules, Calendar, and Operations of the House May 12, 2021 A BILL TO BE ENTITLED AN ACT TO ESTABLISH THE COMPLETING ACCESS TO BROADBAND PROGRAM, TO CREATE A FIXED WIRELESS AND SATELLITE BROADBAND GRANT PROGRAM WITHIN THE G.R.E.A.T.
PROGRAM.
PROGRAM, AND TO MAKE CHANGES TO THE GROWING RURAL ECONOMIES WITH ACCESS TO TECHNOLOGY (G.R.E.A.T.) PROGRAM.
"§ 143B-1373.1.
"§ 143B-1373.2.
(2) Department.
(2) Eligible area.
– The Department of Information Technology.
– An area that is unserved or underserved in a countydesignated as a development tier one or tier two area, as defined in G.S.
(3) Eligible area.
143B-437.08, or a rural census tract, as defined in G.S.
– An area that is unserved or underserved in a county.
143B-472.127, in anyother countywith total employment of less than 500,000, as of January 1, 2020, as measured pursuant to G.S.
A county that has utilized federal funding for broadband infrastructure projects on or after May 1, 2021, is not eligible.
143B-437.52(c)(3).
(4) Office.
(3) Federal funds.
– The Broadband Infrastructure Office within the Department of Information Technology.
– Funds provided directly to a county from the federal American Rescue Plan (P.L.
(5) Project area.
117-2) that are eligible to be used for the purpose of deploying broadband service.
(4) Project area.
(6) Unserved orunderserved.
(5) Unserved orunderserved.
–Alocationwithin acountythat has nodeployment of broadband service or that has internet access service that does not meet the definition of broadband service.
–Alocationwithinacountythathas no deployment of broadband service or that has internet access service that does not meet the definition of broadband service.
Areas where a private provider has been designated to receive funds through other State- or federally funded programs designed specifically for broadband deployment shall be considered served if such funding is intended to result in construction of broadband in the area within 18 months or for the duration of the federal funding program for that area, or if the funding recipient is otherwise in good standing with the funding agency's regulations governing the funding program.
(b) The Completing Access to Broadband Fund (CAB Fund) is established as a special revenue fund in the Department of Information Technology.
*H947-v-2* General Assembly Of North Carolina Session 2021 (b) The Completing Access to Broadband Fund (CAB Fund) is established as a special revenue fund in the Department of Information Technology.
State funds appropriated to this Fund shall be considered an information technology project within the meaning of G.S.
State funds *H947-v-1* General Assembly Of North Carolina Session 2021 appropriated to this Fund shall be considered an information technology project within the meaning of G.S.
Monies awarded from the CAB Fund shall be used for infrastructure and infrastructure costs, as those terms are defined in G.S.
143B-1373(a).
All identified projects shall be subject to the bid process requirements in this subsection.
In selecting project areas to receive funding, the Office shall give priority to eligible areas that a county has requested funding for based upon utilizing the Office's Community Broadband Planning Playbook and those counties that meet the criteria established in subsection (e) of this section.
In selectingproject areas to receive funding, theOffice shall give priority to eligible areas that a county has requested funding for based upon utilizing the Office's Community Broadband Planning Playbook and those counties that meet the criteria established in subsection (e) of this section.
Notwithstanding Article 8 of Chapter 143 of the General Statutes, or any other provision of law to the contrary, the Office may delegate to a county the bid process to select a provider for the project area in accordance with Part 4 of this Article.
The Department shall utilize its authority under Part 4 of this Article to develop competitive bid processes for the procurement of the construction, installation, and operation of broadband infrastructure.
Notwithstanding Article 8 of Chapter 143 of the General Statutes, or any other provision of law to the contrary, the Department may delegate to a county the authority to select a provider for the project area in accordance with Part 4 of this Article.
The Department shall reserve the authority to approve the selection of a county pursuant to this subsection.
Unless the county has bid processes acceptable to the Office, the Office shall utilize customizable forms and procedures developed by the Department for the purposes of this subsection.
Selections made pursuant to this subsection are not subject to the Department's administrative review authority under Article 3A of Chapter 150B of the General Statutes or the Department's administrative rules regarding information technology bid protests and contested case procedures.
Selection of project areas shall be subject to the protections provided in G.S.
143B-1373(c).
In conjunction with the bid process, a proposed project area shall be posted on the Department's website for a period of at least 10 days.
Upon submission of credible evidence, a broadband service provider may request a project scope adjustment to the Office in accordance with G.S.
143B-1373(e).
Upon a finding that the evidence submitted by the broadband service provider is credible, the Office shall work with the county to amend the scope of the project.
Nothing in this subsection shall be deemed to grant authority for a county to own, operate, or otherwise control broadband infrastructure contracted for under this section.
(d) A broadband service provider selected for a project under this section shall be required to provide at least thirty-five percent (35%) of the total estimated project cost.
(d) A broadband service provider selected for a project under this section may provide up to thirty percent (30%) of the total estimated project cost.
The Officemaycommitupto thirty-fivepercent (35%) ofthetotal estimatedprojectcost frommonies in the CAB Fund.
The Office may commit up to thirty-five percent (35%) of the total estimated project cost from monies in the CAB Fund.
The county requesting the project shall be responsible for thirty percent (30%) of the total estimated project cost and shall utilize federal funds for that purpose.
The countyrequesting the project shall be responsible for at least thirty-five percent (35%) of the total estimated project cost and shall utilize federal American Rescue Plan Act (P.L.
117-2) funds or nonrestricted general funds for that purpose.
Show all 273 changed rows (233 more)
Previous
Latest
No countymay receive more than four million dollars ($4,000,000) in aggregate funding from the CAB Fund in any single fiscal year.
A county shall use unrestricted general funds or federal funds for its portion of the total estimated project costs.
(e) Notwithstanding the project cost responsibility allocations in subsection (d) of this section, for a county receiving from the federal government less than an aggregate of eight million dollars ($8,000,000) in federal American Rescue Plan Act (P.L.
No single project shall receive an amount greater than two million dollars ($2,000,000) from the CAB Fund, and no county may receive more than five million dollars ($5,000,000) in aggregate funding from the CAB Fund in any single fiscal year.
117-2) funds, a broadband serviceproviderselected for aproject shall providenot lessthan fifteen percent (15%) Page 2 House Bill 947-Second Edition General Assembly Of North Carolina Session 2021 of the total estimated project cost.
(e) Notwithstanding the project cost responsibility allocations in subsection (d) of this section, for a county receiving from the federal government less than eight million dollars ($8,000,000) in federal funds, a broadband service provider selected for a project shall be required to provide at least thirtypercent (30%) of the total estimated project cost.
If a broadband service provider provides more than fifteen percent (15%) of the total estimated project cost, the State and county cost responsibilities shall be equally apportioned.
The following cost responsibility allocations for counties and the State apply:
The following cost responsibility allocations for counties meeting the requirements of this subsection and the State apply:
Direct Federal Funds Received County Responsibility State Responsibility Up to $2,000,000 10% 60% $2,000,000, up to $2,750,000 15% 55% $2,750,000, up to $3,250,000 20% 50% $3,250,000, up to $3,750,000 25% 45% (f) A broadband service provider selected for a project under this section shall enter into an agreement with the Office that shall include the project description, time lines, benchmarks, proposed broadband speeds, and any other information and documentation the Office deems necessary.
Direct Federal Funds Received County Responsibility State Responsibility $250,000, up to $4,000,000 5%, minimum Up to 80% $4,000,000, up to $8,000,000 10%, minimum Up to 75% (f) A broadband service provider selected for a project under this section shall enter into an agreement with the Office that shall include the project description, time lines, benchmarks, proposed broadband speeds, and any other information and documentation the Office deems necessary.
Upon execution of an agreement, the county shall provide its portion of the total estimated project costs to the Office to be combined with CAB Funds awarded for the project and placed in a separate project account.
All proposed broadband speeds must meet or exceed the federal guidelines for use of American Rescue Plan Act (P.L.
The Office shall provide project oversight and, upon completion of established benchmarks in the project agreement, the Office shall disburse funds from the project account to the broadband service provider." PART II.
117-2) funds.
EXPANSION OF G.R.E.A.T.
Upon execution of an agreement, the countyshall provide its portion of the total estimated project costs to the Office to be combined with CAB Funds awarded for the project and placed in a separate project account.
PROGRAM FOR FIXED WIRELESS AND SATELLITE BROADBAND GRANTS SECTION 2.1.
The Office shall provide project oversight and, upon completion of established benchmarks in the project agreement, the Office shall disburse funds from the project account to the broadband service provider.
Article 15 of Chapter 143B of the General Statutes is amended by adding a new section to read:
The forfeiture provisions in G.S.
"§ 143B-1373.1.
143B-1373(l) shall apply to agreements entered into under this section." PART II.
AMERICAN RESCUE PLAN ACT FUND ADMINISTRATION SECTION 2.1.
program fixed wireless and satellite broadband grants.
From the funds appropriated in Part IV of this act, and in accordance with applicable federal guidelines, the Department of Information Technology shall administer broadband infrastructure grants through the Growing Rural Economies with Access to Technology grant program.
Page 2 House Bill 947-First Edition General Assembly Of North Carolina Session 2021 (a) The following definitions apply in this section:
Grant applications shall be submitted and grant funds shall be awarded pursuant to G.S.
(1) Broadband service.
143B-1373, with the exception of the following:
– Internet access service provided by low-orbit geostationary satellites or fixed wireless networks with (i) a latency of 500 milliseconds or less and (ii) transmission speeds that are equal to or greater than the requirements for the minimum performance tier, as provided by the Federal Communications Commission in Paragraph 39 of the report and order adopted January 30, 2020, and released February 7, 2020.
(1) The definition of "eligible economically distressed county" in G.S.
(2) Equipment.
143B-1373(a) shall mean a county designated as a development tier one or tier two area, as defined in G.S.
– The antenna and any necessary hardware provided by a broadband service provider to a subscriber that enables the subscriber to connect to the broadband service.
143B-437.08, or a rural census tract, as defined in G.S.
The term does not include a modem.
143B-472.127(a)(2), located in any other county.
(3) Fixed wireless provider.
For the purposes of this subdivision, the tier designation that is in effect as of the beginning of a fiscal year shall be applied for all grants awarded for that fiscal year.
–Abroadband serviceproviderthat provides internet access to a subscriber via fixed antenna that receives a radio link from the provider's network to the subscriber.
With the exception of funds expended under this section or under G.S.
(4) Grantee.
143B-1373.1, a county that has utilized federal funding for broadband infrastructure on or after May 1, 2021, shall be ineligible.
– A broadband provider that has been awarded a grant pursuant to this section.
(2) The definition of "eligible project" in G.S.
(5) Office.
143B-1373(a) shall be a discrete and specific project located in an unserved economically distressed area seeking to provide broadband service to homes, businesses, and community anchor points not currently served.
– The Broadband Infrastructure Office in the Department of Information Technology.
Eligible projects do not include middle mile, backhaul, and other similar projects not directed at broadband service-to-end users.
(6) Satellite broadband provider.
If a contiguous project area crosses from one eligible county into one or more eligible adjacent counties, for the purposes of this section, the project shall be deemed to be located in the county where the greatest number of unserved households are proposed to be served.
– A broadband service provider that provides internet access directly to consumers via satellite technology.
(3) The financial contribution restrictions for partnerships in G.S.
(7) Secretary.
143B-1373(a)(11a) are removed.
– The Secretary of the Department of Information Technology.
(4) The definition of "unserved area" in G.S.
(8) Unserved household.
143B-1373(a) shall be a designated geographic area that is presently without access to broadband service, as defined in G.S.
– A household located in this State that does not have access to broadband service from a wireline or wireless service provider.
143B-1373(a), or where internet access service does not meet the definition of broadband service.
A household that is included in an area where a grant from the Growing Rural Economies with Access to Technology (G.R.E.A.T.) program pursuant to G.S.
Areas where a private provider has been designated to receive funds through other State- or federally funded programs designed specifically for broadband deployment shall be considered served if House Bill 947-Second Edition Page 3 General Assembly Of North Carolina Session 2021 such funding is intended to result in construction of broadband in the area within 18 months or for the duration of the federal funding program for that area or if the funding recipient is otherwise in good standing with the funding agency's regulations governing the funding program.
143B-1373has been awardedis not eligibleforagrant underthis section.
(5) The provisions of G.S.
(b) Applications for grants will be submitted at times designated by and on forms prescribed by the Secretary.
143B-1373(c) are replaced with the following:
Notwithstanding any other provision of law, if the Secretary deems some of the information in an application to contain proprietary information, the Secretary may provide that such information is not a public record, as that term is defined in G.S.
A private provider receiving State or federal funds to deploy broadband service in unserved areas may qualify such area for protection by submitting a listing of the census blocks, or portions thereof, comprising the State- or federally funded project areas in a manner prescribed by the Office.
132-1, subject to public records or other laws requiring the disclosure of such information and have that portion of the application redacted.
The Office shall only utilize this data to update maps of census blocks to reflect these census blocks, or portions thereof, as being served.
An application shall include, at a minimum, the following information:
Failure on the part of a provider to submit the listing of census blocks by the cutoff date shall result in those areas being eligible for inclusion under the G.R.E.A.T.
(1) The identity of the applicant.
grant program during subsequent program years.
(2) The specific address of the subscriber.
The Office shall use the census block data provided only for mapping of unserved areas.
(3) A description of the services provided, including the upstream and downstream broadband speeds delivered, latency metrics, and any applicable data caps.
A project area shall remain protected for a period of 18 months from the submission of the listing information required under this subdivision;
Any applicant proposing a data cap below 150 Gigabytes of usage per month shall also provide justification to the satisfaction of the Office that the proposed cap is in the public interest and consistent with industry standards.
provided, however, a private provider that has received protection for a project area shall submit written documentation by April 30 of the year following the program year that broadband deployment has begun, been completed, or is otherwise in good standing, in the census blocks, or portions thereof, that have been deemed ineligible by the Office under this subsection.
(4) The cost to be charged to the unserved household for the equipment needed to connect to the broadband service for the next two years.
Upon submission of documentation satisfactory to the Office, a protected project area shall remain protected until project completion.
(5) Evidence of a contract with the subscriber, including the amount charged for the equipment and the installation of the equipment, necessary for providing broadband service to the subscriber.
A project area where a private provider has forfeited or otherwise defaulted on an agreement in connection with receipt of funds to deploy broadband service shall be eligible for inclusion in this program in subsequent program years.
(6) The terms and conditions imposed upon the subscriber, including restrictions on use and possession of equipment used for broadband service connection.
Information provided to the Office pursuant to this subdivision is not a public record, as that term is defined in G.S.
(7) Any other information or supplementary documentation requested by the Office.
132-1.
(c) The Office shall determine eligibility for a grant pursuant to this section based upon the information provided in the application of a broadband service provider, and any other House Bill 947-First Edition Page 3 General Assembly Of North Carolina Session 2021 information or supplementary documentation requested by the Office, and shall award grants to applicants that demonstrate the provision of broadband service via a subscription from an unserved household.
(6) The provisions of G.S.
The Office shall provide grants to eligible broadband service providers for subscriptions to unserved households as follows:
143B-1373(d1) are replaced with the following:
(1) Up to one thousand one hundred dollars ($1,100) for each satellite broadband subscription, or up to seven hundred dollars ($700.00) for each fixed wireless subscription, providing broadband speeds of 50 megabits per second download and 3 megabits per second upload, or greater.
An application submitted pursuant to this section shall include a project area map that provides location-specific data in a format required by the Office.
(2) Up to seven hundred dollars ($700.00) for each satellite broadband subscription, or up to five hundred dollars ($500.00) for each fixed wireless subscription, providing less than 50 megabits per second download and 3 megabits per second upload.
A provider submitting an application pursuant to this section shall bear the burden of proof that the proposed area to be served can, in fact, be served using the proposed technology.
The grants awarded by the Office shall not exceed the cost of the broadband provider's equipment, including any installation costs, necessary to provide broadband service to the household that has been provided to a subscriber.
The burden of proof may be satisfied by the submission ofdata,maps,andanyotherinformationsatisfactoryto the Office, demonstrating that the area and number of prospective broadband recipients proposed to be served can be provided the minimum upload and download speeds indicated in the application.
(d) Eligibility for a grant award is dependent upon the household maintaining broadband service with the grantee for at least 24 consecutive months.
(7) The provisions in G.S.
No grant shall be awarded for a subscription at an address that the Office has previously awarded a grant under this section.
143B-1373(e) are replaced with the following:
A granteeshallsubmitdocumentationtotheOfficeannuallythatwillprovideinformationsufficient for the Office to verify eligibility of subscriptions, including that the household was unserved.
Applications shall be made publiclyavailable byposting on the website of the Department of Information Technology for a period of at least 20 days prior to award.
Payment of grant funds is subject to documentation showing eligibility of subscriptions.
During the 20-day period, any interested party may submit comments to the Secretary concerning any pending application.
(e) The Office shall require a grantee to enter into an agreement.
A broadband service provider currently providing broadband service in a project area proposed in an application may submit a protest of any application on the grounds the proposed project covers an area that is a protected area under subsection (c) of this section or that the proposed project area contains ten percent (10%) or more of total households with access to broadband service as defined in this section.
The agreement shall contain at least all of the following:
Protests shall be submitted in writing, accompanied by all credible and relevant supporting documentation, including specific Page 4 House Bill 947-Second Edition General Assembly Of North Carolina Session 2021 addresses, and detailed mapping demonstrating that the protesting broadband provider has installed infrastructure sufficient to provide broadband service to the specific addresses provided in the protest, along with an attestation that broadband service is available to the exterior of the structure at the specific addresses indicated.
(1) An address of the household subscribing for broadband service for which the grant is sought.
The protest shall be considered by the Office in connection with the review of the application.
(2) A provision that requires the grantee to maintain its service for the subscriber for at least 24 consecutive months.
Upon submission of evidence satisfactory to the Office that the proposed project area includes a protected area or prospective broadband recipients that are presently served, as measured using amethodologysatisfactoryto the Office, theOfficemaywork with an applicant to amend an application to reduce the number of unserved prospectivebroadbandrecipients in theproject areato reflect an accuratelevel of current broadband service.
(3) A provision establishing the conditions under which the grant agreement may be terminated and under which grant funds may be recaptured by the Office.
The Office may revise application scores in accordance with amended applications;
(4) A provision stating that unless the agreement is terminated pursuant to its terms, the agreement is binding and constitutes a continuing contractual obligation of the State and the grantee.
however, the Office may reject any amended application resulting in a lower application score to the extent that the lower score would have impacted the ranking of the application in the initial scoring process.
(5) A provision that establishes any allowed variation in the terms of the agreement that will not subject the grantee to grant reduction, amendment, or termination of the agreement.
For applications with filed protests, the Secretary shall issue a written decision to the protesting party at least 15 days prior to the approval of that application.
(6) A provision describing the manner in which the amount of the grant will be measured and administered to ensure compliance with the agreement and this section.
Following a protest that is granted for a portion of the application, the Office mayrelease to an applicant the locations or areas declared ineligible.
(7) A provision stating that any recapture of a grant and any reduction in the amount of the grant or the term of the agreement must, at a minimum, be proportional to the failure to comply measured relative to the condition or criterion with respect to which the failure occurred.
The information released to the applicant is not a public record, as that term is definedunder G.S.
(8) A provision describing the methodology the Office will use to verify subscriptions and the types of information required to be submitted by the grantee.
132-1, andshall remain confidential.
(9) A provision stating that the grantee may not impose data caps upon any eligible subscription for the term of the agreement.
Any provider submitting a protest shall verify that the information in the protest is accurate and that the protest is submitted in good faith.
(10) A provision stating that the equipment necessary for a subscriber to receive broadband service from the grantee shall be deemed a fixed asset upon the propertyof the eligible subscription and shall transfer with the propertyto any successors.
The Office may deny any protest or application that contains inaccurate information.
Page 4 House Bill 947-First Edition General Assembly Of North Carolina Session 2021 (11) Any other provision the Office deems necessary.
As a means of resolving a protest, the Office may utilize speed tests to determine if the protested area or individual households or businesses currently have access to broadband service as defined in this section.
(f) If the grantee fails to meet or comply with any condition or requirement set forth in an agreement, the Office shall reduce the amount of the grant or the term of the agreement, may terminate the agreement, or both.
The Department shall publish the speed test methodology it uses to assess speed levels pursuant to this section.
The reduction in the amount of the grant or the term must, at a minimum, beproportional to thefailureto complymeasured relativeto thecondition with respect to which the failure occurred.
All decisions regarding the speed test to be utilized and the manner by which the speed tests are applied shall be made by the Secretary or the Secretary's designee.
If the Office finds that the grantee has manipulated or attempted to manipulate data with the purpose of increasing the amount of a grant, the Office shall immediately terminate the agreement and take action to recapture any grant funds disbursed in any year in which the Office finds the grantee manipulated or attempted to manipulate data with the purpose of increasing the amount of a grant.
(8) The partnership scoring provision in G.S.
(g) The grantee shall certify and provide to the Office evidence consistent with a Federal Communications Commission attestation that the proposed minimum upstream and minimum downstream broadband speeds and latency metrics identified in the application guidelines are and will be available throughout the project area during the term of the agreement prior to any end user connections.
143B-1373(g)(1) is replaced with the following:
A grantee may receive a disbursement of a grant only after the Office has certified that the grantee has met the terms and conditions of the agreement.
Projects proposing a partnership shall be given points in their application score.
A grantee shall submit a certification of compliance with the agreement to the Office.
A proposed partnership shall (i) be in writing, (ii) provide the specific terms and conditions of the partnership, and (iii) be signed and attested to by the parties.
The Office shall require the grantee to provide any necessary evidence of compliance to verify that the terms of the agreement have been met.
A county or nonprofit may enter into proposed agreements with more than one applicant.
(h) The Office shall require that a grantee offer the proposed advertised minimum download and minimum upload speeds and subscription cost identified in the application for the duration of the 24 consecutive months provided in the agreement.
For the purposes of scoring under this subdivision, one point shall be given for a proposed partnership that will make available existing infrastructure that has been installed for the partner's enterprise, nonconsumer broadband purposes, or any other property, buildings, or structures owned by the partner, for a proposed project under this section.
Upon request, a grantee shall provide to the Office evidence consistent with a Federal Communications Commission attestation that the grantee is making available the proposed advertised speed, or a faster speed, as contained in the grant agreement." PART III.
A county or nonprofit entity that proposes to provide a financial match shall be given one point.
Notwithstanding Article 8 of Chapter 143 of the General Statutes,oranyprovision oflawto thecontrary, acountymayuseunrestricted general funds or federal American Rescue Plan Act (P.L.
117-1) funds allocated to it for the purpose of improving broadband infrastructure for a financial match.
An applicant shall receive two additional points for a proposed partnership where the county's financial match is comprised entirely from federal American Rescue Plan Act (P.L.
117-2) funds intended for broadband infrastructure.
Nothing in this subdivision shall be deemed to House Bill 947-Second Edition Page 5 General Assembly Of North Carolina Session 2021 authorize a county to provide broadband service.
For projects where the application includes a proposed partnership, the agreement shall contain a provision requiring a certification of the existence of the partnership prior to disbursement of grant funds.
(9) The scoring model measures contained in G.S.
143B-1373(g)(5) are replaced with the following:
a.
For projects proposed in the Piedmont or Coastal Plain Regions:
Est.
Cost per Household/Business Points Up to $3,500 9 $3,500, up to $5,000 8 $5,000, up to $6,000 7 $6,000 and over 0 b.
For projects located in the Mountain Region:
Est.
Cost per Household/Business Points Up to $4,500 9 $4,500, up to $6,000 8 $6,000, up to $7,000 7 $7,000 and over 0 (10) The base speed multiplier provided in G.S.
143B-1373(g)(6) shall be administered as follows:
Minimum Download:
Minimum Upload Score Multiplier 100:20 Mbps.
or greater.
1.00 100 Mbps., symmetrical 2.00 Greater than 100:100 Mbps.
3.00 An applicant proposing minimum download and minimum upload speeds of less than 100 Mbps., symmetrical, shall provide an attestation to the Office that, upon project completion, the completed infrastructure will be scalable to a minimum of 100 Mbps.
download and 100 Mbps.
upload on or before December 31, 2026, subject to the return of all federal American Rescue Plan Act (P.L.
117-2) funds received under this section and all of the grant forfeiture provisions in G.S.
143B-1373(l).
(11) Additional points shall be awarded to counties providing a portion of a project's matching funds entirely from federal American Rescue Plan Act (P.L.
117-2) funds the county received directly from the federal government.
For counties that received an aggregate of eight million dollars ($8,000,000) or more directly from the federal government, the following points shall be added to the application score:
County Match Points $1,000,000, up to $2,000,000 1 $2,000,000, up to $4,000,000 2 $4,000,000, up to $6,000,000 3 $6,000,000, up to $8,000,000 4 $8,000,000, or greater 5 For counties that (i) received less than an aggregate of eight million dollars ($8,000,000) directlyfrom the federal government from the American Rescue Plan Act (P.L.
117-2) and (ii) are providing a portion of a project's matching funds using the entiretyof the federal funds the countyreceived, together with Page 6 House Bill 947-Second Edition General Assembly Of North Carolina Session 2021 any other unrestricted general fund monies, if needed, the following points shall be added to the application score:
County Match Points $250,000, up to $6,000,000 6 $6,000,000, up to $8,000,000 7 (12) The grant limitation amounts in G.S.
143B-1373(i) are changed as follows:
A single grant award shall not exceed four million dollars ($4,000,000).
No combination of grant awards involving any single county may exceed eight million dollars ($8,000,000) in a fiscal year.
Any project that is applied for and not funded in an award round under this section shall be eligible for funding under the Completing Access to Broadband program pursuant to G.S.
143B-1373.1.
(13) The provisions of G.S.
143B-1373(j) are replaced with the following:
Grant recipients are required to provide matching funds based upon the application scoring pursuant to this section in the following minimum amounts:
Score Matching Requirement 12.0 points or less 50% Greater than 12.0 points, but less than 17.5 points 45% 17.5 points, up to 22.0 points 40% Greater than 22.0 points 30% Up to fifty percent (50%) of matching funds paid by the grant recipient may be comprised of third-party funding including funds from other grant programs or federal funds, to the extent applicable rules permit.
A grant recipient receiving a portion of matching funds from a county, where the county portion of matching funds is partially comprised of federal American Rescue Plan Act (P.L.
117-2) funding, may have the grant recipient's portion of the matching requirement imposed under this subdivision reduced to a maximum of twenty-five percent (25%).
A grant recipient receiving a portion of matching funds from a county, where the county portion of matching funds is entirely comprised of federal American Rescue Plan Act (P.L.
117-2) funding, may have the grant recipient's portion of the matching requirement imposed under this subdivision reduced to a maximum of fifteen percent (15%).
SECTION 2.2.
The Department of Information Technology shall utilize a portion of the administrative funds authorized in Section 4.2 of this act for legal and appraisal services needed to assist the Department of Administration in administering the provisions of G.S.
146-29.2(b1).
The Department of Administration shall utilize all available resources to prioritize the review and disposition of requests for collocation, installation, and operation of equipment for broadband providers receiving grants under this Part.
PART III.
area.
– A county designated as a development tier one or tier two area, and rural census tracts located in development tier three areas, as defined in G.S.
– A county designated as a development tier one or tier two area, as defined in G.S.
143B-473.08.
143B-473.08.G.S.
For the purposes of this subdivision, the term "rural census tract" has the same meaning as contained in G.S.
143B-437.08, or a rural census tract, as defined in G.S.
143B-472.127(a)(2).
143B-472.127(a)(2), located in any other county.
Counties with total employment of 500,000 or more, as of January 1, 2020, as measured pursuant to G.S.
House Bill 947-Second Edition Page 7 General Assembly Of North Carolina Session 2021 (6) Eligible project.
143B-437.52(c)(3), are not eligible.
– An eligible project is a discrete and specific project located in an unserved economically distressed area of an economically distressed county seeking to provide broadband service to homes, businesses, and communityanchorpointsnotcurrentlyserved.Eligibleprojectsdonotinclude middle mile, backhaul, and other similar projects not directed at broadband service to end users.
(6) Eligible project.
– An eligible project is a discrete and specific project located in an unserved area of an economically distressed county seeking to provide broadband service to homes, businesses, and community anchor points not currently served.
Eligible projects do not include middle mile, backhaul, and other similar projects not directed at broadband service to end users.
To qualify for an award under this section, no more than an incidental number of households or businesses, not to exceed ten percent (10%) of the total households or businesses within the boundaries of the project area submitted by the applicant, may have terrestrially deployed Internet access service with transmission speeds greater than 10 Mbps download and 1 Mbps upload.
To qualify for an award under this section, no more than an incidental number of households or businesses, not to exceed ten percent (10%) of the total households or businesses within the boundaries of the project area submitted by the applicant, may have House Bill 947-First Edition Page 5 General Assembly Of North Carolina Session 2021 terrestrially deployed Internet access service with transmission speeds greater than 10 Mbps download and 1 Mbps upload.
Areas where a private provider has been designated to receive funds through other State State- or federally funded programs designed specifically for broadband deployment shall be considered served if such funding is intended to result in construction of broadband in the area within 18 months.months or for the duration of the federal funding program for that area, or if the funding recipient is otherwise in good standing with the funding agency's regulations governing the funding program.
Areas where a private provider has been designated to receive funds through other State or federally funded programs designed specifically for broadband deployment shall be considered served if such funding is intended to result in construction of broadband in the area within 18 months.
… (c) Project areas comprised of census blocks, or portions thereof, within which a broadband provider is receiving matching funds to deploy broadband service within the next 18 months are ineligible for the GREAT program.
(b) The Growing Rural Economies with Access to Technology Fund is established as a special revenue fund in the Department of Information Technology.
State funds appropriated to this Fund shall be considered an information technology project within the meaning of G.S.
143C-1-2.TheSecretarymayawardgrants from theGrowingRural Economies with Access to Technology Fund to eligible recipients for eligible projects.
The funds shall be used by the recipient to pay for infrastructure costs associated with an eligible project.
State funds appropriated to this Fund shall be considered an information technology project within the meaning of G.S.
143C-1-2.as follows:
(1) For eligible projects awarded funds under this section to be used bya recipient to pay for infrastructure costs associated with an eligible project.
(2) For awards to grantees providing fixed wireless or satellite broadband service pursuant to G.S.
143B-1373.1.
Monies appropriated to the Fund for fixed wireless or satellite broadband grants under G.S.
143B-1373.1 shall be held separately to be awarded as grants under that section.
(c) Project areas comprised of census blocks, or portions thereof, within which a broadband provider is receiving matching funds to deploy terrestrial broadband service within the next 18 months are ineligible for the GREAT program.
A private provider receiving Universal Service or Connect America Phase II, or nonfederal State or federal funds to deploybroadband service in unserved areas mayqualifysuch area for protection by submitting within 60 days of the application period a listing of the census blocks, or portions thereof, comprising the State- or federally funded project areas meeting this requirement and nothing more to in a manner prescribed by the Office.
A private provider receiving Universal Service or Connect America Phase II, federal or nonfederal funds to deploy terrestrial broadband service may qualify such area for protection by submitting within 60 days of the application period a listing of the census blocks, or portions thereof, comprising the federally funded project areas meeting this requirement and nothing more to the Office.
This will enable the office to update maps and advise applicants as to the unserved areas of the State that are eligible for consideration in that program year.
This will enable the office to update maps and advise applicants as to the unserved areas of the State that are eligible for consideration in that program year.TheOfficeshall onlyutilizethisdatato updatemapsofcensus blocksto reflect thesecensus blocks, or portions thereof, as being served.
The Office shall only utilize this data to update maps of census blocks to reflect these census blocks, or portions thereof, as being served.
Failure on the part of a provider to submit the listing of census blocks by the cutoff date shall result in those areas being eligible for inclusion under this program during the upcoming program year.
Failure on the part of a provider to submit the listing of census blocks by the cutoff date shall result in those areas being eligible for inclusion under this program during the upcoming subsequent program year.
The Office shall use the census block data providedonlyformappingofunservedareas.Uponexpirationofthe18-monthreservationperiod described in this subsection, a private provider that has received a reservation of census blocks shall submit written documentation by April 30 of the year following the program year that broadband deployment has begun or been completed in the census blocks, or portions thereof, that have been deemed ineligible by the Office due to the existence of a federally funded project area.
years.
The Office shall use the census block data provided only for mapping of unserved areas.
Upon expiration of the 18-month reservation period described in this subsection, A project area shall remain protected for a period of 18 months from the submission of the listing information required under this subsection;
provided, however, a private provider that has received a reservation of census blocks protection for a project area shall submit written documentation by April 30 of the year following the program year that broadband deployment has begun or been completed completed, or is otherwise in good standing, in the census blocks, or portions thereof, that have been deemed ineligible by the Office due to the existence of a federally funded project area.
under this subsection.
Upon submission of documentation satisfactoryto theOffice, aprotectedproject area shall remain protected until project completion.
Page 8 House Bill 947-Second Edition General Assembly Of North Carolina Session 2021 A project area where a private provider has forfeited or otherwise defaulted on an agreement in connection with receipt of funds to deploy broadband service shall be eligible for inclusion in this program in subsequent program years.
… (d1) An application submitted pursuant to this section shall include a project area map that provides location-specific data in a format required by the Office.
Nothing in this subsection shall be deemed to make ineligible a project area in an area where a federal Rural Digital Opportunity Fund grant was awarded to a satellite broadband provider.
… Page 6 House Bill 947-First Edition General Assembly Of North Carolina Session 2021 (d1) An application submitted pursuant to this section shall include a project area map using the State broadband maps maintained bythe Department.
The project area map shall depict that the project boundary does not conflict with served areas as shown on the State broadband maps.
To further assist with defining the project area, the project map shall provide street addresses and road names for areas on the map where public roads intersect project boundary lines.
Served areas include those areas known to have existing broadband service, areas with an ongoing broadband project funded under this section, areas with projected FCC funded projects, and any other data the Department has included to differentiate between served and unserved areas.
To submit a protest under subsection (e) of this section, a broadband provider shall provide data sufficient for the Office to conclude that any areas being challenged have broadband service as defined in this section.
The burden of proof may be satisfied by the submission of data, maps, and any other information satisfactory to the Office, demonstrating that the area and number of prospective broadband recipients proposed to be served can be provided the minimum upload and download speeds indicated in the application.
The burden of proof may be satisfied by the submission of data, maps, and anyother information satisfactory to the Office, demonstrating that the area and number of prospective broadband recipients proposed to be served can be provided the minimum upload and download speeds indicated in the application.
During the30-day20-dayperiod, anyinterested partymaysubmit comments to theSecretaryconcerning anypendingapplication.Abroadbandserviceproviderofbroadbandservicescurrentlyproviding broadband service in a project area proposed in an application may submit a protest of any application on the grounds the proposed project covers an area that is not an eligible a protected area under subsection (c) of this section.
During the30-day20-dayperiod, anyinterested partymaysubmit comments to theSecretaryconcerning any pending application.
section, or that the proposed project area contains ten percent (10%) or more of total households with access to broadband service as defined in this section.
A provider of broadband services may submit a protest of any application on the grounds the proposed project covers an area that is not an eligible area under this section.
Protests shall be submitted in writing, accompanied by all credible and relevant supporting documentation, and including specific addresses, and detailed mapping demonstrating that the protesting broadband provider has installed infrastructure sufficient to provide broadband service to the specific addresses provided in the protest, along with an attestation that broadband service is available in the public right-of-way at the specific addresses indicated.
Protests shall be submitted in writing, accompanied by all relevant supporting documentation, and shall be considered by the Office in connection with the review of the application.
The protest shall be considered by the Office in connection with the review of the application.
Uponsubmission ofevidence satisfactoryto the Officethat the proposed project area includes prospective broadband recipients that are served, as measured using a methodology satisfactory to the Office, the Office may work with an applicant to amend an application to reduce the number of unserved prospective broadband recipients in the project area to reflect an accurate level of current broadband service.
Uponsubmission ofevidence satisfactoryto the Officethat the proposed project area includes a protected area or prospective broadband recipients that are presently served, as measured using a methodology satisfactory to the Office, the Office may work with an applicant to amend an application to reduce the number of unserved prospective broadband recipients in the project area to reflect an accurate level of current broadband service.
however, the Office may reject any amended application resulting in a lower application score to the extent that the lower score would haveimpactedthe ranking ofthe application in theinitial scoringprocess.
however, the Office may reject any amended application resulting in a lower application score to the extent that the lower score would have impacted the ranking of the application in the initial scoring process.
For applications with filed protests, the Secretary shall issue a written decision to the protesting party at least 15 days prior to the approval of that application.
For applications with filed protests, the Secretaryshallissueawrittendecisiontotheprotestingpartyatleast15days prior totheapproval of that application.
… (g) Applicationsshallbescoredbaseduponasystemthatawardsasinglepointforcriteria considered to be the minimum level for the provision of broadband service with additional points House Bill 947-Second Edition Page 9 General Assembly Of North Carolina Session 2021 awarded to criteria that exceed minimum levels.
… (g) Applicationsshallbescoredbaseduponasystemthatawardsasinglepointforcriteria considered to be the minimum level for the provision of broadband service with additional points awarded to criteria that exceed minimum levels.
A proposed partnership shall (i) be in writing, (ii) providethespecifictermsandconditions ofthepartnership,and(iii)be signed and attested to by the parties.
A proposed partnership shall (i) be in writing, (ii) House Bill 947-First Edition Page 7 General Assembly Of North Carolina Session 2021 providethespecifictermsandconditions ofthepartnership,and(iii)besigned and attested to by the parties.
Projects involving partnerships shall be given six points in their application score.shall be given one point.
Projects involving partnerships shall be given six points in their application score.
shall be given one point.
Funds received from the federal American Rescue Plan Act (P.L.
An applicant shall receive two additional points for a proposed partnership where the county's financial match is comprised entirely from federal American Rescue Plan (P.L.
117-2) may not be used for the purposes of this subdivision.
117-2) funds intended for broadband infrastructure.
… (5) Cost per household or business.
(2) Unserved households.
– The Office shall give additional points to projects based upon the estimated number of unserved households within the eligible economically distressed county, as determined by the most recent data published by the Federal Communications Commission or any other information available to the Office.
Points shall be given to projects that will be located in counties with estimated unserved households as follows:
Unserved Households Points Given 500 or less 1 501-1400 2 Over 1400 3 (3) Unserved households to be served.
– The Office shall give additional points to projects that will provide broadband service based upon the percentage of the total unserved households within the eligible economically distressed county that the project will serve.
The number of unserved households shall be determined using the most recent data published by the Federal Communications Commission or any other information available to the Office.
Points shall be given to projects that will serve a percentage of unserved households within the project area as follows:
% Unserved Households To Be Served Points Given Under Less than 15% 1 15% to 25% 2 Over 25% 3 (4) Unserved businesses.
– The Office shall give additional points to projects that will provide broadband service to unserved businesses located within the eligibleeconomicallydistressedcounty,as determinedbythemost recent data published by the Federal Communications Commission or any other information available to the Office.
Points shall be given to projects that serve unserved businesses within the project area as follows:
a.
Projects proposing to serve between 1 and 4 businesses shall receive 1 point.
Page 8 House Bill 947-First Edition General Assembly Of North Carolina Session 2021 b.
Projects proposing to serve between 5 and 10 businesses shall receive 2 points.
c.
Projects proposing to serve either (i) more than 10 businesses or (ii) an agricultural operation, agricultural processingfacility, or a business with 31 or more full-time employees shall receive 3 points.
(5) Cost per household or business.
Cost per Partnership Using Private Provider Household/Business Infrastructure OnlyPoints Up to $1,700$3,500 4 9 $1,701-2,200$3,500, up to $5,000 3 8 $2,201-2,700$5,000, up to $6,000 2 7 $2,701-3,200$6,000 and over 1 60 b.
Cost per Partnership Using Private Provider Household/Business Infrastructure Only Up to $1,700 4 9 $1,701-2,200 3 8 $2,201-2,700 2 7 $2,701-3,200 1 6 b.
Cost per Partnership Using Private Provider Household/Business Infrastructure OnlyPoints Up to $2,500$4,500 4 9 $2,501-3,300$4,500, up to $6,000 3 8 $3,301-3,800$6,000, up to $7,000 2 7 $3,801-4,300$7,000 and over 1 60 (6) Base speed multiplier.
Cost per Partnership Using Private Provider Household/Business Infrastructure Only Up to $2,500 4 9 $2,501-3,300 3 8 $3,301-3,800 2 7 $3,801-4,300 1 6 (6) Base speed multiplier.
1.35 Page 10 House Bill 947-Second Edition General Assembly Of North Carolina Session 2021 100:10 Mbps.
1.35 100:10 Mbps.
2.00 100 Mbps., symmetrical.
2.00 Symmetrical.
3.00 Greater than 100:100 Mbps.
3.00 … (h) The Office shall score applications based upon the metrics provided in subsection (g) of this section.
4.00 … (i) (Effective July 1, 2021) Applications receiving the highest score shall receive priority status for the awarding of grants pursuant this section.
In awarding grants based upon the scoring metrics, the Office shall also award an additional point to projects where a county has a Community Broadband Planning Playbook that meets the guidelines established by the Office.
(h1) Additional points shall be awarded to counties providing a portion of a project's matching funds entirely from federal American Rescue Plan (P.L.
117-2) funds the county received directly from the federal government.
For counties that received eight million dollars ($8,000,000) or more directly from the federal government, the following points shall be added to the application score:
County Match Points Up to $2,000,000 1 $2,000,000, up to $4,000,000 2 $4,000,000, up to $6,000,000 3 $6,000,000, up to $8,000,000 4 $8,000,000, or greater 5 House Bill 947-First Edition Page 9 General Assembly Of North Carolina Session 2021 For counties that (i) received less than eight million dollars ($8,000,000) directly from the federal government from the American Rescue Plan (P.L.
117-2) and (ii) are providing a portion of a project's matching funds using the entirety of the federal funds the county received, together with any other unrestricted general fund monies, if needed, the following points shall be added to the application score:
County Match Points Up to $6,000,000 6 $6,000,000, up to $8,000,000 7 (i) (Effective July 1, 2021) Applications receiving the highest score shall receive priority status for the awarding of grants pursuant this section.
If funds remain available after all top scoring projects have been awarded a grant, then the next highest scoring projects may be awarded a grant even if the project is located in a county where a grant has been awarded in that fiscal year provided the total award associated with that countydoes not exceed two eight million dollars ($2,000,000) ($8,000,000) in that fiscal year.
If funds remain available after all top scoring projects have been awarded a grant, then the next highest scoring projects may be awarded a grant even if the project is located in a county where a grant has been awarded in that fiscal year provided the total award associated with that county does not exceed two six million dollars ($2,000,000) ($6,000,000) in that fiscal year.
143B-1373.1.
143B-1373.2.
Score Matching Requirement 12.0 points or less 55%50% Greater than 12.0 points, but less than 17.5 points 50%45% 17.5 points, up to 22.0 points 45%40% Greater than 22.0 points 35%30% Up to fifty percent (50%) of matching funds paid by the grant recipient may be comprised of third-partyfundingincludingfunds from other grant programs.
Score Matching Requirement 12.0 points or less 55%50% Greater than 12.0 points, but less than 17.5 points 50%45% 17.5 points, up to 22.0 points 45%40% Greater than 22.0 points 35%30% Page 10 House Bill 947-First Edition General Assembly Of North Carolina Session 2021 Up to fifty percent (50%) of matching funds paid by the grant recipient may be comprised of third-partyfundingincludingfunds from other grant programs.
Anyother current or future House Bill 947-Second Edition Page 11 General Assembly Of North Carolina Session 2021 federal funds may be used, including any future phase of the Connect America Fund, for the required matching funds within the parameters of this program.
Anyother current or future federal funds may be used, including any future phase of the Connect America Fund, for the required matching funds within the parameters of this program.
… (p) The Department may use up to one percent (1.0%) of the State funds appropriated funds each fiscal year to administer the GREAT program.program established under this section." 8 PART IV.
A grant recipient receiving a portion of matching funds from a county, where the county portion of matching funds is partially comprised of federal American Rescue Plan (P.L.
117-2) funding, may have the matching requirement imposed under this subsection reduced to a maximum of twenty-five percent (25%).
A grant recipient receiving a portion of matching funds from a county, where the county portion of matching funds is entirely comprised of federal American Rescue Plan (P.L.
117-2) funding, may have the matching requirement imposed under this subsection reduced to a maximum of fifteen percent (15%).
… (p) The Department may use up to one percent (1.0%) of the State funds appropriated funds each fiscal year to administer the GREAT program.program established under this section." PART IV.
There is appropriated from the State Fiscal Recovery Fund, established in Section 2.2 of Senate Bill 172, 2021 Regular Session, to the Growing Rural Economies with Access to Technology Fund the sum of three hundred fifty million dollars ($350,000,000) in nonrecurring funds for the 2021-2022 fiscal year for broadband infrastructure grants awarded pursuant to G.S.
There is appropriated from the funds received by the State of North Carolina pursuant to the American Rescue Plan Act of 2021, P.L.
143B-1373, as modified under Part II of this act.
117-2, to the Completing Access to Broadband Fund in the Department of Information Technology the sum of four hundred million dollars ($400,000,000) for the 2021-2022 fiscal year to be used pursuant to G.S.
143B-1373.2.
Subject to applicable federal guidelines, of the funds appropriated in this act, the Department of Information Technology may use up to one and one-tenth percent (1.1%) for administration of broadband grant programs receiving American Rescue Plan Act (P.L.
There is appropriated from the funds received by the State of North Carolina pursuant to the American Rescue Plan Act of 2021, P.L.
117-2) funds in this act.
117-2, to the Growing Rural Economies with Access to Technology Fund the sum of twelve million dollars ($12,000,000) for the2021-2022fiscal yearforfixedwirelessandsatellitebroadbandgrantsto beawardedpursuant to G.S.
143B-1373.1.
It is the intent of the General Assembly, in subsequent legislation, to appropriate funds received by the State of North Carolina pursuant to the American Rescue Plan Act of 2021 (P.L.
There is appropriated from the funds received by the State of North Carolina pursuant to the American Rescue Plan Act of 2021, P.L.
117-2) in the amount of four hundred million dollars ($400,000,000) for the Completing Access to Broadband program established in Part I of this act.
117-2, to the Growing Rural Economies with Access to Technology Fund the sum of three hundred forty million dollars ($340,000,000) for the 2021-2022 fiscal year for broadband infrastructure grants awarded pursuant to G.S.
143B-1373.
SECTION 4.4.
Subject to applicable federal guidelines, of the funds appropriated in this act, the Department of Information Technology may use up to one percent (1%) for administration of broadband grant programs receiving American Rescue Plan Act (P.L.
117-2) funds in this act.
143B-1373 and G.S.
143B-1373, 143B-1373.1, and 143B-1373.2, the Office of Broadband Infrastructure shall utilize the development tier status in the annual ranking performed by the Department of Commerce pursuant to G.S.
143B-1373.1, the Office of Broadband Infrastructure shall utilize the development tier status in the annual ranking performed by the Department of Commerce pursuant to G.S.
Page 12 House Bill 947-Second Edition
House Bill 947-First Edition Page 11
View plain text versions (3)

How this bill changes current law

6 changes Share ↗

Compared against the N.C. General Statutes as published AI-generated reading aid — verify against the official bill.

The bill establishes new broadband funding programs and modifies existing definitions and eligibility criteria within the GREAT program.

  • N.C.G.S. § 143B-1373

    the term also includes community anchor points, agricultural operations, and agricultural processing facilities.

    The definition of 'Business' no longer explicitly mentions community anchor points, agricultural operations, and agricultural processing facilities.

  • N.C.G.S. § 143B-1373

    Eligible project is a discrete and specific project located in an unserved economically distressed area seeking to provide broadband service to homes, businesses, and community anchor points not currently served. → The definition of 'eligible project' in G.S. 143B-1373(a) shall be a discrete and specific project located in an unserved economically distressed area seeking to provide broadband service to homes, businesses, and community anchor points not currently served.

    No change to the definition itself; it is repeated under new criteria without modification.

  • N.C.G.S. § 143B-1373

    a county that has utilized federal funding for broadband infrastructure projects on or after May 1, 2021, is not eligible. → or under G.S. 143B-1373.1, a county that has utilized federal funding for broadband infrastructure on or after May 1, 2021, shall be ineligible.

    An explicit reference to another section has been added regarding ineligibility for counties utilizing specific federal funding.

  • N.C.G.S. § 143B-1373

    The financial contribution restrictions for partnerships in G.S. 143B-1373(a)(11a) are removed.

    The bill removes financial contribution restrictions for partnerships that were previously in place.

  • N.C.G.S. § 143B-1373

    A designated geographic area that is presently without access to broadband service, as defined in this section, offered by a wireline or fixed wireless provider. → A designated geographic area that is presently without access to broadband service, as defined in G.S. 143B-1373(a), or where internet access service does not meet the definition of broadband service.

    The definition of 'unserved area' has been broadened to include areas with inadequate internet service.

  • N.C.G.S. § 143B-1373

    The provisions of G.S. 143B-1373(c) are replaced with the following:

    The bill fully replaces subsection (c), implying change without specifying the new provisions in the provided text.

Action History

  1. Special Message Received From House

  2. Passed 1st Reading

  3. Ref To Com On Rules and Operations of the Senate

  4. Reptd Fav

  5. Cal Pursuant Rule 36(b)

  6. Added to Calendar

  7. Passed 2nd Reading

  8. Passed 3rd Reading

  9. Special Message Sent To Senate

  10. Reptd Fav Com Substitute

  11. Re-ref Com On Rules, Calendar, and Operations of the House

  12. Withdrawn From Com

  13. Re-ref to the Com on Appropriations, if favorable, Rules, Calendar, and Operations of the House

  14. Passed 1st Reading

  15. Ref to the Com on Energy and Public Utilities, if favorable, Appropriations, if favorable, Rules, Calendar, and Operations of the House

  16. Filed

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

3 sponsors · 42 co-sponsors · 134 not signed on

Sponsors (3)

Co-sponsors (42)

Not signed on (134)

134 members have not signed on to this bill.

Show all 134 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Second Reading

Passed 109 Yea · 0 Nay · 11 Other
Party YeaNayPresentNot Voting
Democratic 26001
Unaffiliated 41004
U 1001
Republican 41005
Total 1090011
% of votes cast 91%0%0%9%
How each member voted (120)
Member Party Vote
Autry — Yea
Clemmons — Yea
Cooper-Suggs — Yea
Farkas — Yea
Fisher — Yea
Garrison — Yea
Gill — Yea
Graham — Yea
Harris — Yea
Hunt — Yea
Hunter — Yea
Hurtado — Yea
Insko — Yea
Lucas — Yea
Martin — Yea
Richardson — Yea
Terry — Yea
vonHaefen — Yea
Wray — Yea
Bradford — Yea
Bumgardner — Yea
Cleveland — Yea
Davis — Yea
Elmore — Yea
Faircloth — Yea
Hardister — Yea
Hurley — Yea
Johnson — Yea
McElraft — Yea
McNeill — Yea
Mills — Yea
Moore — Yea
Saine — Yea
Sasser — Yea
Szoka — Yea
Yarborough — Yea
Zachary — Yea
Gailliard — Not Voting
Boles — Not Voting
Carter — Not Voting
Rogers — Not Voting
C. Smith — Yea
K. Baker — Yea
K. Smith — Yea
R. Smith — Yea
Abe Jones Democratic Yea
Allison A. Dahle Democratic Yea
Amber M. Baker Democratic Yea
Amos L. Quick, III Democratic Yea
Becky Carney Democratic Yea
Brandon Lofton Democratic Yea
Brian Turner Democratic Yea
Carolyn G. Logan Democratic Yea
Cecil Brockman Democratic Not Voting
Cynthia Ball Democratic Yea
Dante Pittman Democratic Yea
Deb Butler Democratic Yea
Eric Ager Democratic Yea
Gale Adcock Democratic Yea
Garland E. Pierce Democratic Yea
Graig Meyer Democratic Yea
James Roberson Democratic Yea
Joe John Democratic Yea
Marcia Morey Democratic Yea
Mary Belk Democratic Yea
Pricey Harrison Democratic Yea
Robert T. Reives, II Democratic Yea
Shelly Willingham Democratic Yea
Terence Everitt Democratic Yea
Terry M. Brown Jr. Democratic Yea
Vernetta Alston Democratic Yea
Zack Hawkins Democratic Yea
Ben T. Moss, Jr. Republican Yea
Bobby Hanig Republican Yea
Brenden H. Jones Republican Yea
Charles W. Miller Republican Yea
Chris Humphrey Republican Yea
David Willis Republican Yea
Dean Arp Republican Yea
Dennis Riddell Republican Yea
Destin Hall Republican Yea
Diane Wheatley Republican Yea
Donna McDowell White Republican Yea
Donny Lambeth Republican Yea
Dudley Greene Republican Yea
Edward C. Goodwin Republican Yea
Erin Paré Republican Yea
Frank Iler Republican Yea
Harry Warren Republican Yea
Howard Penny, Jr. Republican Yea
Hugh Blackwell Republican Yea
Jay Adams Republican Yea
Jeff Zenger Republican Yea
Jeffrey C. McNeely Republican Yea
Jimmy Dixon Republican Yea
John A. Torbett Republican Yea
John R. Bell, IV Republican Not Voting
John Sauls Republican Yea
Julia C. Howard Republican Not Voting
Karl E. Gillespie Republican Yea
Keith Kidwell Republican Yea
Kelly E. Hastings Republican Yea
Kyle Hall Republican Yea
Larry C. Strickland Republican Yea
Larry W. Potts Republican Yea
Mark Brody Republican Yea
Mark Pless Republican Yea
Matthew Winslow Republican Yea
Mike Clampitt Republican Yea
Mitchell S. Setzer Republican Not Voting
Phil Shepard Republican Yea
Ray Pickett Republican Yea
Sam Watford Republican Yea
Sarah Stevens Republican Not Voting
Steve Tyson Republican Yea
Timothy D. Moffitt Republican Yea
W. Ted Alexander Republican Not Voting
William D. Brisson Republican Yea
Carla D. Cunningham U Not Voting
Nasif Majeed U Yea

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors HB 947?
HB 947 is sponsored by Eric Ager (Democratic), Jake Johnson (Republican), K. Smith, Dean Arp (Republican), Donny Lambeth (Republican), Saine, Jay Adams (Republican), Adcock, John R. Bell, IV (Republican), Hugh Blackwell (Republican), Boles, Bradford, Jimmy Dixon (Republican), Faircloth, Garrison, Karl E. Gillespie (Republican), Dudley Greene (Republican), Hanig, Harris, Zack Hawkins (Democratic), Hunt, Hurtado, Frank Iler (Republican), Brenden H. Jones (Republican), Keith Kidwell (Republican), Carolyn G. Logan (Democratic), Lucas, McElraft, McNeill, Timothy D. Moffitt (Republican), Ray Pickett (Republican), Larry W. Potts (Republican), Dennis Riddell (Republican), Larry C. Strickland (Republican), Szoka, Brian Turner (Democratic), Steve Tyson (Republican), Harry Warren (Republican), Donna McDowell White (Republican), Matthew Winslow (Republican), Wray, Julie von Haefen (Democratic), Sarah Stevens (Republican), Ben T. Moss, Jr. (Republican), and Mike Clampitt (Republican).
What is the current status of HB 947?
This bill died with 2021-2022 Session. It reached “Passed House” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track HB 947?
Track HB 947 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HB 947

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HB 947

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →