Virginia 2027 Regular Session Status: In Committee

SB 192 — State-owned bottomlands; localities, property interest.

Last action — Continued from last session

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. 2
    In Committee
  3. 3
    Passed Senate
  4. 4
    Passed House of Delegates
  5. 5
    To Executive
  6. 6
    Enacted

This bill is in committee in the Senate. Introduced January 09, 2026. It must pass committee before a floor vote.

Next likely step: a committee vote, then a floor vote in the Senate.

Prognosis

Stalled 14% · moderate confidence

Where this bill stands today.

Odds of enactment

Low

How often bills like it became law.

  • In Committee

    Current position in the legislative process.

  • 1 sponsor

    1 primary, 0 co-sponsors signed on.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

In plain language

This bill grants legal property interest to cities or counties for state-owned bottomlands in certain flood management projects.

The bill allows cities or counties with agreements for flood or storm risk management with the Army to hold property interests in state-owned waters and lands. This interest enables them to obtain necessary easements for project completion.

What this means for you
  • Local Governments: If you are a city or county, this means you can secure the rights needed for projects that help manage flood risks.

Summary

State-owned bottomlands; localities; property interest. Provides that any city or county that is party to an executed project partnership agreement with the Department of the Army for a flood or storm risk management program, damage reduction project, or similar program specifically authorized by the United States Congress shall be deemed to hold a legal property interest in the use of state-owned waters, bottoms, or subsurface soils sufficient to qualify for any easements necessary for the construction or completion of the project or program.

Bill Text

What changed in the latest version

47 added · 55 removed

Plain-language change summary

The recent amendments to Bill SB 192 involve changes that clarify the authority of the Marine Resources Commission in conveying easements and interests in certain coastal properties to the City of Norfolk. Specifically, it now authorizes these actions as part of Norfolk's Coastal Storm Risk Management Project, which is aimed at enhancing the city's resilience against flooding and coastal storms. This change is significant because it facilitates the city's ability to implement important environmental protections and infrastructure improvements that can ultimately safeguard local communities from climate-related risks.

→
Previous
Latest
+ 2027 SESSION + INTRODUCED + + + 26102448D I SENATE BILL NO.
OFFERED FOR CONSIDERATION 2/10/2026 + + + + + + + + SENATE BILL NO.
192 Offered January 14, 2026 N A BILL to amend and reenact § 28.2-1200.1 of the Code of Virginia, relating to state-owned bottomlands;
192 + + AMENDMENT IN THE NATURE OF A SUBSTITUTE + (Proposed by the Senate Committee on Agriculture, Conservation and Natural Resources + + + on February 10, 2026) + + (Patron Prior to Substitute—Senator Williams Graves) + A BILL to authorize the Marine Resources Commission to convey certain easements and other legal interest to the City of Norfolk for certain property relating to the City of Norfolk's Coastal Storm Risk Management Project.
localities;
Be it enacted by the General Assembly of Virginia:
property interest.
T R ————— Patron—Williams Graves O ————— Referred to Committee on Agriculture, Conservation and Natural Resources D ————— U Be it enacted by the General Assembly of Virginia:
That § 28.2-1200.1 of the Code of Virginia is amended and reenacted as follows:
§ 1.
C § 28.2-1200.1.
For purposes of this act "Phase I" means the following drawings:
Conveyance of state-owned bottomlands.
(i) "Norfolk CSRM State-Owned Bottom and Right-of-Way Map," Map Number – 68 Phase IA, dated October 8, 2025, prepared by TKY;
E A.
(ii) Drawing entitled "Grandy Village Living Shoreline Preliminary Bottom Impacts WSSI #36556.01," Exhibit 1, prepared by Wetland Studies and Solutions, Inc., a Davey Company;
In order to fulfill the Commonwealth's responsibility under Article XI of the Constitution of VirginiaDto conserve and protect public lands for the benefit of the people, the Commonwealth shall not convey fee simple title to state-owned bottomlands covered by waters.
(iii) Drawing entitled "Richmond and Surrey Crescent Shoreline State Bottom Impacts";
However, the Commonwealth may grant a lease, easement, or other limited interest in state-owned bottomlands covered by waters pursuant to § 28.2-1208 or as long as the property is used by a governmental entity for the performance of a governmental activity, as defined in §§ 28.2-1300 and 28.2-1400.
(iv) "Wetlands Impact Analysis Phase 1A-WS-1," Map:
B.
Wetlands Impact Analysis (JPA), dated August 28, 2025, revised January 15, 2026, developed by JAO;
1.
(v) "Wetlands Impact Analysis Phase 1A-WS-2," Map:
The Commonwealth may convey fee simple title to specified parcels of state-owned bottomlands that have been lawfully filled.
Wetlands Impact Analysis (JPA), dated August 28, 2025, revised January 15, 2026, developed by JAO;
For the purpose of this section, "lawfully filled" means the deposit of fill was (i) authorized by statute, (ii) pursuant to valid court order, (iii) authorized or permitted by state officials pursuant to statutory authority subsequent to July 1, 1960, or (iv) under apparent color of authority prior to July 1, 1960.
(vi) "Wetlands Impact Analysis Phase 1A-PS-HP- 1," Map:
In the absence of information to the contrary, it may be presumed that state-owned bottomlands S filled prior to July 1, 1960, were filled under apparent color of authority and, it may also be presumed, that all of the fill on the specified parcel was lawfully authorized if a substantial portion of the fill on such parc9l was authorized.
Wetlands Impact Analysis (JPA), dated August 28, 2025, revised January 15, 2026, developed by JAO;
Properties not qualified under clauses (i) through (iv) of this subdivision shall not be eligible for conveyance under this section.
(vii) "Wetlands Impact Analysis Phase 1A-FD-1," Map:
2.
Wetlands Impact Analysis (JPA)DDwithExcludedPermitAreaTable, dated August 28, 2025, revised January 22, 2026, developed by JAO;
Titles to lands that (i) were once or may have been state-owned bottomlands covered by waters, (ii) were filled prior to July 1, 1960, and (iii) were acquired by private persons in good faith for value after such lands were filled, are hereby declared to be free and clear of any claimed ownership or interest by the Commonwealth and are released to such private persons and their successors and assigns by the Commonwealth to the extent that the areas of these lands were not state-owned bottomlands covered by waters on July 1, 1960.
(viii) "Wetlands Impact Analysis Phase 1A-HP," Map:
3.
Wetlands Impact Analysis (JPA)DDwithExcludedPermitAreaTable, dated August 28, 2025, revised January 27, 2026, developed by JAO;
This subsection shall not apply to any state-owned bottomlands filled by a publicly funded initiative and put to a continuing public use, which includes beach nourishment projects and public landings.
(ix) "Wetlands Impact Analysis Phase 1A-RR-1," Map:
35 C.
Wetlands Impact Analysis (JPA), dated August 28, 2025, revised January 15, 2026, developed by JAO;
Except as provided in subsection D, the grantee in a conveyance under subdivision B 1 shall 36 compensate the Commonwealth in an amount commensurate with the property interest being conveyed, / 37 which shall be considered equivalent to 25 percent of the assessed value of the specified parcel, exclusive of 38 any buildings or other improvements.
(x) "Wetlands Impact Analysis Phase 1A-PS-NC-1," Map:
The assessed value shall be established as the average of the local real 39 estate tax assessments for the most recent 10 years available for the specified parcel.
Wetlands Impact Analysis (JPA), dated August 28, 2025, revised January 15, 2026, developed by JAO;
If no such assessments are available for the specified parcel, then the assessed value shall be calculated as the percentage, by square footage or acreage, that the specified parcel represents of the larger parcel for which such assessments are available.
(xi) "Wetlands Impact Analysis Phase 1A-Sub-1," Map:
D.
Wetlands Impact Analysis (JPA), dated August 28, 2025, revised January 15, 2026, developed by JAO;
If the Commission determines that unique circumstances exist, the Commission may allow the grantee in a conveyance under subdivision B 1 to compensate the Commonwealth in an amount less than 25 percent of the assessed value of the specified parcel.
(xii) "Wetlands Impact Analysis Phase 1A-Sub-2," Map:
Any such determination by the Commission shall be justified in writing and shall not be subject to judicial review.
Wetlands Impact Analysis (JPA), dated August 28, 2025, revised January 15, 2026, developed by JAO;
E.
and (xiii) "Wetlands Impact Analysis Phase No Impact," Map:
Any city or county that is party to an executed project partnership agreement with the Department of the Army for a flood or storm risk management program, damage reduction project, or similar program specifically authorized by the United States Congress shall be deemed to hold a legal property interest in the use of state-owned waters, bottoms, or subsurface soils sufficient to qualify for any easements necessary for the construction or completion of the project or program.
Wetlands Impact Analysis (JPA), dated August 28, 2025, revised January 15, 2026, developed by JAO.
§ 2.
That, in consideration of the mutual promises of the parties and the payment of $1, and on terms otherwise acceptable to the Marine Resources Commission (the Commission), the Commission is hereby DRAFT OFFERED FOR CONSIDERATION 2/10/2026 authorized to convey to the City of Norfolk, in locations acceptable to the Commission, the following real property interests in subaqueous land that are necessary for Phase I, as generally shown on the Phase I drawings:
permanent easement interests;
temporary construction easements;
and fee simple interests, pursuant to quitclaims.
§ 3.
That, in consideration of the mutual promises of the parties and the payment of $1, and on terms otherwise acceptable to the Commission, the Commission is hereby authorized to quitclaim to the City any interest that the Commonwealth may have in and to the property known as Newton Canal, a/k/a Mahone's Canal, a/k/a Brambleton Canal, which property is located within the boundaries of City of Norfolk GPIN 1437339770.
§ 4.
That the conveyances authorized herein shall be made in consultation with the Chief Resilience Officer of the Commonwealth and the Office of the Attorney General.
The conveyances authorized herein shall be approved by the Governor and made in a form approved by the Office of the Attorney General.
Show all 41 changed rows (1 more)
Previous
Latest
The appropriate officials of the Commonwealth are hereby authorized to prepare, execute, and deliver such deeds and other documents as may be necessary to accomplish the conveyances.
View plain text versions (2)

How this bill changes current law

16 changes Share ↗

Compared against the Code of Virginia as published AI-generated reading aid — verify against the official bill.

This bill amends 1 section(s) of the Code of Virginia: 28.2-1200.1.

  • 28.2-1200.1

    E. Any

    Inserts “E. Any”.

  • 28.2-1200.1

    city or county

    Inserts “city or county”.

  • 28.2-1200.1

    that is party to an executed project partnership agreement with the Department of the Army for a flood or storm risk management

    Inserts “that is party to an executed project partnership agreement with the Department of the Army for a flood or storm risk management”.

  • 28.2-1200.1

    program

    Inserts “program”.

  • 28.2-1200.1

    ,

    Inserts “,”.

  • 28.2-1200.1

    damage reduction project

    Inserts “damage reduction project”.

  • 28.2-1200.1

    ,

    Inserts “,”.

  • 28.2-1200.1

    or

    Inserts “or”.

  • 28.2-1200.1

    similar

    Inserts “similar”.

  • 28.2-1200.1

    program specifically authorized by the United States Congress shall be deemed to

    Inserts “program specifically authorized by the United States Congress shall be deemed to”.

  • 28.2-1200.1

    hold

    Inserts “hold”.

  • 28.2-1200.1

    a legal property interest in the use of state-owned waters, bottoms, or subsurface soils sufficient to qualify for

    Inserts “a legal property interest in the use of state-owned waters, bottoms, or subsurface soils sufficient to qualify for”.

  • 28.2-1200.1

    any

    Inserts “any”.

  • 28.2-1200.1

    easements

    Inserts “easements”.

  • 28.2-1200.1

    necessary

    Inserts “necessary”.

  • 28.2-1200.1

    for the construction or completion of the project or program.

    Inserts “for the construction or completion of the project or program.”.

Action History

  1. Continued from last session

  2. Continued to next session in Finance and Appropriations (15-Y 0-N)

  3. Committee substitute printed 26107590D-S1

  4. Reported from Agriculture, Conservation and Natural Resources with substitute and rereferred to Finance and Appropriations (15-Y 0-N)

  5. Senate committee offered

  6. Fiscal Impact Statement from Department of Planning and Budget (SB192)

  7. Referred to Committee on Agriculture, Conservation and Natural Resources

  8. Prefiled and ordered printed; Offered 01-14-2026 26102448D

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 147 not signed on

Co-sponsors (0)

None.

Not signed on (147)

147 members have not signed on to this bill.

Show all 147 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does SB 192 do?
State-owned bottomlands; localities; property interest. Provides that any city or county that is party to an executed project partnership agreement with the Department of the Army for a flood or storm risk management program, damage reduction project, or similar program specifically authorized by the United States Congress shall be deemed to hold a legal property interest in the use of state-owned waters, bottoms, or subsurface soils sufficient to qualify for any easements necessary for the construction or completion of the project or program.
Who sponsors SB 192?
SB 192 is sponsored by Angelia Williams Graves.
What is the current status of SB 192?
This bill is in committee in the Senate. Introduced January 09, 2026. It must pass committee before a floor vote.
Where can I track SB 192?
Track SB 192 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 192

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 192

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →