Pennsylvania 2019-2020 Regular Session Status: Passed Senate Bipartisan · 9 D · 7 R cosponsors

SB 596 — An Act amending Title 66 (Public Utilities) of the Pennsylvania Consolidated Statutes, in restructuring of electric utility industry, providing for transportation fueling infrastructure development.

Last action — Referred to CONSUMER AFFAIRS

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. 3
    Passed Senate
  4. 4
    Passed House
  5. 5
    To Executive
  6. 6
    Enacted

This bill died with 2019-2020 Regular Session. It reached “Passed Senate” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Bill Text

What changed in the latest version

374 added · 392 removed

Plain-language change summary

The amendments to Bill SB 596 include added details emphasizing the importance of planning for transportation electrification in Pennsylvania. It highlights the state's diverse landscape and the need for tailored infrastructure investments to support electric vehicles, which can enhance public health and economic growth while also reducing reliance on imported fuels. This matters because it underscores Pennsylvania's commitment to adopting cleaner transportation technologies and addressing environmental concerns.

→
Previous
Latest
PRIOR PRINTER'S NO.
PRINTER'S NO.
665 PRINTER'S NO.
665 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL Session of No.
1343 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL Session of No.
596 2019 INTRODUCED BY MENSCH, KILLION, BOSCOLA, BROWNE, COSTA, YUDICHAK, FARNESE, SANTARSIERO, BREWSTER, FONTANA AND STREET, APRIL 30, 2019 REFERRED TO CONSUMER PROTECTION AND PROFESSIONAL LICENSURE, APRIL 30, 2019 AN ACT Amending Title 66 (Public Utilities) of the Pennsylvania Consolidated Statutes, in restructuring of electric utility industry, providing for transportation fueling infrastructure development.
596 2019 INTRODUCED BY MENSCH, KILLION, BOSCOLA, BROWNE, COSTA, YUDICHAK, FARNESE, SANTARSIERO, BREWSTER, FONTANA, STREET, BLAKE, COLLETT, LEACH, ARGALL, LANGERHOLC, BARTOLOTTA, IOVINO, L.
WILLIAMS, LAUGHLIN, J.
WARD, PITTMAN, KEARNEY AND STEFANO, APRIL 30, 2019 SENATOR TOMLINSON, CONSUMER PROTECTION AND PROFESSIONAL LICENSURE, AS AMENDED, OCTOBER 30, 2019 AN ACT Amending Title 66 (Public Utilities) of the Pennsylvania industry, providing for transportation fueling infrastructure development.
(b) Transportation electrification opportunity assessment.-- In order to support economic development opportunities arising from new transportation technologies, the Governor or a designee <-- of the Governor shall conduct a Statewide transportation electrification opportunity assessment, including opportunities for hydrogen and other fuel-cell electric vehicles supported by electrical infrastructure, and INCLUDING OPPORTUNITIES FOR <-- HYDROGEN AND OTHER FUEL CELL ELECTRIC VEHICLES SUPPORTED BY ELECTRICAL INFRASTRUCTURE, THE COMMISSION SHALL establish a goal for Statewide expansion of transportation electrification that is 50% above current market forecasts for December 31, 2030, in <-- the assessment.
(b) Transportation electrification opportunity assessment.-- In order to support economic development opportunities arising from new transportation technologies, the Governor or a designee of the Governor shall conduct a Statewide transportation electrification opportunity assessment, including opportunities for hydrogen and other fuel-cell electric vehicles supported by electrical infrastructure, and establish a goal for Statewide expansion of transportation electrification that is 50% above current market forecasts for December 31, 2030, in the assessment.
The assessment shall be based on the forecasts 20190SB0596PN1343 - 2 - of no less than three independent, nationally recognized analysts with expertise in transportation and energy market forecasting BASED ON EXISTING GOVERNMENTAL AND PRIVATE SECTOR <-- FORECASTS.
The assessment shall be based on the forecasts of no less than three independent, nationally recognized analysts with expertise in transportation and energy market forecasting.
The goal shall be established within 60 days of the effective date of this section.
The goal shall be established within 60 days of the effective date 20190SB0596PN0665 - 2 - of this section.
At the time the Statewide goal is established, the Governor or a designee of the Governor <-- COMMISSION may also establish regional goals for each group of <-- priority alternative transportation infrastructure counties that are served, in whole or in part, by an electric distribution company.
At the time the Statewide goal is established, the Governor or a designee of the Governor may also establish regional goals for each group of priority alternative transportation infrastructure counties that are served, in whole or in part, by an electric distribution company.
(1) The establishment of an essential public access network, including utility-owned electric vehicle charging stations and nonutility-owned THIRD-PARTY OWNED stations <-- participating in a utility incentive program.
(1) The establishment of an essential public access network, including utility-owned electric vehicle charging stations and nonutility-owned stations participating in a utility incentive program.
(3) The deployment of nonutility-owned THIRD-PARTY OWNED <-- electric vehicle charging stations.
(3) The deployment of nonutility-owned electric vehicle charging stations.
(4) Requirements to ensure that electric distribution company development plans with utility-owned charging 20190SB0596PN1343 - 3 - stations and incentive programs are implemented in a competitive and nondiscriminatory manner and do not limit public access to charging stations owned by third parties not participating in utility incentive programs.
(4) Requirements to ensure that electric distribution company development plans with utility-owned charging stations and incentive programs are implemented in a competitive and nondiscriminatory manner and do not limit public access to charging stations owned by third parties not participating in utility incentive programs.
(5) Open standard communication protocols for electric vehicle charging stations and flexible payment options, including credit card reader and mobile payment options, to facilitate electric vehicle travel throughout this Commonwealth.
(5) Open standard communication protocols for electric 20190SB0596PN0665 - 3 - vehicle charging stations and flexible payment options, including credit card reader and mobile payment options, to facilitate electric vehicle travel throughout this Commonwealth.
(6) Policies to encourage the deployment of charging infrastructure for electric vehicles and equipment in low- <-- income DISADVANTAGED communities and transit serving these <-- communities.
(6) Policies to encourage the deployment of charging infrastructure for electric vehicles and equipment in low- income communities and transit serving these communities.
(2) The regional framework development process shall include representatives from the Department of Transportation, the Department of Environmental Protection, 20190SB0596PN1343 - 4 - county and municipal governments of the priority alternative transportation infrastructure counties served by the electric distribution company, public transit organizations and the electric distribution company.
(2) The regional framework development process shall include representatives from the Department of Transportation, the Department of Environmental Protection, county and municipal governments of the priority alternative transportation infrastructure counties served by the electric distribution company, public transit organizations and the electric distribution company.
Electric distribution companies shall invite representatives of regional planning commissions, school districts, owners of vehicle fleets, transportation network companies, nonprofit environmental organizations, experts in transportation electrification charging infrastructure, manufacturers of transportation electrification equipment and other participants and stakeholders in the transportation electrification market to participate in the regional framework development process.
Electric distribution companies shall invite representatives of regional planning commissions, school districts, owners of vehicle fleets, 20190SB0596PN0665 - 4 - transportation network companies, nonprofit environmental organizations, experts in transportation electrification charging infrastructure, manufacturers of transportation electrification equipment and other participants and stakeholders in the transportation electrification market to participate in the regional framework development process.
(f) Transportation electrification infrastructure development plan.-- (1) An electric distribution company serving one or more priority alternative transportation infrastructure counties shall, consistent with the guidelines established under subsections (c) and (d), file a transportation electrification infrastructure development plan with the 20190SB0596PN1343 - 5 - commission within one year of the establishment of a Statewide goal under subsection (b).
(f) Transportation electrification infrastructure development plan.-- (1) An electric distribution company serving one or more priority alternative transportation infrastructure counties shall, consistent with the guidelines established under subsections (c) and (d), file a transportation electrification infrastructure development plan with the commission within one year of the establishment of a Statewide goal under subsection (b).
The electric distribution company shall provide its transportation electrification infrastructure regional framework as part of the TRANSPORTATION ELECTRIFICATION infrastructure development <-- plan filing.
The electric distribution company shall provide its transportation electrification infrastructure regional framework as part of the infrastructure development plan filing.
(2) The TRANSPORTATION ELECTRIFICATION infrastructure <-- development plan shall describe the company's proposal to support deployment of the transportation electrification infrastructure reasonably necessary to achieve the applicable regional goal established in accordance with subsection (b) or, if no regional goal is established, the Statewide goal established in accordance with subsection (b) as applied to the priority alternative transportation infrastructure counties served by the electric distribution company.
(2) The infrastructure development plan shall describe 20190SB0596PN0665 - 5 - the company's proposal to support deployment of the transportation electrification infrastructure reasonably necessary to achieve the applicable regional goal established in accordance with subsection (b) or, if no regional goal is established, the Statewide goal established in accordance with subsection (b) as applied to the priority alternative transportation infrastructure counties served by the electric distribution company.
The TRANSPORTATION ELECTRIFICATION infrastructure development <-- plan shall include strategies to optimize the use of the electric distribution grid and provide opportunities for the reduction of electric charging costs for customers, including time-of-use, demand management and other innovative rates.
The infrastructure development plan shall include strategies to optimize the use of the electric distribution grid and provide opportunities for the reduction of electric charging costs for customers, including time-of- use, demand management and other innovative rates.
(3) Subject to the guidelines established under subsections (c) and (d), the TRANSPORTATION ELECTRIFICATION <-- infrastructure development plan may include transportation electrification charging stations owned and operated by the electric distribution company and third parties, incentives for customers and third-party charging station owners and customer education programs related to installing or using transportation electrification charging stations.
(3) Subject to the guidelines established under subsections (c) and (d), the infrastructure development plan may include transportation electrification charging stations owned and operated by the electric distribution company and third parties, incentives for customers and third-party charging station owners and customer education programs related to installing or using transportation electrification charging stations.
(g) Commission approval.-- (1) The commission shall, after reasonable notice and 20190SB0596PN1343 - 6 - hearing and within 270 days of submission, approve or disapprove each TRANSPORTATION ELECTRIFICATION infrastructure <-- development plan filed under subsection (f).
(g) Commission approval.-- (1) The commission shall, after reasonable notice and hearing and within 270 days of submission, approve or disapprove each infrastructure development plan filed under subsection (f).
(3) A revised plan shall be approved or disapproved by the commission within 60 days.
20190SB0596PN0665 - 6 - (3) A revised plan shall be approved or disapproved by the commission within 60 days.
(h) Recovery.-- (1) An electric distribution company shall MAY recover, <-- in distribution rates established under section 1308 (relating to voluntary changes in rates) or 1330 (relating to alternative ratemaking for utilities), all reasonable and prudent costs incurred in the implementation of this section, including the costs of transportation electrification infrastructure regional frameworks and TRANSPORTATION <-- ELECTRIFICATION infrastructure development plans, transportation electrification infrastructure, including annual depreciation costs, capital costs over the life of transportation electrification charging technology and required distribution system upgrades, incentives and education provided in accordance with an A TRANSPORTATION <-- ELECTRIFICATION infrastructure development plan approved under subsection (g).
(h) Recovery.-- (1) An electric distribution company shall recover, in distribution rates established under section 1308 (relating to voluntary changes in rates) or 1330 (relating to alternative ratemaking for utilities), all reasonable and prudent costs incurred in the implementation of this section, including the costs of transportation electrification infrastructure regional frameworks and infrastructure development plans, transportation electrification infrastructure, including annual depreciation costs, capital costs over the life of transportation electrification charging technology and required distribution system upgrades, incentives and education provided in accordance with an infrastructure development plan approved under subsection (g).
The commission may determine the appropriate rate structure and cost allocation for the just and reasonable recovery of prudently incurred costs, which may include any payments by customers related to a specific electric vehicle charging station or other transportation 20190SB0596PN1343 - 7 - electrification infrastructure.
The commission may determine the appropriate rate structure and cost allocation for the just and reasonable recovery of prudently incurred costs, which may include any payments by customers related to a specific electric vehicle charging station or other transportation electrification infrastructure.
(2) The costs recovered under paragraph (1) by an <-- electric distribution company may not be otherwise recoverable from ratepayers.
(2) The costs recovered under paragraph (1) by an electric distribution company may not be otherwise recoverable from ratepayers.
(i) Limitation on costs.--The total annual costs charged to customers by an electric distribution company in implementing this section may not exceed 0.25% of the total annual customer bill amount for an electric distribution company, excluding bill amounts for electric energy, for the MOST RECENT 12-month period <-- ending December 31, 2019, or the test year upon which distribution rates were established in the electric distribution company's most recent base distribution rate case proceeding.
(i) Limitation on costs.--The total annual costs charged to customers by an electric distribution company in implementing this section may not exceed 0.25% of the total annual customer bill amount for an electric distribution company, excluding bill amounts for electric energy, for the 12-month period ending 20190SB0596PN0665 - 7 - December 31, 2019, or the test year upon which distribution rates were established in the electric distribution company's most recent base distribution rate case proceeding.
(j) Additional regional frameworks and TRANSPORTATION <-- ELECTRIFICATION infrastructure development plans.--An electric distribution company shall contract for an update of the regional framework required under subsection (e) and file an updated transportation electrification infrastructure development plan required under subsection (f) after five years.
(j) Additional regional frameworks and infrastructure development plans.--An electric distribution company shall contract for an update of the regional framework required under subsection (e) and file an updated transportation electrification infrastructure development plan required under subsection (f) after five years.
Additional regional frameworks and infrastructure development <-- plans shall be developed after December 31, 2025, as directed by the commission.
Additional regional frameworks and infrastructure development plans shall be developed after December 31, 2025, as directed by the commission.
(k) Voluntary development of transportation electrification infrastructure development plans.--An electric distribution company may file a transportation electrification infrastructure development plan for commission approval in accordance with this <-- section for counties within the company's service territory that do not qualify as priority alternative transportation infrastructure counties.
(k) Voluntary development of transportation electrification infrastructure development plans.--An electric distribution company may file a transportation electrification infrastructure development plan for commission approval in accordance with this section for counties within the company's service territory that do not qualify as priority alternative transportation infrastructure counties.
The commission approval requirements of <-- subsection (g) do not apply to plans filed under this subsection.
The commission approval requirements of subsection (g) do not apply to plans filed under this subsection.
Plans filed under this subsection must include an 20190SB0596PN1343 - 8 - affirmative written statement of support by the majority of the elected county representatives for any county included in the plan.
Plans filed under this subsection must include an affirmative written statement of support by the majority of the elected county representatives for any county included in the plan.
(l) Open access for public electric vehicle charging stations.-- (1) An electric vehicle operator who chooses to use a public electric vehicle charging station installed or operated with incentives authorized under a transportation electrification infrastructure development plan or by an electric distribution company shall not be required to enroll in a club, association or membership organization or pay a subscription fee as a condition to use the station.
(l) Open access for public electric vehicle charging stations.-- (1) An electric vehicle operator who chooses to use a public electric vehicle charging station installed or operated with incentives authorized under a transportation electrification infrastructure development plan or by an electric distribution company shall not be required to enroll 20190SB0596PN0665 - 8 - in a club, association or membership organization or pay a subscription fee as a condition to use the station.
Nothing in this section shall prevent nonutility THIRD-PARTY owners <-- and operators of electric vehicle charging stations that are installed or operated without incentives authorized under a transportation electrification infrastructure development plan from including those stations in a subscription or membership network with variable rate structures.
Nothing in this section shall prevent nonutility owners and operators of electric vehicle charging stations that are installed or operated without incentives authorized under a transportation electrification infrastructure development plan from including those stations in a subscription or membership network with variable rate structures.
(2) The owner or lessee of a publicly available parking space, whose primary business is not electric vehicle <-- charging services WITH AN ELECTRIC VEHICLE CHARGING STATION, <-- may restrict the use of that parking space, including by limiting use to EMPLOYEES, customers and visitors of the <-- business.
(2) The owner or lessee of a publicly available parking space, whose primary business is not electric vehicle charging services, may restrict the use of that parking space, including by limiting use to customers and visitors of the business.
(3) The owner or operator of a public electric vehicle charging station installed or operated with incentives authorized under a transportation electrification infrastructure development plan or by an electric distribution company shall disclose the station's geographic location, hours of operation, charging level, hardware 20190SB0596PN1343 - 9 - compatibility, schedule of fees, accepted methods of payment and the amount of network roaming charges for nonmembers, if any, on an ongoing basis to the commission, the Department of Revenue and the United States Department of Energy National Renewable Energy Laboratory.
(3) The owner or operator of a public electric vehicle charging station installed or operated with incentives authorized under a transportation electrification infrastructure development plan or by an electric distribution company shall disclose the station's geographic location, hours of operation, charging level, hardware compatibility, schedule of fees, accepted methods of payment and the amount of network roaming charges for nonmembers, if any, on an ongoing basis to the commission, the Department of Revenue and the United States Department of Energy National Renewable Energy Laboratory.
(m) Publicly funded electric vehicle charging stations.--Any publicly funded PUBLIC electric vehicle charging station using <-- electric distribution company ratepayer funds must use open standard communication protocols and be capable of being networked and submetered at the charging station or other on- site access location.
(m) Publicly funded electric vehicle charging stations.--Any publicly funded electric vehicle charging station using electric distribution company ratepayer funds must use open standard communication protocols and be capable of being networked and submetered at the charging station or other on-site access location.
A third-party owned and operated electric vehicle charging station may not be subject to the requirements of this subsection solely because:
A third-party owned and operated electric vehicle 20190SB0596PN0665 - 9 - charging station may not be subject to the requirements of this subsection solely because:
(o) Natural gas and propane-fueled transportation infrastructure assessment.-- (1) Within one year of the effective date of this section, the Governor or a designee of the Governor <-- COMMISSION shall complete a Statewide assessment of current <-- natural gas and propane-fueled vehicle usage and fueling 20190SB0596PN1343 - 10 - infrastructure in this Commonwealth.
(o) Natural gas and propane-fueled transportation infrastructure assessment.-- (1) Within one year of the effective date of this section, the Governor or a designee of the Governor shall complete a Statewide assessment of current natural gas and propane-fueled vehicle usage and fueling infrastructure in this Commonwealth.
Show all 50 changed rows (10 more)
Previous
Latest
The assessment shall identify opportunities and goals for the expansion of natural gas and propane-fueled vehicle usage and fueling infrastructure in this Commonwealth and make recommendations to the General Assembly and the commission to support the <-- expansion.
The assessment shall identify opportunities and goals for the expansion of natural gas and propane-fueled vehicle usage and fueling infrastructure in this Commonwealth and make recommendations to the General Assembly and the commission to support the expansion.
(2) The Governor or a designee of the Governor shall <-- transmit the assessment and recommendations to the commission for posting THE ASSESSMENT SHALL BE POSTED on the <-- commission's publicly accessible Internet website.
(2) The Governor or a designee of the Governor shall transmit the assessment and recommendations to the commission for posting on the commission's publicly accessible Internet website.
(p) Alternative fuels tax.--An electric distribution company or third party which owns an electric vehicle charging station shall be subject to the alternative fuels tax under 75 Pa.C.S.
(p) Alternative fuels tax.--An electric distribution company or third party which owns an electric vehicle charging station 20190SB0596PN0665 - 10 - shall be subject to the alternative fuels tax under 75 Pa.C.S.
"Electric vehicle charging station." A facility or equipment designed to charge batteries within battery electric vehicles by 20190SB0596PN1343 - 11 - permitting the transfer of electric energy to a battery or other storage device in a battery electric vehicle.
"Electric vehicle charging station." A facility or equipment designed to charge batteries within battery electric vehicles by permitting the transfer of electric energy to a battery or other storage device in a battery electric vehicle.
"NATURAL GAS VEHICLE." A MOTOR VEHICLE THAT CAN OPERATE ON <-- COMPRESSED NATURAL GAS OR LIQUID NATURAL GAS FUEL, INCLUDING DEDICATED BI-FUEL AND DUAL FUEL VEHICLES.
"Priority alternative transportation infrastructure county." A county in this Commonwealth with at least 200,000 people that includes all or part of a metropolitan statistical area with a 20190SB0596PN0665 - 11 - population of at least 500,000 people as defined by the United States Census Bureau.
"Priority alternative transportation infrastructure county." A county in this Commonwealth with at least 200,000 people that includes all or part of a metropolitan statistical area with a population of at least 500,000 people as defined by the United States Census Bureau.
The term does not include a parking space that is part of or associated with a private residence, a parking space provided as a service by a producer of electric vehicles or a parking space that is reserved for the exclusive use of an individual driver or vehicle or for a group of drivers of vehicles, including employees, tenants, visitors or residents 20190SB0596PN1343 - 12 - of a common interest development or residents of an adjacent building.
The term does not include a parking space that is part of or associated with a private residence, a parking space provided as a service by a producer of electric vehicles or a parking space that is reserved for the exclusive use of an individual driver or vehicle or for a group of drivers of vehicles, including employees, tenants, visitors or residents of a common interest development or residents of an adjacent building.
"Transportation electrification infrastructure regional framework." A framework that provides the following information for the priority alternative transportation infrastructure counties served by the electric distribution company:
"Transportation electrification infrastructure regional framework." A framework that provides the following information 20190SB0596PN0665 - 12 - for the priority alternative transportation infrastructure counties served by the electric distribution company:
(3) The additional transportation electrification charging infrastructure that is reasonably necessary to achieve the applicable regional goal established in accordance with subsection (b) or, if no regional goal is established, the Statewide goal established in accordance 20190SB0596PN1343 - 13 - with subsection (b) as applied to the priority alternative transportation infrastructure counties served by the electric distribution company.
(3) The additional transportation electrification charging infrastructure that is reasonably necessary to achieve the applicable regional goal established in accordance with subsection (b) or, if no regional goal is established, the Statewide goal established in accordance with subsection (b) as applied to the priority alternative transportation infrastructure counties served by the electric distribution company.
20190SB0596PN1343 - 14 -
20190SB0596PN0665 - 13 -
View plain text versions (2)

Amendments

1 amendment

Click Show changes on an amendment above to see how it modifies the bill.

Action History

  1. Referred to CONSUMER AFFAIRS

  2. Third consideration and final passage

  3. Re-reported as committed

  4. Re-referred to APPROPRIATIONS

  5. Second consideration

  6. First consideration

  7. PN 1343 Reported as amended

  8. PN 0665 Referred to CONSUMER PROTECTION AND PROFESSIONAL LICENSURE

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 24 co-sponsors · 228 not signed on · 5 voted No

Sponsors (1)

  • Mensch

Co-sponsors (24)

Not signed on (228)

228 members have not signed on to this bill.

Show all 228 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

FINAL PASSAGE

Passed 43 Yea · 6 Nay
Party YeaNayPresentNot Voting
Democratic 14000
Republican 12500
Unaffiliated 17100
Total 43600
% of votes cast 88%12%0%0%
How each member voted (49)
Member Party Vote
YUDICHAK — Yea
AUMENT — Yea
BLAKE — Yea
BREWSTER — Yea
BROWNE — Yea
CORMAN — Yea
DINNIMAN — Yea
DISANTO — Nay
FARNESE — Yea
GORDNER — Yea
IOVINO — Yea
KILLION — Yea
LEACH — Yea
MENSCH — Yea
REGAN — Yea
SABATINA — Yea
SCARNATI — Yea
SCAVELLO — Yea
Anthony H. Williams Democratic Yea
Art Haywood Democratic Yea
Christine M. Tartaglione Democratic Yea
Jay Costa Democratic Yea
Judith L. Schwank Democratic Yea
Katie J. Muth Democratic Yea
Lindsey M. Williams Democratic Yea
Lisa M. Boscola Democratic Yea
Maria Collett Democratic Yea
Sharif Street Democratic Yea
Steven J. Santarsiero Democratic Yea
Timothy P. Kearney Democratic Yea
Vincent J. Hughes Democratic Yea
Wayne D. Fontana Democratic Yea
Camera Bartolotta Republican Yea
Daniel Laughlin Republican Yea
David G. Argall Republican Yea
Doug Mastriano Republican Nay
Elder A. Vogel Republican Yea
Gene Yaw Republican Yea
Joe Pittman Republican Yea
Judy Ward Republican Yea
Kathleen C. Tomlinson Republican Yea
Kim L. Ward Republican Yea
Kristin Phillips-Hill Republican Nay
Lisa Baker Republican Yea
Michele Brooks Republican Nay
Patrick J. Stefano Republican Yea
Scott E. Hutchinson Republican Nay
Scott Martin Republican Nay
Wayne Langerholc Republican Yea

Official roll call →

Passed 24 Yea · 0 Nay
Party YeaNayPresentNot Voting
Republican 9000
Unaffiliated 8000
Democratic 7000
Total 24000
% of votes cast 100%0%0%0%
How each member voted (24)
Member Party Vote
BLAKE — Yea
IOVINO — Yea
KILLION — Yea
MENSCH — Yea
SCAVELLO — Yea
BROWNE — Yea
CORMAN — Yea
SCARNATI — Yea
Art Haywood Democratic Yea
Jay Costa Democratic Yea
Judith L. Schwank Democratic Yea
Maria Collett Democratic Yea
Sharif Street Democratic Yea
Steven J. Santarsiero Democratic Yea
Vincent J. Hughes Democratic Yea
Daniel Laughlin Republican Yea
David G. Argall Republican Yea
Elder A. Vogel Republican Yea
Gene Yaw Republican Yea
Joe Pittman Republican Yea
Kristin Phillips-Hill Republican Yea
Patrick J. Stefano Republican Yea
Scott Martin Republican Yea
Wayne Langerholc Republican Yea

Official roll call →

Passed 14 Yea · 0 Nay
Party YeaNayPresentNot Voting
Republican 4000
Democratic 3000
Unaffiliated 7000
Total 14000
% of votes cast 100%0%0%0%
How each member voted (14)
Member Party Vote
FARNESE — Yea
GORDNER — Yea
KILLION — Yea
REGAN — Yea
SCAVELLO — Yea
YUDICHAK — Yea
SCARNATI — Yea
Lisa M. Boscola Democratic Yea
Maria Collett Democratic Yea
Steven J. Santarsiero Democratic Yea
Judy Ward Republican Yea
Kathleen C. Tomlinson Republican Yea
Kim L. Ward Republican Yea
Lisa Baker Republican Yea

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors SB 596?
SB 596 is sponsored by Anthony H. Williams (Democratic), Judy Ward (Republican), Lindsey M. Williams (Democratic), Steven J. Santarsiero (Democratic), Jay Costa (Democratic), Mensch, Killion, Lisa M. Boscola (Democratic), Browne, Yudichak, Farnese, Brewster, Wayne D. Fontana (Democratic), Sharif Street (Democratic), Blake, Maria Collett (Democratic), Leach, David G. Argall (Republican), Wayne Langerholc (Republican), Camera Bartolotta (Republican), Iovino, Daniel Laughlin (Republican), Joe Pittman (Republican), Timothy P. Kearney (Democratic), and Patrick J. Stefano (Republican).
What is the current status of SB 596?
This bill died with 2019-2020 Regular Session. It reached “Passed Senate” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track SB 596?
Track SB 596 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 596

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 596

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →