Illinois 100th Regular Session Status: In Committee

HB 5083 — UTILITY-NATURAL GAS SUBSIDY

Last action — Session Sine Die

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. 2
    In Committee
  3. 3
    Passed House
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill died with 100th Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Summary

Amends the Public Utilities Act. Provides that a public utility shall demonstrate to the Illinois Commerce Commission that existing customers will not subsidize the cost of new facilities beyond what is provided for in rules and in excess of certain payments by customers for the Commission to approve new construction. Provides that the Commission's order concerning new construction shall explicitly address the economic impact on customers. Requires the Commission to annually report to the General Assembly a gas utility's projects related to a qualifying infrastructure plant, the projected timeline for the replacement of the cast iron and bare and vintage steel in the utility's system, and whether that timeline is adequate to address public safety concerns and reliability. Provides that when a gas public utility connects an applicant to its gas distribution system, certain costs associated with investments in plant additions shall be excluded from a cost-recovery mechanism that allocates the excess cost among existing customers. Requires the Commission to investigate each gas public utility tariff that provides for gas main extensions without additional charge to new customers. Requires the Commission to initiate a rulemaking proceeding providing for rules to establish a uniform method by which a natural gas public utility determines the value of a gas main extension provided to new customers without additional charge.

Bill Text

Action History

  1. Session Sine Die

  2. Referred to Rules Committee

  3. First Reading

  4. Filed with the Clerk by Rep. Thomas Morrison

Sponsors

  • Thomas Morrison · Cosponsor

Sponsorship breakdown

Export CSV (upgrade) →

0 sponsors · 1 co-sponsors · 182 not signed on

Sponsors (0)

None.

Co-sponsors (1)

  • Thomas Morrison

Not signed on (182)

182 members have not signed on to this bill.

Show all 182 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does HB 5083 do?
Amends the Public Utilities Act. Provides that a public utility shall demonstrate to the Illinois Commerce Commission that existing customers will not subsidize the cost of new facilities beyond what is provided for in rules and in excess of certain payments by customers for the Commission to approve new construction. Provides that the Commission's order concerning new construction shall explicitly address the economic impact on customers. Requires the Commission to annually report to the General Assembly a gas utility's projects related to a qualifying infrastructure plant, the projected timeline for the replacement of the cast iron and bare and vintage steel in the utility's system, and whether that timeline is adequate to address public safety concerns and reliability. Provides that when a gas public utility connects an applicant to its gas distribution system, certain costs associated with investments in plant additions shall be excluded from a cost-recovery mechanism that allocates the excess cost among existing customers. Requires the Commission to investigate each gas public utility tariff that provides for gas main extensions without additional charge to new customers. Requires the Commission to initiate a rulemaking proceeding providing for rules to establish a uniform method by which a natural gas public utility determines the value of a gas main extension provided to new customers without additional charge.
Who sponsors HB 5083?
HB 5083 is sponsored by Thomas Morrison.
What is the current status of HB 5083?
This bill died with 100th Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track HB 5083?
Track HB 5083 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HB 5083

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HB 5083

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →