Illinois 98th Regular Session Status: Enacted

SB 2233 — PUBLIC BUILDING-DESIGN BUILD

Last action — Public Act . . . . . . . . . 98-0299

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. ✓
    Passed Senate
  4. ✓
    Passed House
  5. ✓
    To Executive
  6. 6
    Enacted

This bill has been enacted into law. Introduced February 15, 2013. Enacted.

Prognosis

Likely to advance 70% · moderate confidence

Where this bill stands today.

Odds of enactment

High

How often bills like it became law.

  • Enacted

    Current position in the legislative process.

  • 1 sponsor

    0 primary, 1 co-sponsors signed on.

  • Cleared a recorded vote

    Passed 3 recorded votes so far.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Summary

Amends the Public Building Commission Act. Removes the June 1, 2013 date of repeal for provisions regarding design-build contracts in Cook County. Effective immediately.

Bill Text

What changed in the latest version

569 added · 377 removed

Plain-language change summary

The latest version of Bill SB 2233 makes significant changes to the rules surrounding public project contracts in the state of Illinois. It clarifies that commissions can use a design-build delivery method if it's deemed the best option for a specific project. This change is important because it encourages transparency and competitive selection in the contracting process, which can lead to better project outcomes and potentially lower costs. Additionally, the repeal of the previous deadline allows for more flexibility in how these contracts can be managed moving forward.

→
Previous
Latest
SB2233 Engrossed LRB098 05502 OMW 35537 b AN ACT concerning local government.
SB2233 Enrolled LRB098 05502 OMW 35537 b AN ACT concerning local government.
The Public Building Commission Act is amended by changing Sections 20, 20.3, 20.4, 20.5, 20.10, 20.15, 20.20, and 20.25 as follows:
The Public Building Commission Act is amended by changing Sections 2.5, 3, 20, 20.3, 20.4, 20.5, 20.10, 20.15, 20.20, and 20.25 as follows:
(50 ILCS 20/20) (from Ch.
(50 ILCS 20/2.5) (Section scheduled to be repealed on June 1, 2013) Sec.
2.5.
Legislative policy;
conditions for use of design-build.
It is the intent of the General Assembly that a commission be allowed to use the design-build delivery method for public projects if it is shown to be in the commission's best interest for that particular project.
It shall be the policy of the commission in the procurement of design-build services to publicly announce all requirements for design-build services and to procure these services on the basis of demonstrated competence and qualifications and with due regard for the principles of competitive selection.
The commission shall, prior to issuing requests for proposals, promulgate and publish procedures for the solicitation and award of contracts pursuant to this Act.
The commission shall, for each public project or projects permitted under this Act, make a written determination, SB2233 Enrolled - 2 - LRB098 05502 OMW 35537 b including a description as to the particular advantages of the design-build procurement method, that it is in the best interests of the commission to enter into a design-build contract for the project or projects.
In making that determination, the following factors shall be considered:
(1) The probability that the design-build procurement method will be in the best interests of the commission by providing a material savings of time or cost over the design-bid-build or other delivery system.
(2) The type and size of the project and its suitability to the design-build procurement method.
(3) The ability of the design-build entity to define and provide comprehensive scope and performance criteria for the project.
The commission shall require the design-build entity to comply with the utilization goals established by the corporate authorities of the commission for minority and women business enterprises and to comply with Section 2-105 of the Illinois Human Rights Act.
This Section is repealed on June 1, 2018;
provided that any design-build contracts entered into before such date or any procurement of a project under this Act commenced before such date, and the contracts resulting from those procurements, shall remain effective 5 years after the effective date of this amendatory Act of the 95th General Assembly.
SB2233 Enrolled - 3 - LRB098 05502 OMW 35537 b (Source:
P.A.
95-595, eff.
6-1-08.) (50 ILCS 20/3) (from Ch.
1033) Sec.
3.
The following terms, wherever used, or referred to in this Act, mean unless the context clearly requires a different meaning:
(a) "Commission" means a Public Building Commission created pursuant to this Act.
(b) "Commissioner" or "Commissioners" means a Commissioner or Commissioners of a Public Building Commission.
(c) "County seat" means a city, village or town which is the county seat of a county.
(d) "Municipality" means any city, village or incorporated town of the State of Illinois.
(e) "Municipal corporation" includes a county, city, village, town, (including a county seat), park district, school district in a county of 3,000,000 or more population, board of education of a school district in a county of 3,000,000 or more population, sanitary district, airport authority contiguous with the County Seat as of July 1, 1969 and any other municipal body or governmental agency of the State, and until July 1, 2011, a school district that (i) was organized prior to 1860, (ii) is located in part in a city originally incorporated prior to 1840, and (iii) entered into a lease with a Commission prior to 1993, and its board of education, but does not include a school district in a county of less than 3,000,000 population, SB2233 Enrolled - 4 - LRB098 05502 OMW 35537 b a board of education of a school district in a county of less than 3,000,000 population, or a community college district in a county of less than 3,000,000 population, except that until July 1, 2011, a school district that (i) was organized prior to 1860, (ii) is located in part in a city originally incorporated prior to 1840, and (iii) entered into a lease with a Commission prior to 1993, and its board of education, are included.
(f) "Governing body" includes a city council, county board, or any other body or board, by whatever name it may be known, charged with the governing of a municipal corporation.
(g) "Presiding officer" includes the mayor or president of a city, village or town, the presiding officer of a county board, or the presiding officer of any other board or commission, as the case may be.
(h) "Oath" means oath or affirmation.
(i) "Building" means an improvement to real estate to be made available for use by a municipal corporation for the furnishing of governmental services to its citizens, together with any land or interest in land necessary or useful in connection with the improvement.
(j) "Delivery system" means the design and construction approach used to develop and construct a project.
(k) "Design-bid-build" means the traditional delivery system used on public projects that incorporates the Local Government Professional Services Selection Act (50 ILCS 510/) and the principles of competitive selection.
SB2233 Enrolled - 5 - LRB098 05502 OMW 35537 b (l) "Design-build" means a delivery system that provides responsibility within a single contract for the furnishing of architecture, engineering, land surveying and related services as required, and the labor, materials, equipment, and other construction services for the project.
(m) "Design-build contract" means a contract for a public project under this Act between the Commission and a design-build entity to furnish architecture, engineering, land surveying, and related services as required, and to furnish the labor, materials, equipment, and other construction services for the project.
The design-build contract may be conditioned upon subsequent refinements in scope and price and may allow the Commission to make modifications in the project scope without invalidating the design-build contract.
(n) "Design-build entity" means any individual, sole proprietorship, firm, partnership, joint venture, corporation, professional corporation, or other entity that proposes to design and construct any public project under this Act.
A design-build entity and associated design-build professionals shall conduct themselves in accordance with the laws of this State and the related provisions of the Illinois Administrative Code, as referenced by the licensed design professionals Acts of this State.
Show all 98 changed rows (58 more)
Previous
Latest
(o) "Design professional" means any individual, sole proprietorship, firm, partnership, joint venture, corporation, professional corporation, or other entity that offers services SB2233 Enrolled - 6 - LRB098 05502 OMW 35537 b under the Illinois Architecture Practice Act of 1989 (225 ILCS 305/), the Professional Engineering Practice Act of 1989 (225 ILCS 325/), the Structural Engineering Licensing Act of 1989 (225 ILCS 340/), or the Illinois Professional Land Surveyor Act of 1989 (225 ILCS 330/).
(p) "Evaluation criteria" means the requirements for the separate phases of the selection process for design-build proposals as defined in this Act and may include the specialized experience, technical qualifications and competence, capacity to perform, past performance, experience with similar projects, assignment of personnel to the project, and other appropriate factors.
Price may not be used as a factor in the evaluation of Phase I proposals.
(q) "Proposal" means the offer to enter into a design-build contract as submitted by a design-build entity in accordance with this Act.
(r) "Request for proposal" means the document used by the Commission to solicit proposals for a design-build contract.
(s) "Scope and performance criteria" means the requirements for the public project, including but not limited to, the intended usage, capacity, size, scope, quality and performance standards, life-cycle costs, and other programmatic criteria that are expressed in performance-oriented and quantifiable specifications and drawings that can be reasonably inferred and are suited to allow a design-build entity to develop a proposal.
SB2233 Enrolled - 7 - LRB098 05502 OMW 35537 b (t) "Guaranteed maximum price" means a form of contract in which compensation may vary according to the scope of work involved but in any case may not exceed an agreed total amount.
Definitions in this Section with respect to design-build shall have no effect beginning on June 1, 2018;
provided that any design-build contracts entered into before such date or any procurement of a project under this Act commenced before such date, and the contracts resulting from those procurements, shall remain effective 5 years after the effective date of this amendatory Act of the 95th General Assembly.
(Source:
P.A.
94-1071, eff.
1-1-07;
95-595, eff.
6-1-08.) (50 ILCS 20/20) (from Ch.
85, par.
(b) A contract awarded on the basis of competitive bidding shall be awarded after public advertisement published at least once in each week for three consecutive weeks prior to the opening of bids, in a daily newspaper of general circulation in the county where the commission is located, except in the case SB2233 Engrossed - 2 - LRB098 05502 OMW 35537 b of an emergency situation, as determined by the chief executive officer.
(b) A contract awarded on the basis of competitive bidding shall be awarded after public advertisement published at least SB2233 Enrolled - 8 - LRB098 05502 OMW 35537 b once in each week for three consecutive weeks prior to the opening of bids, in a daily newspaper of general circulation in the county where the commission is located, except in the case of an emergency situation, as determined by the chief executive officer.
No bids shall be received at any time subsequent to the time indicated in said advertisement.
No bids shall be received at any time SB2233 Enrolled - 9 - LRB098 05502 OMW 35537 b subsequent to the time indicated in said advertisement.
(c) In addition to the requirements of Section 20.3, the Commission shall advertise a design-build solicitation at SB2233 Engrossed - 3 - LRB098 05502 OMW 35537 b least once in a daily newspaper of general circulation in the county where the Commission is located.
(c) In addition to the requirements of Section 20.3, the Commission shall advertise a design-build solicitation at least once in a daily newspaper of general circulation in the county where the Commission is located.
The successful bidder for such work shall enter into contracts furnished and prescribed by the Board of Commissioners and in addition to any other bonds required under this Act the successful bidder shall execute and give bond, payable to and to be approved by the Commission, with a corporate surety authorized to do business under the laws of the State of Illinois, in an amount to be determined by the Board of Commissioners, conditioned upon the payment of all labor furnished and materials supplied in the prosecution of SB2233 Engrossed - 4 - LRB098 05502 OMW 35537 b the contracted work.
The successful bidder for such work shall enter into contracts furnished and prescribed by the Board of Commissioners and in addition to any other bonds required under this Act the successful bidder shall execute and give bond, payable to and to be approved by the Commission, with a corporate surety authorized to do business under the SB2233 Enrolled - 10 - LRB098 05502 OMW 35537 b laws of the State of Illinois, in an amount to be determined by the Board of Commissioners, conditioned upon the payment of all labor furnished and materials supplied in the prosecution of the contracted work.
(g) (Blank) The provisions of this Section with respect to design-build shall have no effect beginning 5 years after June 1, 2008 (the effective date of Public Act 95-595).
(g) The provisions of this Section with respect to design-build shall have no effect beginning on June 1, 2018;
SB2233 Enrolled - 11 - LRB098 05502 OMW 35537 b provided that any design-build contracts entered into before such date or any procurement of a project under this Act commenced before such date, and the contracts resulting from those procurements, shall remain effective 5 years after June 1, 2008 (the effective date of Public Act 95-595).
8-21-08.) SB2233 Engrossed - 5 - LRB098 05502 OMW 35537 b (50 ILCS 20/20.3) (Section scheduled to be repealed on June 1, 2013) Sec.
8-21-08.) (50 ILCS 20/20.3) (Section scheduled to be repealed on June 1, 2013) Sec.
(2) A preliminary schedule for the completion of the contract.
SB2233 Enrolled - 12 - LRB098 05502 OMW 35537 b (2) A preliminary schedule for the completion of the contract.
The Commission shall SB2233 Engrossed - 6 - LRB098 05502 OMW 35537 b include, at a minimum, its normal prequalification, licensing, registration, and other requirements, but nothing contained herein precludes the use of additional prequalification criteria by the Commission.
The Commission shall include, at a minimum, its normal prequalification, licensing, registration, and other requirements, but nothing contained herein precludes the use of additional prequalification criteria by the Commission.
The design-build entity shall be entitled to rely upon the accuracy of this documentation in the development of its proposal.
The design-build entity shall be entitled to rely upon the accuracy of this SB2233 Enrolled - 13 - LRB098 05502 OMW 35537 b documentation in the development of its proposal.
The Commission shall include in the request for SB2233 Engrossed - 7 - LRB098 05502 OMW 35537 b proposal a minimum of 30 days to develop the Phase II submissions after the selection of entities from the Phase I evaluation is completed.
The Commission shall include in the request for proposal a minimum of 30 days to develop the Phase II submissions after the selection of entities from the Phase I evaluation is completed.
(e) (Blank) This Section is repealed 5 years after the effective date of this amendatory Act of the 95th General Assembly.
(e) This Section is repealed on June 1, 2018;
provided that any design-build contracts entered into before such date or any procurement of a project under this Act commenced before such date, and the contracts resulting from those procurements, shall remain effective 5 years after the effective date of this amendatory Act of the 95th General Assembly.
The scope and performance criteria must be in sufficient detail and contain adequate information to reasonably apprise the qualified design-build entities of the Commission's overall programmatic needs and goals, including criteria and preliminary design plans, general budget parameters, schedule, and delivery requirements.
The scope and performance criteria must be in sufficient detail and contain SB2233 Enrolled - 14 - LRB098 05502 OMW 35537 b adequate information to reasonably apprise the qualified design-build entities of the Commission's overall programmatic needs and goals, including criteria and preliminary design plans, general budget parameters, schedule, and delivery requirements.
This description must include the scope and type of renderings, drawings, and specifications that, at a minimum, will be required by the Commission to be produced by the SB2233 Engrossed - 8 - LRB098 05502 OMW 35537 b design-build entities.
This description must include the scope and type of renderings, drawings, and specifications that, at a minimum, will be required by the Commission to be produced by the design-build entities.
(e) (Blank) This Section is repealed 5 years after the effective date of this amendatory Act of the 95th General Assembly.
(e) This Section is repealed on June 1, 2018;
(Source:
provided that any design-build contracts entered into before such date or any procurement of a project under this Act commenced before such date, and the contracts resulting from those procurements, shall remain effective 5 years after the effective date of this amendatory Act of the 95th General Assembly.
SB2233 Enrolled - 15 - LRB098 05502 OMW 35537 b (Source:
These factors are in addition to any prequalification requirements of SB2233 Engrossed - 9 - LRB098 05502 OMW 35537 b design-build entities that the Commission has set forth.
These factors are in addition to any prequalification requirements of design-build entities that the Commission has set forth.
(7) commitment to assign personnel for the duration of the project and qualifications of the entity's consultants;
(7) commitment to assign personnel for the duration of the SB2233 Enrolled - 16 - LRB098 05502 OMW 35537 b project and qualifications of the entity's consultants;
The Commission may not consider any design-build entity for evaluation or award if the entity has any pecuniary interest in the project or has other relationships or circumstances, SB2233 Engrossed - 10 - LRB098 05502 OMW 35537 b including but not limited to, long-term leasehold, mutual performance, or development contracts with the Commission, that may give the design-build entity a financial or tangible advantage over other design-build entities in the preparation, evaluation, or performance of the design-build contract or that create the appearance of impropriety.
The Commission may not consider any design-build entity for evaluation or award if the entity has any pecuniary interest in the project or has other relationships or circumstances, including but not limited to, long-term leasehold, mutual performance, or development contracts with the Commission, that may give the design-build entity a financial or tangible advantage over other design-build entities in the preparation, evaluation, or performance of the design-build contract or that create the appearance of impropriety.
Upon completion of the qualifications evaluation, the Commission shall create a shortlist of the most highly qualified design-build entities.
Upon completion of the qualifications evaluation, the SB2233 Enrolled - 17 - LRB098 05502 OMW 35537 b Commission shall create a shortlist of the most highly qualified design-build entities.
(c) The Commission shall include in the request for SB2233 Engrossed - 11 - LRB098 05502 OMW 35537 b proposal the evaluating factors to be used in the technical and cost submission components of Phase II.
(c) The Commission shall include in the request for proposal the evaluating factors to be used in the technical and cost submission components of Phase II.
(4) quality of design parameters;
(4) quality of SB2233 Enrolled - 18 - LRB098 05502 OMW 35537 b design parameters;
The Commission shall directly employ or retain a licensed design professional to evaluate the technical and cost SB2233 Engrossed - 12 - LRB098 05502 OMW 35537 b submissions to determine if the technical submissions are in accordance with generally accepted industry standards.
The Commission shall directly employ or retain a licensed design professional to evaluate the technical and cost submissions to determine if the technical submissions are in accordance with generally accepted industry standards.
(d) (Blank) This Section is repealed 5 years after the effective date of this amendatory Act of the 95th General Assembly.
(d) This Section is repealed on June 1, 2018;
provided that any design-build contracts entered into before such date or any procurement of a project under this Act commenced before such date, and the contracts resulting from those procurements, shall remain effective 5 years after the effective date of this amendatory Act of the 95th General Assembly.
6-1-08.) (50 ILCS 20/20.10) (Section scheduled to be repealed on June 1, 2013) Sec.
6-1-08.) SB2233 Enrolled - 19 - LRB098 05502 OMW 35537 b (50 ILCS 20/20.10) (Section scheduled to be repealed on June 1, 2013) Sec.
This Section is repealed 5 years after the effective date of this amendatory Act of the 95th General Assembly.
This Section is repealed on June 1, 2018;
provided that any design-build contracts entered into before such date or any procurement of a project under this Act commenced before such date, and the contracts resulting from those procurements, shall remain effective 5 years after the effective date of this amendatory Act of the 95th General Assembly.
SB2233 Engrossed - 13 - LRB098 05502 OMW 35537 b Proposals may not be reviewed until after the deadline for submission has passed as set forth in the request for proposals.
Proposals may not be reviewed until after the deadline for submission has passed as set forth in the request for proposals.
Phase II design-build proposals shall include a bid bond in the form and security as designated in the request for proposals.
SB2233 Enrolled - 20 - LRB098 05502 OMW 35537 b Phase II design-build proposals shall include a bid bond in the form and security as designated in the request for proposals.
After evaluation begins by the SB2233 Engrossed - 14 - LRB098 05502 OMW 35537 b Commission, clear and convincing evidence of error is required for withdrawal.
After evaluation begins by the Commission, clear and convincing evidence of error is required for withdrawal.
This Section is repealed 5 years after the effective date of this amendatory Act of the 95th General Assembly.
This Section is repealed on June 1, 2018;
provided that any design-build contracts entered into before such date or any procurement of a project under this Act commenced before such date, and the contracts resulting from those procurements, SB2233 Enrolled - 21 - LRB098 05502 OMW 35537 b shall remain effective 5 years after the effective date of this amendatory Act of the 95th General Assembly.
This Section is repealed 5 years after the effective date of this amendatory Act of the 95th General Assembly.
This Section is repealed on June 1, 2018;
provided that any design-build contracts entered into before such date or any procurement of a project under this Act commenced before such date, and the contracts resulting from those procurements, shall remain effective 5 years after the effective date of this amendatory Act of the 95th General Assembly.
6-1-08.) (50 ILCS 20/20.25) (Section scheduled to be repealed on June 1, 2013) Sec.
6-1-08.) (50 ILCS 20/20.25) (Section scheduled to be repealed on June 1, 2013) SB2233 Enrolled - 22 - LRB098 05502 OMW 35537 b Sec.
SB2233 Engrossed - 15 - LRB098 05502 OMW 35537 b (a) Each year, within 60 days following the end of a commission's fiscal year, the commission shall provide a report to the General Assembly addressing the utilization of minority and female owned business enterprises on design-build projects.
(a) Each year, within 60 days following the end of a commission's fiscal year, the commission shall provide a report to the General Assembly addressing the utilization of minority and female owned business enterprises on design-build projects.
(b) The payments for design-build projects by any commission in one fiscal year shall not exceed 25% of the moneys spent on construction projects during the same fiscal year.
(b) The payments for design-build projects by any commission in one fiscal year shall not exceed 50% 25% of the moneys spent on construction projects during the same fiscal year.
(c) (Blank) This Section is repealed 5 years after the effective date of this amendatory Act of the 95th General Assembly.
(c) This Section is repealed on June 1, 2018;
provided that any design-build contracts entered into before such date or any procurement of a project under this Act commenced before such date, and the contracts resulting from those procurements, shall remain effective 5 years after the effective date of this amendatory Act of the 95th General Assembly.
View plain text versions (3)

Action History

  1. Public Act . . . . . . . . . 98-0299

  2. Effective Date August 9, 2013

  3. Governor Approved

  4. Sent to the Governor

  5. Passed Both Houses

  6. House Committee Amendment No. 1 Senate Concurs 057-001-000

  7. House Committee Amendment No. 1 Motion To Concur Recommended Do Adopt State Government and Veterans Affairs; 007-000-000

  8. House Committee Amendment No. 1 Motion to Concur Assignments Referred to State Government and Veterans Affairs

  9. House Committee Amendment No. 1 Motion to Concur Referred to Assignments

  10. House Committee Amendment No. 1 Motion to Concur Filed with Secretary Sen. Kwame Raoul

  11. Added Alternate Chief Co-Sponsor Rep. Carol A. Sente

  12. Placed on Calendar Order of Concurrence House Amendment(s) 1 - May 22, 2013

  13. Secretary's Desk - Concurrence House Amendment(s) 1

  14. Third Reading - Short Debate - Passed 082-031-000

  15. Placed on Calendar Order of 3rd Reading - Short Debate

  16. Second Reading - Short Debate

  17. Placed on Calendar 2nd Reading - Short Debate

  18. Do Pass as Amended / Short Debate Executive Committee; 011-000-000

  19. House Committee Amendment No. 1 Adopted in Executive Committee; by Voice Vote

  20. House Committee Amendment No. 1 Rules Refers to Executive Committee

  21. House Committee Amendment No. 1 Referred to Rules Committee

  22. House Committee Amendment No. 1 Filed with Clerk by Rep. Barbara Flynn Currie

  23. Assigned to Executive Committee

  24. Referred to Rules Committee

  25. First Reading

  26. Chief House Sponsor Rep. Barbara Flynn Currie

  27. Arrived in House

  28. Third Reading - Passed; 053-000-000

  29. Placed on Calendar Order of 3rd Reading April 17, 2013

  30. Second Reading

  31. Placed on Calendar Order of 2nd Reading March 14, 2013

  32. Do Pass State Government and Veterans Affairs; 010-000-000

  33. Assigned to State Government and Veterans Affairs

  34. Referred to Assignments

  35. First Reading

  36. Filed with Secretary by Sen. Kwame Raoul

Sponsors

  • Kwame Raoul · Cosponsor

Sponsorship breakdown

Export CSV (upgrade) →

0 sponsors · 1 co-sponsors · 182 not signed on · 13 voted No

Sponsors (0)

None.

Co-sponsors (1)

  • Kwame Raoul

Not signed on (182)

182 members have not signed on to this bill.

Show all 182 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Concurrence

Passed 57 Yea · 1 Nay · 1 Other
Party YeaNayPresentNot Voting
Unaffiliated 43000
Democrat 12001
Republican 2100
Total 57101
% of votes cast 97%2%0%2%
How each member voted (59)
Member Party Vote
Landek — Yea
Luechtefeld — Yea
Althoff — Yea
Martinez — Yea
Barickman — Yea
Bertino-Tarrant — Yea
Biss — Yea
Bivins — Yea
Bush — Yea
Kotowski — Yea
LaHood — Yea
Link — Yea
Manar — Yea
McCann — Yea
Harris — Yea
McCarter — Yea
McConnaughay — Yea
Brady — Yea
Mulroe — Yea
Muñoz — Yea
Noland — Yea
Radogno — Yea
McGuire — Yea
Silverstein — Yea
Sullivan — Yea
Jacobs — Yea
Cullerton, T. — Yea
Cullerton — Yea
Steans — Yea
Trotter — Yea
Clayborne — Yea
Connelly — Yea
Dillard — Yea
Duffy — Yea
Forby — Yea
Frerichs — Yea
Haine — Yea
Hutchinson — Yea
Oberweis — Yea
Raoul — Yea
Righter — Yea
Sandoval — Yea
Van Pelt — Yea
Bill Cunningham Democrat Not Voting
David Koehler Democrat Yea
Don Harmon Democrat Yea
Emil Jones, III Democrat Yea
Eva-Dina Delgado Democrat Yea
Julie A. Morrison Democrat Yea
Kimberly A. Lightford Democrat Yea
Lakesia Collins Democrat Yea
Laura M. Murphy Democrat Yea
Linda Holmes Democrat Yea
Mattie Hunter Democrat Yea
Michael E. Hastings Democrat Yea
Steve Stadelman Democrat Yea
Chapin Rose Republican Yea
Dave Syverson Republican Yea
Sue Rezin Republican Nay

Official roll call →

Third Reading

Passed 82 Yea · 31 Nay · 5 Other
Party YeaNayPresentNot Voting
Democrat 17701
Unaffiliated 621904
Republican 3500
Total 823105
% of votes cast 69%26%0%4%
How each member voted (118)
Member Party Vote
Acevedo — Yea
Arroyo — Yea
Beiser — Yea
Bellock — Yea
Berrios — Yea
Bost — Yea
Brauer — Nay
Brown — Nay
McAsey — Yea
Fortner — Yea
Golar — Yea
Hurley — Yea
Jakobsson — Yea
Jefferson — Yea
Lang — Yea
Leitch — Yea
Mautino — Yea
McAuliffe — Yea
McSweeney — Yea
Mell — Yea
Moffitt — Yea
Nekritz — Yea
Bradley — Yea
Pihos — Yea
Burke, Daniel — Yea
Senger — Yea
Burke, Kelly — Yea
Sente — Yea
Sullivan — Yea
Mitchell, Christian — Yea
Tabares — Yea
Tryon — Yea
Harris, David — Yea
Turner — Yea
Harris, Greg — Yea
Verschoore — Yea
Hernandez — Yea
Williams — Yea
Davis, Monique — Yea
Jones — Yea
Cavaletto — Yea
Cross — Yea
Currie — Yea
D'Amico — Yea
Flowers — Yea
Hatcher — Yea
Ives — Yea
Jackson — Yea
Brady — Nay
Madigan — Not Voting
Mitchell, Bill — Nay
Poe — Nay
Wheeler — Nay
Soto — Not Voting
Thapedi — Nay
Unes — Nay
Willis — Nay
Yingling — Nay
Zalewski — Not Voting
Cloonen — Nay
Conroy — Nay
Costello — Nay
Demmer — Nay
Drury — Nay
Dunkin — Yea
Durkin — Not Voting
Farnham — Nay
Franks — Nay
Harms — Nay
Hays — Nay
Kay — Yea
Kosel — Yea
Osmond — Yea
Phelps — Yea
Pritchard — Yea
Reboletti — Yea
Reis — Yea
Riley — Yea
Roth — Yea
Sacia — Yea
Sandack — Yea
Schmitz — Yea
Smiddy — Yea
Sommer — Yea
Chapa LaVia — Yea
Anthony DeLuca Democrat Yea
Camille Y. Lilly Democrat Yea
Elgie R. Sims, Jr. Democrat Yea
Emanuel "Chris" Welch Democrat Yea
Fred Crespo Democrat Not Voting
Jay Hoffman Democrat Yea
Jehan Gordon-Booth Democrat Yea
Julie A. Morrison Democrat Nay
Kelly M. Cassidy Democrat Yea
La Shawn K. Ford Democrat Yea
Laura Fine Democrat Yea
Lawrence "Larry" Walsh, Jr. Democrat Yea
Marcus C. Evans, Jr. Democrat Yea
Martin J. Moylan Democrat Nay
Michelle Mussman Democrat Nay
Natalie A. Manley Democrat Nay
Nicholas K. Smith Democrat Nay
Rita Mayfield Democrat Yea
Robert "Bob" Rita Democrat Yea
Robert F. Martwick Democrat Yea
Robyn Gabel Democrat Yea
Sara Feigenholtz Democrat Yea
Stephanie A. Kifowit Democrat Nay
Sue Scherer Democrat Nay
William "Will" Davis Democrat Yea
Brad Halbrook Republican Yea
Charles Meier Republican Nay
Christopher "C.D." Davidsmeyer Republican Nay
Jil Tracy Republican Nay
Joe C. Sosnowski Republican Nay
John M. Cabello Republican Nay
Norine K. Hammond Republican Yea
Wayne A. Rosenthal Republican Yea

Official roll call →

Third Reading

Passed 53 Yea · 0 Nay · 6 Other
Party YeaNayPresentNot Voting
Unaffiliated 39004
Democrat 12001
Republican 2001
Total 53006
% of votes cast 90%0%0%10%
How each member voted (59)
Member Party Vote
LaHood — Yea
Luechtefeld — Yea
Manar — Yea
Althoff — Yea
Martinez — Yea
Barickman — Yea
Bertino-Tarrant — Not Voting
Biss — Yea
Bivins — Yea
Link — Yea
Kotowski — Yea
Landek — Yea
Harris — Yea
Brady — Yea
McCann — Yea
McCarter — Yea
McGuire — Yea
McConnaughay — Yea
Sullivan — Yea
Jacobs — Yea
Mulroe — Yea
Cullerton, T. — Yea
Muñoz — Yea
Cullerton — Yea
Noland — Yea
Steans — Yea
Trotter — Not Voting
Bush — Yea
Clayborne — Not Voting
Connelly — Yea
Dillard — Yea
Duffy — Yea
Haine — Yea
Hutchinson — Yea
Forby — Yea
Frerichs — Yea
Oberweis — Yea
Radogno — Yea
Raoul — Yea
Righter — Yea
Sandoval — Not Voting
Silverstein — Yea
Van Pelt — Yea
Bill Cunningham Democrat Yea
David Koehler Democrat Yea
Don Harmon Democrat Yea
Emil Jones, III Democrat Yea
Eva-Dina Delgado Democrat Yea
Julie A. Morrison Democrat Yea
Kimberly A. Lightford Democrat Not Voting
Lakesia Collins Democrat Yea
Laura M. Murphy Democrat Yea
Linda Holmes Democrat Yea
Mattie Hunter Democrat Yea
Michael E. Hastings Democrat Yea
Steve Stadelman Democrat Yea
Chapin Rose Republican Yea
Dave Syverson Republican Yea
Sue Rezin Republican Not Voting

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does SB 2233 do?
Amends the Public Building Commission Act. Removes the June 1, 2013 date of repeal for provisions regarding design-build contracts in Cook County. Effective immediately.
Who sponsors SB 2233?
SB 2233 is sponsored by Kwame Raoul.
What is the current status of SB 2233?
This bill has been enacted into law. Introduced February 15, 2013. Enacted.
Where can I track SB 2233?
Track SB 2233 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 2233

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 2233

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →