Illinois 98th Regular Session Status: Enacted 1 D cosponsors

SB 9 — PUBLIC UTIL-PERFORMANCE-BASED

Last action — Public Act . . . . . . . . . 98-0015

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. ✓
    Passed Senate
  4. ✓
    Passed House
  5. ✓
    To Executive
  6. 6
    Enacted

This bill has been enacted into law. Introduced January 09, 2013. Enacted.

Prognosis

Advancing 60% · moderate confidence

Where this bill stands today.

Odds of enactment

High

How often bills like it became law.

  • Enacted

    Current position in the legislative process.

  • 3 sponsors

    0 primary, 3 co-sponsors signed on.

  • Single-party support

    Sponsorship is currently within one party (1 D).

  • Mixed recorded votes

    3 passed, 1 failed in recorded votes so far.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Summary

Amends the Public Utilities Act. Makes a technical change in the short title Section.

Bill Text

What changed in the latest version

52 added · 52 removed

Plain-language change summary

The latest version of Bill SB 9 has undergone a title change from "Engrossed" to "Enrolled." This is a procedural update indicating that the bill has passed through all the necessary legislative steps and is now formally enrolled for final approval. This matters because it marks a significant milestone in the legislative process, indicating that the bill is closer to becoming law.

→
Previous
Latest
SB0009 Engrossed LRB098 04269 HLH 34296 b AN ACT concerning regulation.
SB0009 Enrolled LRB098 04269 HLH 34296 b AN ACT concerning regulation.
The Commission may confer in person, or by correspondence, by attending conventions, or in any other way, with Commissions and any and all agencies dealing with public SB0009 Engrossed - 2 - LRB098 04269 HLH 34296 b utilities of other states and of the United States on any matters relating to public utilities.
The Commission may confer in person, or by correspondence, by attending conventions, or in any other way, with Commissions and any and all agencies dealing with public SB0009 Enrolled - 2 - LRB098 04269 HLH 34296 b utilities of other states and of the United States on any matters relating to public utilities.
The Commission may also recommend the enactment of SB0009 Engrossed - 3 - LRB098 04269 HLH 34296 b such legislation with respect to any matter within its jurisdiction as it deems wise or necessary in the public interest.
The Commission may also recommend the enactment of SB0009 Enrolled - 3 - LRB098 04269 HLH 34296 b such legislation with respect to any matter within its jurisdiction as it deems wise or necessary in the public interest.
"Combination SB0009 Engrossed - 4 - LRB098 04269 HLH 34296 b utility" means a utility that, as of January 1, 2011, provided electric service to at least one million retail customers in Illinois and gas service to at least 500,000 retail customers in Illinois.
"Combination SB0009 Enrolled - 4 - LRB098 04269 HLH 34296 b utility" means a utility that, as of January 1, 2011, provided electric service to at least one million retail customers in Illinois and gas service to at least 500,000 retail customers in Illinois.
For purposes of this Section, "peak program year" means the consecutive 12-month period with the highest number of full-time equivalent SB0009 Engrossed - 5 - LRB098 04269 HLH 34296 b jobs that occurs between the beginning of investment year 2 and the end of investment year 4.
For purposes of this Section, "peak program year" means the consecutive 12-month period with the highest number of full-time equivalent SB0009 Enrolled - 5 - LRB098 04269 HLH 34296 b jobs that occurs between the beginning of investment year 2 and the end of investment year 4.
(ii) training facility construction or upgrade projects totaling an estimated $10,000,000, provided that, at a minimum, one such facility shall be located in a municipality having a SB0009 Engrossed - 6 - LRB098 04269 HLH 34296 b population of more than 2 million residents and one such facility shall be located in a municipality having a population of more than 150,000 residents but fewer than 170,000 residents;
(ii) training facility construction or upgrade projects totaling an estimated $10,000,000, provided that, at a minimum, one such facility shall be located in a municipality having a SB0009 Enrolled - 6 - LRB098 04269 HLH 34296 b population of more than 2 million residents and one such facility shall be located in a municipality having a population of more than 150,000 residents but fewer than 170,000 residents;
to be eligible for improvement, the participating SB0009 Engrossed - 7 - LRB098 04269 HLH 34296 b utility's ability to maintain proper tree clearances surrounding the overhead circuit must not have been impeded by third parties;
to be eligible for improvement, the participating SB0009 Enrolled - 7 - LRB098 04269 HLH 34296 b utility's ability to maintain proper tree clearances surrounding the overhead circuit must not have been impeded by third parties;
(A) over a 10-year period, invest an estimated $265,000,000 in electric system upgrades, modernization projects, and training facilities, SB0009 Engrossed - 8 - LRB098 04269 HLH 34296 b including, but not limited to:
(A) over a 10-year period, invest an estimated $265,000,000 in electric system upgrades, modernization projects, and training facilities, SB0009 Enrolled - 8 - LRB098 04269 HLH 34296 b including, but not limited to:
SB0009 Engrossed - 9 - LRB098 04269 HLH 34296 b (iii) associated cyber secure data communication network;
SB0009 Enrolled - 9 - LRB098 04269 HLH 34296 b (iii) associated cyber secure data communication network;
Within 60 days after filing a tariff under subsection (c) of this Section, a participating utility shall submit to the Commission its plan, including scope, schedule, and staffing, for satisfying its infrastructure investment program SB0009 Engrossed - 10 - LRB098 04269 HLH 34296 b commitments pursuant to this subsection (b).
Within 60 days after filing a tariff under subsection (c) of this Section, a participating utility shall submit to the Commission its plan, including scope, schedule, and staffing, for satisfying its infrastructure investment program SB0009 Enrolled - 10 - LRB098 04269 HLH 34296 b commitments pursuant to this subsection (b).
Further, no later than 45 days following the last day of the first, second, and third quarters of each year of the plan, a participating utility shall submit to the Commission a verified quarterly report for the prior quarter that includes (i) the total number of full-time equivalent jobs created during the prior quarter, (ii) the total number of employees as of the last day of the SB0009 Engrossed - 11 - LRB098 04269 HLH 34296 b prior quarter, (iii) the total number of full-time equivalent hours in each job classification or job title, (iv) the total number of incremental employees and contractors in support of the investments undertaken pursuant to this subsection (b) for the prior quarter, and (v) any other information that the Commission may require by rule.
Further, no later than 45 days following the last day of the first, second, and third quarters of each year of the plan, a participating utility shall submit to the Commission a verified quarterly report for the prior quarter that includes (i) the total number of full-time equivalent jobs created during the prior quarter, (ii) the total number of employees as of the last day of the SB0009 Enrolled - 11 - LRB098 04269 HLH 34296 b prior quarter, (iii) the total number of full-time equivalent hours in each job classification or job title, (iv) the total number of incremental employees and contractors in support of the investments undertaken pursuant to this subsection (b) for the prior quarter, and (v) any other information that the Commission may require by rule.
SB0009 Engrossed - 12 - LRB098 04269 HLH 34296 b With respect to the participating utility's investment amount commitments, if, after considering the utility's corrective action plan and compliance thereunder, the Commission enters an order finding, after notice and hearing, that a participating utility is not satisfying its investment amount commitments described in this subsection (b), then the utility shall no longer be eligible to annually update the performance-based formula rate tariff pursuant to subsection (d) of this Section.
SB0009 Enrolled - 12 - LRB098 04269 HLH 34296 b With respect to the participating utility's investment amount commitments, if, after considering the utility's corrective action plan and compliance thereunder, the Commission enters an order finding, after notice and hearing, that a participating utility is not satisfying its investment amount commitments described in this subsection (b), then the utility shall no longer be eligible to annually update the performance-based formula rate tariff pursuant to subsection (d) of this Section.
In meeting the obligations of this subsection (b), to the extent feasible and consistent with State and federal law, the investments under the infrastructure investment program should provide employment opportunities for all segments of the SB0009 Engrossed - 13 - LRB098 04269 HLH 34296 b population and workforce, including minority-owned and female-owned business enterprises, and shall not, consistent with State and federal law, discriminate based on race or socioeconomic status.
In meeting the obligations of this subsection (b), to the extent feasible and consistent with State and federal law, the investments under the infrastructure investment program should provide employment opportunities for all segments of the SB0009 Enrolled - 13 - LRB098 04269 HLH 34296 b population and workforce, including minority-owned and female-owned business enterprises, and shall not, consistent with State and federal law, discriminate based on race or socioeconomic status.
In no event, absent General Assembly approval, shall the SB0009 Engrossed - 14 - LRB098 04269 HLH 34296 b capital investment costs incurred by a participating utility other than a combination utility in satisfying its infrastructure investment program commitments described in subsection (b) of this Section exceed $3,000,000,000 or, for a participating utility that is a combination utility, $720,000,000.
In no event, absent General Assembly approval, shall the SB0009 Enrolled - 14 - LRB098 04269 HLH 34296 b capital investment costs incurred by a participating utility other than a combination utility in satisfying its infrastructure investment program commitments described in subsection (b) of this Section exceed $3,000,000,000 or, for a participating utility that is a combination utility, $720,000,000.
(b-10) All participating utilities shall make contributions for an energy low-income and support program in SB0009 Engrossed - 15 - LRB098 04269 HLH 34296 b accordance with this subsection.
(b-10) All participating utilities shall make contributions for an energy low-income and support program in SB0009 Enrolled - 15 - LRB098 04269 HLH 34296 b accordance with this subsection.
(2) a program that provides grants and other bill payment concessions to disabled veterans who demonstrate a hardship and members of the armed services or reserve forces of the United States or members of the Illinois National Guard who are on active duty pursuant to an SB0009 Engrossed - 16 - LRB098 04269 HLH 34296 b executive order of the President of the United States, an act of the Congress of the United States, or an order of the Governor and who demonstrate a hardship;
(2) a program that provides grants and other bill payment concessions to disabled veterans who demonstrate a hardship and members of the armed services or reserve forces of the United States or members of the Illinois National Guard who are on active duty pursuant to an SB0009 Enrolled - 16 - LRB098 04269 HLH 34296 b executive order of the President of the United States, an act of the Congress of the United States, or an order of the Governor and who demonstrate a hardship;
If a utility elects to file tariffs with the Commission to implement all or a portion of the programs, those SB0009 Engrossed - 17 - LRB098 04269 HLH 34296 b tariffs shall, regardless of the date actually filed, be deemed accepted and approved, and shall become effective on the effective date of this amendatory Act of the 97th General Assembly.
If a utility elects to file tariffs with the Commission to implement all or a portion of the programs, those SB0009 Enrolled - 17 - LRB098 04269 HLH 34296 b tariffs shall, regardless of the date actually filed, be deemed accepted and approved, and shall become effective on the effective date of this amendatory Act of the 97th General Assembly.
In the event the utility SB0009 Engrossed - 18 - LRB098 04269 HLH 34296 b recovers a portion of its costs through automatic adjustment clause tariffs on the effective date of this amendatory Act of the 97th General Assembly, the utility may elect to continue to recover these costs through such tariffs, but then these costs shall not be recovered through the performance-based formula rate.
In the event the utility SB0009 Enrolled - 18 - LRB098 04269 HLH 34296 b recovers a portion of its costs through automatic adjustment clause tariffs on the effective date of this amendatory Act of the 97th General Assembly, the utility may elect to continue to recover these costs through such tariffs, but then these costs shall not be recovered through the performance-based formula rate.
The performance-based formula rate shall be implemented through a tariff filed with the Commission consistent with the provisions of this subsection (c) that shall be applicable to SB0009 Engrossed - 19 - LRB098 04269 HLH 34296 b all delivery services customers.
The performance-based formula rate shall be implemented through a tariff filed with the Commission consistent with the provisions of this subsection (c) that shall be applicable to SB0009 Enrolled - 19 - LRB098 04269 HLH 34296 b all delivery services customers.
SB0009 Engrossed - 20 - LRB098 04269 HLH 34296 b (A) the average for the applicable calendar year of the monthly average yields of 30-year U.S.
SB0009 Enrolled - 20 - LRB098 04269 HLH 34296 b (A) the average for the applicable calendar year of the monthly average yields of 30-year U.S.
SB0009 Engrossed - 21 - LRB098 04269 HLH 34296 b (B) recovery of pension and other post-employment benefits expense, provided that such costs are supported by an actuarial study;
SB0009 Enrolled - 21 - LRB098 04269 HLH 34296 b (B) recovery of pension and other post-employment benefits expense, provided that such costs are supported by an actuarial study;
recovery of expenses related to the annual Commission proceedings under SB0009 Engrossed - 22 - LRB098 04269 HLH 34296 b subsection (d) of this Section to review the inputs to the performance-based formula rate shall be expensed and recovered through the performance-based formula rate;
recovery of expenses related to the annual Commission proceedings under SB0009 Enrolled - 22 - LRB098 04269 HLH 34296 b subsection (d) of this Section to review the inputs to the performance-based formula rate shall be expensed and recovered through the performance-based formula rate;
SB0009 Engrossed - 23 - LRB098 04269 HLH 34296 b (H) historical weather normalized billing determinants;
SB0009 Enrolled - 23 - LRB098 04269 HLH 34296 b (H) historical weather normalized billing determinants;
(5) Provide that if the participating utility's earned rate of return on common equity related to the provision of delivery services for the prior rate year (calculated using costs and capital structure approved by the Commission as provided in subparagraph (2) of this subsection (c), consistent with this Section, in accordance with Commission rules and orders, including, but not limited to, adjustments for goodwill, and after any Commission-ordered disallowances and taxes) is more than 50 basis points higher than the rate of return on common equity calculated pursuant to paragraph (3) of this subsection (c) (after adjusting for any penalties to the rate of return on common equity applied pursuant to the performance metrics provision of subsection (f) of this Section), then the participating utility shall apply a credit through the performance-based formula rate that reflects an amount equal to the value of that portion of the earned rate of return on common equity that is more than 50 basis points higher than the rate of return on common equity calculated pursuant to paragraph (3) of this subsection (c) (after adjusting for any penalties to the rate of return on common equity applied pursuant to the performance metrics provision of subsection (f) of this Section) for the prior SB0009 Engrossed - 24 - LRB098 04269 HLH 34296 b rate year, adjusted for taxes.
(5) Provide that if the participating utility's earned rate of return on common equity related to the provision of delivery services for the prior rate year (calculated using costs and capital structure approved by the Commission as provided in subparagraph (2) of this subsection (c), consistent with this Section, in accordance with Commission rules and orders, including, but not limited to, adjustments for goodwill, and after any Commission-ordered disallowances and taxes) is more than 50 basis points higher than the rate of return on common equity calculated pursuant to paragraph (3) of this subsection (c) (after adjusting for any penalties to the rate of return on common equity applied pursuant to the performance metrics provision of subsection (f) of this Section), then the participating utility shall apply a credit through the performance-based formula rate that reflects an amount equal to the value of that portion of the earned rate of return on common equity that is more than 50 basis points higher than the rate of return on common equity calculated pursuant to paragraph (3) of this subsection (c) (after adjusting for any penalties to the rate of return on common equity applied pursuant to the performance metrics provision of subsection (f) of this Section) for the prior SB0009 Enrolled - 24 - LRB098 04269 HLH 34296 b rate year, adjusted for taxes.
(6) Provide for an annual reconciliation, as described in subsection (d) of this Section, with interest as SB0009 Engrossed - 25 - LRB098 04269 HLH 34296 b described in subsection (d) of this Section, of the revenue requirement reflected in rates for each calendar year, beginning with the calendar year in which the utility files its performance-based formula rate tariff pursuant to subsection (c) of this Section, with what the revenue requirement would have been had the actual cost information for the applicable calendar year been available at the filing date.
(6) Provide for an annual reconciliation, as described in subsection (d) of this Section, with interest as SB0009 Enrolled - 25 - LRB098 04269 HLH 34296 b described in subsection (d) of this Section, of the revenue requirement reflected in rates for each calendar year, beginning with the calendar year in which the utility files its performance-based formula rate tariff pursuant to subsection (c) of this Section, with what the revenue requirement would have been had the actual cost information for the applicable calendar year been available at the filing date.
The SB0009 Engrossed - 26 - LRB098 04269 HLH 34296 b Commission shall enter an order approving, or approving as modified, the performance-based formula rate, including the initial rates, as just and reasonable within 270 days after the date on which the tariff was filed, or, if the tariff is filed within 14 days after the effective date of this amendatory Act of the 97th General Assembly, then by May 31, 2012.
The SB0009 Enrolled - 26 - LRB098 04269 HLH 34296 b Commission shall enter an order approving, or approving as modified, the performance-based formula rate, including the initial rates, as just and reasonable within 270 days after the date on which the tariff was filed, or, if the tariff is filed within 14 days after the effective date of this amendatory Act of the 97th General Assembly, then by May 31, 2012.
Subsequent changes to the performance-based formula rate structure or protocols shall be made as set forth in Section 9-201 of this Act, but nothing in this subsection (c) is intended to limit the Commission's authority under Article IX and other provisions of this Act to initiate an investigation of a participating utility's performance-based formula rate SB0009 Engrossed - 27 - LRB098 04269 HLH 34296 b tariff, provided that any such changes shall be consistent with paragraphs (1) through (6) of this subsection (c).
Subsequent changes to the performance-based formula rate structure or protocols shall be made as set forth in Section 9-201 of this Act, but nothing in this subsection (c) is intended to limit the Commission's authority under Article IX and other provisions of this Act to initiate an investigation of a participating utility's performance-based formula rate SB0009 Enrolled - 27 - LRB098 04269 HLH 34296 b tariff, provided that any such changes shall be consistent with paragraphs (1) through (6) of this subsection (c).
(d) Subsequent to the Commission's issuance of an order approving the utility's performance-based formula rate structure and protocols, and initial rates under subsection (c) of this Section, the utility shall file, on or before May 1 of SB0009 Engrossed - 28 - LRB098 04269 HLH 34296 b each year, with the Chief Clerk of the Commission its updated cost inputs to the performance-based formula rate for the applicable rate year and the corresponding new charges.
(d) Subsequent to the Commission's issuance of an order approving the utility's performance-based formula rate structure and protocols, and initial rates under subsection (c) of this Section, the utility shall file, on or before May 1 of SB0009 Enrolled - 28 - LRB098 04269 HLH 34296 b each year, with the Chief Clerk of the Commission its updated cost inputs to the performance-based formula rate for the applicable rate year and the corresponding new charges.
Provided, however, that the first such reconciliation shall be for the calendar year in which the utility files SB0009 Engrossed - 29 - LRB098 04269 HLH 34296 b its performance-based formula rate tariff pursuant to subsection (c) of this Section and shall reconcile (i) the revenue requirement or requirements established by the rate order or orders in effect from time to time during such calendar year (weighted, as applicable) with (ii) the revenue requirement determined using a year-end rate base for that calendar year calculated pursuant to the performance-based formula rate using (A) actual costs for that year as reflected in the applicable FERC Form 1, and (B) for the first such reconciliation only, the cost of equity, which shall be calculated as the sum of 590 basis points plus the average for the applicable calendar year of the monthly average yields of 30-year U.S.
Provided, however, that the first such reconciliation shall be for the calendar year in which the utility files SB0009 Enrolled - 29 - LRB098 04269 HLH 34296 b its performance-based formula rate tariff pursuant to subsection (c) of this Section and shall reconcile (i) the revenue requirement or requirements established by the rate order or orders in effect from time to time during such calendar year (weighted, as applicable) with (ii) the revenue requirement determined using a year-end rate base for that calendar year calculated pursuant to the performance-based formula rate using (A) actual costs for that year as reflected in the applicable FERC Form 1, and (B) for the first such reconciliation only, the cost of equity, which shall be calculated as the sum of 590 basis points plus the average for the applicable calendar year of the monthly average yields of 30-year U.S.
Notwithstanding anything that may be to the contrary, the intent of the reconciliation is to ultimately reconcile SB0009 Engrossed - 30 - LRB098 04269 HLH 34296 b the revenue requirement reflected in rates for each calendar year, beginning with the calendar year in which the utility files its performance-based formula rate tariff pursuant to subsection (c) of this Section, with what the revenue requirement determined using a year-end rate base for the applicable calendar year would have been had the actual cost information for the applicable calendar year been available at the filing date.
Notwithstanding anything that may be to the contrary, the intent of the reconciliation is to ultimately reconcile SB0009 Enrolled - 30 - LRB098 04269 HLH 34296 b the revenue requirement reflected in rates for each calendar year, beginning with the calendar year in which the utility files its performance-based formula rate tariff pursuant to subsection (c) of this Section, with what the revenue requirement determined using a year-end rate base for the applicable calendar year would have been had the actual cost information for the applicable calendar year been available at the filing date.
Notwithstanding any other provision of this Section or Act or any rule or other requirement adopted by the Commission, a participating utility that is a combination utility with more than one rate zone shall not be required to file a separate set of such data and documentation for each rate zone and may combine such data and documentation into a single set of SB0009 Engrossed - 31 - LRB098 04269 HLH 34296 b schedules.
Notwithstanding any other provision of this Section or Act or any rule or other requirement adopted by the Commission, a participating utility that is a combination utility with more than one rate zone shall not be required to file a separate set of such data and documentation for each rate zone and may combine such data and documentation into a single set of SB0009 Enrolled - 31 - LRB098 04269 HLH 34296 b schedules.
In a proceeding under this subsection (d), the Commission shall enter its order no later than the earlier of SB0009 Engrossed - 32 - LRB098 04269 HLH 34296 b 240 days after the utility's filing of its annual update of cost inputs to the performance-based formula rate or December 31.
In a proceeding under this subsection (d), the Commission shall enter its order no later than the earlier of SB0009 Enrolled - 32 - LRB098 04269 HLH 34296 b 240 days after the utility's filing of its annual update of cost inputs to the performance-based formula rate or December 31.
(e) Nothing in subsections (c) or (d) of this Section shall SB0009 Engrossed - 33 - LRB098 04269 HLH 34296 b prohibit the Commission from investigating, or a participating utility from filing, revenue-neutral tariff changes related to rate design of a performance-based formula rate that has been placed into effect for the utility.
(e) Nothing in subsections (c) or (d) of this Section shall SB0009 Enrolled - 33 - LRB098 04269 HLH 34296 b prohibit the Commission from investigating, or a participating utility from filing, revenue-neutral tariff changes related to rate design of a performance-based formula rate that has been placed into effect for the utility.
(f) Within 30 days after the filing of a tariff pursuant to subsection (c) of this Section, each participating utility shall develop and file with the Commission multi-year metrics designed to achieve, ratably (i.e., in equal segments) over a SB0009 Engrossed - 34 - LRB098 04269 HLH 34296 b 10-year period, improvement over baseline performance values as follows:
(f) Within 30 days after the filing of a tariff pursuant to subsection (c) of this Section, each participating utility shall develop and file with the Commission multi-year metrics designed to achieve, ratably (i.e., in equal segments) over a SB0009 Enrolled - 34 - LRB098 04269 HLH 34296 b 10-year period, improvement over baseline performance values as follows:
(4) Seventy-five percent improvement in the total number of customers who exceed the service reliability SB0009 Engrossed - 35 - LRB098 04269 HLH 34296 b targets as set forth in subparagraphs (A) through (C) of paragraph (4) of subsection (b) of 83 Ill.
(4) Seventy-five percent improvement in the total number of customers who exceed the service reliability SB0009 Enrolled - 35 - LRB098 04269 HLH 34296 b targets as set forth in subparagraphs (A) through (C) of paragraph (4) of subsection (b) of 83 Ill.
design a performance metric SB0009 Engrossed - 36 - LRB098 04269 HLH 34296 b regarding the creation of opportunities for minority-owned and female-owned business enterprises consistent with State and federal law using a base performance value of the percentage of the participating utility's capital expenditures that were paid to minority-owned and female-owned business enterprises in 2010.
design a performance metric SB0009 Enrolled - 36 - LRB098 04269 HLH 34296 b regarding the creation of opportunities for minority-owned and female-owned business enterprises consistent with State and federal law using a base performance value of the percentage of the participating utility's capital expenditures that were paid to minority-owned and female-owned business enterprises in 2010.
The metrics shall include incremental performance goals SB0009 Engrossed - 37 - LRB098 04269 HLH 34296 b for each year of the 10-year period, which shall be designed to demonstrate that the utility is on track to achieve the performance goal in each category at the end of the 10-year period.
The metrics shall include incremental performance goals SB0009 Enrolled - 37 - LRB098 04269 HLH 34296 b for each year of the 10-year period, which shall be designed to demonstrate that the utility is on track to achieve the performance goal in each category at the end of the 10-year period.
If the utility is unable to meet the metrics and performance goals set forth in subparagraphs (5) through (8) of this subsection (f) for such reasons, and the Commission so finds after notice and hearing, then the utility shall be excused from compliance, but only to the limited extent achievement of the affected metrics and performance SB0009 Engrossed - 38 - LRB098 04269 HLH 34296 b goals was hindered by the less than full implementation.
If the utility is unable to meet the metrics and performance goals set forth in subparagraphs (5) through (8) of this subsection (f) for such reasons, and the Commission so finds after notice and hearing, then the utility shall be excused from compliance, but only to the limited extent achievement of the affected metrics and performance SB0009 Enrolled - 38 - LRB098 04269 HLH 34296 b goals was hindered by the less than full implementation.
SB0009 Engrossed - 39 - LRB098 04269 HLH 34296 b (2) With respect to each of the incremental annual performance goals established pursuant to paragraph (2) of subsection (f) of this Section, for each year that the participating utility does not achieve each such goal, the participating utility's return on equity shall be reduced as follows:
SB0009 Enrolled - 39 - LRB098 04269 HLH 34296 b (2) With respect to each of the incremental annual performance goals established pursuant to paragraph (2) of subsection (f) of this Section, for each year that the participating utility does not achieve each such goal, the participating utility's return on equity shall be reduced as follows:
(5) With respect to each of the incremental annual SB0009 Engrossed - 40 - LRB098 04269 HLH 34296 b performance goals established pursuant to subparagraph (5) of subsection (f) of this Section, for each year that the participating utility does not achieve at least 95% of each such goal, the participating utility's return on equity shall be reduced by 5 basis points for each such unachieved goal.
(5) With respect to each of the incremental annual SB0009 Enrolled - 40 - LRB098 04269 HLH 34296 b performance goals established pursuant to subparagraph (5) of subsection (f) of this Section, for each year that the participating utility does not achieve at least 95% of each such goal, the participating utility's return on equity shall be reduced by 5 basis points for each such unachieved goal.
Show all 52 changed rows (12 more)
Previous
Latest
In the event the formula rate tariff established pursuant to SB0009 Engrossed - 41 - LRB098 04269 HLH 34296 b subsection (c) of this Section terminates, the utility's obligations under subsection (f) of this Section and this subsection (f-5) shall also terminate, provided, however, that the tariff mechanism established pursuant to subsection (f) of this Section and this subsection (f-5) shall remain in effect until any penalties due and owing at the time of such termination are applied.
In the event the formula rate tariff established pursuant to SB0009 Enrolled - 41 - LRB098 04269 HLH 34296 b subsection (c) of this Section terminates, the utility's obligations under subsection (f) of this Section and this subsection (f-5) shall also terminate, provided, however, that the tariff mechanism established pursuant to subsection (f) of this Section and this subsection (f-5) shall remain in effect until any penalties due and owing at the time of such termination are applied.
Nothing in this Section shall authorize the Commission to reduce or otherwise obviate the imposition of financial penalties for failing to achieve one or more of the metrics established pursuant to subparagraph SB0009 Engrossed - 42 - LRB098 04269 HLH 34296 b (1) through (4) of subsection (f) of this Section.
Nothing in this Section shall authorize the Commission to reduce or otherwise obviate the imposition of financial penalties for failing to achieve one or more of the metrics established pursuant to subparagraph SB0009 Enrolled - 42 - LRB098 04269 HLH 34296 b (1) through (4) of subsection (f) of this Section.
In the event that the average annual increase exceeds 2.5% as calculated pursuant to this subsection (g), then Sections 16-108.5, 16-108.6, 16-108.7, and 16-108.8 of this Act, other than this subsection, shall be inoperative as they relate to the utility and its service area as of the date of the report due to be submitted pursuant to this subsection and the utility shall no longer be eligible to annually update the SB0009 Engrossed - 43 - LRB098 04269 HLH 34296 b performance-based formula rate tariff pursuant to subsection (d) of this Section.
In the event that the average annual increase exceeds 2.5% as calculated pursuant to this subsection (g), then Sections 16-108.5, 16-108.6, 16-108.7, and 16-108.8 of this Act, other than this subsection, shall be inoperative as they relate to the utility and its service area as of the date of the report due to be submitted pursuant to this subsection and the utility shall no longer be eligible to annually update the SB0009 Enrolled - 43 - LRB098 04269 HLH 34296 b performance-based formula rate tariff pursuant to subsection (d) of this Section.
The fact that this Section becomes inoperative as set forth SB0009 Engrossed - 44 - LRB098 04269 HLH 34296 b in this subsection shall not be construed to mean that the Commission may reexamine or otherwise reopen prudence or reasonableness determinations already made.
The fact that this Section becomes inoperative as set forth SB0009 Enrolled - 44 - LRB098 04269 HLH 34296 b in this subsection shall not be construed to mean that the Commission may reexamine or otherwise reopen prudence or reasonableness determinations already made.
In the event Sections 16-108.5, 16-108.6, 16-108.7, and 16-108.8 of this Act do not become inoperative after December SB0009 Engrossed - 45 - LRB098 04269 HLH 34296 b 31, 2017, then these Sections are inoperative after December 31, 2022 for every participating utility, after which time a participating utility shall no longer be eligible to annually update the performance-based formula rate tariff pursuant to subsection (d) of this Section.
In the event Sections 16-108.5, 16-108.6, 16-108.7, and 16-108.8 of this Act do not become inoperative after December SB0009 Enrolled - 45 - LRB098 04269 HLH 34296 b 31, 2017, then these Sections are inoperative after December 31, 2022 for every participating utility, after which time a participating utility shall no longer be eligible to annually update the performance-based formula rate tariff pursuant to subsection (d) of this Section.
(i) While a participating utility may use, develop, and maintain broadband systems and the delivery of broadband services, voice-over-internet-protocol services, telecommunications services, and cable and video programming services for use in providing delivery services and Smart Grid functionality or application to its retail customers, including, but not limited to, the installation, implementation and maintenance of Smart Grid electric system upgrades as defined in Section 16-108.6 of this Act, a participating utility is prohibited from offering to its retail customers broadband services or the delivery of broadband services, voice-over-internet-protocol services, telecommunications services, or cable or video programming SB0009 Engrossed - 46 - LRB098 04269 HLH 34296 b services, unless they are part of a service directly related to delivery services or Smart Grid functionality or applications as defined in Section 16-108.6 of this Act, and from recovering the costs of such offerings from retail customers.
(i) While a participating utility may use, develop, and maintain broadband systems and the delivery of broadband services, voice-over-internet-protocol services, telecommunications services, and cable and video programming services for use in providing delivery services and Smart Grid functionality or application to its retail customers, including, but not limited to, the installation, implementation and maintenance of Smart Grid electric system upgrades as defined in Section 16-108.6 of this Act, a participating utility is prohibited from offering to its retail customers broadband services or the delivery of broadband services, voice-over-internet-protocol services, telecommunications services, or cable or video programming SB0009 Enrolled - 46 - LRB098 04269 HLH 34296 b services, unless they are part of a service directly related to delivery services or Smart Grid functionality or applications as defined in Section 16-108.6 of this Act, and from recovering the costs of such offerings from retail customers.
(1) No earlier than 5 business days after the effective SB0009 Engrossed - 47 - LRB098 04269 HLH 34296 b date of this amendatory Act of the 98th General Assembly, each participating utility shall file any tariff changes necessary to implement the amendatory language set forth in subsections (c) and (d) of this Section by this amendatory Act of the 98th General Assembly and a revised revenue requirement under the participating utility's performance-based formula rate.
(1) No earlier than 5 business days after the effective SB0009 Enrolled - 47 - LRB098 04269 HLH 34296 b date of this amendatory Act of the 98th General Assembly, each participating utility shall file any tariff changes necessary to implement the amendatory language set forth in subsections (c) and (d) of this Section by this amendatory Act of the 98th General Assembly and a revised revenue requirement under the participating utility's performance-based formula rate.
A participating utility may file a tariff that implements a retroactive charge or credit as described in this paragraph SB0009 Engrossed - 48 - LRB098 04269 HLH 34296 b for amounts not otherwise included in the tariff filing provided for in paragraph (1) of this subsection (k).
A participating utility may file a tariff that implements a retroactive charge or credit as described in this paragraph SB0009 Enrolled - 48 - LRB098 04269 HLH 34296 b for amounts not otherwise included in the tariff filing provided for in paragraph (1) of this subsection (k).
(l) Each participating utility shall be deemed to have been in full compliance with all requirements of subsection (b) of this Section, subsection (c) of this Section, Section 16-108.6 of this Act, and all Commission orders entered pursuant to Sections 16-108.5 and 16-108.6 of this Act, up to and including the effective date of this amendatory Act of the 98th General SB0009 Engrossed - 49 - LRB098 04269 HLH 34296 b Assembly.
(l) Each participating utility shall be deemed to have been in full compliance with all requirements of subsection (b) of this Section, subsection (c) of this Section, Section 16-108.6 of this Act, and all Commission orders entered pursuant to Sections 16-108.5 and 16-108.6 of this Act, up to and including the effective date of this amendatory Act of the 98th General SB0009 Enrolled - 49 - LRB098 04269 HLH 34296 b Assembly.
(B) if the Commission has entered an order pursuant to subsection (e) of Section 16-108.6 of this Act prior to the effective date of this amendatory Act of the SB0009 Engrossed - 50 - LRB098 04269 HLH 34296 b 98th General Assembly that does not accelerate the commencement of the meter deployment schedule approved in the final Commission order on rehearing entered in Docket No.
(B) if the Commission has entered an order pursuant to subsection (e) of Section 16-108.6 of this Act prior to the effective date of this amendatory Act of the SB0009 Enrolled - 50 - LRB098 04269 HLH 34296 b 98th General Assembly that does not accelerate the commencement of the meter deployment schedule approved in the final Commission order on rehearing entered in Docket No.
12-0298 and the Commission shall, after notice and hearing, approve or approve as modified such plan within 90 days after the SB0009 Engrossed - 51 - LRB098 04269 HLH 34296 b utility's filing;
12-0298 and the Commission shall, after notice and hearing, approve or approve as modified such plan within 90 days after the SB0009 Enrolled - 51 - LRB098 04269 HLH 34296 b utility's filing;
Nothing in this subsection is intended to SB0009 Engrossed - 52 - LRB098 04269 HLH 34296 b address whether a participating utility has, or has not, satisfied any or all of the metrics and performance goals established pursuant to subsection (f) of this Section.
Nothing in this subsection is intended to SB0009 Enrolled - 52 - LRB098 04269 HLH 34296 b address whether a participating utility has, or has not, satisfied any or all of the metrics and performance goals established pursuant to subsection (f) of this Section.
View plain text versions (3)

Action History

  1. Public Act . . . . . . . . . 98-0015

  2. Effective Date May 22, 2013

  3. Both Houses Override Total Veto

  4. Override Governor Veto - House Passed 071-041-005

  5. 3/5 Vote Required

  6. Motion Filed Override Governor Veto Rep. Lou Lang

  7. Placed on Calendar Total Veto May 21, 2013

  8. Arrived in House

  9. Override Governor Veto - Senate Passed 044-011-001

  10. 3/5 Vote Required

  11. Motion Filed Override Governor Veto Sen. John J. Cullerton

  12. Placed Calendar Total Veto May 7, 2013

  13. Governor Vetoed

  14. Sent to the Governor

  15. Passed Both Houses

  16. Added Alternate Co-Sponsor Rep. Marcus C. Evans, Jr.

  17. Added Alternate Co-Sponsor Rep. Rich Brauer

  18. Third Reading - Short Debate - Passed 086-028-003

  19. Placed on Calendar Order of 3rd Reading - Short Debate

  20. Held on Calendar Order of Second Reading - Short Debate

  21. Second Reading - Short Debate

  22. Placed on Calendar 2nd Reading - Short Debate

  23. Do Pass / Short Debate Public Utilities Committee; 021-000-000

  24. Added Alternate Chief Co-Sponsor Rep. Robert W. Pritchard

  25. Added Alternate Chief Co-Sponsor Rep. Patricia R. Bellock

  26. Added Alternate Chief Co-Sponsor Rep. Daniel J. Burke

  27. Added Alternate Chief Co-Sponsor Rep. Tom Cross

  28. Assigned to Public Utilities Committee

  29. Referred to Rules Committee

  30. First Reading

  31. Chief House Sponsor Rep. Lou Lang

  32. Arrived in House

  33. Third Reading - Passed; 044-009-001

  34. Placed on Calendar Order of 3rd Reading

  35. Senate Floor Amendment No. 2 Adopted; J. Cullerton

  36. Recalled to Second Reading

  37. Senate Floor Amendment No. 2 Recommend Do Adopt Executive; 012-001-000

  38. Senate Floor Amendment No. 2 Assignments Refers to Executive

  39. Senate Floor Amendment No. 2 Referred to Assignments

  40. Senate Floor Amendment No. 2 Filed with Secretary by Sen. John J. Cullerton

  41. Placed on Calendar Order of 3rd Reading February 14, 2013

  42. Second Reading

  43. Placed on Calendar Order of 2nd Reading February 13, 2013

  44. Do Pass as Amended Executive; 014-000-000

  45. Senate Committee Amendment No. 1 Adopted

  46. Added as Chief Co-Sponsor Sen. Linda Holmes

  47. Added as Chief Co-Sponsor Sen. Pamela J. Althoff

  48. Added as Chief Co-Sponsor Sen. Christine Radogno

  49. Senate Committee Amendment No. 1 Assignments Refers to Executive

  50. Added as Co-Sponsor Sen. Sue Rezin

  51. Added as Co-Sponsor Sen. Gary Forby

  52. Added as Co-Sponsor Sen. David S. Luechtefeld

  53. Senate Committee Amendment No. 1 Referred to Assignments

  54. Senate Committee Amendment No. 1 Filed with Secretary by Sen. John J. Cullerton

  55. Postponed - Executive

  56. Assigned to Executive

  57. Referred to Assignments

  58. First Reading

  59. Filed with Secretary by Sen. John J. Cullerton

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

0 sponsors · 3 co-sponsors · 180 not signed on · 21 voted No

Sponsors (0)

None.

Co-sponsors (3)

Not signed on (180)

180 members have not signed on to this bill.

Show all 180 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Motion

Failed 71 Yea · 41 Nay · 6 Other
Party YeaNayPresentNot Voting
Democrat 101203
Unaffiliated 582403
Republican 3500
Total 714106
% of votes cast 60%35%0%5%
How each member voted (118)
Member Party Vote
Acevedo — Yea
Arroyo — Yea
Beiser — Yea
Bellock — Yea
Berrios — Yea
Mautino — Yea
Bost — Yea
Brauer — Yea
Brown — Yea
Demmer — Yea
Fortner — Yea
Golar — Nay
Harms — Yea
Hurley — Yea
Ives — Not Voting
Jefferson — Nay
Lang — Yea
Leitch — Yea
Farnham — Yea
Madigan — Yea
McAsey — Nay
McAuliffe — Yea
Brady — Yea
McSweeney — Yea
Mell — Nay
Burke, Daniel — Yea
Burke, Kelly — Yea
Mitchell, Bill — Yea
Sullivan — Yea
Mitchell, Christian — Yea
Moffitt — Yea
Harris, David — Yea
Phelps — Yea
Harris, Greg — Yea
Senger — Yea
Hernandez — Yea
Sente — Nay
Smiddy — Yea
Tabares — Yea
Wheeler — Yea
Davis, Monique — Yea
Tryon — Yea
Verschoore — Yea
Zalewski — Yea
Bradley — Nay
Cavaletto — Yea
Cross — Yea
D'Amico — Yea
Durkin — Nay
Flowers — Yea
Franks — Yea
Hatcher — Yea
Jackson — Yea
Kosel — Nay
Williams — Nay
Jones — Nay
Nekritz — Nay
Soto — Not Voting
Thapedi — Nay
Turner — Not Voting
Unes — Nay
Willis — Nay
Yingling — Nay
Cloonen — Nay
Conroy — Nay
Costello — Nay
Currie — Nay
Drury — Nay
Dunkin — Nay
Hays — Nay
Jakobsson — Nay
Kay — Yea
Osmond — Yea
Pihos — Yea
Poe — Yea
Pritchard — Yea
Reboletti — Yea
Reis — Yea
Riley — Yea
Roth — Yea
Sacia — Yea
Sandack — Yea
Schmitz — Yea
Sommer — Nay
Chapa LaVia — Yea
Anthony DeLuca Democrat Yea
Camille Y. Lilly Democrat Not Voting
Elgie R. Sims, Jr. Democrat Nay
Emanuel "Chris" Welch Democrat Yea
Fred Crespo Democrat Yea
Jay Hoffman Democrat Yea
Jehan Gordon-Booth Democrat Not Voting
Julie A. Morrison Democrat Yea
Kelly M. Cassidy Democrat Nay
La Shawn K. Ford Democrat Nay
Laura Fine Democrat Nay
Lawrence "Larry" Walsh, Jr. Democrat Yea
Marcus C. Evans, Jr. Democrat Yea
Martin J. Moylan Democrat Nay
Michelle Mussman Democrat Nay
Natalie A. Manley Democrat Nay
Nicholas K. Smith Democrat Not Voting
Rita Mayfield Democrat Nay
Robert "Bob" Rita Democrat Yea
Robert F. Martwick Democrat Yea
Robyn Gabel Democrat Nay
Sara Feigenholtz Democrat Nay
Stephanie A. Kifowit Democrat Nay
Sue Scherer Democrat Nay
William "Will" Davis Democrat Yea
Brad Halbrook Republican Nay
Charles Meier Republican Nay
Christopher "C.D." Davidsmeyer Republican Nay
Jil Tracy Republican Yea
Joe C. Sosnowski Republican Yea
John M. Cabello Republican Nay
Norine K. Hammond Republican Nay
Wayne A. Rosenthal Republican Yea

Official roll call →

Motion

Passed 44 Yea · 11 Nay · 4 Other
Party YeaNayPresentNot Voting
Unaffiliated 32803
Democrat 10201
Republican 2100
Total 441104
% of votes cast 75%19%0%7%
How each member voted (59)
Member Party Vote
Landek — Yea
Manar — Nay
Althoff — Yea
Martinez — Yea
Barickman — Nay
Bertino-Tarrant — Not Voting
Biss — Nay
Bivins — Yea
Bush — Yea
Frerichs — Yea
Mulroe — Yea
Kotowski — Yea
Sullivan — Nay
LaHood — Nay
Jacobs — Not Voting
McCarter — Nay
Silverstein — Nay
Steans — Not Voting
Duffy — Nay
Link — Yea
Luechtefeld — Yea
McCann — Yea
McConnaughay — Yea
Harris — Yea
Muñoz — Yea
Brady — Yea
Noland — Yea
Oberweis — Yea
Radogno — Yea
McGuire — Yea
Cullerton, T. — Yea
Cullerton — Yea
Trotter — Yea
Clayborne — Yea
Connelly — Yea
Dillard — Yea
Forby — Yea
Haine — Yea
Hutchinson — Yea
Raoul — Yea
Righter — Yea
Sandoval — Yea
Van Pelt — Yea
Bill Cunningham Democrat Nay
David Koehler Democrat Yea
Don Harmon Democrat Nay
Emil Jones, III Democrat Yea
Eva-Dina Delgado Democrat Yea
Julie A. Morrison Democrat Not Voting
Kimberly A. Lightford Democrat Yea
Lakesia Collins Democrat Yea
Laura M. Murphy Democrat Yea
Linda Holmes Democrat Yea
Mattie Hunter Democrat Yea
Michael E. Hastings Democrat Yea
Steve Stadelman Democrat Yea
Chapin Rose Republican Nay
Dave Syverson Republican Yea
Sue Rezin Republican Yea

Official roll call →

Third Reading

Passed 86 Yea · 28 Nay · 4 Other
Party YeaNayPresentNot Voting
Democrat 18700
Unaffiliated 651604
Republican 3500
Total 862804
% of votes cast 73%24%0%3%
How each member voted (118)
Member Party Vote
Acevedo — Yea
Arroyo — Yea
Beiser — Yea
Bellock — Yea
Berrios — Yea
Mautino — Yea
Bost — Yea
Brauer — Yea
Brown — Yea
Costello — Nay
Drury — Not Voting
Ives — Not Voting
Jakobsson — Yea
Jefferson — Yea
Nekritz — Yea
Lang — Yea
Leitch — Yea
McAuliffe — Yea
McSweeney — Yea
Mell — Yea
Moffitt — Yea
Senger — Yea
Soto — Yea
Tabares — Yea
Brady — Yea
Tryon — Yea
Turner — Yea
Burke, Daniel — Yea
Mitchell, Bill — Yea
Sullivan — Yea
Mitchell, Christian — Yea
Harris, David — Yea
Harris, Greg — Yea
Hernandez — Yea
Durkin — Yea
Farnham — Yea
Flowers — Yea
Fortner — Yea
Golar — Yea
Harms — Yea
Hatcher — Yea
Kosel — Yea
Madigan — Yea
Wheeler — Yea
Williams — Yea
Davis, Monique — Yea
Jones — Yea
McAsey — Nay
Bradley — Nay
Sente — Nay
Burke, Kelly — Nay
Sommer — Nay
Thapedi — Not Voting
Unes — Nay
Verschoore — Yea
Willis — Nay
Yingling — Nay
Zalewski — Yea
Cavaletto — Nay
Cloonen — Nay
Conroy — Nay
Cross — Yea
Currie — Yea
D'Amico — Yea
Demmer — Yea
Dunkin — Yea
Franks — Nay
Hays — Nay
Hurley — Yea
Jackson — Yea
Kay — Nay
Osmond — Yea
Phelps — Yea
Pihos — Yea
Poe — Yea
Pritchard — Yea
Reboletti — Yea
Reis — Nay
Riley — Yea
Roth — Yea
Sacia — Yea
Sandack — Yea
Schmitz — Yea
Smiddy — Yea
Chapa LaVia — Not Voting
Anthony DeLuca Democrat Yea
Camille Y. Lilly Democrat Yea
Elgie R. Sims, Jr. Democrat Yea
Emanuel "Chris" Welch Democrat Yea
Fred Crespo Democrat Yea
Jay Hoffman Democrat Yea
Jehan Gordon-Booth Democrat Nay
Julie A. Morrison Democrat Yea
Kelly M. Cassidy Democrat Nay
La Shawn K. Ford Democrat Yea
Laura Fine Democrat Yea
Lawrence "Larry" Walsh, Jr. Democrat Yea
Marcus C. Evans, Jr. Democrat Yea
Martin J. Moylan Democrat Nay
Michelle Mussman Democrat Nay
Natalie A. Manley Democrat Nay
Nicholas K. Smith Democrat Yea
Rita Mayfield Democrat Yea
Robert "Bob" Rita Democrat Yea
Robert F. Martwick Democrat Yea
Robyn Gabel Democrat Yea
Sara Feigenholtz Democrat Yea
Stephanie A. Kifowit Democrat Nay
Sue Scherer Democrat Nay
William "Will" Davis Democrat Yea
Brad Halbrook Republican Nay
Charles Meier Republican Nay
Christopher "C.D." Davidsmeyer Republican Nay
Jil Tracy Republican Yea
Joe C. Sosnowski Republican Yea
John M. Cabello Republican Nay
Norine K. Hammond Republican Nay
Wayne A. Rosenthal Republican Yea

Official roll call →

Third Reading

Passed 44 Yea · 9 Nay · 6 Other
Party YeaNayPresentNot Voting
Democrat 10102
Unaffiliated 31804
Republican 3000
Total 44906
% of votes cast 75%15%0%10%
How each member voted (59)
Member Party Vote
Althoff — Yea
Martinez — Yea
Barickman — Nay
Bertino-Tarrant — Not Voting
Biss — Not Voting
Bivins — Yea
Bush — Yea
McConnaughay — Yea
Mulroe — Yea
Haine — Yea
Link — Yea
Luechtefeld — Yea
Muñoz — Yea
Harris — Yea
Steans — Yea
Brady — Yea
Trotter — Yea
McGuire — Yea
Cullerton, T. — Yea
Clayborne — Yea
Connelly — Yea
Forby — Yea
Frerichs — Yea
Hutchinson — Yea
Cullerton — Yea
Kotowski — Yea
LaHood — Nay
Sullivan — Nay
Landek — Yea
Manar — Nay
Jacobs — Not Voting
McCann — Nay
McCarter — Nay
Noland — Yea
Oberweis — Yea
Dillard — Yea
Duffy — Nay
Radogno — Yea
Raoul — Yea
Righter — Not Voting
Sandoval — Yea
Silverstein — Nay
Van Pelt — Yea
Bill Cunningham Democrat Nay
David Koehler Democrat Yea
Don Harmon Democrat Not Voting
Emil Jones, III Democrat Yea
Eva-Dina Delgado Democrat Yea
Julie A. Morrison Democrat Yea
Kimberly A. Lightford Democrat Not Voting
Lakesia Collins Democrat Yea
Laura M. Murphy Democrat Yea
Linda Holmes Democrat Yea
Mattie Hunter Democrat Yea
Michael E. Hastings Democrat Yea
Steve Stadelman Democrat Yea
Chapin Rose Republican Yea
Dave Syverson Republican Yea
Sue Rezin Republican Yea

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does SB 9 do?
Amends the Public Utilities Act. Makes a technical change in the short title Section.
Who sponsors SB 9?
SB 9 is sponsored by John J. Cullerton, Rich Brauer, and Marcus C. Evans, Jr. (Democrat).
What is the current status of SB 9?
This bill has been enacted into law. Introduced January 09, 2013. Enacted.
Where can I track SB 9?
Track SB 9 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 9

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 9

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →