SB3529 — MAKE-READY INFRASTRUCTURE ACT
Last action — Added as Co-Sponsor Sen. Sara Feigenholtz
-
1Introduced
-
2In Committee
-
3Passed Senate
-
4Passed House
-
5To Executive
-
6Enacted
This bill has been introduced in the Senate. Introduced February 05, 2026. It must pass committee before a floor vote.
Next likely step: a committee referral and hearing.
Prognosis
Where this bill stands today.
Odds of enactment
LowHow often bills like it became law.
Not enough signal yet to read this bill's trajectory — we surface a likelihood only once there's real movement (stage, sponsorship, committee, or votes) to point to.
Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.
Summary
Creates the Make-Ready Infrastructure Rules Act. Sets forth findings. Defines terms. Provides that an electric utility shall propose a new rule, before the electric utility submits its next Multi-Year Integrated Rate Plan, that authorizes the electric utility to design and deploy all electrical distribution infrastructure on the utility side of the meter for all customers who have installed separately metered or submetered infrastructure to support electric vehicle charging stations, other than charging stations in single-family residences. Provides that an electric utility shall recover its revenue requirement for the design and deployment of such electrical distribution infrastructure through periodic Multi-Year Integrated Rate Plan proceedings or through other methods determined by the Commission by rule. Provides that the Commission shall require an electric utility to provide an accurate and full accounting of all the electric utility's expenses related to electrical distribution infrastructure and shall apply appropriate penalties to an electric utility that is not accurately tracking all expenses. Provides that the new proposed rule, once effective, shall be offered to customers as an alternative to the transmission line extension rules in place as of the effective date of the Act for electric vehicle infrastructure and any customer allowances established under the rule shall be based on the full useful life of the electrical distribution infrastructure. Makes other changes.
Bill Text
We don't have the full text on file for this bill yet.
Read SB3529 on the official Illinois source →Action History
-
Added as Co-Sponsor Sen. Sara Feigenholtz
-
Rule 3-9(a) / Re-referred to Assignments
-
Rule 2-10 Committee Deadline Established As April 24, 2026
-
Rule 2-10 Committee Deadline Established As March 27, 2026
-
Assigned to Energy and Public Utilities
-
Referred to Assignments
-
First Reading
-
Filed with Secretary by Sen. Adriane L. Johnson
Sponsors
- Adriane L. Johnson · Primary
- Sara Feigenholtz · Cosponsor
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 1 co-sponsors · 181 not signed on
Sponsors (1)
- Adriane L. Johnson Democrat
Co-sponsors (1)
- Sara Feigenholtz Democrat
Not signed on (181)
181 members have not signed on to this bill.
Show all 181 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Subjects
Frequently asked questions
- What does SB3529 do?
- Creates the Make-Ready Infrastructure Rules Act. Sets forth findings. Defines terms. Provides that an electric utility shall propose a new rule, before the electric utility submits its next Multi-Year Integrated Rate Plan, that authorizes the electric utility to design and deploy all electrical distribution infrastructure on the utility side of the meter for all customers who have installed separately metered or submetered infrastructure to support electric vehicle charging stations, other than charging stations in single-family residences. Provides that an electric utility shall recover its revenue requirement for the design and deployment of such electrical distribution infrastructure through periodic Multi-Year Integrated Rate Plan proceedings or through other methods determined by the Commission by rule. Provides that the Commission shall require an electric utility to provide an accurate and full accounting of all the electric utility's expenses related to electrical distribution infrastructure and shall apply appropriate penalties to an electric utility that is not accurately tracking all expenses. Provides that the new proposed rule, once effective, shall be offered to customers as an alternative to the transmission line extension rules in place as of the effective date of the Act for electric vehicle infrastructure and any customer allowances established under the rule shall be based on the full useful life of the electrical distribution infrastructure. Makes other changes.
- Who sponsors SB3529 ?
- SB3529 is sponsored by Adriane L. Johnson (Democrat) and Sara Feigenholtz (Democrat).
- What is the current status of SB3529 ?
- This bill has been introduced in the Senate. Introduced February 05, 2026. It must pass committee before a floor vote.
- Where can I track SB3529 ?
- Track SB3529 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on SB3529
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of SB3529
Last checked for changes about 2 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →