Oregon 2019 Regular Session Status: Died

HB 3325 — Relating to net metering.

Last action — In committee upon adjournment.

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. Died in session

This bill died with 2019 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Summary

Requires public utility to meet certain requirements for processing applications from nonresidential customer-generators to interconnect to electric distribution system net metering facility that has generating capacity of more than 25 kilowatts but less than two megawatts. Requires Public Utility Commission to adopt rules requiring public utilities to equitably apportion costs of engineering, construction or installation of facilities within public right of way that will allow for safe interconnection of multiple net metering facilities.

Bill Text

We don't have the full text on file for this bill yet.

Read HB 3325 on the official Oregon source →

Action History

  1. In committee upon adjournment.

  2. Public Hearing held.

  3. Public Hearing held.

  4. Referred to Energy and Environment.

  5. First reading. Referred to Speaker's desk.

Sponsorship breakdown

Export CSV (upgrade) →

0 sponsors · 0 co-sponsors · 92 not signed on

Sponsors (0)

None.

Co-sponsors (0)

None.

Not signed on (92)

92 members have not signed on to this bill.

Show all 92 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does HB 3325 do?
Requires public utility to meet certain requirements for processing applications from nonresidential customer-generators to interconnect to electric distribution system net metering facility that has generating capacity of more than 25 kilowatts but less than two megawatts. Requires Public Utility Commission to adopt rules requiring public utilities to equitably apportion costs of engineering, construction or installation of facilities within public right of way that will allow for safe interconnection of multiple net metering facilities.
What is the current status of HB 3325?
This bill died with 2019 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track HB 3325?
Track HB 3325 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HB 3325

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HB 3325

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →