Illinois 97th Regular Session Status: Passed Senate 1 R cosponsors

SB 1608 — UTILITIES-PROCUREMENT PLAN

Last action — Session Sine Die

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. 3
    Passed Senate
  4. 4
    Passed House
  5. 5
    To Executive
  6. 6
    Enacted

This bill died with 97th Regular Session. It reached “Passed Senate” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Summary

Amends the Public Utilities Act. Provides that the required procurement plan for an electric utility shall include proposed bidding rules, bid documents, standard form contracts, and credit documents and policies. Changes provisions concerning the draft and final procurement plans by the Illinois Power Agency, including the role of the Illinois Commerce Commission. Effective immediately.

Bill Text

What changed in the latest version

149 added · 193 removed

Plain-language change summary

The recent amendments to SB 1608 clarify the roles involved in the procurement process for electric utilities. It specifies that a procurement administrator will oversee the bidding process and be responsible for designing it in accordance with established regulations, while also developing benchmarks to evaluate bids. These changes are significant as they aim to enhance accountability and transparency in the procurement process, ultimately benefiting consumers by ensuring fair and competitive bidding practices.

→
Previous
Latest
*LRB09709304ASK49439b* SB1608 97TH GENERAL ASSEMBLY State of Illinois and 2012 SB1608 Introduced 2/9/2011, by Sen.
SB1608 Engrossed LRB097 09304 ASK 49439 b AN ACT concerning utilities.
Mike Jacobs SYNOPSIS AS INTRODUCED:
ILCS 5/16-111.5 Amends the Public Utilities Act.
Provides that the required procurement plan for an electric utility shall include proposed bidding rules, bid documents, standard form contracts, and credit documents and policies.
Changes provisions concerning the draft and final procurement plans by the Illinois Power Agency, including the role of the Illinois Commerce Commission.
Effective immediately.
LRB097 09304 ASK 49439 b A BILL FOR SB1608 LRB097 09304 ASK 49439 b AN ACT concerning utilities.
Those customers that are excluded from the definition of "eligible retail customers" shall not be included in the procurement plan load requirements, and the utility shall procure any supply SB1608 - 2 - LRB097 09304 ASK 49439 b requirements, including capacity, ancillary services, and hourly priced energy, in the applicable markets as needed to serve those customers, provided that the utility may include in its procurement plan load requirements for the load that is associated with those retail customers whose service has been declared or deemed competitive pursuant to Section 16-113 of this Act to the extent that those customers are purchasing power and energy during one of the transition periods identified in subsection (b) of Section 16-113 of this Act.
Those customers that are excluded from the definition of "eligible retail customers" shall not be included in the procurement plan load requirements, and the utility shall procure any supply SB1608 Engrossed - 2 - LRB097 09304 ASK 49439 b requirements, including capacity, ancillary services, and hourly priced energy, in the applicable markets as needed to serve those customers, provided that the utility may include in its procurement plan load requirements for the load that is associated with those retail customers whose service has been declared or deemed competitive pursuant to Section 16-113 of this Act to the extent that those customers are purchasing power and energy during one of the transition periods identified in subsection (b) of Section 16-113 of this Act.
Unless specified otherwise in this Section, in the procurement plan or in the SB1608 - 3 - LRB097 09304 ASK 49439 b implementing tariff, any procurement occurring in accordance with this plan shall be competitively bid through a request for proposals process.
Unless specified otherwise in this Section, in the procurement plan or in the SB1608 Engrossed - 3 - LRB097 09304 ASK 49439 b implementing tariff, any procurement occurring in accordance with this plan shall be competitively bid through a request for proposals process.
This SB1608 - 4 - LRB097 09304 ASK 49439 b plan shall include:
This SB1608 Engrossed - 4 - LRB097 09304 ASK 49439 b plan shall include:
and (E) meet the same credit requirements as apply SB1608 - 5 - LRB097 09304 ASK 49439 b to suppliers of capacity, in the applicable regional transmission organization market;
and (E) meet the same credit requirements as apply SB1608 Engrossed - 5 - LRB097 09304 ASK 49439 b to suppliers of capacity, in the applicable regional transmission organization market;
contract terms, time frames for securing products or services, fuel costs, weather patterns, transmission costs, market conditions, and SB1608 - 6 - LRB097 09304 ASK 49439 b the governmental regulatory environment;
contract terms, time frames for securing products or services, fuel costs, weather patterns, transmission costs, market conditions, and SB1608 Engrossed - 6 - LRB097 09304 ASK 49439 b the governmental regulatory environment;
(5) Proposed bidding rules, bid documents, standard form contracts, and credit documents and policies.
SB1608 - 7 - LRB097 09304 ASK 49439 b (iii) serve as the interface between the electric utility and suppliers;
(iii) serve as the interface between the electric utility and suppliers;
(iv) manage the bidder pre-qualification and registration process;
SB1608 Engrossed - 7 - LRB097 09304 ASK 49439 b (iv) manage the bidder pre-qualification and registration process;
SB1608 - 8 - LRB097 09304 ASK 49439 b (x) notify the utility of contract counterparties and contract specifics;
(x) notify the utility of contract counterparties and contract specifics;
and (xi) administer related contingency procurement events.
and SB1608 Engrossed - 8 - LRB097 09304 ASK 49439 b (xi) administer related contingency procurement events.
and (vii) consult with the procurement administrator regarding the development and use of benchmark SB1608 - 9 - LRB097 09304 ASK 49439 b criteria, standard form contracts, credit policies, and bid documents.
and (vii) consult with the procurement administrator regarding the development and use of benchmark criteria, standard form contracts, credit policies, and bid documents.
(d) Except as provided in subsection (j), the planning process shall be conducted as follows:
SB1608 Engrossed - 9 - LRB097 09304 ASK 49439 b (d) Except as provided in subsection (j), the planning process shall be conducted as follows:
Copies of the draft procurement plan shall be SB1608 - 10 - LRB097 09304 ASK 49439 b posted and made publicly available on the Agency's and Commission's websites, and copies shall also be provided to each affected electric utility and each alternative retail electric supplier.
Copies of the draft procurement plan shall be posted and made publicly available on the Agency's and Commission's websites, and copies shall also be provided to SB1608 Engrossed - 10 - LRB097 09304 ASK 49439 b each affected electric utility.
Other interested entities, including alternative retail electric suppliers, also may comment on the procurement plan within the timeframe outlined in this Section.
Other interested entities also may comment on the procurement plan within the timeframe outlined in this Section.
The Agency shall endeavor at all times to identify interested parties and proactively seek out comment from parties affected by Agency proposals.
The Agency shall identify any revisions to SB1608 - 11 - LRB097 09304 ASK 49439 b the draft procurement plan by documenting such revisions in legislative style.
The Agency shall identify any revisions to the draft procurement plan by documenting such revisions in legislative style.
Within 15 10 days after the filing, the Commission shall determine whether a hearing is necessary.
Within 15 10 days after the filing, the SB1608 Engrossed - 11 - LRB097 09304 ASK 49439 b Commission shall determine whether a hearing is necessary.
Given the short timeframe in which parties have to review and comment upon the Agency's final version of the procurement plan, the Commission may, in its discretion, reject any subsequent supplements, amendments, or modifications proposed by the Agency to its final version of the procurement plan filed with the Commission.
Any such supplement, amendment, or modification may be proposed by the Agency in subsequent draft plans.
In its order disposing of the Agency's final procurement plan, the Commission may specifically require and direct the Agency to undertake additional research on specific Agency proposals contained in the Agency's final procurement plan for which the Commission finds the evidentiary record is insufficient or incomplete.
The Commission may provide the Agency with specific questions or areas of inquiry related SB1608 - 12 - LRB097 09304 ASK 49439 b to the Agency's proposal that the Commission wishes the Agency to pursue.
The Commission may require that the Agency provide a report back to the Commission on the results of the Agency's research in a format, and by a date certain, acceptable to the Commission.
The procurement administrator shall also SB1608 - 13 - LRB097 09304 ASK 49439 b administer the prequalification process, including evaluation of credit worthiness, compliance with procurement rules, and agreement to the standard form contract developed pursuant to paragraph (2) of this subsection (e).
The procurement administrator shall also SB1608 Engrossed - 12 - LRB097 09304 ASK 49439 b administer the prequalification process, including evaluation of credit worthiness, compliance with procurement rules, and agreement to the standard form contract developed pursuant to paragraph (2) of this subsection (e).
The terms of the contracts shall not be subject to negotiation by winning bidders, and the bidders must agree to the terms of the contract in advance so that winning bids are SB1608 - 14 - LRB097 09304 ASK 49439 b selected solely on the basis of price.
The terms of the contracts shall not be subject to negotiation by winning bidders, and the bidders must agree to the terms of the contract in advance so that winning bids are SB1608 Engrossed - 13 - LRB097 09304 ASK 49439 b selected solely on the basis of price.
The request for proposals shall set forth a procedure for sealed, binding commitment bidding with pay-as-bid settlement, and provision for SB1608 - 15 - LRB097 09304 ASK 49439 b selection of bids on the basis of price.
The request for proposals shall set forth a procedure for sealed, binding commitment bidding with pay-as-bid settlement, and provision for SB1608 Engrossed - 14 - LRB097 09304 ASK 49439 b selection of bids on the basis of price.
provided, however, that if a needed product is not SB1608 - 16 - LRB097 09304 ASK 49439 b available through the regional transmission organization market it shall be purchased from the wholesale market.
provided, however, that if a needed product is not SB1608 Engrossed - 15 - LRB097 09304 ASK 49439 b available through the regional transmission organization market it shall be purchased from the wholesale market.
(iii) In all cases where there is insufficient SB1608 - 17 - LRB097 09304 ASK 49439 b supply provided under contracts awarded through the procurement process to fully meet the electric utility's load requirement, the utility shall meet the load requirement by procuring power and energy from the applicable regional transmission organization market, including ancillary services, capacity, and day-ahead or real time energy or both;
(iii) In all cases where there is insufficient SB1608 Engrossed - 16 - LRB097 09304 ASK 49439 b supply provided under contracts awarded through the procurement process to fully meet the electric utility's load requirement, the utility shall meet the load requirement by procuring power and energy from the applicable regional transmission organization market, including ancillary services, capacity, and day-ahead or real time energy or both;
The Commission shall review the confidential SB1608 - 18 - LRB097 09304 ASK 49439 b reports submitted by the procurement administrator and procurement monitor, and shall accept or reject the recommendations of the procurement administrator within 2 business days after receipt of the reports.
The Commission shall review the confidential SB1608 Engrossed - 17 - LRB097 09304 ASK 49439 b reports submitted by the procurement administrator and procurement monitor, and shall accept or reject the recommendations of the procurement administrator within 2 business days after receipt of the reports.
Confidential information, including the confidential reports submitted by the procurement administrator and procurement monitor pursuant to subsection (f) of this Section, shall not be made publicly available and shall not be discoverable by any party in any proceeding, SB1608 - 19 - LRB097 09304 ASK 49439 b absent a compelling demonstration of need, nor shall those reports be admissible in any proceeding other than one for law enforcement purposes.
Confidential information, including the confidential reports submitted by the procurement administrator and procurement monitor pursuant to subsection (f) of this Section, shall not be made publicly available and shall not be discoverable by any party in any proceeding, SB1608 Engrossed - 18 - LRB097 09304 ASK 49439 b absent a compelling demonstration of need, nor shall those reports be admissible in any proceeding other than one for law enforcement purposes.
The initial procurement plan shall identify the portfolio of power and energy products to be procured and delivered for the period June 2008 through May 2009, and shall identify the proposed procurement administrator, who shall have the same experience and expertise as is required of a procurement administrator hired pursuant to SB1608 - 20 - LRB097 09304 ASK 49439 b Section 1-75 of the Illinois Power Agency Act.
The initial procurement plan shall identify the portfolio of power and energy products to be procured and delivered for the period June 2008 through May 2009, and shall identify the proposed procurement administrator, who shall have the same experience and expertise as is required of a procurement administrator hired pursuant to SB1608 Engrossed - 19 - LRB097 09304 ASK 49439 b Section 1-75 of the Illinois Power Agency Act.
The Commission shall approve the procurement plan if the Commission determines that it will ensure adequate, reliable, affordable, efficient, and environmentally SB1608 - 21 - LRB097 09304 ASK 49439 b sustainable electric service at the lowest total cost over time, taking into account any benefits of price stability.
The Commission shall approve the procurement plan if the Commission determines that it will ensure adequate, reliable, affordable, efficient, and environmentally SB1608 Engrossed - 20 - LRB097 09304 ASK 49439 b sustainable electric service at the lowest total cost over time, taking into account any benefits of price stability.
Costs incurred pursuant to a contract authorized by this subsection (k) shall be deemed prudently incurred and reasonable in amount and the electric utility SB1608 - 22 - LRB097 09304 ASK 49439 b shall be entitled to full cost recovery pursuant to the tariffs filed with the Commission.
Costs incurred pursuant to a contract authorized by this subsection (k) shall be deemed prudently incurred and reasonable in amount and the electric utility SB1608 Engrossed - 21 - LRB097 09304 ASK 49439 b shall be entitled to full cost recovery pursuant to the tariffs filed with the Commission.
A utility shall recover through the tariff all reasonable costs incurred to implement or comply with any procurement plan that is developed and put into effect pursuant to Section 1-75 of the Illinois Power Agency Act and this Section, including any fees assessed by the Illinois Power SB1608 - 23 - LRB097 09304 ASK 49439 b Agency, costs associated with load balancing, and contingency plan costs.
A utility shall recover through the tariff all reasonable costs incurred to implement or comply with any procurement plan that is developed and put into effect pursuant to Section 1-75 of the Illinois Power Agency Act and this Section, including any fees assessed by the Illinois Power SB1608 Engrossed - 22 - LRB097 09304 ASK 49439 b Agency, costs associated with load balancing, and contingency plan costs.
Show all 42 changed rows (2 more)
Previous
Latest
(o) On or before June 1 of each year, the Commission shall hold an informal hearing for the purpose of receiving comments SB1608 - 24 - LRB097 09304 ASK 49439 b on the prior year's procurement process and any recommendations for change.
(o) On or before June 1 of each year, the Commission shall hold an informal hearing for the purpose of receiving comments SB1608 Engrossed - 23 - LRB097 09304 ASK 49439 b on the prior year's procurement process and any recommendations for change.
Nothing in this Section is intended to prohibit a utility from filing for a fuel adjustment clause as is otherwise permitted under Section SB1608 - 25 - LRB097 09304 ASK 49439 b 9-220 of this Act.
Nothing in this Section is intended to prohibit a utility from filing for a fuel adjustment clause as is otherwise permitted under Section SB1608 Engrossed - 24 - LRB097 09304 ASK 49439 b 9-220 of this Act.
View plain text versions (2)

Action History

  1. Session Sine Die

  2. Rule 19(a) / Re-referred to Rules Committee

  3. Final Action Deadline Extended-9(b) May 31, 2011

  4. Final Action Deadline Extended-9(b) May 27, 2011

  5. Committee Deadline Extended-Rule 9(b) May 20, 2011

  6. Assigned to Executive Committee

  7. Referred to Rules Committee

  8. Chief House Sponsor Rep. Richard Morthland

  9. Placed on Calendar Order of First Reading

  10. Arrived in House

  11. Third Reading - Passed; 055-000-000

  12. Placed on Calendar Order of 3rd Reading April 11, 2011

  13. Second Reading

  14. Placed on Calendar Order of 2nd Reading March 29, 2011

  15. Do Pass as Amended Energy; 017-000-000

  16. Senate Committee Amendment No. 1 Adopted

  17. Senate Committee Amendment No. 1 Assignments Refers to Energy

  18. Senate Committee Amendment No. 1 Referred to Assignments

  19. Senate Committee Amendment No. 1 Filed with Secretary by Sen. Mike Jacobs

  20. Postponed - Energy

  21. Assigned to Energy

  22. Referred to Assignments

  23. First Reading

  24. Filed with Secretary by Sen. Mike Jacobs

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

0 sponsors · 1 co-sponsors · 182 not signed on

Sponsors (0)

None.

Co-sponsors (1)

Not signed on (182)

182 members have not signed on to this bill.

Show all 182 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Third Reading

Passed 55 Yea · 0 Nay · 4 Other
Party YeaNayPresentNot Voting
Unaffiliated 45001
Democrat 8002
Republican 2001
Total 55004
% of votes cast 93%0%0%7%
How each member voted (59)
Member Party Vote
Duffy — Yea
Frerichs — Yea
Haine — Yea
Muñoz — Yea
Kotowski — Yea
LaHood — Yea
Link — Yea
McCann — Yea
McCarter — Yea
Millner — Yea
Mulroe — Yea
Noland — Yea
Brady — Yea
Schoenberg — Yea
Silverstein — Yea
Jacobs — Yea
Johnson, C. — Yea
Johnson, T. — Yea
Steans — Yea
Trotter — Yea
Sullivan — Yea
Jones, J. — Yea
Wilhelmi — Yea
Cullerton — Yea
Clayborne — Yea
Crotty — Yea
Cultra — Yea
Dillard — Yea
Forby — Yea
Hutchinson — Yea
Landek — Yea
Lauzen — Yea
Meeks — Not Voting
Pankau — Yea
Garrett — Yea
Radogno — Yea
Raoul — Yea
Righter — Yea
Sandack — Yea
Sandoval — Yea
Luechtefeld — Yea
Maloney — Yea
Althoff — Yea
Martinez — Yea
Bivins — Yea
Bomke — Yea
David Koehler Democrat Yea
Don Harmon Democrat Yea
Emil Jones, III Democrat Not Voting
Eva-Dina Delgado Democrat Yea
Kimberly A. Lightford Democrat Yea
Lakesia Collins Democrat Yea
Lakesia Collins Democrat Not Voting
Laura M. Murphy Democrat Yea
Linda Holmes Democrat Yea
Mattie Hunter Democrat Yea
Dave Syverson Republican Not Voting
Kevin Schmidt Republican Yea
Sue Rezin Republican Yea

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does SB 1608 do?
Amends the Public Utilities Act. Provides that the required procurement plan for an electric utility shall include proposed bidding rules, bid documents, standard form contracts, and credit documents and policies. Changes provisions concerning the draft and final procurement plans by the Illinois Power Agency, including the role of the Illinois Commerce Commission. Effective immediately.
Who sponsors SB 1608?
SB 1608 is sponsored by Paul Jacobs (Republican).
What is the current status of SB 1608?
This bill died with 97th Regular Session. It reached “Passed Senate” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track SB 1608?
Track SB 1608 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 1608

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 1608

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →