Illinois 97th Regular Session Status: Enacted

HB 1865 — REGULATION-TECH

Last action — Public Act . . . . . . . . . 97-0325

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. ✓
    Passed House
  4. ✓
    Passed Senate
  5. ✓
    To Executive
  6. 6
    Enacted

This bill has been enacted into law. Introduced February 16, 2011. Enacted.

Prognosis

Likely to advance 70% · moderate confidence

Where this bill stands today.

Odds of enactment

High

How often bills like it became law.

  • Enacted

    Current position in the legislative process.

  • 1 sponsor

    0 primary, 1 co-sponsors signed on.

  • Cleared a recorded vote

    Passed 2 recorded votes so far.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Summary

Amends the Public Utilities Act. Makes a technical change in a Section concerning HVAC affiliate marketing.

Bill Text

What changed in the latest version

65 added · 65 removed

Plain-language change summary

The latest version of Bill HB 1865 replaces the term "Engrossed" with "Enrolled," indicating it has completed the legislative process and is prepared for final approval or signing. This change is important because it signifies that the bill has been reviewed and passed in its current form, moving it closer to becoming law.

→
Previous
Latest
HB1865 Engrossed LRB097 09633 ASK 49770 b AN ACT concerning regulation.
HB1865 Enrolled LRB097 09633 ASK 49770 b AN ACT concerning regulation.
(4) To protect against this threat to economic well-being, health, and safety it is necessary to improve HB1865 Engrossed - 2 - LRB097 09633 ASK 49770 b the process of procuring electricity to serve Illinois residents, to promote investment in energy efficiency and demand-response measures, and to support development of clean coal technologies and renewable resources.
(4) To protect against this threat to economic well-being, health, and safety it is necessary to improve HB1865 Enrolled - 2 - LRB097 09633 ASK 49770 b the process of procuring electricity to serve Illinois residents, to promote investment in energy efficiency and demand-response measures, and to support development of clean coal technologies and renewable resources.
(A) Develop electricity procurement plans to ensure HB1865 Engrossed - 3 - LRB097 09633 ASK 49770 b adequate, reliable, affordable, efficient, and environmentally sustainable electric service at the lowest total cost over time, taking into account any benefits of price stability, for electric utilities that on December 31, 2005 provided electric service to at least 100,000 customers in Illinois and for small multi-jurisdictional electric utilities that (i) on December 31, 2005 served less than 100,000 customers in Illinois and (ii) request a procurement plan for their Illinois jurisdictional load.
(A) Develop electricity procurement plans to ensure HB1865 Enrolled - 3 - LRB097 09633 ASK 49770 b adequate, reliable, affordable, efficient, and environmentally sustainable electric service at the lowest total cost over time, taking into account any benefits of price stability, for electric utilities that on December 31, 2005 provided electric service to at least 100,000 customers in Illinois and for small multi-jurisdictional electric utilities that (i) on December 31, 2005 served less than 100,000 customers in Illinois and (ii) request a procurement plan for their Illinois jurisdictional load.
6-1-09.) (20 ILCS 3855/1-20) HB1865 Engrossed - 4 - LRB097 09633 ASK 49770 b Sec.
6-1-09.) (20 ILCS 3855/1-20) HB1865 Enrolled - 4 - LRB097 09633 ASK 49770 b Sec.
municipal electric HB1865 Engrossed - 5 - LRB097 09633 ASK 49770 b systems, governmental aggregators, or rural electric cooperatives in Illinois.
municipal electric HB1865 Enrolled - 5 - LRB097 09633 ASK 49770 b systems, governmental aggregators, or rural electric cooperatives in Illinois.
(6) To acquire real or personal property, whether tangible or intangible, including without limitation property rights, interests in property, franchises, obligations, contracts, and debt and equity securities, HB1865 Engrossed - 6 - LRB097 09633 ASK 49770 b and to do so by the exercise of the power of eminent domain in accordance with Section 1-21;
(6) To acquire real or personal property, whether tangible or intangible, including without limitation property rights, interests in property, franchises, obligations, contracts, and debt and equity securities, HB1865 Enrolled - 6 - LRB097 09633 ASK 49770 b and to do so by the exercise of the power of eminent domain in accordance with Section 1-21;
HB1865 Engrossed - 7 - LRB097 09633 ASK 49770 b (10) To lend money, invest and reinvest its funds in accordance with the Public Funds Investment Act, and take and hold real and personal property as security for the payment of funds loaned or invested.
HB1865 Enrolled - 7 - LRB097 09633 ASK 49770 b (10) To lend money, invest and reinvest its funds in accordance with the Public Funds Investment Act, and take and hold real and personal property as security for the payment of funds loaned or invested.
(14) To negotiate and enter into agreements with trustees or receivers appointed by United States bankruptcy courts or federal district courts or in other proceedings involving adjustment of debts and authorize proceedings involving adjustment of debts and authorize legal counsel for the Agency to appear in any such HB1865 Engrossed - 8 - LRB097 09633 ASK 49770 b proceedings.
(14) To negotiate and enter into agreements with trustees or receivers appointed by United States bankruptcy courts or federal district courts or in other proceedings involving adjustment of debts and authorize proceedings involving adjustment of debts and authorize legal counsel for the Agency to appear in any such HB1865 Enrolled - 8 - LRB097 09633 ASK 49770 b proceedings.
(22) To engage in any activity or operation that is HB1865 Engrossed - 9 - LRB097 09633 ASK 49770 b incidental to and in furtherance of efficient operation to accomplish the Agency's purposes.
(22) To engage in any activity or operation that is HB1865 Enrolled - 9 - LRB097 09633 ASK 49770 b incidental to and in furtherance of efficient operation to accomplish the Agency's purposes.
(a) The Planning and Procurement Bureau shall each HB1865 Engrossed - 10 - LRB097 09633 ASK 49770 b year, beginning in 2008, develop procurement plans and conduct competitive procurement processes in accordance with the requirements of Section 16-111.5 of the Public Utilities Act for the eligible retail customers of electric utilities that on December 31, 2005 provided electric service to at least 100,000 customers in Illinois.
(a) The Planning and Procurement Bureau shall each HB1865 Enrolled - 10 - LRB097 09633 ASK 49770 b year, beginning in 2008, develop procurement plans and conduct competitive procurement processes in accordance with the requirements of Section 16-111.5 of the Public Utilities Act for the eligible retail customers of electric utilities that on December 31, 2005 provided electric service to at least 100,000 customers in Illinois.
In order to qualify an HB1865 Engrossed - 11 - LRB097 09633 ASK 49770 b expert or expert consulting firm must have:
In order to qualify an HB1865 Enrolled - 11 - LRB097 09633 ASK 49770 b expert or expert consulting firm must have:
HB1865 Engrossed - 12 - LRB097 09633 ASK 49770 b (A) direct previous experience administering a large-scale competitive procurement process;
HB1865 Enrolled - 12 - LRB097 09633 ASK 49770 b (A) direct previous experience administering a large-scale competitive procurement process;
The Agency shall also provide each qualified expert's or expert consulting firm's HB1865 Engrossed - 13 - LRB097 09633 ASK 49770 b response to the request for qualifications.
The Agency shall also provide each qualified expert's or expert consulting firm's HB1865 Enrolled - 13 - LRB097 09633 ASK 49770 b response to the request for qualifications.
HB1865 Engrossed - 14 - LRB097 09633 ASK 49770 b (4) The Agency shall issue requests for proposals to the qualified experts or expert consulting firms to develop a procurement plan for the affected utilities and to serve as procurement administrator.
HB1865 Enrolled - 14 - LRB097 09633 ASK 49770 b (4) The Agency shall issue requests for proposals to the qualified experts or expert consulting firms to develop a procurement plan for the affected utilities and to serve as procurement administrator.
(b) The experts or expert consulting firms retained by the Agency shall, as appropriate, prepare procurement plans, and conduct a competitive procurement process as prescribed in Section 16-111.5 of the Public Utilities Act, to ensure adequate, reliable, affordable, efficient, and environmentally sustainable electric service at the lowest total cost over time, taking into account any benefits of HB1865 Engrossed - 15 - LRB097 09633 ASK 49770 b price stability, for eligible retail customers of electric utilities that on December 31, 2005 provided electric service to at least 100,000 customers in the State of Illinois, and for eligible Illinois retail customers of small multi-jurisdictional electric utilities that (i) on December 31, 2005 served less than 100,000 customers in Illinois and (ii) request a procurement plan for their Illinois jurisdictional load.
(b) The experts or expert consulting firms retained by the Agency shall, as appropriate, prepare procurement plans, and conduct a competitive procurement process as prescribed in Section 16-111.5 of the Public Utilities Act, to ensure adequate, reliable, affordable, efficient, and environmentally sustainable electric service at the lowest total cost over time, taking into account any benefits of HB1865 Enrolled - 15 - LRB097 09633 ASK 49770 b price stability, for eligible retail customers of electric utilities that on December 31, 2005 provided electric service to at least 100,000 customers in the State of Illinois, and for eligible Illinois retail customers of small multi-jurisdictional electric utilities that (i) on December 31, 2005 served less than 100,000 customers in Illinois and (ii) request a procurement plan for their Illinois jurisdictional load.
To the extent that it is available, at least 75% of the renewable energy resources used to meet these standards shall come from wind generation and, beginning on June 1, 2011, at least the following HB1865 Engrossed - 16 - LRB097 09633 ASK 49770 b percentages of the renewable energy resources used to meet these standards shall come from photovoltaics on the following schedule:
To the extent that it is available, at least 75% of the renewable energy resources used to meet these standards shall come from wind generation and, beginning on June 1, 2011, at least the following HB1865 Enrolled - 16 - LRB097 09633 ASK 49770 b percentages of the renewable energy resources used to meet these standards shall come from photovoltaics on the following schedule:
For purposes of this subsection (c), the total amount paid for electric service includes without limitation HB1865 Engrossed - 17 - LRB097 09633 ASK 49770 b amounts paid for supply, transmission, distribution, surcharges, and add-on taxes.
For purposes of this subsection (c), the total amount paid for electric service includes without limitation HB1865 Enrolled - 17 - LRB097 09633 ASK 49770 b amounts paid for supply, transmission, distribution, surcharges, and add-on taxes.
(D) in 2011, the greater of an additional 0.5% of the amount paid per kilowatthour by those customers during the year ending May 31, 2010 or 2% HB1865 Engrossed - 18 - LRB097 09633 ASK 49770 b of the amount paid per kilowatthour by those customers during the year ending May 31, 2007;
(D) in 2011, the greater of an additional 0.5% of the amount paid per kilowatthour by those customers during the year ending May 31, 2010 or 2% HB1865 Enrolled - 18 - LRB097 09633 ASK 49770 b of the amount paid per kilowatthour by those customers during the year ending May 31, 2007;
(3) Through June 1, 2011, renewable energy resources shall be counted for the purpose of meeting the renewable energy standards set forth in paragraph (1) of this subsection (c) only if they are generated from facilities located in the State, provided that HB1865 Engrossed - 19 - LRB097 09633 ASK 49770 b cost-effective renewable energy resources are available from those facilities.
(3) Through June 1, 2011, renewable energy resources shall be counted for the purpose of meeting the renewable energy standards set forth in paragraph (1) of this subsection (c) only if they are generated from facilities located in the State, provided that HB1865 Enrolled - 19 - LRB097 09633 ASK 49770 b cost-effective renewable energy resources are available from those facilities.
(5) Beginning with the year commencing June 1, 2010, an electric utility subject to this subsection (c) shall apply the lesser of the maximum alternative compliance payment rate or the most recent estimated alternative compliance payment rate for its service territory for the corresponding compliance period, established pursuant to subsection (d) of Section HB1865 Engrossed - 20 - LRB097 09633 ASK 49770 b 16-115D of the Public Utilities Act to its retail customers that take service pursuant to the electric utility's hourly pricing tariff or tariffs.
(5) Beginning with the year commencing June 1, 2010, an electric utility subject to this subsection (c) shall apply the lesser of the maximum alternative compliance payment rate or the most recent estimated alternative compliance payment rate for its service territory for the corresponding compliance period, established pursuant to subsection (d) of Section HB1865 Enrolled - 20 - LRB097 09633 ASK 49770 b 16-115D of the Public Utilities Act to its retail customers that take service pursuant to the electric utility's hourly pricing tariff or tariffs.
Each utility shall enter into one or more sourcing agreements with the initial clean coal facility, as provided in paragraph (3) of this subsection (d), covering electricity generated by the initial clean coal facility representing at least 5% of each utility's HB1865 Engrossed - 21 - LRB097 09633 ASK 49770 b total supply to serve the load of eligible retail customers in 2015 and each year thereafter, as described in paragraph (3) of this subsection (d), subject to the limits specified in paragraph (2) of this subsection (d).
Each utility shall enter into one or more sourcing agreements with the initial clean coal facility, as provided in paragraph (3) of this subsection (d), covering electricity generated by the initial clean coal facility representing at least 5% of each utility's HB1865 Enrolled - 21 - LRB097 09633 ASK 49770 b total supply to serve the load of eligible retail customers in 2015 and each year thereafter, as described in paragraph (3) of this subsection (d), subject to the limits specified in paragraph (2) of this subsection (d).
(B) Utilities shall maintain adequate records documenting the purchases under the sourcing agreement to comply with this subsection (d) and shall file an accounting with the load forecast that must be filed HB1865 Engrossed - 22 - LRB097 09633 ASK 49770 b with the Agency by July 15 of each year, in accordance with subsection (d) of Section 16-111.5 of the Public Utilities Act.
(B) Utilities shall maintain adequate records documenting the purchases under the sourcing agreement to comply with this subsection (d) and shall file an accounting with the load forecast that must be filed HB1865 Enrolled - 22 - LRB097 09633 ASK 49770 b with the Agency by July 15 of each year, in accordance with subsection (d) of Section 16-111.5 of the Public Utilities Act.
Notwithstanding the requirements of this subsection (d), the total amount paid under sourcing agreements with clean coal facilities pursuant to the procurement plan for any given year shall be reduced by an amount necessary to limit the annual estimated average net increase due to the HB1865 Engrossed - 23 - LRB097 09633 ASK 49770 b costs of these resources included in the amounts paid by eligible retail customers in connection with electric service to:
Notwithstanding the requirements of this subsection (d), the total amount paid under sourcing agreements with clean coal facilities pursuant to the procurement plan for any given year shall be reduced by an amount necessary to limit the annual estimated average net increase due to the HB1865 Enrolled - 23 - LRB097 09633 ASK 49770 b costs of these resources included in the amounts paid by eligible retail customers in connection with electric service to:
and (E) thereafter, the total amount paid under sourcing agreements with clean coal facilities pursuant to the procurement plan for any single year shall be reduced by an amount necessary to limit the estimated average net increase due to the HB1865 Engrossed - 24 - LRB097 09633 ASK 49770 b cost of these resources included in the amounts paid by eligible retail customers in connection with electric service to no more than the greater of (i) 2.015% of the amount paid per kilowatthour by those customers during the year ending May 31, 2009 or (ii) the incremental amount per kilowatthour paid for these resources in 2013.
and (E) thereafter, the total amount paid under sourcing agreements with clean coal facilities pursuant to the procurement plan for any single year shall be reduced by an amount necessary to limit the estimated average net increase due to the HB1865 Enrolled - 24 - LRB097 09633 ASK 49770 b cost of these resources included in the amounts paid by eligible retail customers in connection with electric service to no more than the greater of (i) 2.015% of the amount paid per kilowatthour by those customers during the year ending May 31, 2009 or (ii) the incremental amount per kilowatthour paid for these resources in 2013.
In order to promote development of clean coal facilities in Illinois, each electric utility subject to this Section shall execute a sourcing agreement to source electricity from a proposed clean coal facility in Illinois (the "initial clean coal facility") that will have a nameplate capacity of at least 500 MW when commercial operation commences, that has a final Clean Air Act permit on the effective date of this amendatory Act of the 95th General Assembly, and that will HB1865 Engrossed - 25 - LRB097 09633 ASK 49770 b meet the definition of clean coal facility in Section 1-10 of this Act when commercial operation commences.
In order to promote development of clean coal facilities in Illinois, each electric utility subject to this Section shall execute a sourcing agreement to source electricity from a proposed clean coal facility in Illinois (the "initial clean coal facility") that will have a nameplate capacity of at least 500 MW when commercial operation commences, that has a final Clean Air Act permit on the effective date of this amendatory Act of the 95th General Assembly, and that will HB1865 Enrolled - 25 - LRB097 09633 ASK 49770 b meet the definition of clean coal facility in Section 1-10 of this Act when commercial operation commences.
and HB1865 Engrossed - 26 - LRB097 09633 ASK 49770 b (ii) provide that all miscellaneous net revenue, including but not limited to net revenue from the sale of emission allowances, if any, substitute natural gas, if any, grants or other support provided by the State of Illinois or the United States Government, firm transmission rights, if any, by-products produced by the facility, energy or capacity derived from the facility and not covered by a sourcing agreement pursuant to paragraph (3) of this subsection (d) or item (5) of subsection (d) of Section 16-115 of the Public Utilities Act, whether generated from the synthesis gas derived from coal, from SNG, or from natural gas, shall be credited against the revenue requirement for this initial clean coal facility;
and HB1865 Enrolled - 26 - LRB097 09633 ASK 49770 b (ii) provide that all miscellaneous net revenue, including but not limited to net revenue from the sale of emission allowances, if any, substitute natural gas, if any, grants or other support provided by the State of Illinois or the United States Government, firm transmission rights, if any, by-products produced by the facility, energy or capacity derived from the facility and not covered by a sourcing agreement pursuant to paragraph (3) of this subsection (d) or item (5) of subsection (d) of Section 16-115 of the Public Utilities Act, whether generated from the synthesis gas derived from coal, from SNG, or from natural gas, shall be credited against the revenue requirement for this initial clean coal facility;
(iii) require the utility party to such sourcing agreement to buy from the initial clean coal facility in each hour an amount of energy HB1865 Engrossed - 27 - LRB097 09633 ASK 49770 b equal to all clean coal energy made available from the initial clean coal facility during such hour times a fraction, the numerator of which is such utility's retail market sales of electricity (expressed in kilowatthours sold) in the State during the prior calendar month and the denominator of which is the total retail market sales of electricity (expressed in kilowatthours sold) in the State by utilities during such prior month and the sales of electricity (expressed in kilowatthours sold) in the State by alternative retail electric suppliers during such prior month that are subject to the requirements of this subsection (d) and paragraph (5) of subsection (d) of Section 16-115 of the Public Utilities Act, provided that the amount purchased by the utility in any year will be limited by paragraph (2) of this subsection (d);
(iii) require the utility party to such sourcing agreement to buy from the initial clean coal facility in each hour an amount of energy HB1865 Enrolled - 27 - LRB097 09633 ASK 49770 b equal to all clean coal energy made available from the initial clean coal facility during such hour times a fraction, the numerator of which is such utility's retail market sales of electricity (expressed in kilowatthours sold) in the State during the prior calendar month and the denominator of which is the total retail market sales of electricity (expressed in kilowatthours sold) in the State by utilities during such prior month and the sales of electricity (expressed in kilowatthours sold) in the State by alternative retail electric suppliers during such prior month that are subject to the requirements of this subsection (d) and paragraph (5) of subsection (d) of Section 16-115 of the Public Utilities Act, provided that the amount purchased by the utility in any year will be limited by paragraph (2) of this subsection (d);
(i) require the utility party to such sourcing agreement to contract with the initial clean coal facility in each hour with respect to an amount of HB1865 Engrossed - 28 - LRB097 09633 ASK 49770 b energy equal to all clean coal energy made available from the initial clean coal facility during such hour times a fraction, the numerator of which is such utility's retail market sales of electricity (expressed in kilowatthours sold) in the utility's service territory in the State during the prior calendar month and the denominator of which is the total retail market sales of electricity (expressed in kilowatthours sold) in the State by utilities during such prior month and the sales of electricity (expressed in kilowatthours sold) in the State by alternative retail electric suppliers during such prior month that are subject to the requirements of this subsection (d) and paragraph (5) of subsection (d) of Section 16-115 of the Public Utilities Act, provided that the amount paid by the utility in any year will be limited by paragraph (2) of this subsection (d);
(i) require the utility party to such sourcing agreement to contract with the initial clean coal facility in each hour with respect to an amount of HB1865 Enrolled - 28 - LRB097 09633 ASK 49770 b energy equal to all clean coal energy made available from the initial clean coal facility during such hour times a fraction, the numerator of which is such utility's retail market sales of electricity (expressed in kilowatthours sold) in the utility's service territory in the State during the prior calendar month and the denominator of which is the total retail market sales of electricity (expressed in kilowatthours sold) in the State by utilities during such prior month and the sales of electricity (expressed in kilowatthours sold) in the State by alternative retail electric suppliers during such prior month that are subject to the requirements of this subsection (d) and paragraph (5) of subsection (d) of Section 16-115 of the Public Utilities Act, provided that the amount paid by the utility in any year will be limited by paragraph (2) of this subsection (d);
(ii) provide that the utility's payment obligation in respect of the quantity of electricity determined pursuant to the preceding clause (i) shall be limited to an amount equal to (1) the difference between the contract price determined pursuant to subparagraph (A) of paragraph (3) of this subsection (d) and the HB1865 Engrossed - 29 - LRB097 09633 ASK 49770 b day-ahead price for electricity delivered to the regional transmission organization market of the utility that is party to such sourcing agreement (or any successor delivery point at which such utility's supply obligations are financially settled on an hourly basis) (the "reference price") on the day preceding the day on which the electricity is delivered to the initial clean coal facility busbar, multiplied by (2) the quantity of electricity determined pursuant to the preceding clause (i);
(ii) provide that the utility's payment obligation in respect of the quantity of electricity determined pursuant to the preceding clause (i) shall be limited to an amount equal to (1) the difference between the contract price determined pursuant to subparagraph (A) of paragraph (3) of this subsection (d) and the HB1865 Enrolled - 29 - LRB097 09633 ASK 49770 b day-ahead price for electricity delivered to the regional transmission organization market of the utility that is party to such sourcing agreement (or any successor delivery point at which such utility's supply obligations are financially settled on an hourly basis) (the "reference price") on the day preceding the day on which the electricity is delivered to the initial clean coal facility busbar, multiplied by (2) the quantity of electricity determined pursuant to the preceding clause (i);
HB1865 Engrossed - 30 - LRB097 09633 ASK 49770 b (iii) provide that all costs associated with the initial clean coal facility will be periodically reported to the Federal Energy Regulatory Commission and to purchasers in accordance with applicable laws governing cost-based wholesale power contracts;
HB1865 Enrolled - 30 - LRB097 09633 ASK 49770 b (iii) provide that all costs associated with the initial clean coal facility will be periodically reported to the Federal Energy Regulatory Commission and to purchasers in accordance with applicable laws governing cost-based wholesale power contracts;
If, in any year after the first year of commercial operation, the owner of the facility fails to demonstrate that the initial clean coal facility captured and sequestered at least 50% of the total carbon HB1865 Engrossed - 31 - LRB097 09633 ASK 49770 b emissions that the facility would otherwise emit or that sequestration of emissions from prior years has failed, resulting in the release of carbon dioxide into the atmosphere, the owner of the facility must offset excess emissions.
If, in any year after the first year of commercial operation, the owner of the facility fails to demonstrate that the initial clean coal facility captured and sequestered at least 50% of the total carbon HB1865 Enrolled - 31 - LRB097 09633 ASK 49770 b emissions that the facility would otherwise emit or that sequestration of emissions from prior years has failed, resulting in the release of carbon dioxide into the atmosphere, the owner of the facility must offset excess emissions.
Compliance with the sequestration HB1865 Engrossed - 32 - LRB097 09633 ASK 49770 b requirements and offset purchase requirements specified in paragraph (3) of this subsection (d) shall be reviewed annually by an independent expert retained by the owner of the initial clean coal facility, with the advance written approval of the Attorney General.
Compliance with the sequestration HB1865 Enrolled - 32 - LRB097 09633 ASK 49770 b requirements and offset purchase requirements specified in paragraph (3) of this subsection (d) shall be reviewed annually by an independent expert retained by the owner of the initial clean coal facility, with the advance written approval of the Attorney General.
(1) to determine the justness, reasonableness, and prudence of the inputs to the formula referenced in subparagraphs (A)(i) through (A)(iii) of paragraph (3) of this subsection (d), prior to an adjustment in those inputs including, without limitation, the capital structure and return on equity, fuel costs, and other operations and maintenance costs and (2) to approve the costs to be passed through to customers under the sourcing agreement by which HB1865 Engrossed - 33 - LRB097 09633 ASK 49770 b the utility satisfies its statutory obligations.
(1) to determine the justness, reasonableness, and prudence of the inputs to the formula referenced in subparagraphs (A)(i) through (A)(iii) of paragraph (3) of this subsection (d), prior to an adjustment in those inputs including, without limitation, the capital structure and return on equity, fuel costs, and other operations and maintenance costs and (2) to approve the costs to be passed through to customers under the sourcing agreement by which HB1865 Enrolled - 33 - LRB097 09633 ASK 49770 b the utility satisfies its statutory obligations.
(xi) append documentation showing that the HB1865 Engrossed - 34 - LRB097 09633 ASK 49770 b formula rate and contract, insofar as they relate to the power purchase provisions, have been approved by the Federal Energy Regulatory Commission pursuant to Section 205 of the Federal Power Act;
(xi) append documentation showing that the HB1865 Enrolled - 34 - LRB097 09633 ASK 49770 b formula rate and contract, insofar as they relate to the power purchase provisions, have been approved by the Federal Energy Regulatory Commission pursuant to Section 205 of the Federal Power Act;
The owner of the initial clean coal facility shall submit to the Commission, the Agency, and the General Assembly a front-end engineering and design study, a facility cost report, method of financing (including but not limited to structure and associated costs), and an operating and maintenance cost quote for the HB1865 Engrossed - 35 - LRB097 09633 ASK 49770 b facility (collectively "facility cost report"), which shall be prepared in accordance with the requirements of this paragraph (4) of subsection (d) of this Section, and shall provide the Commission and the Agency access to the work papers, relied upon documents, and any other backup documentation related to the facility cost report.
The owner of the initial clean coal facility shall submit to the Commission, the Agency, and the General Assembly a front-end engineering and design study, a facility cost report, method of financing (including but not limited to structure and associated costs), and an operating and maintenance cost quote for the HB1865 Enrolled - 35 - LRB097 09633 ASK 49770 b facility (collectively "facility cost report"), which shall be prepared in accordance with the requirements of this paragraph (4) of subsection (d) of this Section, and shall provide the Commission and the Agency access to the work papers, relied upon documents, and any other backup documentation related to the facility cost report.
To assist in the preparation of its report, the Commission, in consultation with the Agency, may HB1865 Engrossed - 36 - LRB097 09633 ASK 49770 b hire one or more experts or consultants, the costs of which shall be paid for by the owner of the initial clean coal facility.
To assist in the preparation of its report, the Commission, in consultation with the Agency, may HB1865 Enrolled - 36 - LRB097 09633 ASK 49770 b hire one or more experts or consultants, the costs of which shall be paid for by the owner of the initial clean coal facility.
During such time period, the Commission shall implement any directive of the General Assembly, resolve any disputes between the parties HB1865 Engrossed - 37 - LRB097 09633 ASK 49770 b to the sourcing agreement concerning the terms of such agreement, approve the form of such agreement, and issue an order finding that the sourcing agreement is prudent and reasonable.
During such time period, the Commission shall implement any directive of the General Assembly, resolve any disputes between the parties HB1865 Enrolled - 37 - LRB097 09633 ASK 49770 b to the sourcing agreement concerning the terms of such agreement, approve the form of such agreement, and issue an order finding that the sourcing agreement is prudent and reasonable.
(ii) an estimate of the capital cost of the balance of the plant, including any capital costs associated with sequestration of carbon dioxide emissions and all interconnects and interfaces required to operate the facility, such as transmission of electricity, construction or backfeed power supply, pipelines to transport HB1865 Engrossed - 38 - LRB097 09633 ASK 49770 b substitute natural gas or carbon dioxide, potable water supply, natural gas supply, water supply, water discharge, landfill, access roads, and coal delivery.
(ii) an estimate of the capital cost of the balance of the plant, including any capital costs associated with sequestration of carbon dioxide emissions and all interconnects and interfaces required to operate the facility, such as transmission of electricity, construction or backfeed power supply, pipelines to transport HB1865 Enrolled - 38 - LRB097 09633 ASK 49770 b substitute natural gas or carbon dioxide, potable water supply, natural gas supply, water supply, water discharge, landfill, access roads, and coal delivery.
(a) The delivered fuel cost estimate will be provided by a recognized third party expert or HB1865 Engrossed - 39 - LRB097 09633 ASK 49770 b experts in the fuel and transportation industries.
(a) The delivered fuel cost estimate will be provided by a recognized third party expert or HB1865 Enrolled - 39 - LRB097 09633 ASK 49770 b experts in the fuel and transportation industries.
(E) Amounts paid to third parties unrelated to the owner or owners of the initial clean coal facility to HB1865 Engrossed - 40 - LRB097 09633 ASK 49770 b prepare the core plant construction cost quote, including the front end engineering and design study, and the operating and maintenance cost quote will be reimbursed through Coal Development Bonds.
(E) Amounts paid to third parties unrelated to the owner or owners of the initial clean coal facility to HB1865 Enrolled - 40 - LRB097 09633 ASK 49770 b prepare the core plant construction cost quote, including the front end engineering and design study, and the operating and maintenance cost quote will be reimbursed through Coal Development Bonds.
Show all 65 changed rows (25 more)
Previous
Latest
The Agency and the Commission may approve any such utility HB1865 Engrossed - 41 - LRB097 09633 ASK 49770 b sourcing agreements that do not exceed cost-based benchmarks developed by the procurement administrator, in consultation with the Commission staff, Agency staff and the procurement monitor, subject to Commission review and approval.
The Agency and the Commission may approve any such utility HB1865 Enrolled - 41 - LRB097 09633 ASK 49770 b sourcing agreements that do not exceed cost-based benchmarks developed by the procurement administrator, in consultation with the Commission staff, Agency staff and the procurement monitor, subject to Commission review and approval.
(h) The Agency shall assess fees to each bidder to recover the costs incurred in connection with a competitive HB1865 Engrossed - 42 - LRB097 09633 ASK 49770 b procurement process.
(h) The Agency shall assess fees to each bidder to recover the costs incurred in connection with a competitive HB1865 Enrolled - 42 - LRB097 09633 ASK 49770 b procurement process.
"Eligible retail customers" for the purposes of this Section means those retail customers that purchase power and energy from the electric utility under fixed-price bundled HB1865 Engrossed - 43 - LRB097 09633 ASK 49770 b service tariffs, other than those retail customers whose service is declared or deemed competitive under Section 16-113 and those other customer groups specified in this Section, including self-generating customers, customers electing hourly pricing, or those customers who are otherwise ineligible for fixed-price bundled tariff service.
"Eligible retail customers" for the purposes of this Section means those retail customers that purchase power and energy from the electric utility under fixed-price bundled HB1865 Enrolled - 43 - LRB097 09633 ASK 49770 b service tariffs, other than those retail customers whose service is declared or deemed competitive under Section 16-113 and those other customer groups specified in this Section, including self-generating customers, customers electing hourly pricing, or those customers who are otherwise ineligible for fixed-price bundled tariff service.
Each procurement plan shall analyze the HB1865 Engrossed - 44 - LRB097 09633 ASK 49770 b projected balance of supply and demand for eligible retail customers over a 5-year period with the first planning year beginning on June 1 of the year following the year in which the plan is filed.
Each procurement plan shall analyze the HB1865 Enrolled - 44 - LRB097 09633 ASK 49770 b projected balance of supply and demand for eligible retail customers over a 5-year period with the first planning year beginning on June 1 of the year following the year in which the plan is filed.
HB1865 Engrossed - 45 - LRB097 09633 ASK 49770 b (2) Analysis of the impact of any demand side and renewable energy initiatives.
HB1865 Enrolled - 45 - LRB097 09633 ASK 49770 b (2) Analysis of the impact of any demand side and renewable energy initiatives.
The cost-effective demand-response measures HB1865 Engrossed - 46 - LRB097 09633 ASK 49770 b shall be procured whenever the cost is lower than procuring comparable capacity products, provided that such products shall:
The cost-effective demand-response measures HB1865 Enrolled - 46 - LRB097 09633 ASK 49770 b shall be procured whenever the cost is lower than procuring comparable capacity products, provided that such products shall:
(iv) the proposed mix and selection of standard HB1865 Engrossed - 47 - LRB097 09633 ASK 49770 b wholesale products for which contracts will be executed during the next year, separately or in combination, to meet that portion of its load requirements not met through pre-existing contracts, including but not limited to monthly 5 x 16 peak period block energy, monthly off-peak wrap energy, monthly 7 x 24 energy, annual 5 x 16 energy, annual off-peak wrap energy, annual 7 x 24 energy, monthly capacity, annual capacity, peak load capacity obligations, capacity purchase plan, and ancillary services;
(iv) the proposed mix and selection of standard HB1865 Enrolled - 47 - LRB097 09633 ASK 49770 b wholesale products for which contracts will be executed during the next year, separately or in combination, to meet that portion of its load requirements not met through pre-existing contracts, including but not limited to monthly 5 x 16 peak period block energy, monthly off-peak wrap energy, monthly 7 x 24 energy, annual 5 x 16 energy, annual off-peak wrap energy, annual 7 x 24 energy, monthly capacity, annual capacity, peak load capacity obligations, capacity purchase plan, and ancillary services;
The procurement plan shall include, for load requirements HB1865 Engrossed - 48 - LRB097 09633 ASK 49770 b included in the procurement plan, the process for (i) hourly balancing of supply and demand and (ii) the criteria for portfolio re-balancing in the event of significant shifts in load.
The procurement plan shall include, for load requirements HB1865 Enrolled - 48 - LRB097 09633 ASK 49770 b included in the procurement plan, the process for (i) hourly balancing of supply and demand and (ii) the criteria for portfolio re-balancing in the event of significant shifts in load.
HB1865 Engrossed - 49 - LRB097 09633 ASK 49770 b (vii) have the discretion to negotiate to determine whether bidders are willing to lower the price of bids that meet the benchmarks approved by the Commission;
HB1865 Enrolled - 49 - LRB097 09633 ASK 49770 b (vii) have the discretion to negotiate to determine whether bidders are willing to lower the price of bids that meet the benchmarks approved by the Commission;
HB1865 Engrossed - 50 - LRB097 09633 ASK 49770 b (ii) monitor and report to the Commission on the progress of the procurement process;
HB1865 Enrolled - 50 - LRB097 09633 ASK 49770 b (ii) monitor and report to the Commission on the progress of the procurement process;
(1) Beginning in 2008, each Illinois utility procuring power pursuant to this Section shall annually provide a HB1865 Engrossed - 51 - LRB097 09633 ASK 49770 b range of load forecasts to the Illinois Power Agency by July 15 of each year, or such other date as may be required by the Commission or Agency.
(1) Beginning in 2008, each Illinois utility procuring power pursuant to this Section shall annually provide a HB1865 Enrolled - 51 - LRB097 09633 ASK 49770 b range of load forecasts to the Illinois Power Agency by July 15 of each year, or such other date as may be required by the Commission or Agency.
All comments submitted to the Agency shall be specific, supported by data or other detailed analyses, and, if objecting to all or a portion of the procurement HB1865 Engrossed - 52 - LRB097 09633 ASK 49770 b plan, accompanied by specific alternative wording or proposals.
All comments submitted to the Agency shall be specific, supported by data or other detailed analyses, and, if objecting to all or a portion of the procurement HB1865 Enrolled - 52 - LRB097 09633 ASK 49770 b plan, accompanied by specific alternative wording or proposals.
(e) The procurement process shall include each of the HB1865 Engrossed - 53 - LRB097 09633 ASK 49770 b following components:
(e) The procurement process shall include each of the HB1865 Enrolled - 53 - LRB097 09633 ASK 49770 b following components:
The procurement administrator, in consultation with the utilities, the Commission, and other interested parties and subject to Commission oversight, shall develop and provide standard contract forms for the supplier contracts that meet generally accepted industry HB1865 Engrossed - 54 - LRB097 09633 ASK 49770 b practices.
The procurement administrator, in consultation with the utilities, the Commission, and other interested parties and subject to Commission oversight, shall develop and provide standard contract forms for the supplier contracts that meet generally accepted industry HB1865 Enrolled - 54 - LRB097 09633 ASK 49770 b practices.
The price benchmarks may also be adjusted to take into account differences between the information HB1865 Engrossed - 55 - LRB097 09633 ASK 49770 b reflected in the underlying data sources and the specific products and procurement process being used to procure power for the Illinois utilities.
The price benchmarks may also be adjusted to take into account differences between the information HB1865 Enrolled - 55 - LRB097 09633 ASK 49770 b reflected in the underlying data sources and the specific products and procurement process being used to procure power for the Illinois utilities.
If both of these conditions are met, and the default results in termination of the contract, the HB1865 Engrossed - 56 - LRB097 09633 ASK 49770 b utility shall immediately notify the Illinois Power Agency that a request for proposals must be issued to procure replacement power, and the procurement administrator shall run an additional procurement event.
If both of these conditions are met, and the default results in termination of the contract, the HB1865 Enrolled - 56 - LRB097 09633 ASK 49770 b utility shall immediately notify the Illinois Power Agency that a request for proposals must be issued to procure replacement power, and the procurement administrator shall run an additional procurement event.
If changes are identified that would likely HB1865 Engrossed - 57 - LRB097 09633 ASK 49770 b result in increased supplier participation, or that would address concerns causing the Commission to reject the results of the prior procurement event, the procurement administrator may implement those changes and rerun the request for proposals process according to a schedule determined by those parties and consistent with Section 1-75 of the Illinois Power Agency Act and this subsection.
If changes are identified that would likely HB1865 Enrolled - 57 - LRB097 09633 ASK 49770 b result in increased supplier participation, or that would address concerns causing the Commission to reject the results of the prior procurement event, the procurement administrator may implement those changes and rerun the request for proposals process according to a schedule determined by those parties and consistent with Section 1-75 of the Illinois Power Agency Act and this subsection.
HB1865 Engrossed - 58 - LRB097 09633 ASK 49770 b (f) Within 2 business days after opening the sealed bids, the procurement administrator shall submit a confidential report to the Commission.
HB1865 Enrolled - 58 - LRB097 09633 ASK 49770 b (f) Within 2 business days after opening the sealed bids, the procurement administrator shall submit a confidential report to the Commission.
(h) The names of the successful bidders and the load HB1865 Engrossed - 59 - LRB097 09633 ASK 49770 b weighted average of the winning bid prices for each contract type and for each contract term shall be made available to the public at the time of Commission approval of a procurement event.
(h) The names of the successful bidders and the load HB1865 Enrolled - 59 - LRB097 09633 ASK 49770 b weighted average of the winning bid prices for each contract type and for each contract term shall be made available to the public at the time of Commission approval of a procurement event.
(j) Within 60 days following the effective date of this HB1865 Engrossed - 60 - LRB097 09633 ASK 49770 b amendatory Act, each electric utility that on December 31, 2005 provided electric service to at least 100,000 customers in Illinois shall prepare and file with the Commission an initial procurement plan, which shall conform in all material respects to the requirements of the procurement plan set forth in subsection (b);
(j) Within 60 days following the effective date of this HB1865 Enrolled - 60 - LRB097 09633 ASK 49770 b amendatory Act, each electric utility that on December 31, 2005 provided electric service to at least 100,000 customers in Illinois shall prepare and file with the Commission an initial procurement plan, which shall conform in all material respects to the requirements of the procurement plan set forth in subsection (b);
The electric utility may file a response to any objections to its procurement plan within 7 days after the date objections are due to be HB1865 Engrossed - 61 - LRB097 09633 ASK 49770 b filed.
The electric utility may file a response to any objections to its procurement plan within 7 days after the date objections are due to be HB1865 Enrolled - 61 - LRB097 09633 ASK 49770 b filed.
These contracts shall be for a term of no more than 5 years and shall, for each respective utility or for any Illinois electric utilities that are affiliated by virtue HB1865 Engrossed - 62 - LRB097 09633 ASK 49770 b of a common parent company and that are thereby considered a single electric utility for purposes of this subsection (k), not exceed in the aggregate 3,000 megawatts for any hour of the year.
These contracts shall be for a term of no more than 5 years and shall, for each respective utility or for any Illinois electric utilities that are affiliated by virtue HB1865 Enrolled - 62 - LRB097 09633 ASK 49770 b of a common parent company and that are thereby considered a single electric utility for purposes of this subsection (k), not exceed in the aggregate 3,000 megawatts for any hour of the year.
The tariffs shall include a formula rate or charge designed to pass through both the costs incurred by the utility in procuring a supply of electric power and energy for the applicable customer HB1865 Engrossed - 63 - LRB097 09633 ASK 49770 b classes with no mark-up or return on the price paid by the utility for that supply, plus any just and reasonable costs that the utility incurs in arranging and providing for the supply of electric power and energy.
The tariffs shall include a formula rate or charge designed to pass through both the costs incurred by the utility in procuring a supply of electric power and energy for the applicable customer HB1865 Enrolled - 63 - LRB097 09633 ASK 49770 b classes with no mark-up or return on the price paid by the utility for that supply, plus any just and reasonable costs that the utility incurs in arranging and providing for the supply of electric power and energy.
For the public interest, safety, and welfare, the Commission also has HB1865 Engrossed - 64 - LRB097 09633 ASK 49770 b authority to adopt rules to carry out the provisions of this Section on an emergency basis immediately following the effective date of this amendatory Act.
For the public interest, safety, and welfare, the Commission also has HB1865 Enrolled - 64 - LRB097 09633 ASK 49770 b authority to adopt rules to carry out the provisions of this Section on an emergency basis immediately following the effective date of this amendatory Act.
If the Commission grants all of the HB1865 Engrossed - 65 - LRB097 09633 ASK 49770 b necessary approvals for the proposed facility, such supply shall thereafter be considered as a pre-existing contract under subsection (b) of this Section.
If the Commission grants all of the HB1865 Enrolled - 65 - LRB097 09633 ASK 49770 b necessary approvals for the proposed facility, such supply shall thereafter be considered as a pre-existing contract under subsection (b) of this Section.
View plain text versions (3)

Action History

  1. Public Act . . . . . . . . . 97-0325

  2. Effective Date August 12, 2011

  3. Governor Approved

  4. Sent to the Governor

  5. Passed Both Houses

  6. Third Reading - Passed; 033-024-000

  7. Placed on Calendar Order of 3rd Reading May 13, 2011

  8. Second Reading

  9. Placed on Calendar Order of 2nd Reading May 6, 2011

  10. Do Pass Energy; 010-000-000

  11. Assigned to Energy

  12. Referred to Assignments

  13. First Reading

  14. Chief Senate Sponsor Sen. Mike Jacobs

  15. Placed on Calendar Order of First Reading

  16. Arrive in Senate

  17. Third Reading - Short Debate - Passed 102-000-000

  18. Placed on Calendar Order of 3rd Reading - Short Debate

  19. Second Reading - Short Debate

  20. Placed on Calendar 2nd Reading - Short Debate

  21. Do Pass as Amended / Short Debate Public Utilities Committee; 024-000-000

  22. House Committee Amendment No. 1 Adopted in Public Utilities Committee; by Voice Vote

  23. House Committee Amendment No. 1 Rules Refers to Public Utilities Committee

  24. Re-assigned to Public Utilities Committee

  25. House Committee Amendment No. 1 Referred to Rules Committee

  26. House Committee Amendment No. 1 Filed with Clerk by Rep. Patrick J. Verschoore

  27. Assigned to Executive Committee

  28. Referred to Rules Committee

  29. First Reading

  30. Filed with the Clerk by Rep. Patrick J. Verschoore

Sponsors

  • Patrick J. Verschoore · Cosponsor

Sponsorship breakdown

Export CSV (upgrade) →

0 sponsors · 1 co-sponsors · 182 not signed on · 4 voted No

Sponsors (0)

None.

Co-sponsors (1)

  • Patrick J. Verschoore

Not signed on (182)

182 members have not signed on to this bill.

Show all 182 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Third Reading

Passed 33 Yea · 24 Nay · 2 Other
Party YeaNayPresentNot Voting
Unaffiliated 242002
Democrat 9100
Republican 0300
Total 332402
% of votes cast 56%41%0%3%
How each member voted (59)
Member Party Vote
Hutchinson — Yea
Link — Yea
Haine — Yea
Kotowski — Yea
Landek — Nay
Lauzen — Nay
Jacobs — Yea
Luechtefeld — Nay
Sullivan — Yea
Cullerton — Yea
McCann — Nay
McCarter — Nay
Meeks — Yea
Millner — Not Voting
Brady — Nay
Johnson, C. — Nay
Johnson, T. — Nay
Mulroe — Yea
Jones, J. — Nay
Muñoz — Yea
Noland — Yea
Pankau — Nay
Schoenberg — Yea
Silverstein — Yea
Steans — Yea
Trotter — Yea
Wilhelmi — Yea
Clayborne — Yea
Crotty — Yea
Cultra — Nay
Dillard — Nay
Duffy — Nay
Forby — Yea
Frerichs — Yea
Garrett — Not Voting
Radogno — Nay
Raoul — Yea
Righter — Nay
Sandack — Nay
Sandoval — Yea
LaHood — Nay
Maloney — Yea
Althoff — Nay
Martinez — Yea
Bivins — Nay
Bomke — Nay
David Koehler Democrat Yea
Don Harmon Democrat Yea
Emil Jones, III Democrat Yea
Eva-Dina Delgado Democrat Yea
Kimberly A. Lightford Democrat Yea
Lakesia Collins Democrat Yea
Lakesia Collins Democrat Yea
Laura M. Murphy Democrat Nay
Linda Holmes Democrat Yea
Mattie Hunter Democrat Yea
Dave Syverson Republican Nay
Kevin Schmidt Republican Nay
Sue Rezin Republican Nay

Official roll call →

Third Reading

Passed 102 Yea · 0 Nay · 16 Other
Party YeaNayPresentNot Voting
Unaffiliated 860013
Democrat 12001
Republican 4002
Total 1020016
% of votes cast 86%0%0%14%
How each member voted (118)
Member Party Vote
Brauer — Yea
Brown — Yea
Burns — Not Voting
Colvin — Yea
Connelly — Yea
McAsey — Yea
McAuliffe — Not Voting
McCarthy — Yea
Golar — Yea
Holbrook — Yea
Jefferson — Not Voting
Kay — Yea
Mathias — Yea
May — Yea
Reitz — Yea
Lyons — Yea
Dugan — Yea
Dunkin — Yea
Eddy — Yea
Farnham — Yea
Lang — Yea
Madigan — Yea
Mendoza — Yea
Moffitt — Yea
McGuire — Yea
Morthland — Yea
Nekritz — Yea
Bradley — Yea
Osterman — Yea
Brady — Yea
Mitchell, Bill — Yea
Phelps — Yea
Senger — Yea
Mitchell, Jerry — Yea
Sente — Yea
Burke, Daniel — Yea
Harris, David — Yea
Burke, Kelly — Yea
Harris, Greg — Yea
Sullivan — Yea
Soto — Yea
Thapedi — Yea
Tryon — Yea
Hernandez — Yea
Turner — Yea
Unes — Yea
Verschoore — Yea
Howard — Yea
Winters — Yea
Yarbrough — Yea
Zalewski — Yea
Watson — Yea
Williams — Yea
Davis, Monique — Yea
Cavaletto — Yea
Coladipietro — Yea
Cole — Yea
Cross — Yea
Currie — Yea
D'Amico — Yea
Flowers — Yea
Fortner — Yea
Franks — Yea
Hatcher — Yea
Hays — Yea
Jakobsson — Yea
Nybo — Yea
Osmond — Yea
Pihos — Not Voting
Poe — Yea
Pritchard — Yea
Ramey — Yea
Reboletti — Yea
Riley — Yea
Roth — Yea
Sacia — Yea
Saviano — Yea
Schmitz — Yea
Acevedo — Yea
Arroyo — Yea
Barickman — Yea
Beiser — Yea
Beaubien — Not Voting
Durkin — Not Voting
Gordon — Not Voting
Jackson — Not Voting
Kosel — Not Voting
Leitch — Yea
Mell — Not Voting
Mulligan — Not Voting
Reis — Yea
Sommer — Not Voting
Jones — Not Voting
Bellock — Yea
Berrios — Yea
Biss — Yea
Mautino — Yea
Bost — Yea
Chapa LaVia — Yea
Anthony DeLuca Democrat Yea
Bill Cunningham Democrat Yea
Camille Y. Lilly Democrat Yea
Fred Crespo Democrat Yea
Julie A. Morrison Democrat Yea
La Shawn K. Ford Democrat Yea
Michelle Mussman Democrat Yea
Nicholas K. Smith Democrat Yea
Rita Mayfield Democrat Yea
Robert "Bob" Rita Democrat Not Voting
Robyn Gabel Democrat Yea
Sara Feigenholtz Democrat Yea
William "Will" Davis Democrat Yea
Brad Stephens Republican Not Voting
Chapin Rose Republican Yea
Jil Tracy Republican Yea
Joe C. Sosnowski Republican Yea
Norine K. Hammond Republican Yea
Wayne A. Rosenthal Republican Not Voting

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does HB 1865 do?
Amends the Public Utilities Act. Makes a technical change in a Section concerning HVAC affiliate marketing.
Who sponsors HB 1865?
HB 1865 is sponsored by Patrick J. Verschoore.
What is the current status of HB 1865?
This bill has been enacted into law. Introduced February 16, 2011. Enacted.
Where can I track HB 1865?
Track HB 1865 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HB 1865

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HB 1865

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →