Net energy metering; eligible customer-generators and agricultural customer-generators.
Do you support it?
Want to know if it passes?
We'll email you when SB 271 moves — a committee vote, a floor vote, or a signature. Nothing else.
Free forever · unsubscribe in one click.
Your answer was recorded either way.
Which district are you in?
Your ZIP is all we need to match you to your own representatives — so we can tell you how they voted on SB 271.
You're tracking SB 271
We'll email you the moment it moves.
SB 271 — Net energy metering; eligible customer-generators and agricultural customer-generators.
Last action — Impact statement from SCC (SB271ER)
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
✓In Committee
-
✓Passed Senate
-
✓Passed House of Delegates
-
✓To Executive
-
6Enacted
This bill has been enacted into law. Introduced January 09, 2024. Enacted.
Signed by Governor Glenn Youngkin (Republican) on April 17, 2024.
Prognosis
Where this bill stands today.
Odds of enactment
HighHow often bills like it became law.
-
Enacted
Current position in the legislative process.
-
1 sponsor
1 primary, 0 co-sponsors signed on.
-
Cleared a recorded vote
Passed 8 recorded votes so far.
Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.
Summary
Net energy metering; eligible customer-generators and eligible agricultural customer-generators. Provides that no contract, lease, or arrangement by which a third party owns, maintains, or operates an electrical generating facility on an eligible customer-generator's property shall constitute the sale of electricity or cause the customer-generator or the third party to be considered an electric utility by virtue of participating in net energy metering. The bill prohibits an eligible customer-generator or eligible agricultural customer-generator from being required to provide proof of liability insurance or to purchase additional liability insurance as a condition of interconnection. The bill exempts eligible customer-generators and eligible agricultural customer-generators that operate a battery storage device of capacity commensurate with and equal to or greater than that of the electrical generating facility and in conjunction with the electrical generating facility from standby charges. The bill provides that any eligible customer-generator or eligible agricultural customer-generator may participate in demand response, energy efficiency, or peak reduction from dispatch of onsite battery service, provided that the compensation received is in exchange for a distinct service that is not already compensated by net metering credits for electricity exported to the electric distribution system or compensated by any other utility program or tariff. This bill is identical to HB 1062.
Bill Text
What changed in the latest version
300 added · 317 removedPlain-language change summary
The recent amendments made to Bill SB 271 clarify the terms surrounding net energy metering for eligible customer-generators and agricultural customer-generators in Virginia. Notably, the amendment specifies the timeline for interconnection to begin and end for electric cooperatives, ensuring that existing agricultural customer-generators have a clear path forward regarding their energy generation status. This matters because it establishes more defined regulations that can support sustainable energy practices, encouraging more individuals and farmers to participate in renewable energy efforts.
RECONVENED SESSION REENROLLED VIRGINIA ACTS OF ASSEMBLY --–– 2024 RECONVENED SESSION CHAPTER 783R An Act to amend and reenact §§ 56-594 and 56-594.02 of the Code of Virginia, relating to net energy metering;
E N [S 271] Approved AprilR 17,O 20241. Be it enacted by the General Assembly of Virginia:
1.
L A.
The Commission shall establish by regulation a program that affords eligible customer-generators the opportunity to participate in net energy metering, and a program, to begin no later than JulyJuEy 1, 2014, for customers of investor-owned utilities and to begin no later than July 1, 2015, and to end July 1, 2019, for customers of electric cooperatives as provided in subsection G, to afford eligible agriculturalagDicultural butcustomer-generators needthe notopportunity beto limitedparticipate to,in requirementsnet forenergy (i)metering. retail sellers;
(ii)The ownersregulations ormay operatorsinclude, of distribution or transmission facilities;
On and after July 1, 2017, small agricultural generators or eligible agricultural customer-generators may elect to interconnect pursuant to the provisions of this section or as small agricultural generators pursuant to § 56-594.2, but notSot both.
Existing eligible agricultural customer-generators may elect to become small agricultural generators,gener2tors, but may2019, notinterconnection revertof to being eligible agricultural customer-generators aftershall cease for electric cooperatives 1, only, and such election.facilities shall interconnect solely as small agricultural generators.
On and after July 1, 2019, interconnection of eligible agricultural customer-generators shall cease for electric cooperatives only, and such facilities shall interconnect solely as small agricultural generators.
"Eligible agricultural customer-generator" means a customer that operates a renewable energy generating facility as part of an agricultural business, which generating facility (i) uses as its sole energy source solar power, wind power, or aerobic or anaerobic digester gas, (ii) does not have an aggregate generation capacity of more than 500 kilowatts, (iii) is located on land owned or controlled by the agricultural business, (iv) is connected to the customer's wiring on the customer's side of its interconnection with the distributor;
An eligible agricultural customer-generator may be served by multiple meters serving the eligible agricultural customer-generator that are located at the same or adjacent sites, such that the eligible agricultural customer-generator may aggregate in a single account the electricity consumption and generation measured by the meters, provided that the same utility serves all such meters.
(ii) usesor asleased itsby totalthe sourcecustomer ofand fuelis renewableconnected energy,to asthe definedcustomer's inwiring §on 56-576;the customer's side of itsnd owned interconnection with the distributor;
(iii) is located on land owned or leased by the customer and is connected to the customer's wiring on the customer's side of its interconnection with the distributor;
In addition to the electrical generating facility size limitations in clause (i), the capacity of any generating facility installed under this section between July 1, 2015, and July 1, 2020, shall not exceed the expected annual energy installed consumption based on the previous 12 months of billing history or an annualized calculation of billing of 6 history if 12 months of billing history is not available.
In addition to the electrical generating facility size limitation in clause (i), in the certificated service territory of a Phase I Utility, the capacity of any of 5 generating facility installed under this section after July 1, 2020, shall not exceed 100 percent of the expected annual energy consumption based on the previous 12 months of billing history or an annualized calculation of billing history if 12 months of billing history is not available, and in the certificated service territory of a Phase II Utility, the capacity of any generating facility installed under this section after July 1, 2020, shall not exceed 150 percent of the expected annual energy consumption based on the previous 12 months of billing history or an annualized calculation of billing history if 12 months of billing history is not available.
however, at the time that the eligible customer-generator or eligible agricultural customer-generator enters into a power purchase agreement with its supplier, the eligible of 6 customer-generator or eligible agricultural customer-generator shall have a one-time option to sell the renewable energy certificates associated with such electrical generating facility to its suppliersuppliRr and be compensated at an amount that is established by the Commission to reflect the value of such renEwable agricultural customer-generator and the supplier from voluntarily entering into an agreement for the sale and purchase of excess electricity or renewable energy certificates.certificates at mutually-agreed upon prices if the eligible customer-generator or eligible agricultural customer-generator does not exercise its oNtion to sell its renewable energy certificates to its supplier at Commission-approved prices at the time that the eligible customer-generator or eligible agricultural customer-generator enters into a power purchase agreement with its supplier.
NothingAll incosts thisincurred sectionby shall prevent the eligible customer-generator or eligible agricultural customer-generator and the supplier fromto voluntarily entering into an agreement for the sale of 5 and purchase of excess electricity orOnd renewable energy certificates atfrom mutually-agreed upon prices if the eligible customer-generatorcustomer-generators or eligible agricultural customer-generatoradjustment doesclause, notif exercisethe its option to sell its renewable energy certificates to its supplier athas Commission-approved prices at the time that the eligible customer-generator or eligible agricultural customer-generator enters into a powerCommission-approved purchaseRPS agreementplan. with its supplier.
All costs incurred by the supplier to purchase excess electricity and renewable energy certificates from eligible customer-generators or eligible agricultural customer-generators shall be recoverable through its Renewable Energy Portfolio Standard (RPS) rate adjustment clause, if the supplier has a Commission-approved RPS plan.
For purposes of this section, "all costs" shall be defined as the rates paid to the eligible customer-generator or eligible agricultural customer-generatorcustomEr-generator for the purchase of excess electricity and renewable energy certificates and any administrative costs incurred to manage the eligible customer-generator's or eligible agricultural customer-generator's power purchase arrangements.
The net metering standard contract or tariff shall be available to eligible customer-generators or eligible agricultural customer-generators on a first-come, first-served basis in each electric distribution company's Virginia service area until the rated generating capacity owned and operated by eligible customer-generators, eligible agricultural customer-generators, and small agricultural generators in the Commonwealth reaches six percent, in the aggregate, five percent of which is available to all customers and one percent of which is available only to low-income utility customers of each electric distribution company's adjusted Virginia peak-load forecast for the previous year, and shall require the supplier to pay the eligible customer-generator or eligible agricultural customer-generatorcustomer-gSnerator for such excess electricity in a timely manner at a rate to be established by the Commission.
2 On and after the earlier of (i) 2024 for a Phase I Utility or 2025 for a Phase II Utility oror1(ii) (ii) when the aggregate rated generating capacity owned and operated by eligible customer-generators, eligible agricultural customer-generators, and small agricultural generators in the Commonwealth reaches three percent of a Phase I or Phase II Utility's adjusted Virginia peak-load forecast for the previous year, the Commission shall conduct a net energy metering proceeding.
(b) an amount the utility shall pay to appropriately compensate the customer, as determined by the Commission, for the total benefits such facilities provide;other information the Commission deems relevant.
(c)The theCommission directshall andestablish indirectan economicappropriate impactrateny ofstructure netrelated meteringthereto, which shall govern compensation related to all eligible customer-generators, eligible agricultural customer-generators, and small agricultural generators, except low-income utility customers, that interconnect after the Commonwealth;effective date established in the Commission's final order.
and (d) any other information the Commission deems relevant.
The Commission shall establish an appropriate rate structure related thereto, which shall govern compensation related to all eligible customer-generators, eligible agricultural customer-generators, and small agricultural generators, except low-income utility customers, that interconnect after the effective date established in the Commission's final order.
As part of the net energy metering proceeding, the Commission shall evaluate the six percentshall aggregateenter netits meteringfinal caporder in such a proceeding no later than 12 months after it commences suchsion proceeding, and may,such final order shall establish a date by which the new terms and conditions shall apply for interconnection and shall also provide that, if appropriate,the raiseterms orand removeconditions suchof cap.compensation in the final order differ from the terms and conditions available to customers before the proceeding, low-income utility customers may interconnect under whichever terms are most favorable to them.
The Commission shall enter its final order in such a proceeding no later than 12 months after it commences such proceeding, and such final order shall establish a date by which the new terms and conditions shall apply for interconnection and shall also provide that, if the terms and conditions of compensation in the final order differ from the terms and conditions available to customers before the proceeding, low-income utility customers may interconnect under whichever terms are most favorable to them.
Any residential eligible customer-generator or eligible agricultural customer-generator, in the service territory of a Phase II Utility who owns and operates, or contracts with other persons to own, operate, or both, an electrical generating facility with a capacity that exceeds 15 kilowatts shall pay to its supplier, in addition to any other charges authorized by law, a monthly standby charge.
The amountamounty to of the standby charge and the terms and conditions under which it is assessed shall be in accordance with a methodology developed by the supplier and approved by the Commission.
Such an eligible customer-generator or eligible agricultural customer-generator shall not be liable for a standby charge until the date specified in an order of the Commission approving its supplier's methodology.
For charge of 6 customers of all other investor-owned utilities, on and after July 1, 2020, standby charges are prohibited for any residential eligible customer-generator or agricultural customer-generator.
The Commission may adopt such rules or establish such guidelines as may be necessary for its of 5 general administration of this section.
The Commission shall conduct pilot programs under which a person that owns or operates a solar-powered or wind-powered electricity generation facility located on premises owned or leased by an eligible customer-generator, as defined in § 56-594, shall be permitted to sell the electricity generated from such facility exclusively to such eligible customer-generator under a power purchase agreement of 6 used to provide third party financing of the costs of such a renewable generation facility (third party power purchase agreement), subject to the following terms, conditions, and restrictions:
R 1.
Notwithstanding subsection G of § 56-580 or any other provision of law, a pilot program shallsEall be conductedcon2. within the certificated service territory of each investor-owned electric utility ("Pilot Utility");
2.Except as provided in this subdivision, both jurisdictional and nonjurisdictional customers maytility");
Except as provided in this subdivision, both jurisdictional and nonjurisdictional customers may participate in such pilot programs on a first-come, first-serve basis.
The aggregated capacity of all generation facilities that are subject to such third party power purchase agreements at any timetimN during the pilot program shall not exceed 500 megawatts for Virginia jurisdictional customers and 500 megawatts for Virginia nonjurisdictional customers.
Such limitation on the aggregated capacity of such facilities shall constitute a portion of the existing limit of six percent of each Pilot Utility'sUtilitO's adjusted Virginia peak-load forecast for the previous year that is available to eligible customer-generators provisions of 5§ pursuant56-594, the seller and the customer shall elect either to subsection(i) Eenter into their third party power purchase agreement subject to the conditions and provisions of the Pilot Utility's net energy metering program under § 56-594.56-594 or (ii) provide that electricity generated from the generation Eacilities subject to the third party power purchase agreement will not be net metered under § 56-594, provided that an election not to net meter under § 56-594 shall not exempt the third party power purchase agreement and the parties thereto from the requirements of this section that incorporate provisions of § 56-594;
Notwithstandingand anyno provisionmore ofthan thisthree sectionmegawatts that incorporates provisions of § 56-594, the seller and the customer shall electbe eithereligible tofor (i)a enter into their third party power purchase agreement subject to the conditions and provisions of the Pilot Utility's net energy metering program under §as 56-594pilot orprogram; (ii) provide that electricity generated from the generation facilities subject to the third party power purchase agreement will not be net metered under § 56-594, provided that an election not to net meter under § 56-594 shall not exempt the third party power purchase agreement and the parties thereto from the requirements of this section that incorporate provisions of § 56-594;
Show all 52 changed lines (12 more)
3.
A solar-powered or wind-powered generation facility with a capacity of no less than 50 kilowatts and no more than three megawatts shall be eligible for a third party power purchase agreement under a pilot program;
The maximum generation capacity of three S megawatts shall not affect the limits on the capacity of electrical generating capacities of 25252kilowatts kilowatts for residential customers and three megawatts for nonresidential customers set forth in subsectionsubsect1on B of § 56-594, which limitations shall continue to apply to net energy metering generation facilities regardless of whether they are the subject of a third party power purchase agreement under the pilot program;program;egardless 4.
4.
The customer under a third party power purchase agreement under the pilot program shall be subject to the interconnection and other requirements imposed on eligible customer-generators pursuant to subsection C of § 56-594, including the requirement that the customer bear the reasonable costs, as determinedsubsection;by by the Commission, of the items described in clauses (i), (ii), (a) and (iii) (b) of such subsection;6.
6.
An affiliate of the Pilot Utility shall be permitted to offer and enter into third party power purchase arrangements on the same basis as may any other person that satisfies the requirements of being a seller under a third party power purchase agreement under the pilot program.program.equirements of B.
B.
Any third party power purchase agreement that is not entered into pursuant to the pilot program established pursuant to subsection A is prohibited in the Pilot Utility's service territory, unless such third party power purchase agreement is entered into between a licensed supplier and a retail customer pursuant to § 56-577 where such supplier is responsible for serving 100 percent of the load requirements for each retail customer account it serves.
responsible for serving 100 percent of the load requirements D.
E.electric power to an eligible customer-generator under a third party power purchase agreement enteredg of 6 into pursuant to the pilot program established under this section, a public utility or a competitive service provider, (ii) imposing a requirement that such a person meet 100 percent of the load requirements for each retail customer account it serves, or (iii) affecting third party power purchase agreements in effect prior to July 1, 2013.
Nothing in this section shall be construed as (i) rendering any person, by virtue of its selling electric power to an eligible customer-generator under a third party power purchase agreement entered into pursuant to the pilot program established under this section, a public utility or a competitive service provider, (ii) imposing a requirement that such a person meet 100 percent of the load requirements for each retail customer account it serves, or (iii) affecting third party power purchase agreements in effect prior to July 1, 2013.
Show all 52 changed rows (12 more)
View plain text versions (5)
- SB271ER2 View text pdf April 17, 2024
- CHAP0783 View text Current pdf April 17, 2024
- SB271ER View text pdf March 04, 2024
- Engrossed Printed as engrossed 24102701D-E pdf February 01, 2024
- Prefiled Prefiled and ordered printed; offered 01/10/24 24102701D pdf January 09, 2024
Action History
-
Impact statement from SCC (SB271ER)
-
Acts of Assembly Chapter text (CHAP0783)
-
Enacted, Chapter 783 (effective 7/1/24)
-
Signed by Speaker as reenrolled
-
Signed by President as reenrolled
-
Reenrolled bill text (SB271ER2)
-
Reenrolled
-
Governor's recommendation adopted
-
VOTE: Adoption (57-Y 40-N)
-
House concurred in Governor's recommendation (57-Y 40-N)
-
Senate concurred in Governor's recommendation (40-Y 0-N)
-
Governor's recommendation received by Senate
-
Governor's Action Deadline 11:59 p.m., April 8, 2024
-
Enrolled Bill Communicated to Governor on March 11, 2024
-
Signed by President
-
Signed by Speaker
-
Bill text as passed Senate and House (SB271ER)
-
Enrolled
-
House amendment agreed to by Senate (22-Y 17-N)
-
VOTE: Passage (53-Y 45-N)
-
Passed House with amendment (53-Y 45-N)
-
Engrossed by House as amended
-
Committee amendment agreed to
-
Read third time
-
Read second time
-
Reported from Labor and Commerce with amendment(s) (13-Y 9-N)
-
Impact statement from SCC (SB271E)
-
Referred to Committee on Labor and Commerce
-
Read first time
-
Placed on Calendar
-
Read third time and passed Senate (22-Y 18-N)
-
Passed by for the day
-
Printed as engrossed 24102701D-E
-
Engrossed by Senate as amended SB271E
-
Committee amendments agreed to
-
Reading of amendments waived
-
Read second time
-
Constitutional reading dispensed (40-Y 0-N)
-
Reported from Commerce and Labor with amendments (9-Y 6-N)
-
Senate committee, floor amendments and substitutes offered
-
Impact statement from SCC (SB271)
-
Referred to Committee on Commerce and Labor
-
Prefiled and ordered printed; offered 01/10/24 24102701D
Sponsors
- Suhas Subramanyam · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 147 not signed on · 65 voted No
Sponsors (1)
Co-sponsors (0)
None.
Not signed on (147)
147 members have not signed on to this bill.
Show all 147 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Votes
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Unaffiliated | 56 | 40 | 0 | 3 |
| Total | 56 | 40 | 0 | 3 |
| % of votes cast | 57% | 40% | 0% | 3% |
How each member voted (99)
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Unaffiliated | 40 | 0 | 0 | 0 |
| Total | 40 | 0 | 0 | 0 |
| % of votes cast | 100% | 0% | 0% | 0% |
How each member voted (40)
| Member | Party | Vote |
|---|---|---|
| Aaron R. Rouse | — | Yea |
| Angelia Williams Graves | — | Yea |
| Barbara A. Favola | — | Yea |
| Bill DeSteph | — | Yea |
| Bryce E. Reeves | — | Yea |
| Carroll Foy, Jennifer D. | — | Yea |
| Christie New Craig | — | Yea |
| Christopher T. Head | — | Yea |
| Danica A. Roem | — | Yea |
| David R. Suetterlein | — | Yea |
| David W. Marsden | — | Yea |
| Ebbin, Adam P. | — | Yea |
| Emily M. Jordan | — | Yea |
| Glen H. Sturtevant, Jr. | — | Yea |
| Hashmi, Ghazala F. | — | Yea |
| J.D. "Danny" Diggs | — | Yea |
| Jennifer B. Boysko | — | Yea |
| Jeremy S. McPike | — | Yea |
| L. Louise Lucas | — | Yea |
| Lamont Bagby | — | Yea |
| Lashrecse D. Aird | — | Yea |
| Mamie E. Locke | — | Yea |
| Mark D. Obenshain | — | Yea |
| Mark J. Peake | — | Yea |
| McGuire, John J., III | — | Yea |
| R. Creigh Deeds | — | Yea |
| Richard H. Stuart | — | Yea |
| Russet Perry | — | Yea |
| Ryan T. McDougle | — | Yea |
| Saddam Azlan Salim | — | Yea |
| Schuyler T. VanValkenburg | — | Yea |
| Scott A. Surovell | — | Yea |
| Stella G. Pekarsky | — | Yea |
| Subramanyam, Suhas | — | Yea |
| T. Travis Hackworth | — | Yea |
| Tammy Brankley Mulchi | — | Yea |
| Tara A. Durant | — | Yea |
| Timmy French | — | Yea |
| Todd E. Pillion | — | Yea |
| William M. Stanley, Jr. | — | Yea |
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Unaffiliated | 22 | 17 | 0 | 1 |
| Total | 22 | 17 | 0 | 1 |
| % of votes cast | 55% | 43% | 0% | 3% |
How each member voted (40)
| Member | Party | Vote |
|---|---|---|
| Aaron R. Rouse | — | Yea |
| Angelia Williams Graves | — | Yea |
| Barbara A. Favola | — | Yea |
| Bill DeSteph | — | Nay |
| Bryce E. Reeves | — | Nay |
| Carroll Foy, Jennifer D. | — | Yea |
| Christie New Craig | — | Nay |
| Christopher T. Head | — | Nay |
| Danica A. Roem | — | Yea |
| David R. Suetterlein | — | Yea |
| David W. Marsden | — | Yea |
| Ebbin, Adam P. | — | Yea |
| Emily M. Jordan | — | Nay |
| Glen H. Sturtevant, Jr. | — | Nay |
| Hashmi, Ghazala F. | — | Yea |
| J.D. "Danny" Diggs | — | Nay |
| Jennifer B. Boysko | — | Yea |
| Jeremy S. McPike | — | Yea |
| L. Louise Lucas | — | Yea |
| Lamont Bagby | — | Yea |
| Lashrecse D. Aird | — | Yea |
| Mamie E. Locke | — | Yea |
| Mark D. Obenshain | — | Nay |
| Mark J. Peake | — | Nay |
| McGuire, John J., III | — | Nay |
| R. Creigh Deeds | — | Yea |
| Richard H. Stuart | — | Nay |
| Russet Perry | — | Yea |
| Ryan T. McDougle | — | Nay |
| Saddam Azlan Salim | — | Yea |
| Schuyler T. VanValkenburg | — | Yea |
| Scott A. Surovell | — | Yea |
| Stella G. Pekarsky | — | Yea |
| Subramanyam, Suhas | — | Yea |
| T. Travis Hackworth | — | Nay |
| Tammy Brankley Mulchi | — | Nay |
| Tara A. Durant | — | Nay |
| Timmy French | — | Nay |
| Todd E. Pillion | — | Nay |
| William M. Stanley, Jr. | — | Not Voting |
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Unaffiliated | 52 | 45 | 0 | 2 |
| Total | 52 | 45 | 0 | 2 |
| % of votes cast | 53% | 45% | 0% | 2% |
How each member voted (99)
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Unaffiliated | 13 | 9 | 0 | 0 |
| Total | 13 | 9 | 0 | 0 |
| % of votes cast | 59% | 41% | 0% | 0% |
How each member voted (22)
| Member | Party | Vote |
|---|---|---|
| Alfonso H. Lopez | — | Yea |
| Charniele L. Herring | — | Yea |
| Chris S. Runion | — | Nay |
| Convirs-Fowler, Kelly K. | — | Yea |
| Dan I. Helmer | — | Yea |
| Gilbert, C. Todd | — | Nay |
| Irene Shin | — | Yea |
| Israel D. O'Quinn | — | Nay |
| Jason S. Ballard | — | Nay |
| Jeion A. Ward | — | Yea |
| Joseph P. McNamara | — | Yea |
| LeVere Bolling, Destiny | — | Yea |
| Maldonado, Michelle Lopes | — | Yea |
| Marshall, Daniel W., III | — | Nay |
| Michael B. Feggans | — | Yea |
| Michael J. Jones | — | Yea |
| Michael J. Webert | — | Nay |
| Mundon King, Candi | — | Yea |
| Richard C. "Rip" Sullivan, Jr. | — | Yea |
| Terry G. Kilgore | — | Nay |
| Tony O. Wilt | — | Nay |
| Wren M. Williams | — | Nay |
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Unaffiliated | 22 | 18 | 0 | 0 |
| Total | 22 | 18 | 0 | 0 |
| % of votes cast | 55% | 45% | 0% | 0% |
How each member voted (40)
| Member | Party | Vote |
|---|---|---|
| Aaron R. Rouse | — | Yea |
| Angelia Williams Graves | — | Yea |
| Barbara A. Favola | — | Yea |
| Bill DeSteph | — | Nay |
| Bryce E. Reeves | — | Nay |
| Carroll Foy, Jennifer D. | — | Yea |
| Christie New Craig | — | Nay |
| Christopher T. Head | — | Nay |
| Danica A. Roem | — | Yea |
| David R. Suetterlein | — | Yea |
| David W. Marsden | — | Yea |
| Ebbin, Adam P. | — | Yea |
| Emily M. Jordan | — | Nay |
| Glen H. Sturtevant, Jr. | — | Nay |
| Hashmi, Ghazala F. | — | Yea |
| J.D. "Danny" Diggs | — | Nay |
| Jennifer B. Boysko | — | Yea |
| Jeremy S. McPike | — | Yea |
| L. Louise Lucas | — | Yea |
| Lamont Bagby | — | Yea |
| Lashrecse D. Aird | — | Yea |
| Mamie E. Locke | — | Yea |
| Mark D. Obenshain | — | Nay |
| Mark J. Peake | — | Nay |
| McGuire, John J., III | — | Nay |
| R. Creigh Deeds | — | Yea |
| Richard H. Stuart | — | Nay |
| Russet Perry | — | Yea |
| Ryan T. McDougle | — | Nay |
| Saddam Azlan Salim | — | Yea |
| Schuyler T. VanValkenburg | — | Yea |
| Scott A. Surovell | — | Yea |
| Stella G. Pekarsky | — | Yea |
| Subramanyam, Suhas | — | Yea |
| T. Travis Hackworth | — | Nay |
| Tammy Brankley Mulchi | — | Nay |
| Tara A. Durant | — | Nay |
| Timmy French | — | Nay |
| Todd E. Pillion | — | Nay |
| William M. Stanley, Jr. | — | Nay |
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Unaffiliated | 40 | 0 | 0 | 0 |
| Total | 40 | 0 | 0 | 0 |
| % of votes cast | 100% | 0% | 0% | 0% |
How each member voted (40)
| Member | Party | Vote |
|---|---|---|
| Aaron R. Rouse | — | Yea |
| Angelia Williams Graves | — | Yea |
| Barbara A. Favola | — | Yea |
| Bill DeSteph | — | Yea |
| Bryce E. Reeves | — | Yea |
| Carroll Foy, Jennifer D. | — | Yea |
| Christie New Craig | — | Yea |
| Christopher T. Head | — | Yea |
| Danica A. Roem | — | Yea |
| David R. Suetterlein | — | Yea |
| David W. Marsden | — | Yea |
| Ebbin, Adam P. | — | Yea |
| Emily M. Jordan | — | Yea |
| Glen H. Sturtevant, Jr. | — | Yea |
| Hashmi, Ghazala F. | — | Yea |
| J.D. "Danny" Diggs | — | Yea |
| Jennifer B. Boysko | — | Yea |
| Jeremy S. McPike | — | Yea |
| L. Louise Lucas | — | Yea |
| Lamont Bagby | — | Yea |
| Lashrecse D. Aird | — | Yea |
| Mamie E. Locke | — | Yea |
| Mark D. Obenshain | — | Yea |
| Mark J. Peake | — | Yea |
| McGuire, John J., III | — | Yea |
| R. Creigh Deeds | — | Yea |
| Richard H. Stuart | — | Yea |
| Russet Perry | — | Yea |
| Ryan T. McDougle | — | Yea |
| Saddam Azlan Salim | — | Yea |
| Schuyler T. VanValkenburg | — | Yea |
| Scott A. Surovell | — | Yea |
| Stella G. Pekarsky | — | Yea |
| Subramanyam, Suhas | — | Yea |
| T. Travis Hackworth | — | Yea |
| Tammy Brankley Mulchi | — | Yea |
| Tara A. Durant | — | Yea |
| Timmy French | — | Yea |
| Todd E. Pillion | — | Yea |
| William M. Stanley, Jr. | — | Yea |
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Unaffiliated | 9 | 6 | 0 | 0 |
| Total | 9 | 6 | 0 | 0 |
| % of votes cast | 60% | 40% | 0% | 0% |
How each member voted (15)
| Member | Party | Vote |
|---|---|---|
| Aaron R. Rouse | — | Yea |
| Bill DeSteph | — | Nay |
| Bryce E. Reeves | — | Nay |
| David W. Marsden | — | Yea |
| Ebbin, Adam P. | — | Yea |
| Jeremy S. McPike | — | Yea |
| L. Louise Lucas | — | Yea |
| Lamont Bagby | — | Yea |
| Mamie E. Locke | — | Yea |
| Mark D. Obenshain | — | Nay |
| Mark J. Peake | — | Nay |
| R. Creigh Deeds | — | Yea |
| Ryan T. McDougle | — | Nay |
| Scott A. Surovell | — | Yea |
| William M. Stanley, Jr. | — | Nay |
Subjects
Frequently asked questions
- What does SB 271 do?
- Net energy metering; eligible customer-generators and eligible agricultural customer-generators. Provides that no contract, lease, or arrangement by which a third party owns, maintains, or operates an electrical generating facility on an eligible customer-generator's property shall constitute the sale of electricity or cause the customer-generator or the third party to be considered an electric utility by virtue of participating in net energy metering. The bill prohibits an eligible customer-generator or eligible agricultural customer-generator from being required to provide proof of liability insurance or to purchase additional liability insurance as a condition of interconnection. The bill exempts eligible customer-generators and eligible agricultural customer-generators that operate a battery storage device of capacity commensurate with and equal to or greater than that of the electrical generating facility and in conjunction with the electrical generating facility from standby charges. The bill provides that any eligible customer-generator or eligible agricultural customer-generator may participate in demand response, energy efficiency, or peak reduction from dispatch of onsite battery service, provided that the compensation received is in exchange for a distinct service that is not already compensated by net metering credits for electricity exported to the electric distribution system or compensated by any other utility program or tariff. This bill is identical to HB 1062.
- Who sponsors SB 271?
- SB 271 is sponsored by Subramanyam, Suhas.
- What is the current status of SB 271?
- This bill has been enacted into law. Introduced January 09, 2024. Enacted.
- Where can I track SB 271?
- Track SB 271 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on SB 271
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of SB 271
Last checked for changes 3 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →