Supporting Washington's clean energy economy and transitioning to a clean, affordable, and reliable energy ...
Do you support it?
Want to know if it passes?
We'll email you when SB 5116 moves — a committee vote, a floor vote, or a signature. Nothing else.
Free forever · unsubscribe in one click.
Your answer was recorded either way.
Which district are you in?
Your ZIP is all we need to match you to your own representatives — so we can tell you how they voted on SB 5116.
You're tracking SB 5116
We'll email you the moment it moves.
SB 5116 — Supporting Washington's clean energy economy and transitioning to a clean, affordable, and reliable energy future.
Last action — Effective date 5/7/2019.
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
✓In Committee
-
✓Passed Senate
-
✓Passed House
-
✓To Executive
-
6Enacted
This bill has been enacted into law. Introduced January 10, 2019. Enacted.
Prognosis
Where this bill stands today.
Odds of enactment
HighHow often bills like it became law.
-
Enacted
Current position in the legislative process.
-
17 sponsors
1 primary, 16 co-sponsors signed on.
-
Single-party support
Sponsorship is currently within one party (7 D).
-
Mixed recorded votes
3 passed, 5 failed in recorded votes so far.
Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.
Bill Text
What changed in the latest version
1 added · 1 removedPlain-language change summary
The updated version of SB 5116 introduces several important changes aimed at accelerating Washington's shift to clean energy. Firstly, it now explicitly mandates that all electric utilities must eliminate the use of coal-fired resources by 2025 and ensures that all retail electricity sales in the state are greenhouse gas neutral by 2030, leading up to a goal of 100% clean energy by 2045. This emphasis on swift transitions to renewable sources underscores the legislature's commitment to addressing climate change more decisively, which could ultimately lead to cleaner air and better health outcomes for residents. Additionally, the bill includes provisions for creating jobs in the clean energy sector, ensuring that economic benefits are widespread, particularly among vulnerable communities.
S-1538.2SECONDZ-0344.2SENATE SUBSTITUTE SENATE BILL 5116State of Washington66th Legislature2019 Regular SessionBySenateSessionBySenators Ways & Means (originally sponsored by Senators Carlyle, Palumbo, McCoy, Pedersen, Wellman, Das, Rolfes, Frockt, Wilson, C., Kuderer, Nguyen, Keiser, Liias, Hunt, Saldaña, Darneille, and Billig;
by request of Governor Inslee)READInsleePrefiled FIRST01/10/19.AN TIME 02/21/19.AN ACT Relating to supporting Washington's clean energy economy and transitioning to a clean, affordable, and reliable energy future;
amending RCW 19.280.030, 80.84.010, 82.08.962, 82.12.962, 80.04.250, 43.21F.090, 19.285.030, and 19.285.040;43.21F.090;
adding new sections to chapter 80.28 RCW;
ItBy iseliminating the policy of the state to eliminate coal-fired electricity, transitionand transitioning the state's electricity supply to one hundred percent carbon-neutralcarbon neutral by 2030, andwe can achieve an entirely carbon free electricity supply by 2045.(3) The transition to one hundred percent carbon-freeclean byenergy 2045.is underway, but must happen faster than our current policies can deliver.
In implementing this chapter, the state must prioritize the maximization of family wage job creation, seek to ensure that all customers are benefiting from the transition to a clean energy economy, and provide safeguards to ensure that the achievement of this policy does not impair the reliability of the electricity system or impose unreasonable costs on utility customers.(3) The transition to one hundred percent clean energy is underway, but must happen faster than our current policies can deliver.
The prices of clean energy technologies continue to fall, and are, in many cases, competitive or even cheaper than conventional energy sources.(4) The legislature finds that Washington can accomplish the goals of this act while:while promoting energy independence, creating high-quality jobs in the clean energy sector, continuing to electrify the transportation sector, maintaining stable and affordable rates for all customers, and protecting clean air and water in the Pacific Northwest.
Promoting energy independence;
creating high-quality jobs in the clean energy sector;
maximizing the value of hydropower, our principal renewable resource;
continuing to electrify the transportation sector;
maintaining safe and reliable electricity to all customers at stable and affordable rates;
and protecting clean air and water in the Pacific Northwest.
Our abundance of renewable energy and our strong clean technologytech sector make Washington wellwell-positioned positioned to be at the forefront of the transition to one hundred percent clean electricity.(5) The legislature declares that utilities in the state have an important role to play in this transition, and must be fully empowered, through regulatory tools and incentives, to achieve the goals of this policy.
Given these changes, the legislature recognizes and finds that the utilities and transportation commission's statutory grant of authority for rate making includes consideration and implementation of performance and incentive-based regulation, multiyear rate plans, and other flexible regulatory mechanisms where appropriate to achieve fair, just, reasonable, and sufficient rates and its public interest objectives.(6)objectives.NEW TheSECTION. Sec. legislature recognizes and finds that the public interest includes, but is not limited to:
The equitable distribution of benefits and reduction of burdens to vulnerable populations and highly impacted communities;
long-term and short-term public health, economic, and environmental benefits, costs, and risks;
and energy security and resiliency.
It is the intent of the legislature that in achieving this policy for Washington, there should not be an increase in environmental health impacts to highly impacted communities.NEW SECTION. Sec.
The definitions in this section apply throughout this chapter unless the context clearly requires otherwise.(1) "Allocation of electricity" means, for the purposes of setting electricity rates, the costs and benefits associated with the resources used to provide electricity to an electric utility's retail electricity consumers that are located in this state.(2) "Alternative compliance payment" means the payment established in section 8(2)7(2) of this act.(3)act.(2) "Attorney general" means the Washington state office of the attorney general.(4)general.(3)(a) "Auditor""Biomass means:energy" includes:
(a) The Washington state auditor's office or its designee for qualifying utilities under its jurisdiction that are consumer-owned utilities;
or (b) an independent auditor selected by a utility that is not under the jurisdiction of the state auditor and is not an investor-owned utility.(5)(a) "Biomass energy" includes:
or (iii) municipal solid waste.(6)waste.(4) "Carbon dioxideadder" emissions content inherent in electricity" means the carbon dioxide generated by the production of electricity from fossil fuels.(7) "Carbon dioxide equivalent" has the same meaning as defined in RCW 70.235.010.(8)(a) "Coal-fired resource" means a facilitycalculation that uses coal-fired generating units, or that uses units fired in whole or in part by coal as feedstock, to generate electricity.(b)(i) "Coal-fired resource" does not include an electric generating facility that is included as part of a limited duration wholesale power purchase, not to exceed one month, made by an electric utility for delivery to retail electricity consumers that are located in this state for which the sourceeconomic ofand thesocietal powerimpacts isassociated notwith known at the time of entry into the transaction to procure the electricity.(ii) "Coal-fired resource" does not include an electricincremental generatingincrease facility that is subject to an obligation to meet the standards contained in RCWcarbon 80.80.040(3)(c).(9)dioxide "Commission"emissions means the Washington utilities and transportation commission.(10) "Conservation and efficiency resources" means any reduction in electric power consumption that results from increases in the efficiency of energy use, production, transmission, or distribution.(11) "Consumer-owned utility" means a municipalcalendar electricyear. utility formed under Title 35 RCW, a public utility district formed under Title 54 RCW, an irrigation district formed under chapter 87.03 RCW, a cooperative formed under chapter 23.86 RCW, or a mutual corporation or association formed under chapter 24.06 RCW, that is engaged in the business of distributing electricity to more than one retail electric customer in the state.(12) "Demand response" means changes in electric usage by demand-side resources from their normal consumption patterns in response to changes in the price of electricity over time, or to incentive payments designed to induce lower electricity use, at times of high wholesale market prices or when system reliability is jeopardized.
"DemandFor response"calendar mayyear include2019, measures to increase or decrease electricity production on the customer'scarbon sideadder ofmust thebe meterequal in response to incentive payments.(13) "Department" means the departmentalternative ofcompliance commerce.(14)payment. "Distributed energy resource" means a nonemitting resource that provides electric energy, capacity, or ancillary services to an electric utility and that is located on the distribution system, any subsystem of the distribution system, or behind the customer meter, including conservation and energy efficiency.(15) "Electric utility" means a consumer-owned utility or an investor-owned utility.(16) "Energy assistance" means a program undertaken by a utility to reduce the household energy burden of its customers.(a) Energy assistance includes, but is not limited to, weatherization, conservation and efficiency services, and monetary assistance, such as a grant program or rate class for lower income households, intended to lower a household's energy burden.(b) Energy assistance may include direct customer ownership in energy assets or other strategies if such strategies achieve a reduction in energy burden for the customer above other available conservation and demand-side measures.(17) "Energy assistance need" means the amount of assistance necessary to achieve a level of household energy burden established by the department or commission.(18) "Energy burden" means the share of annual household income used to pay annual home energy bills.(19)(a) "Energy transformation project" means a project or program that provides energy-related goods or services, other than the generation of electricity, and that results in a reduction of fossil fuel consumption and in a reduction of the emission of greenhouse gases attributable to that consumption, which provides benefits to the customers of an electric utility.(b) "Energy transformation project" may include but is not limited to:(i) Home weatherization or other energy efficiency measures, including market transformation for energy efficiency products, in excess of the target established under RCW 19.285.040(1), if applicable, other state obligations, or other obligations in effect on the effective date of this section;(ii) Support for electrification of the transportation sector including, but not limited to:(A) Equipment on an electric utility's transmission and distribution system to accommodate electric vehicle connections, and smart grid systems that enable electronic interaction between the electric utility and charging systems, and facilitate the utilization of vehicle batteries for system needs;(B) Incentives for car dealers to sell electric vehicles;(C) Incentives for property owners to install charging equipment for electric vehicles;
and(D)The Incentivescarbon foradder must be increased each January 1st by one and three-quarter percent, rounded to the electrificationnearest ofdollar.(5) vehicle"Coal-fired fleets;(iii)resource" Investmentmeans a facility that uses coal-fired generating units, or that uses units fired in distributedwhole energyor resources;(iv)in Investmentspart by coal as feedstock, to generate electricity.(6) "Commission" means the Washington utilities and transportation commission.(7) "Conservation and efficiency resources" means any reduction in renewableelectric naturalpower gasconsumption that results from increases in the efficiency of energy use, production, includingtransmission, equipmentor distribution.(8) "Consumer-owned utility" means a municipal electric utility formed under Title 35 RCW, a public utility district formed under Title 54 RCW, an irrigation district formed under chapter 87.03 RCW, a cooperative formed under chapter 23.86 RCW, or a mutual corporation or association formed under chapter 24.06 RCW, that is engaged in the business of distributing electricity to conditionmore biogas,than one retail electric customer in the state.(9) "Demand response" means changes in electric usage by demand-side resources from their normal consumption patterns in response to changes in the price of electricity over time, or equipmentto usedincentive solelypayments fordesigned to induce lower electricity use at times of high wholesale market prices or when system reliability is jeopardized.(10) "Department" means the purposedepartment of deliveringcommerce.(11) biogas"Distributed forenergy consumption;(v)resource" Contributionsmeans a nonemitting resource that provides electric energy, capacity, or ancillary services to self-directedan investmentselectric inutility and that is located on the followingdistribution measuressystem, any subsystem of the distribution system, or behind the customer meter.(12) "Electric utility" means a consumer-owned utility or an investor-owned utility.(13) "Emitting electric generation" means electricity from a generating resource that is not a renewable resource that provides electric energy, capacity, or ancillary services to servean electric utility and that is produced by a generating facility that emits greenhouse gases as a by-product of energy generation at that facility.(14) "Energy transformation project" means a project or program that provides energy-related goods or services other than the sitesgeneration of largeelectricity industrialand gasthat results in a reduction in fossil fuel consumption by the customers of an electric utility and electricalin customers:the emission of greenhouse gases attributable to that consumption.
(A)"Energy Conservation;transformation project" may include but is not limited to:
(B)Home newweatherization renewableor resources;other energy efficiency measures;
(C)support behind-the-meterfor technologyelectric thatvehicles facilitatesor demandrelated responseinfrastructure; cooperation to reduce peak loads;
(D)and infrastructure for the storage of renewable energy on the electric grid.(15) "Fossil fuel" means natural gas, petroleum, coal, or any form of solid, liquid, or gaseous fuel derived from such material.(16) "Governing body" means the council of a city or town, the commissioners of an irrigation district, municipal electric utility, or public utility district, or the board of directors of an electric cooperative or mutual association that has the authority to supportset electrificationand approve rates.(17) "Greenhouse gas" includes carbon dioxide, methane, nitrous oxide, hydrofluorocarbons, perfluorocarbons, sulfur hexafluoride, and any other gas or gases designated by the department of transportationecology needs;by rule under RCW 70.235.010.(18) "Highly impacted communities" means communities designated under the cumulative impacts analysis in section 18 of this act.(19) "Investor-owned utility" means a company owned by investors that meets the definition of RCW 80.04.010 and is engaged in distributing electricity to more than one retail electric customer in the state.(20) "Low-income" means household incomes as defined by the department or commission, provided that the definition may not exceed the higher of eighty percent of area median household income or two hundred percent of the federal poverty level, adjusted for household size.(21)(a) "Natural gas" means naturally occurring mixtures of hydrocarbon gases and vapors consisting principally of methane, whether in gaseous or liquid form, including methane clathrate.(b) "Natural gas" does not include renewable natural gas.(22)(a) "New large hydroelectric generation" means hydroelectric generation that requires new diversions, new impoundments, new bypass reaches, or expansion of existing reservoirs, constructed after the effective date of this section, unless the diversions, bypass reaches, or reservoir expansions are necessary for the operation of a pumped storage facility that:
or(i) (E)Does renewablenot naturalconflict gaswith production,existing includingstate gasor conditioningfederal equipmentfish forrecovery biogas;plans;
and(vi) Projects and programs(ii) thatcomplies achievewith energyall efficiencylocal, state, and emissionfederal reductionslaws in the agricultural sector, including bioenergy and biogasregulations.(b) projects.(20)"New "Fossillarge fuel"hydroelectric meansgeneration" naturaldoes gas,not petroleum,include coal,hydroelectric orgeneration anyresulting formfrom ofefficiency solid, liquid, or gaseousother fuelimprovements derivedmade fromto suchhydroelectric agenerating material.(21)facilities "Governingexisting body"as means the council of a city or town, the commissionerseffective ofdate an irrigation district, municipal electric utility, or public utility district, or the board of directorsthis ofsection.(23) an"Nonemitting electric cooperativegeneration" ormeans mutualelectricity associationfrom thata hasgenerating thefacility authority to set and approve rates.(22) "Greenhouse gas" includes carbon dioxide, methane, nitrous oxide, hydrofluorocarbons, perfluorocarbons, sulfur hexafluoride, and any other gas or gasesa designatedresource, byincluding the department of ecology by rule under RCW 70.235.010.(23) "Greenhouse gas content calculation" means a calculationdistributed madeenergy byresource, thethat departmentprovides ofelectric ecology,energy, incapacity, consultation with the department, for the purposes of determining the emissions from the complete combustion or oxidationancillary ofservices fossilto fuelsan andelectric theutility greenhouse gas emissions in electricity for use in calculating the greenhouse gas emissions content in electricity, expressed in carbon dioxide equivalent.(24) "Highly impacted communities" are those communities designated by the agencies based on cumulative impact analyses in section 24 of this act and census tracts that aredoes fullynot oremit partiallygreenhouse ongases "Indian country" as defineda inby-product 18of U.S.C.energy generation.
Sec.For the purposes of sections 4 and 5 of this act, "nonemitting electric generation" does not include new large hydroelectric generation.(24)(a) "Nonpower attributes" means all environmentally related characteristics, exclusive of energy, capacity reliability, and other electrical power service attributes, that are associated with the generation of electricity, including but not limited to the facility's fuel type, geographic location, vintage, qualification as an eligible renewable resource, and avoided emissions of pollutants to the air, soil, or water, and avoided emissions of carbon dioxide and other greenhouse gases.(b) "Nonpower attributes" does not include any aspects, claims, characteristics, and benefits associated with the on-site capture and destruction of methane or other greenhouse gases at a facility through a digester system, landfill gas collection system, or other mechanism, which may be separately marketable as greenhouse gas emission reduction credits, offsets, or similar tradable commodities.
1151.(25)However, "Investor-ownedthese utility"separate meansavoided aemissions companymay ownednot byresult investorsin thator meetsotherwise have the definitioneffect of "corporation"attributing ingreenhouse RCWgas 80.04.010emissions and is engaged in distributing electricity to morethe thanelectricity.(25) one"Renewable retailenergy electriccredit" customer in the state.(26) "Low-income" means householda incomestradable ascertificate defined by the department or commission, provided that the definition may not exceed the higher of eightyproof percent of areaone medianmegawatt-hour household income or two hundred percent of the federal poverty level, adjusted for household size.(27) "Market customer" means a nonresidentialrenewable customerresource. of an electric utility that:
(a)The Purchasescertificate electricityincludes fromall anof entitythe ornonpower entitiesattributes otherassociated thanwith thethat utilityone withmegawatt-hour whichof itelectricity, and the certificate is directlyverified interconnected;by a renewable energy credit tracking system selected by the department.(26) "Renewable natural gas" means a methane-rich gas derived from organic feedstocks that has been conditioned to meet standards for natural gas derived from fossil fuel sources.(27) "Renewable resource" means:
or(a) (b)Water, generatesexcept electricityfor tonew meetlarge itshydroelectric owngeneration; needs.(28)(a) "Natural gas" means naturally occurring mixtures of hydrocarbon gases and vapors consisting principally of methane, whether in gaseous or liquid form, including methane clathrate.(b) "Natural gas" does not include renewable natural gas or the portion of renewable natural gas when blended into other fuels.(29)(a) "Nonemitting electric generation" means electricity from a generating facility or a resource, including a distributed energy resource, that provides electric energy, capacity, or ancillary services to an electric utility and that does not emit greenhouse gases as a by-product of energy generation.(b) "Nonemitting electric generation" does not include renewable resources.(30)(a) "Nonpower attributes" means all environmentally related characteristics, exclusive of energy, capacity reliability, and other electrical power service attributes, that are associated with the generation of electricity, including but not limited to the facility's fuel type, geographic location, vintage, qualification as a renewable resource, and avoided emissions of pollutants to the air, soil, or water, and avoided emissions of carbon dioxide and other greenhouse gases.(b) "Nonpower attributes" does not include any aspects, claims, characteristics, and benefits associated with the on-site capture and destruction of methane or other greenhouse gases at a facility through a digester system, landfill gas collection system, or other mechanism, which may be separately marketable as greenhouse gas emission reduction credits, offsets, or similar tradable commodities.
However, these separate avoided emissions may not result in or otherwise have the effect of attributing greenhouse gas emissions to the electricity.(31) "Qualified transmission line" means an overhead transmission line that is:
(a) Designed to carry a voltage in excess of one hundred thousand volts;
(b) owned in whole or in part by an investor-owned utility;
and (c) primarily or exclusively used by such an investor-owned utility as of the effective date of this section to transmit electricity generated by a coal-fired resource.(32) "Renewable energy credit" means a tradable certificate of proof of one megawatt-hour of a renewable resource.
The certificate includes all of the nonpower attributes associated with that one megawatt-hour of electricity and the certificate is verified by a renewable energy credit tracking system selected by the department.(33) "Renewable natural gas" means a gas consisting largely of methane and other hydrocarbons derived from the decomposition of organic material in landfills, wastewater treatment facilities, and anaerobic digesters.(34) "Renewable resource" means:
Show all 319 changed lines (279 more)
(a) Water;
(e) renewablelandfill natural gas;
(g) biodieselgas fuel that is not derived from cropssewage raisedtreatment onfacilities; land cleared from old growth or first growth forests;
or (h) biomassbiodiesel energy.(35)(a)fuel "Retail electric customer" means a person or entity that purchasesis electricity from any electric utility for ultimate consumption and not forderived resale.(b)from "Retailcrops electricraised customer"on doesland notcleared include, in the case of any electric utility, any person or entity that purchases electricity exclusively from carbon-freeold-growth and eligible renewable resources, as defined in RCW 19.285.030 as of January 1, 2019, pursuant to a special contract with an investor-owned utility approved by an order of the commission prior to the effective date of this section.(36) "Retail electric load" means the amount of megawatt-hours of electricity delivered in a given calendar year by an electric utility to its Washington retail electric customers.(37) "Thermal renewable energy credit" means, with respect to a facility that generates electricity using biomass energy that also generates thermal energy for a secondary purpose, a renewable energy credit that is equivalent to three million four hundred twelve thousand British thermal units of energy used for such secondary purpose.(38) "Unbundled renewable energy credit" means a renewable energy credit that is sold, delivered, or purchasedfirst separatelygrowth fromforests; electricity.
Allor thermal(i) biomass energy.(28) "Retail electric customer" means a person or entity that purchases electricity for ultimate consumption and not for resale.(29) "Retail electric load" means the amount of megawatt-hours of weather-adjusted electricity delivered in a given calendar year by an electric utility to its Washington retail electric customers.(30) "Unbundled renewable energy creditscredit" aremeans considereda unbundled renewable energy credits.(39)credit that is sold, delivered, or purchased separately from electricity.(31) "Unspecified electricity" means an electricity source for which the fuel attribute is unknown or has been separated from the energy.(40)energy.(32) "Vulnerable populations"communities" meansincludes communities thatdesignated experienceunder athe disproportionate cumulative riskimpacts fromanalysis environmentalconducted burdensunder duesection to:(a)18 Adverseof socioeconomicthis factors,act.NEW includingSECTION. Sec. unemployment, high housing and transportation costs relative to income, access to food and health care, and linguistic isolation;
and(b) Sensitivity factors, such as low birth weight and higher rates of hospitalization.NEW SECTION. Sec.
(1) On or before December 31, 2025, all electric utilities must eliminate coal-firedfrom resourceselectric fromrates theirall allocationcosts ofassociated electricity.with delivering electricity to Washington customers that is generated from a coal-fired resource.
This does not include costs associated with decommissioning and remediation of these facilities.facilities.(2) The commission must accelerate depreciation schedules for any coal-fired resource owned by investor-owned utilities to a date no later than December 31, 2025.(3) The commission may not extend the depreciation schedule for any generating resource that generates electricity through the combustion or oxidation of a fossil fuel.(4) An electric utility that fails to comply with the requirements of this section must pay the administrative penalty established under section 7(1) of this act.NEW SECTION. Sec.
The commission shall allow in electric rates all decommissioning and remediation costs prudently incurred by an electric utility for a coal-fired facility.(2) The commission shall accelerate depreciation schedules for any coal-fired resource to a date no later than December 31, 2025.
The commission may accelerate the depreciation schedule for any qualified transmission line owned by an investor-owned utility when the commission finds the qualified transmission line is no longer used and useful and there is no reasonable likelihood that the qualified transmission line will be utilized in the future.
The adjusted depreciation schedule must require such a coal-fired resource or qualified transmission line to be fully depreciated on or before December 31, 2025.(3) The commission shall allow in rates, directly or indirectly, amounts on an investor-owned utility's books of account that the commission finds represent prudently incurred undepreciated investment in a fossil fuel generating resource that has been retired from service when:(a) The retirement is due to ordinary wear and tear, casualties, acts of God, acts of governmental authority, inability to procure or use fuel, termination or expiration of any ownership, and operation agreement affecting such a fossil fuel generating resource;
or(b) The commission finds that the retirement is in the public interest.(4) An electric utility that fails to comply with the requirements of subsection (1) of this section must pay the administrative penalty established under section 8(1) of this act.NEW SECTION. Sec.
(1) It is the policy of the state that all retail sales of electricity to Washington retail electric customers be greenhouse gas neutral by January 1, 2030.(a) By January 1, 2030, and each year thereafter through December 31, 2044, an electric utility must demonstrate its compliance with this standardtarget using a combination of nonemitting electric generation and electricity from renewable resources and resourcesother technologies that reduce greenhouse gas emissions.
To achieve compliance with this standard,target, an electric utility must:
(i) PursueUse all cost-effective, reliable, and feasible conservation and efficiency resources and demand response resources to reduce or manage retail electric load,load; using the methodology established in RCW 19.285.040, if applicable;
and (ii) use electricity from renewable resources and nonemitting electric generation in an amount equal to one hundred percent of the utility's average annual retail electric load.(b)load minus any nonemitting electric generation in operation on the effective date of this section.(b) Through December 31, 2044,2039, an electric utility may satisfy up to twenty percent of its compliance obligation under (a) of this subsection with an alternative compliance option consistent with this section.
AnBeginning alternativeJanuary compliance1, option2040, mayand includethrough anyDecember combination31, of2044, thean following:(i)electric Makingutility anmay alternativesatisfy complianceup paymentto underten sectionpercent 8(2) of thisits act;(ii)compliance Usingobligation unbundledunder renewable(a) energyof credits,this includingsubsection unbundledwith renewablean energyalternative creditscompliance usedoption forconsistent compliance with RCWthis 19.285.040.section.
RenewableAn energyalternative credits used for compliance withoption this section may beinclude bankedany andcombination used for compliance within three years of being generated;(iii) Investing in energy transformation projects, provided the projectsfollowing:(i) meetMaking the requirements of subsection (2) of this section and are not credited as resources used to meet the standard under (a) of this subsection;(iv) Use electricity from an energyalternative recovery facility using municipal solid waste as the principal fuel source, where the facility was constructed prior to 1992, and the facility is operated in compliance withpayment federal and state air quality standards.(c) The department must adopt rules providing for the measuring and tracking of thermal renewable energy credits that may be used for compliance under (b)(ii)section of7(2) this subsection.(d) Electricity from renewable resources used to meet an electric utility's compliance obligation under (a) of this subsectionact;(ii) mustUsing beunbundled verified by the retirement of renewable energy credits.credits;
Renewableor(iii) energyInvesting creditsin mustenergy betransformation trackedprojects, andprovided retiredsuch inprojects themeet tracking system selected by the department.(e)requirements Inof meetingsubsection the(2) targetsof established under this section,section hydroelectricand generationare may not includecredited newas diversions,resources newused impoundments,to newmeet bypassthe reaches,standard orunder expansion(a) of existingthis reservoirssubsection.(c) constructedRenewable afterresources theused effectiveto datemeet ofan thiselectric sectionutility's unlesscompliance theobligation diversions,under bypass(a) reaches,of orthis reservoirsubsection expansionsmust arebe necessaryverified forby the operationretirement of arenewable pumpedenergy storagecredits. facility that:
(i)Renewable Doesenergy notcredits conflictmust withbe existingtracked stateand orretired federalin fishthe recoverytracking plans;system selected by the department.(d) Nonemitting electric generation resources used to meet an electric utility's compliance obligation under (a) of this subsection must be generated during the compliance year and must be verified by documentation that the electric utility owns the nonpower attributes of the electricity generated by the nonemitting resource.(2) Investments in energy transformation projects used to satisfy an alternative compliance option provided under subsection (1)(b) of this section must use criteria developed by the department of ecology, in consultation with the department of commerce.
andEnergy (ii)transformation compliesprojects withmust alldemonstrate local,standards state, and federal laws and regulations.(f) Nothing in (e) of thisquality, subsectionincluding:(a) precludesMeasurable animpacts electric utility that ownscan andbe operatesdemonstrated hydroelectric generating facilities from making efficiency or other improvements to itsresult hydroelectricin generating facilities existing as of the effective date of this section or installingfacilitate hydroelectricreal generationnet reductions in pipes,fossil culverts,fuel irrigationuse canals, and other manmade waterways, as long as those changes do not create conflicts with existing state or federalgreenhouse fishgas recoveryreductions plansthrough and comply with all local, state, and federal laws and regulations.(g) Nonemitting electric generation resources used to meet an electricapproved utility'sprotocol;(b) complianceNonreversible obligationimpacts underthat (a)are ofpermanent;(c) thisImpacts subsection must be generated during the compliance year and must be verified by documentation that theare electricadditional utilityto ownswhat thewould nonpowerhave attributesoccurred ofbut thefor electricity generated by the nonemittinginvestment resource.(h)through Nothing in this section prohibits an electric utility from purchasing or exchanging power from the Bonneville power administration.(2) Investments in energy transformation projectsproject usedas todemonstrated satisfy an alternative compliance option provided under subsection (1)(b) of this section must use criteria developed by the departmentfollowing: of ecology, in consultation with the department and the commission.
For(i) theThe purposeimpacts ofcan creditingbe anshown energyto transformationresult projectfrom toward the standardinvestment initself subsectionand (1)(a)not ofresult thissolely section,from themarket departmentforces ofexisting ecologyat must establish a conversion factor consistent with the emissiontime factorsof for unspecified electricity or, if the departmentinvestment; has not adopted an emissions factor for unspecified electricity, 0.437 metric tons of carbon dioxide per megawatt-hour of electricity.
Emissions(ii) reductionsthe frominvestment or energy transformation projectsproject mustis be:(a)not Real,otherwise specific,required identifiable,by andlaw quantifiable;(b)or Permanent:regulation, is not used as a compliance mechanism for other federal, state, or local laws or regulations, or is not required as a result of a legal settlement or other legal action or court order binding on the recipient or grantor of the funds;
Theand department(iii) mustany look to other jurisdictionstest infor settingadditionality thisthat standardis andidentified makein aan reasonableapproved determinationprotocol onfor length of time;(c) Enforceable by the stateenergy oftransformation Washington;(d)project Verifiable;(e)type; Not required by another statute, rule, or other legal requirement in place as of the effective date of this section;
and(f)and(d) NotVerifiable reasonablyimpacts assumedthat toallow occurfor absent investment, or if an investment has already been made, not reasonably assumed to occur absent additional funding in the nearrigorous future.(3)auditing Energy transformation projects must be associated with the consumption of energyquantification inmethodologies, Washingtoncalculations, and must not create a new use of fossil fuels that results in a net increase of fossil fuel usage.(4) The compliance eligibility of energy transformation projects may be scaled or prorated by anstate approvedagencies protocoland inthird-party orderverifiers to distinguish effects related to reductions in electricityaccordance usagewith fromprocedures reductionsdefined in fossilapproved fuelprotocols; usage.(5) Any compliance obligation fulfilled through an investment in an energy transformation project is eligible for use only by:
(a)or(e) Any other standard included in an approved protocol for the energy transformation project type.(3) Energy transformation projects must be associated with the consumption of energy in Washington and must not create a new use of fossil fuels in Washington that results in a net increase of fossil fuel usage.(4) The compliance eligibility of energy transformation projects may be scaled or prorated by an approved protocol in order to distinguish effects related to reductions in electricity usage from reductions in fossil fuel usage.(5) Any compliance obligation fulfilled through an investment in an energy transformation project is eligible for use only by the electric utility that makes the investment;investment.(6) The department shall implement rule making, in consultation with the commission and the department of ecology, to establish the guidelines for utilities to implement energy transformation project investments.
(b)This ifrule themaking investmentmust isestablish:(a) madeAn byinitial thelist Bonnevilleof powereligible administration,energy bytransformation electricproject utilitiestypes;(b) thatA areprocedure preferencewith customersopportunity offor thepublic Bonnevilleinput powerand administration;consultation in order to adapt, adopt, or create protocols for each eligible energy project transformation type;
orand(c) (c)Verification ifprocedures, thereporting investmentstandards, isand madeother bylogistical aissues jointas operatingnecessary.(7) agencyIn organizedapproving annual targets established by investor-owned utilities under chaptersubsection 43.52(1) RCW,of this section, the commission, after a memberhearing, ofmust adopt by order interim targets for each investor-owned utility, informed by the jointutility's operatingclean agency.energy action plans submitted under RCW 19.280.030.
An electric utility making an investment in partnership with another electric utility or entity may claim credit proportional to its share invested of the total project cost.(6) The department shall implement rule making, in consultation with the commission andmust, theat departmenta ofminimum, ecology,adopt tointerim establishtargets the guidelines for utilities to implement energy transformationefficiency, projectdemand investmentsresponse, including,and butrenewable notenergy.(8) limitedIn to,establishing verificationannual procedures,targets reportingunder standards,subsection and(1) otherof logisticalthis issuessection, asthe necessary.(7)governing Thebody commission,of after a hearing,consumer-owned utility must adopt, reject, or adopt withinterim conditions,targets, informed by order,the interimutility's targets and a clean energy implementationaction planplans forsubmitted eachunder investor-ownedRCW utility.19.280.030.
InterimThe governing body must, at a minimum, adopt interim targets for energy efficiency, demand response, and cleanrenewable energyenergy.(9) implementationIn plansmeeting annual targets established under subsection (1) of this section, an electric utility must bedemonstrate informedthat byit thehas cleanachieved energyall actioncost-effective, plansreliable, submittedand underfeasible RCWconservation 19.280.030and efficiency resources, reductions in demand, and mustdemand bemanagement adoptedprior noto latermaking thannew sixinvestments monthsto aftermeet projected demand, and to the cleanmaximum energyextent actionfeasible planmust:(a) hasAchieve beentargets submittedat pursuantthe tolowest RCWreasonable 19.280.030.cost;
Initialand(b) interimIn targetsthe mustacquisition beof adoptednew byresources Decemberconstructed 31,after 2022.the effective date of this section:(i) Maximize the creation of family wage jobs, insofar as doing so is consistent with (a) of this subsection;
Theand(ii) commissionRely must,on atrenewable aresources minimum,and adoptenergy interimstorage, targetsinsofar foras energydoing efficiency,so demandis response,consistent andwith renewable(a) energy.of this subsection.(10) An electric utility that fails to meet the requirements of this section must pay the administrative penalty established under section 7(1) of this act.NEW SECTION. Sec.
The commission may adopt more stringent targets and periodically adjust or expedite timelines if it can be demonstrated that levels of attainment can be achieved in a manner consistent with the following:(a) Maintaining and protecting the safety, reliable operation, and balancing of the electric system;(b) Planning to meet the standard at the lowest reasonable cost, considering risk;(c) Ensuring that all customers are benefiting from the transition to clean energy, including:
An equitable distribution of energy and nonenergy benefits and reduction of burdens to vulnerable populations and highly impacted communities;
long-term and short-term public health and environmental benefits, costs, and risks;
and energy security and resiliency;
and(d) Ensuring that no customer or class of customers are unreasonably harmed by resulting increases in the cost of utility-supplied electricity necessary to comply with the standard established under subsection (1) of this section.(8) The governing body of a consumer-owned utility must, after a public meeting, adopt interim targets and a clean energy implementation plan, informed by the clean energy action plan submitted under RCW 19.280.030.
Interim targets and clean energy implementation plans must be submitted to the auditor and made available to the public.
The governing body must, at a minimum, adopt interim targets for energy efficiency, demand response, and renewable energy.
The governing body may adopt more stringent targets and periodically adjust or expedite timelines if it can be demonstrated that levels of attainment can be achieved in a manner consistent with the following:(a) Maintaining and protecting the safety, reliable operation, and balancing of the electric system;(b) Planning to meet the standard at the lowest reasonable cost, considering risk;(c) Ensuring that all customers are benefiting from the transition to clean energy, including:
An equitable distribution of energy and nonenergy benefits and reduction of burdens to vulnerable populations and highly impacted communities;
long-term and short-term public health and environmental benefits, costs, and risks;
and energy security and resiliency;
and(d) Ensuring that no customer or class of customers are unreasonably harmed by resulting increases in the cost of utility-supplied electricity necessary to comply with the standard established under subsection (1) of this section.(9)(a) In meeting interim targets established under this section, an electric utility must, consistent with the requirements of RCW 19.285.040, if applicable, pursue all cost-effective, reliable, and feasible conservation and efficiency resources, and demand response.
In making new investments, an electric utility must, to the maximum extent feasible:(i) Achieve targets at the lowest reasonable cost, considering risk;(ii) Consider acquisition of existing renewable resources;
and(iii) In the acquisition of new resources constructed after the effective date of this section, rely on renewable resources and energy storage, insofar as doing so is consistent with (a)(i) of this subsection.(b) Electric utilities subject to RCW 19.285.040 must demonstrate pursuit of all conservation and efficiency resources through compliance with the requirements in RCW 19.285.040.(10) An electric utility that fails to meet the requirements of this section must pay the administrative penalty established under section 8(1) of this act.(11) In complying with this section, an electric utility must, consistent with the requirements of RCW 19.280.030 and section 24 of this act, seek to maximize equitable distribution of energy and nonenergy benefits and reduction of burdens to vulnerable populations and highly impacted communities;
long-term and short-term public health and environmental benefits, costs, and risks;
and energy security and resiliency.(12) Customers who become market customers after the effective date of this section must comply with the obligations of this section.(13) A market customer that purchases electricity exclusively from carbon-free resources and eligible renewable resources, as defined in RCW 19.285.030 as of January 1, 2019, pursuant to a special contract with an investor-owned utility approved, prior to the effective date of this section, by order of the commission must be subject to the requirements of such an order and not to the standards established in this section.
For purposes of interpreting any such special contract, chapter 19.285 RCW, as in effect on January 1, 2019, is not, either directly or indirectly, amended or supplemented.NEW SECTION. Sec.
(1) It is the policy of the state that nonemitting electric generation and electricity from renewable resources supply one hundred percent of all retail sales of electricity to Washington retail electric customers by January 1, 2045.(2)2045. Each electric utility must incorporate subsection (1) of this section into all relevant planning and resource acquisition practices.(3) Customers who become market customers after the effective date of this section are subject to the requirements of this section to the same extent as the electric utility to which they are interconnected.
ThisBy requirementJanuary does1, not2045, applyand toeach anyyear marketthereafter, customeran thatelectric purchasesutility electricitymust exclusivelysupply fromone carbon-freehundred percent of its retail electric sales using nonemitting electric generation and renewable resourcesresources, pursuantor topay athe specialadministrative contractpenalty approvedestablished byunder thesection commission7(1) orof this act.(2) Each electric utility must incorporate the governingpolicy bodyestablished onunder orsubsection before(1) of this section into all relevant planning and procurement practices and demonstrate compliance with this section annually, beginning January 1, 2046.(3) An electric utility must comply with the effectivestandard dateestablished under subsection (1) of this section.section in a manner consistent with the following:(a) Maintaining and protecting the safety, reliable operation, and balancing of the electric system;(b) Planning to meet the standard at the lowest reasonable cost;
(4)and(c) InEnsuring planningthat toall meetcustomers projectedare demandbenefiting consistentfrom with the requirementstransition ofto subsectionclean (2)energy.(4) ofIn thismeeting sectionannual andtargets RCWestablished 19.285.040,under ifsubsection applicable,(1) of this section, an electric utility must pursuedemonstrate that it has achieved all cost-effective, reliable, and feasible conservation and efficiency resources, reductions in demand, and demand response.management prior to making new investments to meet projected demand, and to the maximum extent feasible must:(a) Achieve targets at the lowest reasonable cost;
and(b) In makingthe newacquisition investments,of annew electricresources utilityconstructed must,after to the maximumeffective extentdate feasible:(a)of Achievethis targetssection:(i) atMaximize the lowestcreation reasonableof cost,family consideringwage risk;(b)jobs, Considerinsofar acquisitionas ofdoing existingso renewableis resources;consistent with (a) of this subsection;
and(c)and(ii) InRely the acquisition of new resources constructed after the effective date of this section, rely on renewable resources and energy storage, insofar as doing so is consistent with (a) of this subsection.(5) TheAn commission,electric department,utility energythat facilityfails siteto evaluationmeet council,the departmentrequirements of ecology, and all other state agencies shall incorporate this section intomust allpay relevantthe planningadministrative andpenalty utilizeestablished allunder programssection authorized7(1) by statute to achieve subsection (1) of this section.(6)(a)act.(6) InThe satisfyingcommission, the requirementsdepartment, ofthe thisenergy section,facility hydroelectricsite generationevaluation maycouncil, notthe includedepartment newof diversions,ecology, newand impoundments,all newother bypassstate reaches,agencies orshall expansionincorporate ofthe existingpolicy reservoirsestablished constructedunder aftersubsection the(1) effective date of this section unlessinto theall diversions,relevant bypassplanning reaches,and orutilize reservoirall expansionsprograms areauthorized necessaryby forstatute theto operationachieve ofthe apolicy.NEW pumpedSECTION. Sec. storage facility that:
(i) Does not conflict with existing state or federal fish recovery plans;
and (ii) complies with all local, state, and federal laws and regulations.(b) Nothing in (a) of this subsection precludes an electric utility that owns and operates hydroelectric generating facilities from making efficiency or other improvements to its hydroelectric generating facilities existing as of the effective date of this section or installing hydroelectric generation in pipes, culverts, irrigation canals, and other manmade waterways as long as those changes do not create conflicts with existing state or federal fish recovery plans and comply with all local, state, and federal laws and regulations.(7) Nothing in this section prohibits an electric utility from purchasing or exchanging power from the Bonneville power administration.(8) Nothing in this section prohibits an electric utility from purchasing power from an energy recovery facility using municipal solid waste as the principal fuel source, where the facility was constructed prior to 1992, and the facility is operated in compliance with federal and state air quality standards.(9) Customers who become new market customers as of the effective date of this section must comply with the obligations of this section.(10) Any market customer that purchases electricity exclusively from carbon-free resources and eligible renewable resources, as defined in RCW 19.285.030 as of January 1, 2019, pursuant to a special contract with an investor-owned utility approved, prior to the effective date of this section, by order of the commission is subject to the requirements of such an order and not to the standards established in this section.
For the purposes of interpreting such a special contract, chapter 19.285 RCW, as in effect on January 1, 2019, is not, either directly or indirectly, amended or supplemented.NEW SECTION. Sec.
(1)By EachJanuary electric1, utility2021, mustand discloseat itsleast greenhouseevery gastwo contentyears calculationthereafter and in conformancecompliance with thisRCW section.43.01.036, the commission and the department shall submit a joint report to the legislature.
AThe utility'sjoint disclosurereport must beinclude consistentthe following:(1) A review of the policies described in sections 4 and 5 of this act focused on technologies, forecasts, and existing transmission, and an evaluation of safety, environmental and public safety protection, affordability, and system reliability.(2) An evaluation identifying the potential benefits and impacts on system reliability associated with achieving the fuelpolicies sourcesdescribed thatin itsections reports4 and discloses5 of this act.(3) An evaluation identifying the nature of any anticipated financial costs and benefits to electric, gas, and water utilities, including customer rate impacts and benefits.(4) An assessment of the impacts of the policies described in compliancesections with4 chapterand 19.29A5 RCW.of this act on low-income customers and vulnerable communities.(5) The barriers to, and benefits of, achieving the policies described in sections 4 and 5 of this act.NEW SECTION. Sec.
The department must by rule incorporate the carbon content disclosure into the power source or fuel mix disclosure required under chapter 19.29A RCW.(2) For unspecified electricity, the utility must use an emissions rate determined, and periodically updated, by the department by rule.(3) For the purposes of this section, the Bonneville power administration may exclude from its fuel mix reported to the department any purchases of electric generation that are made for the purpose of serving load outside of the state of Washington.NEW SECTION. Sec.
(1) ByAn Januaryelectric 1,utility 2021,that andfails atto leastcomply everywith twothe yearsstandards thereafterestablished and in compliancesections with3 RCWthrough 43.01.036,5 of this act shall pay an administrative penalty to the commissionstate andof Washington in the departmentamount shallof submitone ahundred jointdollars reportfor each megawatt-hour of emitting or unspecified electric generation used to meet the legislature.utility's retail electric load.
TheBeginning joint report must include the following:(a) A review of the standards described in sections2027, 3this throughpenalty 5must ofbe thisadjusted act focused on technologies,a forecasts,biennial andbasis existingaccording transmission,to andthe anrate evaluation of safety,change environmentalof and public safety protection, affordability, and system reliability.(b)(i) An evaluation, produced in consultation with electric utilities, transmission operators in Washington, the reliabilityinflation coordinatorindicator, forgross electricdomestic utilities,product-implicit andprice anydeflator, regionalas planningpublished organizationby serving electric utilities, identifying the potentialbureau benefits,of impacts,economic andanalysis risksof on system reliability associated with achieving the standardsUnited describedStates indepartment sectionsof 4commerce andor 5its ofsuccessor. this act.
TheBeginning evaluation must assess whether electric utilities have sufficient electric generation resources to meet forecasted retail electric load in addition2040, tothe adequatecommission transmissionmay capabilityby torule implementincrease sectionsthis 3penalty throughfor 5investor-owned ofutilities thisif act.(ii) If the evaluationcommission findsdetermines insufficientthat generationdoing resourcesso orwill inadequateaccelerate transmissionutilities' capability,compliance with the evaluationstandards mustestablished alsounder identifythis theact mitigation and investmentsthat necessarydoing toso correctis thosein deficiencies at the lowestpublic reasonableinterest.(2) cost.(c)Consistent Anwith evaluation identifying the naturerequirements of anysection anticipated4(1)(b) financialof coststhis andact, benefitsa toutility electric,may gas,opt andto watermake utilities,a includingpayment customerin ratethe impactsamount andof benefitsthe including,administrative butpenalty notas limitedan to:(i)alternative Ratescompliance ofpayment, electricwithout utilities;(ii)incurring Greenhousea gaspenalty emissionsfor ofnoncompliance.(3) electricUpon utilities;(iii)petition Theby allocationan ofinvestor-owned riskutility, between customers and electricafter utilities;(iv)a Thehearing, allocationthe ofcommission financialmay costsissue amongan electricorder utilitiesrelieving in the stateutility andof whetherits retailadministrative electricpenalty customersobligation areunder equitablysubsection bearing(1) the financial costs of implementing sections 3 through 5 of this act;(v)section Theif timingit offinds costthat recoverythe forutility thehad generationno ofchoice electricitybut generatedto byuse nonemittingemitting electric generation orto renewablemaintain resources;(vi)the Thereliability resourceand procurementsafety process of electricthe utilities;grid.
and(vii) The barrierscommission to,may anduse benefitsits of,standard implementingpractice sectionsand 4procedures andto 5make ofa thisreliability act.(d)determination Anunder evaluationthis ofsubsection.(4) newThe orattorney emerginggeneral technologiesmay thatrelieve coulda beconsumer-owned consideredutility toof beits aadministrative renewablepenalty resource.(e)obligation Anunder assessmentsubsection (1) of this section if the impactsattorney ofgeneral sectionsfinds 3that throughthe 5utility ofhad thisno actchoice onbut middle-incometo families,use smallemitting businesses,electric andgeneration manufacturersto inmaintain Washington.(2)reliability Ifand safety of the jointgrid reportbased indicateson adversedocumentation systemsubmitted reliabilityby impactsthe fromgoverning implementationbody of sectionsthe 4consumer-owned andutility.(5) 5An ofelectric thisutility act,must thenincorporate the governor,administrative consistentpenalty withestablished theunder emergencysubsection powers(1) inherentof inthis RCWsection 43.21G.040,as maya suspendcost oradder delaywhen:(a) implementationEvaluating ofand thisselecting chapterconservation untilpolicies, systemprograms, reliabilityand impactstargets;(b) canDeveloping beintegrated addressed.resource plans and clean energy action plans under RCW 19.280.030;
Adverseand(c) systemEvaluating reliabilityand impactsselecting mayresource include,options.(6) butAn areelectric notutility limitedmust to,notify its retail electric customers in published form within three months of paying the inabilityadministrative penalty established under subsection (1) of electricthis utilitiessection.(7) orMoneys transmissioncollected operatorsunder tothis meetsection reliabilitymust standardsbe mandateddeposited byinto lawthe low-income weatherization and requiredstructural byrehabilitation prudentassistance utilityaccount practices.NEWcreated in RCW 70.164.030.(8) For an investor-owned utility, the commission shall determine compliance with the requirements of this chapter.(9) For consumer-owned utilities, the Washington state auditor's office is responsible for auditing compliance with this chapter and rules adopted under this chapter that apply to those utilities, and the attorney general is responsible for enforcing that compliance.NEW SECTION. Sec.
(1) AnOn or before December 31, 2026, and annually thereafter, each electric utility thatmust failsreport to complythe withdepartment on its progress in the preceding year in meeting the standards established in sections 3 andthrough 45 of this actact, shallincluding paythe anfollowing:(a) administrativeExpected penaltyelectricity tosavings thefrom stateconservation ofand Washingtonefficiency inresources;(b) Expenditures on conservation and efficiency resources;(c) Actual electricity savings results;(d) The utility's annual retail electric load for the prior five years;(e) The amount of sixtymegawatt-hours dollarsof for each megawatt-hourtype of electricresource generationacquired;(f) usedThe totype, meetamount, loadand thatcost isassociated notwith electricityrenewable fromenergy acredits renewableretired;(g) resourceAn orassessment nonemittingof electricthe generation.impacts of the standards on low-income customers and vulnerable communities in the utility's service area;
Beginningand(h) Actions taken in 2027,other thissectors penaltyto mustreduce begreenhouse adjustedgas onemissions awhile biennialreducing basisgreenhouse accordinggas toemissions in the rateelectricity ofsector.(2) changeAn investor-owned utility must also report all information required in subsection (1) of this section to the inflationcommission.(3) indicator,An grosselectric domesticutility productmust implicitalso pricemake deflator,reports asrequired publishedin bythis thesection bureauavailable ofto economicits analysisretail ofelectric customers.(4) The department shall ensure that the Uniteddisclosures Statesrequired departmentunder ofchapter commerce19.29A orRCW itsare successor.consistent with the reporting requirements of this act.NEW SECTION. Sec.
Beginning in 2040, the commission may by rule increase this penalty for investor-owned utilities if the commission determines that doing so will accelerate utilities' compliance with the standards established under this chapter and that doing so is in the public interest.(2) Consistent with the requirements of section 4(1)(b) of this act, a utility may opt to make a payment in the amount of the administrative penalty as an alternative compliance payment, without incurring a penalty for noncompliance.(3)(a) Upon its own motion or at the request of an investor-owned utility, and after a hearing, the commission may issue an order relieving the utility of its administrative penalty obligation under subsection (1) of this section if it finds that:(i) After taking all reasonable measures, the investor-owned utility's compliance with this chapter is likely to result in conflicts with or compromises to its obligation to comply with the mandatory and enforceable reliability standards of the North American electric reliability corporation, violate prudent utility practice for assuring resource adequacy, or compromise the power quality or integrity of its system;
or(ii) The investor-owned utility is unable to comply with the standards established in sections 3 and 4 of this act due to reasons beyond the reasonable control of the investor-owned utility, as set forth in subsection (8) of this section.(b) If the commission issues an order pursuant to (a) of this subsection that relieves an investor-owned utility of its administrative penalty obligation under subsection (1) of this section, the commission may issue an order:(i) Notwithstanding the standards established in sections 3 and 4 of this act, temporarily exempting the investor-owned utility from the requirements of section 4 of this act for an amount of time sufficient to allow the investor-owned utility to achieve full compliance with the standard;(ii) Directing the investor-owned utility to file a progress report to the commission on achieving full compliance with the standard within six months after issuing the order, or within an amount of time determined to be reasonable by the commission;
and(iii) Directing the investor-owned utility to take specific actions to achieve full compliance with the requirements of this chapter.(c) An investor-owned utility may request an extension of a temporary exemption granted under this section.
An investor-owned utility that requests an extension must request an update to the order issued by the commission under (b) of this subsection.(4) Subsection (3) of this section does not permanently relieve an investor-owned utility of its obligation to comply with the requirements of this chapter.(5)(a) The attorney general may, at the recommendation of the auditor and, in accordance with the findings of the joint report to the legislature submitted pursuant to section 7 of this act, relieve a consumer-owned utility of its administrative penalty obligation under subsection (1) of this section if the attorney general finds that:(i) The consumer-owned utility's compliance with this chapter is likely to result in conflicts with or compromises to its obligation to comply with the mandatory and enforceable reliability standards of the North American electric reliability corporation, violate prudent utility practice for assuring resource adequacy, or compromise the power quality or integrity of its system;(ii) The consumer-owned utility is unable to comply with the standards established in sections 3 and 4 of this act due to reasons beyond the reasonable control of the utility, as set forth in subsection (8) of this section and based on documentation submitted by the governing body of the consumer-owned utility.(b) Notwithstanding the standards established in sections 3 and 4 of this act, the attorney general may issue a finding:(i) Temporarily exempting the consumer-owned utility from the requirements of section 4 of this act for an amount of time sufficient to allow the consumer-owned utility to achieve full compliance with the standard;(ii) Directing the consumer-owned utility to file a progress report to the attorney general on achieving full compliance with the standard within six months after issuing the finding, or within an amount of time determined to be reasonable by the attorney general;
and(iii) Directing the consumer-owned utility to take specific actions to achieve full compliance with the requirements of this chapter.(c) A consumer-owned utility may request an extension of a temporary exemption granted under this section.(d) This subsection does not permanently relieve a consumer-owned utility of its obligation to comply with the requirements of this chapter.(6) Upon petition by an investor-owned utility, and after a hearing, the commission may issue an order relieving the utility of the requirements of this section if it finds that the utility had no choice but to use electric generation that is not electricity from a renewable resource or nonemitting electric generation to maintain the reliability and safety of the grid.
The commission may use its standard practices and procedures to make a reliability determination under this subsection.(7) The attorney general may relieve a consumer-owned utility of the requirements of this section if the auditor finds that the utility had no choice but to use electric generation that is not electricity from a renewable resource or nonemitting electric generation to maintain reliability and safety of the grid based on documentation submitted by the governing body of the consumer-owned utility.(8) To the extent an event or circumstance cannot be reasonably foreseen and ameliorated, such events or circumstances beyond the reasonable control of an electric utility may include but are not limited to:(a) Weather-related damage;(b) Natural disasters;(c) Mechanical or resource failure;(d) Failure of a third party to meet contractual obligations to the electric utility;(e) Actions of governmental authorities that adversely affect the generation, transmission, or distribution of nonemitting electric generation or renewable resources under contract to an electric utility;(f) Inability to acquire sufficient transmission to transmit electricity from nonemitting electric generation or renewable resources to load;
and(g) Substantial limitations, restrictions, or prohibitions on nonemitting electric generation or renewable resources.(9) An electric utility must notify its retail electric customers in published form within three months of paying the administrative penalty established under subsection (1) of this section.
An electric utility is not required to notify its retail electric customers when making a payment in the amount of the administrative penalty as an alternative compliance payment consistent with the requirements of section 4(1)(b) of this act.(10) Moneys collected under this section must be deposited into the low-income weatherization and structural rehabilitation assistance account created in RCW 70.164.030.(11) For an investor-owned utility, the commission shall determine compliance with the requirements of this chapter.(12) For utilities that are consumer-owned utilities, the auditor is responsible for auditing compliance with this chapter and rules adopted under this chapter that apply to those utilities and the attorney general is responsible for enforcing that compliance.(13) At a request of an investor-owned or consumer-owned utility, the governor may exempt an electric utility from paying the administrative penalty in this chapter when the governor declares an energy emergency pursuant to RCW 43.21G.040.(14) A utility shall be deemed to be in compliance with section 4(1) of this act if it complies with the following:(a) A clean energy implementation plan adopted pursuant to section 4 (7) and (8) of this act must:
(i) Be informed by the utility's clean energy action plans submitted under RCW 19.280.030;
and (ii) identify specific actions to be taken by the utility over the next four years, consistent with the long-range integrated resource plan and resource adequacy requirements, to meet the interim targets ordered by the commission and other compliance obligations established in sections 4 and 5 of this act.
The average annual incremental cost of compliance with sections 4 and 5 of this act for each year during the implementation period identified in the clean energy implementation plan may not exceed a three percent increase of the investor-owned utility's weather-adjusted sales to customers for electric operations reported by the investor-owned utility in its most recent commission basis report filed with the commission.
All costs included in the determination of rate impact must be directly attributable to actions necessary to comply with section 4 or 5 of this act.(b) The governing body of a consumer-owned utility must adopt a clean energy implementation plan developed pursuant to RCW 19.280.030 for the consumer-owned utility.
The clean energy implementation plan must:
(i) Be informed by the consumer-owned utility's clean energy action plans developed under RCW 19.280.030;
and (ii) identify specific actions to be taken by the consumer-owned utility over the next four years, consistent with the long-range integrated resource plan and resource adequacy requirements, to meet the interim targets adopted by the governing body and other compliance obligations established in sections 4 and 5 of this act.
The average annual incremental cost of compliance with sections 4 and 5 of this act for each year during the implementation period identified in the consumer-owned utility's clean energy implementation plan may not exceed a three percent increase of the consumer-owned utility's retail revenue requirement above the previous year.(c) If an electric utility relies on (a)(ii) or (b)(ii) of this subsection as a basis for compliance with the standards in sections 4 and 5 of this act, it must demonstrate that it has maximized investments in renewable and nonemitting resources prior to using alternative compliance options allowed under section 4(1)(b) of this act.(d) The commission, for investor-owned utilities, or the auditor, for consumer-owned utilities, must consider an electric utility to be in compliance with the interim targets adopted pursuant to section 4 (7) and (8) of this act if the electric utility demonstrates compliance with its clean energy implementation plan.(e) The commission, for investor-owned utilities, or the auditor, for consumer-owned utilities, must also consider an electric utility to be in compliance with RCW 19.285.040(2) if the electric utility demonstrates it has achieved the limit on the incremental cost of compliance established in (a)(ii) or (b)(ii) of this subsection.(f) The commission for investor-owned utilities and the department for consumer-owned utilities shall adopt rules establishing the methodology for calculating the incremental cost of compliance with this chapter, as compared to the cost of an alternative lowest reasonable cost portfolio of investments that are reasonably available.(15) Notwithstanding subsection (1) of this section, for a consumer-owned electric utility with fewer than two hundred fifty thousand customers and that owns a natural gas-fired generation facility located in the state as of January 1, 2019, the auditor shall consider the electric utility to be in compliance with both section 4(1) of this act and RCW 19.285.040(2) if the electric utility demonstrates that its incremental cost of compliance exceeds five percent of the utility's annual retail revenue in a given year.
The auditor shall determine the utility's incremental cost of compliance by comparing the cost of selected renewable and nonemitting resource portfolio with the lowest cost alternative portfolio of resources that are reasonably available to the utility.(16) Beginning January 1, 2030, a qualifying utility is considered to be in compliance with an annual target in RCW 19.285.040(2)(a) if the utility uses electricity from renewable resources, nonemitting electric generation, and renewable energy credits as defined in RCW 19.285.030, in an amount equal to one hundred percent of the utility's average annual retail electric load.
Nothing in this subsection relieves the requirements of a qualifying utility to comply with RCW 19.285.040(1).NEW SECTION. Sec.
(1) The departmentcommission mustmay adopt rules establishingto reportingensure requirementsthe forproper electricimplementation utilitiesand enforcement of this chapter as it applies to demonstrateinvestor-owned complianceutilities.(2) withThe department may adopt rules to ensure the proper implementation and enforcement of this chapter.chapter as it applies to consumer-owned utilities.
The requirements must, to the extent practicable, be consistent with the disclosures required under chapter 19.29A RCW.(2) An investor-owned utility must also report all information required in subsection (1) of this section to the commission.(3) An electric utility must also make reports required in this section available to its retail electric customers.NEW SECTION. Sec.
10.
(1) It is the intent of this chapter that the commission and department adopt rules to streamline the implementation of this act with chapter 19.285 RCW to simplify compliance and avoid duplicative processes.
The commission may adopt rules to ensure the proper implementation and enforcement of this chapter as it applies to investor-owned utilities.(2) The department may adopt rules to ensure the proper implementation and enforcement of this chapter as it applies to consumer-owned utilities.
10.
The requirements of sections 3 through 9 of this act do not replace or modify the requirements established under chapter 19.285 RCW.Sec.
(1) The requirements of sections 3 through 8 of this act do not replace or modify the requirements established under chapter 19.285 RCW.
All utility activities to comply with the requirements established under chapter 19.285 RCW also qualify for compliance with the requirements contained in this chapter.(2) Any market customer that purchases electricity exclusively from carbon-free resources and eligible renewable resources, as defined in RCW 19.285.030 as of January 1, 2019, pursuant to a special contract with an investor-owned utility approved, prior to the effective date of this section, by order of the commission is subject to the requirements of such an order and not to sections 4 and 5 of this act.
For the purposes of interpreting such a special contract, chapter 19.285 RCW, as in effect on January 1, 2019, is not, either directly or indirectly, amended or supplemented.NEW SECTION. Sec.
12.
(1) It is the intent of the legislature to demonstrate progress toward making energy assistance funds available to low-income households consistent with the targets identified in this section.(2) An electric utility must make funding available for energy assistance to low-income households by July 31, 2021.
Each utility must demonstrate progress on energy assistance pursuant to the assessment and plans in subsection (4) of this section.
To the extent practicable, priority must be given to low-income households with a higher energy burden.(3) Beginning July 31, 2020, each retail supplier must disclose the following information on energy assistance and energy assistance need in their service territory.
The disclosure must be updated biennially and submitted to the department.
The disclosure must include, but is not limited to:(a) The number of low-income households in the utility's service territory;(b) The level of energy assistance need in the utility's service territory;
and(c) The amount and type of energy assistance and the number and type of households served in the electric utility's most recent completed budget period.(4) In addition to the disclosures required in subsection (3) of this section, each electric utility must submit biennially to the department an assessment and plans to improve:(a) The mechanisms used to reduce energy burden including, but not limited to, a low-income specific rate class and the effectiveness of those mechanisms in both short-term and sustained energy burden reductions;(b) The outreach strategies used to maximize participation of all eligible households, including consultation with community-based organizations and Indian tribes as appropriate, and comprehensive enrollment campaigns that are language and culturally appropriate to the vulnerable populations in their service territory to inform and enroll more difficult to reach eligible households;
and(c) Current and prospective funding mechanisms including, but not limited to, customer rates, system benefits charges, public funds, and private funds needed to meet sixty percent of the energy assistance need or a fifteen percent increase over 2020 levels, whichever is greater, by 2030, and ninety percent of the energy assistance need by 2050.(5) A consumer-owned utility may enter into an agreement with a public university, community-based organization, or joint operating agency organized under chapter 43.52 RCW to aggregate the disclosures required in this section and submit the assessment required in subsection (4) of this section.(6) The commission, for investor-owned utilities, and department, for consumer-owned utilities, shall adopt rules to implement this section including, but not limited to, a shared definition and calculation of energy burden and energy assistance need.
The governing boards for consumer-owned utilities is solely responsible for enforcement of this chapter for consumer-owned utilities.(7) The commission and department must submit biennially to the legislature a report aggregating utility disclosures into a statewide summary of energy assistance programs, energy burden, and energy assistance need, and identifying and sharing optimal mechanisms for energy assistance.NEW SECTION. Sec.
13.
(1) The department and the commission must convene a stakeholder work group to examine the:(a) Efficient and consistent integration of this act and transactions with carbon and electricity markets outside the state;
and(b) Compatibility of the requirements under this act relative to a linked cap-and-trade program.(2) To assist in its examination of the issues identified in this section, as well as any other issues pertinent to its review, the work group must, at a minimum, consist of light and power businesses, gas distribution businesses, the Bonneville power administration, and other agencies.(3) The work group must prepare a report to the legislature of its findings and recommendations to improve the carbon transparency and market liquidity in electricity markets and submit the report, in compliance with RCW 43.01.036, by December 1, 2020.
The department and the department of ecology must provide necessary data and other support to the work group.(4) This section expires June 30, 2021.Sec.
14.
The integrated resource plan, at a minimum, must include:(a) A range of forecasts, for at least the next ten years or longer, of projected customer demand which takes into account econometric data and customer usage;(b) An assessment of commercially available conservation and efficiency resources,resources. as informed, as applicable, by the ten-year assessment for cost-effective conservation potential under RCW 19.285.040.
Such assessment may include, as appropriate, opportunities for development of combined heat and power as an energy and capacity resource, demand response and load management programs, and currently employed and new policies and programs needed to obtain the conservation and efficiency resources;(c) An assessment of commercially available, utility scale renewable and nonrenewable generating technologies including a comparison of the benefits and risks of purchasing power or building new resources;(d) A comparative evaluation of renewable and nonrenewable generating resources, including transmission and distribution delivery costs, and conservation and efficiency resources using "lowest reasonable cost" as a criterion;(e) An assessment of methods, commercially available technologies, or facilities for integrating renewable resources, including but not limited to battery storage and pumped storage, and addressing overgeneration events, if applicable to the utility's resource portfolio;(f) An assessment and ten-year forecast of the availability of regional generation and transmission capacity on which the utility may rely to provide and deliver electricity to its customers;(g) A determination of load loss probability under different resource acquisition scenarios for implementing sections 3 through 5 of this act;(h) A ten-year forecast of distributed energy resources that may be installed by the utility's customers and an assessment of their effect on the utility's load and operations;(i) An identification of an appropriate resource adequacy requirement and measurement metric consistent with prudent utility practice in implementing sections 3 through 5 of this act;(j) The integration of the demand forecasts ((and)), resource evaluations, and resource adequacyevaluations requirement into a long-range assessment describing the mix of supply side generating resources and conservation and efficiency resources that will meet current and projected needs, including mitigating overgeneration events and implementingmeeting the standards established in sections 3 through 5 of this act, at the lowest reasonable cost and risk to the utility and its ((ratepayers))customers,ratepayers; while maintaining and protecting the safety, reliable operation, and balancing of its electric system;
((and))(k)((and))(g) AnA assessmentshort-term ofplan energyidentifying andthe nonenergyspecific benefitsactions to be taken by the utility consistent with the long-range integrated resource plan;(h) By December 31, 2020, and reductionsin ofeach burdenssubsequent toplan, vulnerablea populationsten-year clean energy action plan, which identifies an action plan and highlyproposed impactedinterim communities;targets for meeting the standard in section 4 of this act;
long-termand(i) By December 31, 2025, and short-termin publiceach healthsubsequent plan, a twenty-year clean energy action plan, which identifies an action plan and environmentalproposed benefits,interim costs,targets for meeting the standard in section 5 of this act.(2) All other utilities may elect to develop a full integrated resource plan as set forth in subsection (1) of this section or, at a minimum, shall develop a resource plan that:(a) Estimates loads for the next five and risks;ten years;(b) Enumerates the resources that will be maintained and/or acquired to serve those loads;
and energy security and risk;
informed by the cumulative impact analysis performed by the department of health pursuant to section 24 of this act;(l) A ((short-term))ten-year clean energy action plan proposing interim targets for implementing sections 3 and 4 of this act at the lowest reasonable cost, and at an acceptable resource adequacy standard;
and a four-year clean energy implementation plan identifying the specific actions to be taken by the utility consistent with the long-range integrated resource plan;
and(m) A twenty-year clean energy transformation plan identifying the lowest reasonable cost pathways to implement section 5 of this act.(2) For an investor-owned utility, the clean energy action plan and clean energy implementation plan must:
(a) Propose interim targets for meeting the requirement in section 4 of this act;
(b) identify and be informed by the utility's ten-year cost-effective conservation potential assessment as determined under RCW 19.285.040, if applicable;
(c) establish a resource adequacy requirement;
(d) identify the potential cost-effective demand response and load management programs that may be acquired;
(e) identify renewable resources, nonrenewable resources, and distributed energy resources that may be acquired and evaluate how each identified resource may be expected to contribute to meeting the utility's resource adequacy requirement;
(f) identify any need to develop new, or expand or upgrade existing, transmission and distribution facilities;
and (g) identify the nature and possible extent to which the utility may need to rely on alternative compliance options under section 4(1)(b) of this act, if appropriate.(3)(a) An electric utility shall consider the social cost of greenhouse gas emissions, as determined by the commission for investor-owned utilities pursuant to section 15 of this act and the department for consumer-owned utilities, when developing integrated resource plans and clean energy action plans.
An electric utility must incorporate the social cost of greenhouse gas emissions as a cost adder when:(i) Evaluating and selecting conservation policies, programs, and targets;(ii) Developing integrated resource plans and clean energy action plans;
and(iii) Evaluating and selecting intermediate term and long-term resource options.(b) For the purposes of this subsection:
(i) Gas consisting largely of methane and other hydrocarbons derived from the decomposition of organic material in landfills, wastewater treatment facilities, and anaerobic digesters must be considered a nonemitting resource;
and (ii) qualified biomass energy must be considered a nonemitting resource.(4) To facilitate broad, equitable, and efficient implementation of this act, a consumer-owned energy utility may enter into an agreement with a joint operating agency organized under chapter 43.52 RCW or other nonprofit organization to develop and implement a joint clean energy action plan in collaboration with other utilities.(5) All other utilities may elect to develop a full integrated resource plan as set forth in subsection (1) of this section or, at a minimum, shall develop a resource plan that:(a) Estimates loads for the next five and ten years;(b) Enumerates the resources that will be maintained and/or acquired to serve those loads;
or (iii) conservation and efficiency resources, why such a decision was made;made;(d) By December 31, 2020, and in each subsequent plan, includes a ten-year clean energy action plan, which identifies an action plan and proposed interim targets for meeting the standard in section 4 of this act;
and(d)and(f) By December 31, 2020,2025, identifiesand howin theeach utilitysubsequent plansplan, overincludes a ten-yeartwenty-year periodclean toenergy meetaction theplan, standardwhich inidentifies sectionan 4action ofplan this act and byproposed Decemberinterim 31,targets 2025,for identifiesmeeting how the utilitystandard plansin over a twenty-year period to implement section 5 of this act.(((3)))(6)act.(3) Assessments for demand side resources included in an integrated resource plan may include combined heat and power systems as one of the measures in a conservation supply curve.
The value of recoverable waste heat resulting from combined heat and power must be reflected in analyses of cost-effectiveness under this subsection.(((4)))(7)subsection.(4) An electric utility that is required to develop a resource plan under this section must complete its initial plan by September 1, 2008.(((5)2008.(5) Resource))(8)Resource Plansplans developed under this section must be updated on a regular basis, at a minimum on intervals of two years.(((6)))(9)years.(6) Plans shall not be a basis to bring legal action against electric utilities.(((7)))(10)utilities.(7) Each electric utility shall publish its final plan either as part of an annual report or as a separate document available to the public.
15.12.
AThis new section is added to chapter 80.28 RCW to read as follows:For the purposestax ofpreference thisperformance act,statement thefor cost of greenhouse gas emissions resulting from the generationtax ofpreferences electricity,contained includingin thesections effect13 of emissions is equal to the cost per metric ton of carbon dioxide equivalent emissions, using the two and one-half14, percentchapter discount. rate, listed in table 2, technical support document:
Technical., updateLaws of the2019 social(sections cost13 ofand carbon14 forof regulatorythis impactact). analysis under Executive Order No.
12866, published by the interagency working group on social cost of greenhouse gases of the United States government, August 2016.
The commission must adjust the costs established in this section to reflect the effect of inflation.Sec.
16.
RCW 80.84.010 and 2016 c 220 s 1 are each amended to read as follows:The definitions in this section apply throughout this chapter unless the context clearly requires otherwise.(1) "Eligible coal plant" means a coal-fired electric generation facility that:
(a) ((Had two or fewer generating units as of January 1, 1980, and four generating units as of January 1, 2016;
(b)))Is owned in whole or in part by more than one electrical company as of January 1, 2016;
and (((c)))(b) provides, as a portion of the load served by the coal-fired electric generation facility, electricity paid for in rates by customers in the state of Washington.(2) "Eligible coal unit" means any generating unit of an eligible coal plant.NEW SECTION. Sec.
17.
This section is the tax preference performance statement for the tax preferences contained in sections 18 and 19, chapter .
., Laws of 2019 (sections 18 and 19 of this act).
It is the legislature's intent to extend the expiration date of the existing sales and use tax exemption for machinery and equipment used directly in generating certain types of alternative energy, in order to reduce the price charged to customers for that machinery and equipment, thereby inducing some customers to buy machinery and equipment for alternative energy when they might not otherwise, thereby displacing electricity from fossil-fueled generating resources, thereby reducing the amount of carbon dioxide emissions in Washington.Washington.(3) The joint legislative audit and review committee is not required to perform a tax preference review under chapter 43.136 RCW for the tax preferences contained in sections 13 and 14, chapter .
It., isLaws also the intent of the2019 legislature(sections to13 maximizeand cost14 savings associated with clean energy construction for Washington electric customers by encouraging development of these resources in time for projects to benefit from both this incentiveact) and expiringit federal incentives.(3) It is also the legislature'sintent specific public policy objective to provide an incentive for more of the projectslegislature that meet the objectives of subsection (2) of this section to beallow constructed with high labor standards, including family level wages and providing benefits including health care and pensions, as well as maximizing access to economic benefits from such projects for local workers and diverse businesses.(4) The joint legislative audit and review committee is not required to perform a tax preference review under chapter 43.136 RCW for the tax preferences containedto inexpire sectionsupon 18their andscheduled 19,expiration chapterdates.Sec. .
.,13. Laws of 2019 (sections 18 and 19 of this act) and it is the intent of the legislature to allow the tax preferences to expire upon their scheduled expiration dates.Sec.
18.RCW 82.08.962 and 2018 c 164 s 5 are each amended to read as follows:(1)(a) ((Except as provided in RCW 82.08.963,))Purchasers who have paid the tax imposed by RCW 82.08.020 on machinery and equipment used directly in generating electricity using fuel cells, wind, sun, biomass energy, tidal or wave energy, geothermal resources, or technology that converts otherwise lost energy from exhaust, as the principal source of power, or to sales of or charges made for labor and services rendered in respect to installing such machinery and equipment, are eligible for an exemption as provided in this section, but only if the purchaser develops with such machinery, equipment, and labor a facility capable of generating not less than one thousand watts of electricity.(b) Beginning on July 1, 2011, through January 1, ((2020))2030, the amount of the exemption under this subsection (1) is equal to seventy-five percent of the state and local sales tax paid.
RCWThe 82.08.962purchaser andis 2018 c 164 s 5 are each amended to read as follows:(1)(a) ((Except as provided in RCW 82.08.963,))Purchasers who have paid the tax imposed by RCW 82.08.020 on machinery and equipment used directly in generating electricity using fuel cells, wind, sun, biomass energy, tidal or wave energy, geothermal resources, or technology that converts otherwise lost energy from exhaust, as the principal source of power, or to sales of or charges made for labor and services rendered in respect to installing such machinery and equipment, are eligible for an exemption asunder provided in this section,subsection but(1)(b) onlyin if the purchaserform developsof with such machinery, equipment, and labor a facilityremittance.(2) capableFor ofpurposes generating not less than one thousand watts of electricity.(b) Beginning on July 1, 2011, through ((January 1, 2020))December 31, 2019, the amount of the exemption under this subsectionsection (1)and isRCW equal82.12.962, to seventy-five percent of the statefollowing anddefinitions localapply:(a) sales"Biomass taxenergy" paid.includes:
The purchaser is eligible for an exemption under this subsection (1)(b) in the form of a remittance.(c) Beginning January 1, 2020, through December 31, 2030, the purchaser is entitled to an exemption, in the form of a remittance, under this subsection (1)(c) in an amount equal to:(i) Fifty percent of the state and local sales tax paid, if the department of labor and industries certifies that the project includes procurement from and contracts with women, minority, or veteran-owned businesses, includes procurement from and contracts with entities that have a history of complying with federal and state wage and hour laws and regulations, apprenticeship utilization, and preferred entry for workers living in the area where the project is being constructed.
In the event that a project is built without one or more of these standards and a project developer or its designated principle contractor demonstrates it has made all good faith efforts to meet the standards but was unable to comply due to lack of availability of qualified businesses or local hires, the department of labor and industries may certify that the developer complied with that standard;(ii) Seventy-five percent of the state and local sales tax paid, if the department of labor and industries certifies that the project complies with (c)(i) of this subsection and compensates workers at prevailing wage rates determined by local collective bargaining as determined by the department of labor and industries;
or(iii) One hundred percent of the state and local sales tax paid, if the department of labor and industries certifies that the project is developed under a community workforce agreement or project labor agreement.(d) In order to qualify for the remittance under (c) of this subsection, installation of the qualifying machinery and equipment must commence no earlier than January 1, 2020, and be completed by December 31, 2030.(2) The department of labor and industries shall initiate an emergency rule making on the effective date of this section to be completed by December 1, 2019, to:(a) Define and set minimum requirements for all labor standards identified in subsection (1)(c) of this section;
and(b) Set requirements for all good faith efforts under subsection (1)(c)(i) and (ii) of this section, as well as documentation requirements and a certification process.
Requirements for all good faith efforts must be designed to maximize the likelihood that the project is completed with said standards and could include proactive outreach to firms that are women, minority, and veteran-owned businesses, advertising in local community publications and publications appropriate to identified firms, participating in community job fairs, conferences, and trade shows, and other measures.
The certification process and timeline must be designed to prevent undue delay to project development.(3) For purposes of this section and RCW 82.12.962, the following definitions apply:(a) "Biomass energy" includes:
or (F) building fixtures that are not integral and necessary to the generation of electricity that are permanently affixed to and become a physical part of a building.(((3)))(d)building.(3)(a) "ProjectMachinery laborand agreement"equipment andis "community"used workforcedirectly" agreement"in meansgenerating aelectricity prehireby collectivewind bargainingenergy, agreementsolar withenergy, onebiomass energy, tidal or morewave laborenergy, organizationsgeothermal resources, or technology that establishesconverts otherwise lost energy from exhaust if it provides any part of the termsprocess andthat conditionscaptures the energy of employmentthe wind, sun, biomass energy, tidal or wave energy, geothermal resources, or technology that converts otherwise lost energy from exhaust, converts that energy to electricity, and stores, transforms, or transmits that electricity for aentry specificinto constructionor projectoperation in parallel with electric transmission and distribution systems.(b) Machinery and equipment is an"used agreementdirectly" describedin generating electricity by fuel cells if it provides any part of the process that captures the energy of the fuel, converts that energy to electricity, and stores, transforms, or transmits that electricity for entry into or operation in 29parallel U.S.C.with electric transmission and distribution systems.(4)(a) A purchaser claiming an exemption in the form of a remittance under subsection (1)(b) of this section must pay the tax imposed by RCW 82.08.020 and all applicable local sales taxes imposed under the authority of chapters 82.14 and 81.104 RCW.
Sec.
158(f).(4)(a) Machinery and equipment is "used directly" in generating electricity by wind energy, solar energy, biomass energy, tidal or wave energy, geothermal resources, or technology that converts otherwise lost energy from exhaust if it provides any part of the process that captures the energy of the wind, sun, biomass energy, tidal or wave energy, geothermal resources, or technology that converts otherwise lost energy from exhaust, converts that energy to electricity, and stores, transforms, or transmits that electricity for entry into or operation in parallel with electric transmission and distribution systems.(b) Machinery and equipment is "used directly" in generating electricity by fuel cells if it provides any part of the process that captures the energy of the fuel, converts that energy to electricity, and stores, transforms, or transmits that electricity for entry into or operation in parallel with electric transmission and distribution systems.(((4)))(5)(a)(i) A purchaser claiming an exemption in the form of a remittance under subsection (1)(b) or (c) of this section must pay the tax imposed by RCW 82.08.020 and all applicable local sales taxes imposed under the authority of chapters 82.14 and 81.104 RCW.
and documents describing the machinery and equipment.(ii)equipment.(b) The application for remittance must include a copy of the certificate issued for the project by the department of labor and industries under subsection (2) of this section.(b) The department must determine eligibility under this section based on the information provided by the purchaser, which is subject to audit verification by the department.
The department must on a quarterly basis remit exempted amounts to qualifying purchasers who submitted applications during the previous quarter.(((5)))(6)quarter.(5) The exemption provided by this section expires September 30, 2017, as it applies to:
or (b) sales of or charges made for labor and services rendered in respect to installing such machinery and equipment.(((6)))(7)equipment.(6) This section expires January 1, ((2020))2030.Sec.
19.14.
RCW 82.12.962 and 2018 c 164 s 7 are each amended to read as follows:(1)(a) ((Except as provided in RCW 82.12.963,))Consumers who have paid the tax imposed by RCW 82.12.020 on machinery and equipment used directly in generating electricity using fuel cells, wind, sun, biomass energy, tidal or wave energy, geothermal resources, or technology that converts otherwise lost energy from exhaust, or to sales of or charges made for labor and services rendered in respect to installing such machinery and equipment, are eligible for an exemption as provided in this section, but only if the purchaser develops with such machinery, equipment, and labor a facility capable of generating not less than one thousand watts of electricity.(b) Beginning on July 1, 2011, through ((JanuaryJanuary 1, 2020))December((2020))2030, 31, 2019, the amount of the exemption under this subsection (1) is equal to seventy-five percent of the state and local sales tax paid.
The consumer is eligible for an exemption under this subsection (1)(b) in the form of a remittance.(((2)))(c)remittance.(2)(a) BeginningA onperson Januaryclaiming 1, 2020, through December 31, 2030, the consumer is entitled to an exemption,exemption in the form of a remittance,remittance under this subsection (1)(c)(1)(b) inof anthis amountsection equalmust to:(i)pay Fifty percent of the state and local sales use tax paid,imposed ifby theRCW department82.12.020 of labor and industriesall certifiesapplicable thatlocal theuse projecttaxes includesimposed procurementunder fromthe andauthority contracts with women, minority, or veteran-owned businesses, includes procurement from and contracts with entities that have a history of complyingchapters with82.14 federal and state81.104 wageRCW. and hour laws and regulations, apprenticeship utilization, and preferred entry for workers living in the area where the project is being constructed.
In the event that a project is built without one or more of these standards and a project developer or its designated principle contractor demonstrates it has made all good faith efforts to meet the standards but was unable to comply due to lack of availability of qualified businesses or local hires, the department of labor and industries may certify that the developer complied with that standard;(ii) Seventy-five percent of the state and local sales use tax paid, if the department of labor and industries certifies that the project complies with (c)(i) of this subsection and compensates workers at prevailing wage rates determined by local collective bargaining as determined by the department of labor and industries;
or(iii) One hundred percent of the state and local sales use tax paid, if the project is developed under a community workforce agreement or project labor agreement.(d) In order to qualify for the remittance under subsection (1) of this section, installation of the qualifying machinery and equipment must commence no earlier than January 1, 2020, and be completed by December 31, 2030.(2) The department of labor and industries shall initiate an emergency rule making on the effective date of this section to be completed by December 1, 2019, to:(a) Define and set minimum requirements for all labor standards identified in subsection (1)(c) of this section;
and(b) Set requirements for all good faith efforts under subsection (1)(c)(i) and (ii) of this section, as well as documentation requirements and a certification process.
Requirements for all good faith efforts must be designed to maximize the likelihood that the project is completed with said standards and could include proactive outreach to firms that are women, minority, and veteran-owned businesses, advertising in local community publications and publications appropriate to identified firms, participating in community job fairs, conferences, and trade shows, and other measures.
The certification process and timeline must be designed to prevent undue delay to project development.(3)(a)(i) A person claiming an exemption in the form of a remittance under subsection (1)(b) of this section must pay the tax imposed by RCW 82.12.020 and all applicable local use taxes imposed under the authority of chapters 82.14 and 81.104 RCW.
and documents describing the machinery and equipment.(ii)equipment.(b) The application for remittance must include a copy of the certificate issued for the project by the department of labor and industries under subsection (1) of this section.(b) The department must determine eligibility under this section based on the information provided by the consumer, which is subject to audit verification by the department.
The department must on a quarterly basis remit exempted amounts to qualifying consumers who submitted applications during the previous quarter.(((3)))(4)quarter.(3) Purchases exempt under RCW 82.08.962 are also exempt from the tax imposed under RCW 82.12.020.(((4)))(5)82.12.020.(4) The definitions in RCW 82.08.962 apply to this section.(((5)))(6)section.(5) The exemption provided in subsection (1) of this section does not apply:(a) To machinery and equipment used directly in the generation of electricity using solar energy and capable of generating no more than five hundred kilowatts of electricity, or to sales of or charges made for labor and services rendered in respect to installing such machinery and equipment, when first use within this state of such machinery and equipment, or labor and services, occurs after September 30, 2017;
and(b) To any other machinery and equipment described in subsection (1)(a) of this section, or to sales of or charges made for labor and services rendered in respect to installing such machinery or equipment, when first use within this state of such machinery and equipment, or labor and services, occurs after December 31, ((2019))2029.(((6)))(7)((2019))2029.(6) This section expires January 1, ((2020))2030.Sec.
20.15.
((In determining what property is used and useful for providing electric, gas, wastewater company services, or water service, the commission may include the reasonable costs of construction work in progress to the extent that the commission finds that inclusion is in the public interest.))Theinterest.(2)))The valuation may include consideration of any property of the public service company acquired or constructed by or during the rate effective period, including the reasonable costs of construction work in progress, to the extent that the commission finds that such an inclusion is in the public interest and will yield fair, just, reasonable, and sufficient rates.(3) The commission may provide changes to rates under this section for up to forty-eight months after the rate effective date using any standard, formula, method, or theory of valuation reasonably calculated to arrive at fair, just, reasonable, and sufficient rates.
The commission must establish an appropriate process to identify, review, and approve public service company property that becomes used and useful for service in this state after the rate effective date.(4) The commission has the power to make revaluations of the property of any public service company from time to time.(((3)))(5) The commission shall, before any hearing is had, notify the complainants and the public service company concerned of the time and place of such hearing by giving at least thirty days' written notice thereof, specifying that at the time and place designated a hearing will be held for the purpose of ascertaining the value of the company's property, used and useful as aforesaid, which notice must be sufficient to authorize the commission to inquire into and pass upon the matters designated in this section.(6) Nothing in this section limits the commission's authority to consider and implement performance and incentive-based regulation, multiyear rate plans, and other flexible regulatory mechanisms.NEWmechanisms.(7)(a) SECTION. Sec.Electrical companies and gas companies shall use the carbon adder for planning, evaluating, and acquiring all resources, both supply-side and demand-side resources.(b) For the purposes of this subsection, gas consisting largely of methane and other hydrocarbons derived from the decomposition of organic material in landfills, wastewater treatment facilities, and anaerobic digesters must be considered a nonemitting resource.Sec.
21.16.
A new section is added to chapter 80.28 RCW to read as follows:(1) An electrical company may account for and defer for later consideration by the commission costs incurred in connection with major projects in the electrical company's clean energy implementation plan pursuant to RCW 19.280.030(1)(l), or selected in the electrical company's solicitation of bids for delivering electric capacity, energy, or capacity and energy, or conservation.
The deferral in this subsection begins with the date on which the resource begins commercial operation or the effective date of the power purchase agreement and continues for a period not to exceed twenty-four months.
However, if during such a period the electrical company files a general rate case or other proceeding for the recovery of such costs, deferral ends on the effective date of the final decision by the commission in such a proceeding.
Creation of such a deferral account does not by itself determine the actual costs of the resource or power purchase agreement, whether recovery of any or all of these costs is appropriate, or other issues to be decided by the commission in a general rate case or other proceeding.(2) The costs that an electrical company may account for and defer for later consideration by the commission pursuant to subsection (1) of this section include all operating and maintenance costs, depreciation, taxes, cost of capital associated with the applicable resource, or the execution of a power purchase agreement.
Such costs of capital include:(a) The electrical company's authorized return on equity for any resource acquired or developed by the electrical company;
or(b) For the duration of a power purchase agreement, a rate of return of no less than the authorized cost of debt and no greater than the authorized rate of return of the electrical company.Sec.
22.
For each review, an advisory committee shall be established with a membership resembling as closely as possible the original energy strategy advisory committee specified under section 1, chapter 201, Laws of 1991.))by December 31, 2020, and at least once every eight years thereafter, subject to funding provided for this purpose, for the purpose of aligning the state energy strategy with the requirements of RCWsections 43.21F.0881 andthrough chapters10 19.285of andthis 19.---act, RCW (the43.21F.088, new chapter created in section 27 of this act), and the emission reduction targets recommended by the department of ecology under RCW 70.235.040.
The membership of the energy strategy advisory committee must consist of the following:(a) One person recommended by investor-owned electric utilities;(b) One person recommended by investor-owned natural gas utilities;(c) One person employed by or recommended by a natural gas pipeline serving the state;(d) One person recommended by suppliers of petroleum products;(e) One person recommended by municipally owned electric utilities;(f) One person recommended by public utility districts;(g) One person recommended by rural electrical cooperatives;(h) One person recommended by industrial energy users;(i)users;(h) One person recommended by commercial energy users;(j)users;(i) One person recommended by agricultural energy users;(k)users;(j) One person recommended by the association of Washington cities;(l)cities;(k) One person recommended by the Washington association of counties;(m)counties;(l) One person recommended by Washington Indian tribes;(n)tribes;(m) One person recommended by businesses in the clean energy industry;(o)industry;(n) One person recommended by labor unions;(p)unions;(o) Two persons recommended by civic organizations, one of which must be a representative of a civic organization that represents vulnerable populations;(q)communities;(p) Two persons recommended by environmental organizations;(r)organizations;(q) One person representing independent power producers;(s) The chair of the energy facility site evaluation council or the chair's designee;(t)designee;(r) One of the representatives of the state of Washington to the Pacific Northwest electric power and conservation planning council selected by the governor;(u)governor;(s) The chair of the utilities and transportation commission or the chair's designee;(v)designee;(t) One member from each of the two largest caucuses of the house of representatives selected by the speaker of the house of representatives;
and(w)and(u) One member from each of the two largest caucuses of the senate selected by the presidentmajority leader of the senate.(2) The chair of the advisory committee must be appointed by the governor from citizen members.
23.17.
(1) By January 1, 2020, the department of commerce must convene an energy and climate policy advisory committee to develop recommendations to the legislature for the coordination of existing resources, or the establishment of new ones, for the purposes ofof:(a) examiningExamining the costs and benefits of energy-related policies, programs, functions, activities, and incentivesincentives, onincluding anbut on-goingnot basislimited andto: conducting other energy-related studies and analyses as may be directed by the legislature.(2) The advisory committee convened under this section must consist of, at minimum, representatives of each the state's public four-year institutions of higher education, the Pacific Northwest National Laboratory, and the Washington state institute for public policy.(3) Subject to the availability of amounts appropriated for this specific purpose, and in compliance with RCW 43.01.036, the department of commerce must submit its recommendations in a report to the legislature by December 31, 2020.NEW SECTION. Sec.
24.(i) Those that reduce greenhouse gas emissions from the electric power generation, transmission, and distribution sector of the economy;
Byand December(ii) 31, 2020, the departmentstandards ofestablished healthin mustsections develop3 athrough cumulative5 impactof analysisthis toact; designate the communities highly impacted by fossil fuel pollution and climate change in Washington.
Theand(b) cumulativeConducting impactother analysisenergy-related maystudies integrateand withanalyses andas buildmay uponbe otherdirected concurrentby cross-agencythe effortslegislature.(2) inThe developingadvisory acommittee cumulativeconvened impactunder analysisthis andsection populationmust trackingconsist resourcesof, usedat byminimum, representatives of each the departmentstate's public four-year institutions of healthhigher education, the Pacific Northwest National Laboratory, and analysisthe performedWashington bystate institute for public policy.(3) Subject to the Universityavailability of Washingtonamounts appropriated for this specific purpose, and in compliance with RCW 43.01.036, the department of environmentalcommerce andmust occupationalsubmit healthits sciences.recommendations in a report to the legislature by December 31, 2020.NEW SECTION. Sec.
By18. December 31, 2021, the department of commerce and the utilities and transportation commission shall adopt rules establishing the requirements for incorporating the cumulative impact analysis into the criteria for developing clean energy action plans and clean energy transformation plans, as required in RCW 19.280.030.NEW SECTION. Sec.
25.By December 31, 2019, the department of health must conduct a cumulative impact analysis to designate the communities highly impacted by fossil fuel pollution and climate change in Washington.
(1) The legislaturecumulative findsimpact thatanalysis basedmay onintegrate currentwith technology,and therebuild willupon likelyother needpopulation totracking beresources upgradesused toby electricitythe transmissiondepartment of health and distributionanalysis infrastructureperformed acrossby the stateUniversity toof meetWashington thedepartment goalsof specifiedenvironmental inand thisoccupational act.health sciences.NEW SECTION. Sec.
These19. facilities require a significant planning horizon to deliver electricity generation sites to retail electric load.
Pursuant to RCW 80.50.040, the energy facility site evaluation council chair shall convene a transmission corridors work group and report its findings to the governor and the appropriate committees of the legislature by December 31, 2020.(2) The work group must include one representative from each of the following state agencies:
The department of commerce, the utilities and transportation commission, the department of ecology, the department of fish and wildlife, the department of natural resources, the department of transportation, the department of archaeology and historic preservation, and the state military department.
The work group shall also include two representatives designated by the association of Washington cities, one from central or eastern Washington and one from western Washington;
two representatives designated by the Washington state association of counties, one from central or eastern Washington and one from western Washington;
two members designated by sovereign tribal governments;
one member representing affected utility industries;
one member representing public utility districts;
and two members representing statewide environmental organizations.
The energy facility site evaluation council chair shall invite the Bonneville power administration and the United States department of defense to each appoint an ex officio work group member.(3) The work group shall:(a) Review the need for upgraded and new electricity transmission and distribution facilities to improve reliability, relieve congestion, and enhance the capability of the transmission and distribution facilities in the state to deliver electricity from electric generation, nonemitting electric generation, or renewable resources to retail electric load;(b) Identify areas where transmission and distribution facilities may need to be enhanced or constructed;
and(c) Identify environmental review options that may be required to complete the designation of such corridors and recommend ways to expedite review of transmission projects without compromising required environmental protection.(4) The energy facility site evaluation council may contract services to assist in the work group efforts.(5) This section expires January 1, 2021.NEW SECTION. Sec.
26.
27.20.
Sections 1 through 1310 and 2619 of this act constitute a new chapter in Title 19 RCW.Sec.RCW.NEW SECTION. Sec.
28.21.
RCW 19.285.030 and 2017 c 315 s 1 are each amended to read as follows:The definitions in this section apply throughout this chapter unless the context clearly requires otherwise.(1) "Attorney general" means the Washington state office of the attorney general.(2) "Auditor" means:
(a) The Washington state auditor's office or its designee for qualifying utilities under its jurisdiction that are not investor-owned utilities;
or (b) an independent auditor selected by a qualifying utility that is not under the jurisdiction of the state auditor and is not an investor-owned utility.(3)(a) "Biomass energy" includes:
(i) Organic by-products of pulping and the wood manufacturing process;
(ii) animal manure;
(iii) solid organic fuels from wood;
(iv) forest or field residues;
(v) untreated wooden demolition or construction debris;
(vi) food waste and food processing residuals;
(vii) liquors derived from algae;
(viii) dedicated energy crops;
and (ix) yard waste.(b) "Biomass energy" does not include:
(i) Wood pieces that have been treated with chemical preservatives such as creosote, pentachlorophenol, or copper-chrome-arsenic;
(ii) wood from old growth forests;
or (iii) municipal solid waste.(4) "Coal transition power" has the same meaning as defined in RCW 80.80.010.(5) "Commission" means the Washington state utilities and transportation commission.(6) "Conservation" means any reduction in electric power consumption resulting from increases in the efficiency of energy use, production, or distribution.(7) "Cost-effective" has the same meaning as defined in RCW 80.52.030.(8) "Council" means the Washington state apprenticeship and training council within the department of labor and industries.(9) "Customer" means a person or entity that purchases electricity for ultimate consumption and not for resale.(10) "Department" means the department of commerce or its successor.(11) "Distributed generation" means an eligible renewable resource where the generation facility or any integrated cluster of such facilities has a generating capacity of not more than five megawatts.(12) "Eligible renewable resource" means:(a) Electricity from a generation facility powered by a renewable resource other than freshwater that commences operation after March 31, 1999, where:
(i) The facility is located in the Pacific Northwest;
or (ii) the electricity from the facility is delivered into Washington state on a real-time basis without shaping, storage, or integration services;(b) Incremental electricity produced as a result of efficiency improvements completed after March 31, 1999, to hydroelectric generation projects owned by a qualifying utility and located in the Pacific Northwest where the additional generation does not result in new water diversions or impoundments;(c) Hydroelectric generation from a project completed after March 31, 1999, where the generation facility is located in irrigation pipes, irrigation canals, water pipes whose primary purpose is for conveyance of water for municipal use, and wastewater pipes located in Washington where the generation does not result in new water diversions or impoundments;(d) Qualified biomass energy;(e) For a qualifying utility that serves customers in other states, electricity from a generation facility powered by a renewable resource other than freshwater that commences operation after March 31, 1999, where:
(i) The facility is located within a state in which the qualifying utility serves retail electrical customers;
and (ii) the qualifying utility owns the facility in whole or in part or has a long-term contract with the facility of at least twelve months or more;
((or))(f)(i) Incremental electricity produced as a result of a capital investment completed after January 1, 2010, that increases, relative to a baseline level of generation prior to the capital investment, the amount of electricity generated in a facility that generates qualified biomass energy as defined under subsection (18)(c)(ii) of this section and that commenced operation before March 31, 1999.(ii) Beginning January 1, 2007, the facility must demonstrate its baseline level of generation over a three-year period prior to the capital investment in order to calculate the amount of incremental electricity produced.(iii) The facility must demonstrate that the incremental electricity resulted from the capital investment, which does not include expenditures on operation and maintenance in the normal course of business, through direct or calculated measurement;(g) That portion of incremental electricity produced as a result of efficiency improvements completed after March 31, 1999, attributable to a qualifying utility's share of the electricity output from hydroelectric generation projects whose energy output is marketed by the Bonneville power administration where the additional generation does not result in new water diversions or impoundments;
or(h) The environmental attributes, including renewable energy credits, from (g) of this subsection transferred to investor-owned utilities pursuant to the Bonneville power administration's residential exchange program.(13) "Investor-owned utility" has the same meaning as defined in RCW 19.29A.010.(14) "Load" means the amount of kilowatt-hours of electricity delivered in the most recently completed year by a qualifying utility to its Washington retail customers.(15)(a) "Nonpower attributes" means all environmentally related characteristics, exclusive of energy, capacity reliability, and other electrical power service attributes, that are associated with the generation of electricity from a renewable resource, including but not limited to the facility's fuel type, geographic location, vintage, qualification as an eligible renewable resource, and avoided emissions of pollutants to the air, soil, or water, and avoided emissions of carbon dioxide and other greenhouse gases.(b) "Nonpower attributes" does not include any aspects, claims, characteristics, and benefits associated with the on-site capture and destruction of methane or other greenhouse gases at a facility through a digester system, landfill gas collection system, or other mechanism, which may be separately marketable as greenhouse gas emission reduction credits, offsets, or similar tradable commodities.
However, these separate avoided emissions may not result in or otherwise have the effect of attributing greenhouse gas emissions to the electricity.(16) "Pacific Northwest" has the same meaning as defined for the Bonneville power administration in section 3 of the Pacific Northwest electric power planning and conservation act (94 Stat.
2698;
16 U.S.C.
Sec.
839a).(17) "Public facility" has the same meaning as defined in RCW 39.35C.010.(18) "Qualified biomass energy" means electricity produced from a biomass energy facility that:
(a) Commenced operation before March 31, 1999;
(b) contributes to the qualifying utility's load;
and (c) is owned either by:
(i) A qualifying utility;
or (ii) an industrial facility that is directly interconnected with electricity facilities that are owned by a qualifying utility and capable of carrying electricity at transmission voltage.(19) "Qualifying utility" means an electric utility, as the term "electric utility" is defined in RCW 19.29A.010, that serves more than twenty-five thousand customers in the state of Washington.
The number of customers served may be based on data reported by a utility in form 861, "annual electric utility report," filed with the energy information administration, United States department of energy.(20) "Renewable energy credit" means a tradable certificate of proof, except as provided in RCW 19.285.040(2)(m), of at least one megawatt-hour of an eligible renewable resource where, except as provided in subsection (12)(h) of this section, the generation facility is not powered by freshwater.
The certificate includes all of the nonpower attributes associated with that one megawatt-hour of electricity, and the certificate is verified by a renewable energy credit tracking system selected by the department.(21) "Renewable resource" means:
(a) Water;
(b) wind;
(c) solar energy;
(d) geothermal energy;
(e) landfill gas;
(f) wave, ocean, or tidal power;
(g) gas from sewage treatment facilities;
(h) biodiesel fuel ((as defined in RCW 82.29A.135)) that is not derived from crops raised on land cleared from old growth or first-growth forests where the clearing occurred after December 7, 2006;
or (i) biomass energy.(22) "Rule" means rules adopted by an agency or other entity of Washington state government to carry out the intent and purposes of this chapter.(23) "Year" means the twelve-month period commencing January 1st and ending December 31st.Sec.
29.
RCW 19.285.040 and 2017 c 315 s 2 are each amended to read as follows:(1) Each qualifying utility shall pursue all available conservation that is cost-effective, reliable, and feasible.(a) By January 1, 2010, using methodologies consistent with those used by the Pacific Northwest electric power and conservation planning council in the most recently published regional power plan as it existed on June 12, 2014, or a subsequent date as may be provided by the department or the commission by rule, each qualifying utility shall identify its achievable cost-effective conservation potential through 2019.
Nothing in the rule adopted under this subsection precludes a qualifying utility from using its utility specific conservation measures, values, and assumptions in identifying its achievable cost-effective conservation potential.
At least every two years thereafter, the qualifying utility shall review and update this assessment for the subsequent ten-year period.(b) Beginning January 2010, each qualifying utility shall establish and make publicly available a biennial acquisition target for cost-effective conservation consistent with its identification of achievable opportunities in (a) of this subsection, and meet that target during the subsequent two-year period.
At a minimum, each biennial target must be no lower than the qualifying utility's pro rata share for that two-year period of its cost-effective conservation potential for the subsequent ten-year period.(c)(i) Except as provided in (c)(ii) and (iii) of this subsection, beginning on January 1, 2014, cost-effective conservation achieved by a qualifying utility in excess of its biennial acquisition target may be used to help meet the immediately subsequent two biennial acquisition targets, such that no more than twenty percent of any biennial target may be met with excess conservation savings.(ii) Beginning January 1, 2014, a qualifying utility may use single large facility conservation savings in excess of its biennial target to meet up to an additional five percent of the immediately subsequent two biennial acquisition targets, such that no more than twenty-five percent of any biennial target may be met with excess conservation savings allowed under all of the provisions of this section combined.
For the purposes of this subsection (1)(c)(ii), "single large facility conservation savings" means cost-effective conservation savings achieved in a single biennial period at the premises of a single customer of a qualifying utility whose annual electricity consumption prior to the conservation savings exceeded five average megawatts.(iii) Beginning January 1, 2012, and until December 31, 2017, a qualifying utility with an industrial facility located in a county with a population between ninety-five thousand and one hundred fifteen thousand that is directly interconnected with electricity facilities that are capable of carrying electricity at transmission voltage may use cost-effective conservation from that industrial facility in excess of its biennial acquisition target to help meet the immediately subsequent two biennial acquisition targets, such that no more than twenty-five percent of any biennial target may be met with excess conservation savings allowed under all of the provisions of this section combined.(d) In meeting its conservation targets, a qualifying utility may count high-efficiency cogeneration owned and used by a retail electric customer to meet its own needs.
High-efficiency cogeneration is the sequential production of electricity and useful thermal energy from a common fuel source, where, under normal operating conditions, the facility has a useful thermal energy output of no less than thirty-three percent of the total energy output.
The reduction in load due to high-efficiency cogeneration shall be:
(i) Calculated as the ratio of the fuel chargeable to power heat rate of the cogeneration facility compared to the heat rate on a new and clean basis of a best-commercially available technology combined-cycle natural gas-fired combustion turbine;
and (ii) counted towards meeting the biennial conservation target in the same manner as other conservation savings.(e) The commission may determine if a conservation program implemented by an investor-owned utility is cost-effective based on the commission's policies and practice.(f) The commission may rely on its standard practice for review and approval of investor-owned utility conservation targets.(2)(a) Except as provided in (j) of this subsection, each qualifying utility shall use eligible renewable resources or acquire equivalent renewable energy credits, or any combination of them, to meet the following annual targets:(i) At least three percent of its load by January 1, 2012, and each year thereafter through December 31, 2015;(ii) At least nine percent of its load by January 1, 2016, and each year thereafter through December 31, 2019;
and(iii) At least fifteen percent of its load by January 1, 2020, and each year thereafter.(b) A qualifying utility may count distributed generation at double the facility's electrical output if the utility:
(i) Owns or has contracted for the distributed generation and the associated renewable energy credits;
or (ii) has contracted to purchase the associated renewable energy credits.(c) In meeting the annual targets in (a) of this subsection, a qualifying utility shall calculate its annual load based on the average of the utility's load for the previous two years.(d) A qualifying utility shall be considered in compliance with an annual target in (a) of this subsection if:
(i) The utility's weather-adjusted load for the previous three years on average did not increase over that time period;
(ii) after December 7, 2006, the utility did not commence or renew ownership or incremental purchases of electricity from resources other than coal transition power or renewable resources other than on a daily spot price basis and the electricity is not offset by equivalent renewable energy credits;
and (iii) the utility invested at least one percent of its total annual retail revenue requirement that year on eligible renewable resources, renewable energy credits, or a combination of both.(e) The requirements of this section may be met for any given year with renewable energy credits produced during that year, the preceding year, or the subsequent year.
Each renewable energy credit may be used only once to meet the requirements of this section.(f) In complying with the targets established in (a) of this subsection, a qualifying utility may not count:(i) Eligible renewable resources or distributed generation where the associated renewable energy credits are owned by a separate entity;
or(ii) Eligible renewable resources or renewable energy credits obtained for and used in an optional pricing program such as the program established in RCW 19.29A.090.(g) Where fossil and combustible renewable resources are cofired in one generating unit located in the Pacific Northwest where the cofiring commenced after March 31, 1999, the unit shall be considered to produce eligible renewable resources in direct proportion to the percentage of the total heat value represented by the heat value of the renewable resources.(h)(i) A qualifying utility that acquires an eligible renewable resource or renewable energy credit may count that acquisition at one and two-tenths times its base value:(A) Where the eligible renewable resource comes from a facility that commenced operation after December 31, 2005;
and(B) Where the developer of the facility used apprenticeship programs approved by the council during facility construction.(ii) The council shall establish minimum levels of labor hours to be met through apprenticeship programs to qualify for this extra credit.(i) A qualifying utility shall be considered in compliance with an annual target in (a) of this subsection if events beyond the reasonable control of the utility that could not have been reasonably anticipated or ameliorated prevented it from meeting the renewable energy target.
Such events include weather-related damage, mechanical failure, strikes, lockouts, and actions of a governmental authority that adversely affect the generation, transmission, or distribution of an eligible renewable resource under contract to a qualifying utility.(j)(i) Beginning January 1, 2016, only a qualifying utility that owns or is directly interconnected to a qualified biomass energy facility may use qualified biomass energy to meet its compliance obligation under this subsection.(ii) A qualifying utility may no longer use electricity and associated renewable energy credits from a qualified biomass energy facility if the associated industrial pulping or wood manufacturing facility ceases operation other than for purposes of maintenance or upgrade.(k) An industrial facility that hosts a qualified biomass energy facility may only transfer or sell renewable energy credits associated with qualified biomass energy generated at its facility to the qualifying utility with which it is directly interconnected with facilities owned by such a qualifying utility and that are capable of carrying electricity at transmission voltage.
The qualifying utility may only use an amount of renewable energy credits associated with qualified biomass energy that are equivalent to the proportionate amount of its annual targets under (a)(ii) and (iii) of this subsection that was created by the load of the industrial facility.
A qualifying utility that owns a qualified biomass energy facility may not transfer or sell renewable energy credits associated with qualified biomass energy to another person, entity, or qualifying utility.(l) Beginning January 1, 2020, a qualifying utility may use eligible renewable resources as identified under RCW 19.285.030(12) (g) and (h) to meet its compliance obligation under this subsection (2).
A qualifying utility may not transfer or sell these eligible renewable resources to another utility for compliance purposes under this chapter.(m) Renewable energy credits allocated under RCW 19.285.030(12)(h) may not be transferred or sold to another qualifying utility for compliance under this chapter.(n) Beginning January 1, 2030, a qualifying utility is considered to be in compliance with an annual target in (a) of this subsection if the utility uses electricity from:
(i) Renewable resources and renewable energy credits as defined in RCW 19.285.030;
and (ii) nonemitting electric generation as defined in section 2 of this act, in an amount equal to one hundred percent of the utility's average annual retail electric load.
Nothing in this subsection relieves the requirements of a qualifying utility to comply with subsection (1) of this section.(3) Utilities that become qualifying utilities after December 31, 2006, shall meet the requirements in this section on a time frame comparable in length to that provided for qualifying utilities as of December 7, 2006.NEW SECTION. Sec.
30.
31.22.
Show all 319 changed rows (279 more)
View plain text versions (4)
- Bill View text Current html
- Substitute Second Substitute Bill html
- Substitute Engrossed Second Substitute Bill html
- Substitute Substitute Bill html
Action History
-
Effective date 5/7/2019.
-
Chapter 288, 2019 Laws.
-
Governor signed.
-
Delivered to Governor.
-
Speaker signed.
-
President signed.
-
Passed final passage; yeas, 29; nays, 20; absent, 0; excused, 0.
-
Senate concurred in House amendments.
-
Third reading, passed; yeas, 56; nays, 42; absent, 0; excused, 0.
-
Rules suspended. Placed on Third Reading.
-
Committee amendment(s) adopted as amended.
-
Committee amendment not adopted.
-
Rules Committee relieved of further consideration. Placed on second reading.
-
Referred to Rules 2 Review.
-
Scheduled for public hearing in the House Committee on Appropriations at 09:00 AM
-
Minority; do not pass.
-
APP - Majority; do pass with amendment(s) but without amendment(s) by Finance.
-
Scheduled for public hearing in the House Committee on Appropriations at 09:00 AM
-
Referred to Appropriations.
-
Scheduled for public hearing in the House Committee on Finance at 08:00 AM
-
Minority; do not pass.
-
FIN - Majority; do pass with amendment(s) but without amendment(s) by Environment & Energy.
-
Scheduled for public hearing in the House Committee on Finance at 01:30 PM
-
Referred to Finance.
-
Scheduled for public hearing in the House Committee on Environment & Energy at 03:30 PM
-
Minority; without recommendation.
-
Minority; do not pass.
-
ENVI - Majority; do pass with amendment(s).
-
Scheduled for public hearing in the House Committee on Environment & Energy at 08:00 AM
-
First reading, referred to Environment & Energy.
-
Third reading, passed; yeas, 28; nays, 19; absent, 0; excused, 2.
-
Third reading.
-
Held on second reading.
-
Floor amendment(s) adopted.
-
2nd substitute bill substituted.
-
2nd substitute bill substituted.
-
2nd substitute bill substituted.
-
Placed on second reading by Rules Committee.
-
Placed on second reading by Rules Committee.
-
Placed on second reading by Rules Committee.
-
Passed to Rules Committee for second reading.
-
Passed to Rules Committee for second reading.
-
Passed to Rules Committee for second reading.
-
Scheduled for public hearing in the Senate Committee on Ways & Means at 03:30 PM
-
Minority; without recommendation.
-
Minority; do not pass.
-
WM - Majority; 2nd substitute bill be substituted, do pass.
-
Minority; without recommendation.
-
Minority; do not pass.
-
WM - Majority; 2nd substitute bill be substituted, do pass.
-
Minority; without recommendation.
-
Minority; do not pass.
-
WM - Majority; 2nd substitute bill be substituted, do pass.
-
Scheduled for public hearing in the Senate Committee on Ways & Means at 03:30 PM
-
Referred to Ways & Means.
-
Referred to Ways & Means.
-
Scheduled for public hearing in the Senate Committee on Environment, Energy & Technology at 10:00 AM
-
Minority; without recommendation.
-
Minority; do not pass.
-
And refer to Ways & Means.
-
ENET - Majority; 1st substitute bill be substituted, do pass.
-
Minority; without recommendation.
-
Minority; do not pass.
-
And refer to Ways & Means.
-
ENET - Majority; 1st substitute bill be substituted, do pass.
-
Scheduled for public hearing in the Senate Committee on Environment, Energy & Technology at 10:00 AM
-
First reading, referred to Environment, Energy & Technology.
-
Prefiled for introduction.
Sponsors
- Carlyle · Primary
- Palumbo · Cosponsor
- McCoy · Cosponsor
- Jamie Pedersen · Cosponsor
- Lisa Wellman · Cosponsor
- Das · Cosponsor
- Rolfes · Cosponsor
- Frockt · Cosponsor
- Kuderer · Cosponsor
- Keiser · Cosponsor
- Marko Liias · Cosponsor
- Rebecca Saldaña · Cosponsor
- Darneille · Cosponsor
- Billig · Cosponsor
- Victoria Hunt · Cosponsor
- Joe Nguyen · Cosponsor
- Claire Wilson · Cosponsor
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 16 co-sponsors · 134 not signed on · 81 voted No
Sponsors (1)
- Carlyle
Co-sponsors (16)
- Palumbo
- McCoy
- Jamie Pedersen Democrat Voted No
- Lisa Wellman Democrat Voted No
- Das
- Rolfes
- Frockt
- Kuderer
- Keiser
- Marko Liias Democrat Voted No
- Rebecca Saldaña Democrat Voted No
- Darneille
- Billig
- Victoria Hunt Democrat Voted No
- Joe Nguyen Democrat Voted No
- Claire Wilson Democrat Voted No
Not signed on (134)
134 members have not signed on to this bill.
Show all 134 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Votes
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Unaffiliated | 16 | 11 | 0 | 0 |
| Republican | 0 | 9 | 0 | 0 |
| Democrat | 13 | 0 | 0 | 0 |
| Total | 29 | 20 | 0 | 0 |
| % of votes cast | 59% | 41% | 0% | 0% |
How each member voted (49)
| Member | Party | Vote |
|---|---|---|
| Bailey | — | Nay |
| Becker | — | Nay |
| Billig | — | Yea |
| Brown | — | Nay |
| Carlyle | — | Yea |
| Darneille | — | Yea |
| Das | — | Yea |
| Ericksen | — | Nay |
| Frockt | — | Yea |
| Hawkins | — | Nay |
| Hobbs | — | Yea |
| Honeyford | — | Nay |
| Keiser | — | Yea |
| Kuderer | — | Yea |
| McCoy | — | Yea |
| Mullet | — | Yea |
| O'Ban | — | Nay |
| Padden | — | Nay |
| Palumbo | — | Yea |
| Randall | — | Yea |
| Rivers | — | Nay |
| Rolfes | — | Yea |
| Sheldon | — | Yea |
| Takko | — | Yea |
| Wilson, L. | — | Nay |
| Zeiger | — | Nay |
| Van De Wege | — | Yea |
| Annette Cleveland | Democrat | Yea |
| Bob Hasegawa | Democrat | Yea |
| Claire Wilson | Democrat | Yea |
| Jamie Pedersen | Democrat | Yea |
| Jesse Salomon | Democrat | Yea |
| Joe Nguyen | Democrat | Yea |
| Lisa Wellman | Democrat | Yea |
| Liz Lovelett | Democrat | Yea |
| Manka Dhingra | Democrat | Yea |
| Marko Liias | Democrat | Yea |
| Rebecca Saldaña | Democrat | Yea |
| Steve Conway | Democrat | Yea |
| Victoria Hunt | Democrat | Yea |
| Curtis King | Republican | Nay |
| Jeff Holy | Republican | Nay |
| Jim Walsh | Republican | Nay |
| John Braun | Republican | Nay |
| Judy Warnick | Republican | Nay |
| Keith Wagoner | Republican | Nay |
| Mark Schoesler | Republican | Nay |
| Phil Fortunato | Republican | Nay |
| Shelly Short | Republican | Nay |
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Unaffiliated | 19 | 14 | 0 | 0 |
| Republican | 22 | 0 | 0 | 0 |
| Democrat | 0 | 43 | 0 | 0 |
| Total | 41 | 57 | 0 | 0 |
| % of votes cast | 42% | 58% | 0% | 0% |
How each member voted (98)
| Member | Party | Vote |
|---|---|---|
| Vick | — | Yea |
| Wilcox | — | Yea |
| Young | — | Yea |
| Appleton | — | Nay |
| Blake | — | Nay |
| Chambers | — | Yea |
| Chandler | — | Yea |
| Chopp | — | Nay |
| Cody | — | Nay |
| DeBolt | — | Yea |
| Dolan | — | Nay |
| Hoff | — | Yea |
| Hudgins | — | Nay |
| Irwin | — | Yea |
| Jenkin | — | Yea |
| Kirby | — | Nay |
| Klippert | — | Yea |
| Kraft | — | Yea |
| Kretz | — | Yea |
| Maycumber | — | Yea |
| McCaslin | — | Yea |
| Mead | — | Nay |
| Morris | — | Nay |
| Mosbrucker | — | Yea |
| Pellicciotti | — | Nay |
| Pettigrew | — | Nay |
| Sells | — | Nay |
| Shea | — | Yea |
| Smith | — | Yea |
| Sullivan | — | Nay |
| Sutherland | — | Yea |
| Tarleton | — | Nay |
| Van Werven | — | Yea |
| Amy Walen | Democrat | Nay |
| Beth Doglio | Democrat | Nay |
| Bill Ramos | Democrat | Nay |
| Chris Kilduff | Democrat | Nay |
| Cindy Ryu | Democrat | Nay |
| Dave Paul | Democrat | Nay |
| Debra Entenman | Democrat | Nay |
| Debra Lekanoff | Democrat | Nay |
| Derek Stanford | Democrat | Nay |
| Drew Hansen | Democrat | Nay |
| Gerry Pollet | Democrat | Nay |
| Jake Fey | Democrat | Nay |
| Javier Valdez | Democrat | Nay |
| Joe Fitzgibbon | Democrat | Nay |
| John Lovick | Democrat | Nay |
| June Robinson | Democrat | Nay |
| Kristine Reeves | Democrat | Nay |
| Larry Springer | Democrat | Nay |
| Lauren Davis | Democrat | Nay |
| Laurie Jinkins | Democrat | Nay |
| Lillian Ortiz-Self | Democrat | Nay |
| Lisa Callan | Democrat | Nay |
| Marcus Riccelli | Democrat | Nay |
| Mari Leavitt | Democrat | Nay |
| Melanie Morgan | Democrat | Nay |
| Mia Gregerson | Democrat | Nay |
| Mike Chapman | Democrat | Nay |
| Monica Jurado Stonier | Democrat | Nay |
| My-Linh Thai | Democrat | Nay |
| Nicole Macri | Democrat | Nay |
| Noel Frame | Democrat | Nay |
| Roger Goodman | Democrat | Nay |
| Sharon Shewmake | Democrat | Nay |
| Sharon Tomiko Santos | Democrat | Nay |
| Sharon Wylie | Democrat | Nay |
| Shelley Kloba | Democrat | Nay |
| Steve Bergquist | Democrat | Nay |
| Steve Tharinger | Democrat | Nay |
| Strom Peterson | Democrat | Nay |
| Tana Senn | Democrat | Nay |
| Timm Ormsby | Democrat | Nay |
| Tina Orwall | Democrat | Nay |
| Vandana Slatter | Democrat | Nay |
| Alex Ybarra | Republican | Yea |
| Andrew Barkis | Republican | Yea |
| Carolyn Eslick | Republican | Yea |
| Chris Corry | Republican | Yea |
| Chris Gildon | Republican | Yea |
| Dan Griffey | Republican | Yea |
| Drew MacEwen | Republican | Yea |
| Drew Stokesbary | Republican | Yea |
| Ed Orcutt | Republican | Yea |
| Jenny Graham | Republican | Yea |
| Jeremie Dufault | Republican | Yea |
| Jim Walsh | Republican | Yea |
| Joe Schmick | Republican | Yea |
| Keith Goehner | Republican | Yea |
| Mary Dye | Republican | Yea |
| Matt Boehnke | Republican | Yea |
| Michelle Valdez | Republican | Yea |
| Mike Steele | Republican | Yea |
| Mike Volz | Republican | Yea |
| Paul Harris | Republican | Yea |
| Skyler Rude | Republican | Yea |
| Tom Dent | Republican | Yea |
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Democrat | 0 | 43 | 0 | 0 |
| Unaffiliated | 19 | 14 | 0 | 0 |
| Republican | 22 | 0 | 0 | 0 |
| Total | 41 | 57 | 0 | 0 |
| % of votes cast | 42% | 58% | 0% | 0% |
How each member voted (98)
| Member | Party | Vote |
|---|---|---|
| Chopp | — | Nay |
| Cody | — | Nay |
| DeBolt | — | Yea |
| Dolan | — | Nay |
| Hoff | — | Yea |
| Hudgins | — | Nay |
| Irwin | — | Yea |
| Jenkin | — | Yea |
| Kirby | — | Nay |
| Klippert | — | Yea |
| Kraft | — | Yea |
| Kretz | — | Yea |
| Maycumber | — | Yea |
| McCaslin | — | Yea |
| Mead | — | Nay |
| Morris | — | Nay |
| Mosbrucker | — | Yea |
| Pellicciotti | — | Nay |
| Pettigrew | — | Nay |
| Sells | — | Nay |
| Shea | — | Yea |
| Smith | — | Yea |
| Sullivan | — | Nay |
| Sutherland | — | Yea |
| Tarleton | — | Nay |
| Vick | — | Yea |
| Wilcox | — | Yea |
| Young | — | Yea |
| Appleton | — | Nay |
| Blake | — | Nay |
| Chambers | — | Yea |
| Chandler | — | Yea |
| Van Werven | — | Yea |
| Amy Walen | Democrat | Nay |
| Beth Doglio | Democrat | Nay |
| Bill Ramos | Democrat | Nay |
| Chris Kilduff | Democrat | Nay |
| Cindy Ryu | Democrat | Nay |
| Dave Paul | Democrat | Nay |
| Debra Entenman | Democrat | Nay |
| Debra Lekanoff | Democrat | Nay |
| Derek Stanford | Democrat | Nay |
| Drew Hansen | Democrat | Nay |
| Gerry Pollet | Democrat | Nay |
| Jake Fey | Democrat | Nay |
| Javier Valdez | Democrat | Nay |
| Joe Fitzgibbon | Democrat | Nay |
| John Lovick | Democrat | Nay |
| June Robinson | Democrat | Nay |
| Kristine Reeves | Democrat | Nay |
| Larry Springer | Democrat | Nay |
| Lauren Davis | Democrat | Nay |
| Laurie Jinkins | Democrat | Nay |
| Lillian Ortiz-Self | Democrat | Nay |
| Lisa Callan | Democrat | Nay |
| Marcus Riccelli | Democrat | Nay |
| Mari Leavitt | Democrat | Nay |
| Melanie Morgan | Democrat | Nay |
| Mia Gregerson | Democrat | Nay |
| Mike Chapman | Democrat | Nay |
| Monica Jurado Stonier | Democrat | Nay |
| My-Linh Thai | Democrat | Nay |
| Nicole Macri | Democrat | Nay |
| Noel Frame | Democrat | Nay |
| Roger Goodman | Democrat | Nay |
| Sharon Shewmake | Democrat | Nay |
| Sharon Tomiko Santos | Democrat | Nay |
| Sharon Wylie | Democrat | Nay |
| Shelley Kloba | Democrat | Nay |
| Steve Bergquist | Democrat | Nay |
| Steve Tharinger | Democrat | Nay |
| Strom Peterson | Democrat | Nay |
| Tana Senn | Democrat | Nay |
| Timm Ormsby | Democrat | Nay |
| Tina Orwall | Democrat | Nay |
| Vandana Slatter | Democrat | Nay |
| Alex Ybarra | Republican | Yea |
| Andrew Barkis | Republican | Yea |
| Carolyn Eslick | Republican | Yea |
| Chris Corry | Republican | Yea |
| Chris Gildon | Republican | Yea |
| Dan Griffey | Republican | Yea |
| Drew MacEwen | Republican | Yea |
| Drew Stokesbary | Republican | Yea |
| Ed Orcutt | Republican | Yea |
| Jenny Graham | Republican | Yea |
| Jeremie Dufault | Republican | Yea |
| Jim Walsh | Republican | Yea |
| Joe Schmick | Republican | Yea |
| Keith Goehner | Republican | Yea |
| Mary Dye | Republican | Yea |
| Matt Boehnke | Republican | Yea |
| Michelle Valdez | Republican | Yea |
| Mike Steele | Republican | Yea |
| Mike Volz | Republican | Yea |
| Paul Harris | Republican | Yea |
| Skyler Rude | Republican | Yea |
| Tom Dent | Republican | Yea |
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Unaffiliated | 13 | 20 | 0 | 0 |
| Republican | 0 | 22 | 0 | 0 |
| Democrat | 43 | 0 | 0 | 0 |
| Total | 56 | 42 | 0 | 0 |
| % of votes cast | 57% | 43% | 0% | 0% |
How each member voted (98)
| Member | Party | Vote |
|---|---|---|
| Appleton | — | Yea |
| Blake | — | Nay |
| Chambers | — | Nay |
| Chandler | — | Nay |
| Chopp | — | Yea |
| Cody | — | Yea |
| DeBolt | — | Nay |
| Dolan | — | Yea |
| Hoff | — | Nay |
| Hudgins | — | Yea |
| Irwin | — | Nay |
| Jenkin | — | Nay |
| Kirby | — | Yea |
| Klippert | — | Nay |
| Kraft | — | Nay |
| Kretz | — | Nay |
| Maycumber | — | Nay |
| McCaslin | — | Nay |
| Mead | — | Yea |
| Morris | — | Yea |
| Mosbrucker | — | Nay |
| Pellicciotti | — | Yea |
| Pettigrew | — | Yea |
| Sells | — | Yea |
| Shea | — | Nay |
| Smith | — | Nay |
| Sullivan | — | Yea |
| Sutherland | — | Nay |
| Tarleton | — | Yea |
| Vick | — | Nay |
| Wilcox | — | Nay |
| Young | — | Nay |
| Van Werven | — | Nay |
| Amy Walen | Democrat | Yea |
| Beth Doglio | Democrat | Yea |
| Bill Ramos | Democrat | Yea |
| Chris Kilduff | Democrat | Yea |
| Cindy Ryu | Democrat | Yea |
| Dave Paul | Democrat | Yea |
| Debra Entenman | Democrat | Yea |
| Debra Lekanoff | Democrat | Yea |
| Derek Stanford | Democrat | Yea |
| Drew Hansen | Democrat | Yea |
| Gerry Pollet | Democrat | Yea |
| Jake Fey | Democrat | Yea |
| Javier Valdez | Democrat | Yea |
| Joe Fitzgibbon | Democrat | Yea |
| John Lovick | Democrat | Yea |
| June Robinson | Democrat | Yea |
| Kristine Reeves | Democrat | Yea |
| Larry Springer | Democrat | Yea |
| Lauren Davis | Democrat | Yea |
| Laurie Jinkins | Democrat | Yea |
| Lillian Ortiz-Self | Democrat | Yea |
| Lisa Callan | Democrat | Yea |
| Marcus Riccelli | Democrat | Yea |
| Mari Leavitt | Democrat | Yea |
| Melanie Morgan | Democrat | Yea |
| Mia Gregerson | Democrat | Yea |
| Mike Chapman | Democrat | Yea |
| Monica Jurado Stonier | Democrat | Yea |
| My-Linh Thai | Democrat | Yea |
| Nicole Macri | Democrat | Yea |
| Noel Frame | Democrat | Yea |
| Roger Goodman | Democrat | Yea |
| Sharon Shewmake | Democrat | Yea |
| Sharon Tomiko Santos | Democrat | Yea |
| Sharon Wylie | Democrat | Yea |
| Shelley Kloba | Democrat | Yea |
| Steve Bergquist | Democrat | Yea |
| Steve Tharinger | Democrat | Yea |
| Strom Peterson | Democrat | Yea |
| Tana Senn | Democrat | Yea |
| Timm Ormsby | Democrat | Yea |
| Tina Orwall | Democrat | Yea |
| Vandana Slatter | Democrat | Yea |
| Alex Ybarra | Republican | Nay |
| Andrew Barkis | Republican | Nay |
| Carolyn Eslick | Republican | Nay |
| Chris Corry | Republican | Nay |
| Chris Gildon | Republican | Nay |
| Dan Griffey | Republican | Nay |
| Drew MacEwen | Republican | Nay |
| Drew Stokesbary | Republican | Nay |
| Ed Orcutt | Republican | Nay |
| Jenny Graham | Republican | Nay |
| Jeremie Dufault | Republican | Nay |
| Jim Walsh | Republican | Nay |
| Joe Schmick | Republican | Nay |
| Keith Goehner | Republican | Nay |
| Mary Dye | Republican | Nay |
| Matt Boehnke | Republican | Nay |
| Michelle Valdez | Republican | Nay |
| Mike Steele | Republican | Nay |
| Mike Volz | Republican | Nay |
| Paul Harris | Republican | Nay |
| Skyler Rude | Republican | Nay |
| Tom Dent | Republican | Nay |
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Unaffiliated | 15 | 11 | 0 | 1 |
| Republican | 0 | 8 | 0 | 1 |
| Democrat | 13 | 0 | 0 | 0 |
| Total | 28 | 19 | 0 | 2 |
| % of votes cast | 57% | 39% | 0% | 4% |
How each member voted (49)
| Member | Party | Vote |
|---|---|---|
| Bailey | — | Nay |
| Becker | — | Nay |
| Billig | — | Yea |
| Brown | — | Nay |
| Carlyle | — | Yea |
| Darneille | — | Yea |
| Das | — | Yea |
| Ericksen | — | Nay |
| Frockt | — | Yea |
| Hawkins | — | Nay |
| Hobbs | — | Not Voting |
| Honeyford | — | Nay |
| Keiser | — | Yea |
| Kuderer | — | Yea |
| McCoy | — | Yea |
| Mullet | — | Yea |
| O'Ban | — | Nay |
| Padden | — | Nay |
| Palumbo | — | Yea |
| Randall | — | Yea |
| Rivers | — | Nay |
| Rolfes | — | Yea |
| Sheldon | — | Yea |
| Takko | — | Yea |
| Wilson, L. | — | Nay |
| Zeiger | — | Nay |
| Van De Wege | — | Yea |
| Annette Cleveland | Democrat | Yea |
| Bob Hasegawa | Democrat | Yea |
| Claire Wilson | Democrat | Yea |
| Jamie Pedersen | Democrat | Yea |
| Jesse Salomon | Democrat | Yea |
| Joe Nguyen | Democrat | Yea |
| Lisa Wellman | Democrat | Yea |
| Liz Lovelett | Democrat | Yea |
| Manka Dhingra | Democrat | Yea |
| Marko Liias | Democrat | Yea |
| Rebecca Saldaña | Democrat | Yea |
| Steve Conway | Democrat | Yea |
| Victoria Hunt | Democrat | Yea |
| Curtis King | Republican | Nay |
| Jeff Holy | Republican | Nay |
| Jim Walsh | Republican | Not Voting |
| John Braun | Republican | Nay |
| Judy Warnick | Republican | Nay |
| Keith Wagoner | Republican | Nay |
| Mark Schoesler | Republican | Nay |
| Phil Fortunato | Republican | Nay |
| Shelly Short | Republican | Nay |
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Unaffiliated | 12 | 15 | 0 | 0 |
| Republican | 9 | 0 | 0 | 0 |
| Democrat | 0 | 13 | 0 | 0 |
| Total | 21 | 28 | 0 | 0 |
| % of votes cast | 43% | 57% | 0% | 0% |
How each member voted (49)
| Member | Party | Vote |
|---|---|---|
| Bailey | — | Yea |
| Becker | — | Yea |
| Billig | — | Nay |
| Brown | — | Yea |
| Carlyle | — | Nay |
| Darneille | — | Nay |
| Das | — | Nay |
| Ericksen | — | Yea |
| Frockt | — | Nay |
| Hawkins | — | Yea |
| Hobbs | — | Nay |
| Honeyford | — | Yea |
| Keiser | — | Nay |
| Kuderer | — | Nay |
| McCoy | — | Nay |
| Mullet | — | Nay |
| O'Ban | — | Yea |
| Padden | — | Yea |
| Palumbo | — | Nay |
| Randall | — | Nay |
| Rivers | — | Yea |
| Rolfes | — | Nay |
| Sheldon | — | Yea |
| Takko | — | Nay |
| Wilson, L. | — | Yea |
| Zeiger | — | Yea |
| Van De Wege | — | Nay |
| Annette Cleveland | Democrat | Nay |
| Bob Hasegawa | Democrat | Nay |
| Claire Wilson | Democrat | Nay |
| Jamie Pedersen | Democrat | Nay |
| Jesse Salomon | Democrat | Nay |
| Joe Nguyen | Democrat | Nay |
| Lisa Wellman | Democrat | Nay |
| Liz Lovelett | Democrat | Nay |
| Manka Dhingra | Democrat | Nay |
| Marko Liias | Democrat | Nay |
| Rebecca Saldaña | Democrat | Nay |
| Steve Conway | Democrat | Nay |
| Victoria Hunt | Democrat | Nay |
| Curtis King | Republican | Yea |
| Jeff Holy | Republican | Yea |
| Jim Walsh | Republican | Yea |
| John Braun | Republican | Yea |
| Judy Warnick | Republican | Yea |
| Keith Wagoner | Republican | Yea |
| Mark Schoesler | Republican | Yea |
| Phil Fortunato | Republican | Yea |
| Shelly Short | Republican | Yea |
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Unaffiliated | 12 | 15 | 0 | 0 |
| Republican | 9 | 0 | 0 | 0 |
| Democrat | 0 | 13 | 0 | 0 |
| Total | 21 | 28 | 0 | 0 |
| % of votes cast | 43% | 57% | 0% | 0% |
How each member voted (49)
| Member | Party | Vote |
|---|---|---|
| Bailey | — | Yea |
| Becker | — | Yea |
| Billig | — | Nay |
| Brown | — | Yea |
| Carlyle | — | Nay |
| Darneille | — | Nay |
| Das | — | Nay |
| Ericksen | — | Yea |
| Frockt | — | Nay |
| Hawkins | — | Yea |
| Hobbs | — | Nay |
| Honeyford | — | Yea |
| Keiser | — | Nay |
| Kuderer | — | Nay |
| McCoy | — | Nay |
| Mullet | — | Nay |
| O'Ban | — | Yea |
| Padden | — | Yea |
| Palumbo | — | Nay |
| Randall | — | Nay |
| Rivers | — | Yea |
| Rolfes | — | Nay |
| Sheldon | — | Yea |
| Takko | — | Nay |
| Wilson, L. | — | Yea |
| Zeiger | — | Yea |
| Van De Wege | — | Nay |
| Annette Cleveland | Democrat | Nay |
| Bob Hasegawa | Democrat | Nay |
| Claire Wilson | Democrat | Nay |
| Jamie Pedersen | Democrat | Nay |
| Jesse Salomon | Democrat | Nay |
| Joe Nguyen | Democrat | Nay |
| Lisa Wellman | Democrat | Nay |
| Liz Lovelett | Democrat | Nay |
| Manka Dhingra | Democrat | Nay |
| Marko Liias | Democrat | Nay |
| Rebecca Saldaña | Democrat | Nay |
| Steve Conway | Democrat | Nay |
| Victoria Hunt | Democrat | Nay |
| Curtis King | Republican | Yea |
| Jeff Holy | Republican | Yea |
| Jim Walsh | Republican | Yea |
| John Braun | Republican | Yea |
| Judy Warnick | Republican | Yea |
| Keith Wagoner | Republican | Yea |
| Mark Schoesler | Republican | Yea |
| Phil Fortunato | Republican | Yea |
| Shelly Short | Republican | Yea |
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Unaffiliated | 13 | 14 | 0 | 0 |
| Republican | 9 | 0 | 0 | 0 |
| Democrat | 2 | 11 | 0 | 0 |
| Total | 24 | 25 | 0 | 0 |
| % of votes cast | 49% | 51% | 0% | 0% |
How each member voted (49)
| Member | Party | Vote |
|---|---|---|
| Bailey | — | Yea |
| Becker | — | Yea |
| Billig | — | Nay |
| Brown | — | Yea |
| Carlyle | — | Nay |
| Darneille | — | Nay |
| Das | — | Nay |
| Ericksen | — | Yea |
| Frockt | — | Nay |
| Hawkins | — | Yea |
| Hobbs | — | Nay |
| Honeyford | — | Yea |
| Keiser | — | Nay |
| Kuderer | — | Nay |
| McCoy | — | Nay |
| Mullet | — | Nay |
| O'Ban | — | Yea |
| Padden | — | Yea |
| Palumbo | — | Nay |
| Randall | — | Yea |
| Rivers | — | Yea |
| Rolfes | — | Nay |
| Sheldon | — | Yea |
| Takko | — | Nay |
| Wilson, L. | — | Yea |
| Zeiger | — | Yea |
| Van De Wege | — | Nay |
| Annette Cleveland | Democrat | Nay |
| Bob Hasegawa | Democrat | Yea |
| Claire Wilson | Democrat | Yea |
| Jamie Pedersen | Democrat | Nay |
| Jesse Salomon | Democrat | Nay |
| Joe Nguyen | Democrat | Nay |
| Lisa Wellman | Democrat | Nay |
| Liz Lovelett | Democrat | Nay |
| Manka Dhingra | Democrat | Nay |
| Marko Liias | Democrat | Nay |
| Rebecca Saldaña | Democrat | Nay |
| Steve Conway | Democrat | Nay |
| Victoria Hunt | Democrat | Nay |
| Curtis King | Republican | Yea |
| Jeff Holy | Republican | Yea |
| Jim Walsh | Republican | Yea |
| John Braun | Republican | Yea |
| Judy Warnick | Republican | Yea |
| Keith Wagoner | Republican | Yea |
| Mark Schoesler | Republican | Yea |
| Phil Fortunato | Republican | Yea |
| Shelly Short | Republican | Yea |
Subjects
Frequently asked questions
- Who sponsors SB 5116?
- SB 5116 is sponsored by Carlyle, Palumbo, McCoy, Jamie Pedersen (Democrat), Lisa Wellman (Democrat), Das, Rolfes, Frockt, Kuderer, Keiser, Marko Liias (Democrat), Rebecca Saldaña (Democrat), Darneille, Billig, Victoria Hunt (Democrat), Joe Nguyen (Democrat), and Claire Wilson (Democrat).
- What is the current status of SB 5116?
- This bill has been enacted into law. Introduced January 10, 2019. Enacted.
- Where can I track SB 5116?
- Track SB 5116 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on SB 5116
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of SB 5116
Last checked for changes 3 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →