Net energy metering; solar interconnection, cost recovery.
Do you support it?
Want to know if it passes?
We'll email you when HB 117 moves — a committee vote, a floor vote, or a signature. Nothing else.
Free forever · unsubscribe in one click.
Your answer was recorded either way.
Which district are you in?
Your ZIP is all we need to match you to your own representatives — so we can tell you how they voted on HB 117.
You're tracking HB 117
We'll email you the moment it moves.
HB 117 — Net energy metering; solar interconnection, cost recovery.
Last action — Left in Labor and Commerce
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
✓In Committee
-
Died in session
This bill died with 2024 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.
Summary
Net energy metering; solar interconnection; cost recovery. Provides that an electric distribution company shall pay 33 cents ($0.33) per kilowatt-hour per day for the costs of lost electricity production for any and all delays beyond the regulatory notice period required by the State Corporation Commission related to net energy metering. The bill requires that, for the purposes of net energy metering, an eligible customer-generator shall bear all reasonable costs of equipment required at the eligible customer-generator's premises for the interconnection to the supplier's electric distribution system, including commercially reasonable costs of additional controls, tests, or liability insurance. Additionally, the bill allows for cost recovery by Phase I and Phase II Utilities for electric distribution grid transformation projects that support the interconnection of generating facilities using energy derived from sunlight that are owned or contracted by eligible customer-generators, subject to the Commission finding those costs to be reasonable and prudent in accordance with existing law.
Bill Text
- Prefiled Prefiled and ordered printed; offered 01/10/24 24101754D Current pdf January 01, 2024
Action History
-
Left in Labor and Commerce
-
Subcommittee failed to recommend reporting (5-Y 5-N)
-
House subcommittee amendments and substitutes offered
-
Impact statement from SCC (HB117)
-
Assigned L & C sub: Subcommittee #3
-
Referred to Committee on Labor and Commerce
-
Prefiled and ordered printed; offered 01/10/24 24101754D
Sponsors
- Jr. Richard C. "Rip" Sullivan · Primary
- Alfonso H. Lopez · Cosponsor
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 1 co-sponsors · 146 not signed on · 5 voted No
Sponsors (1)
Co-sponsors (1)
Not signed on (146)
146 members have not signed on to this bill.
Show all 146 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Votes
Per-member breakdown not published by this state.
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Unaffiliated | 5 | 5 | 0 | 1 |
| Total | 5 | 5 | 0 | 1 |
| % of votes cast | 45% | 45% | 0% | 9% |
How each member voted (11)
| Member | Party | Vote |
|---|---|---|
| Alfonso H. Lopez | — | Yea |
| Charniele L. Herring | — | Nay |
| Gilbert, C. Todd | — | Nay |
| Irene Shin | — | Yea |
| Israel D. O'Quinn | — | Nay |
| Jeion A. Ward | — | Not Voting |
| Michael J. Jones | — | Yea |
| Michael J. Webert | — | Nay |
| Mundon King, Candi | — | Yea |
| Richard C. "Rip" Sullivan, Jr. | — | Yea |
| Wren M. Williams | — | Nay |
Subjects
Frequently asked questions
- What does HB 117 do?
- Net energy metering; solar interconnection; cost recovery. Provides that an electric distribution company shall pay 33 cents ($0.33) per kilowatt-hour per day for the costs of lost electricity production for any and all delays beyond the regulatory notice period required by the State Corporation Commission related to net energy metering. The bill requires that, for the purposes of net energy metering, an eligible customer-generator shall bear all reasonable costs of equipment required at the eligible customer-generator's premises for the interconnection to the supplier's electric distribution system, including commercially reasonable costs of additional controls, tests, or liability insurance. Additionally, the bill allows for cost recovery by Phase I and Phase II Utilities for electric distribution grid transformation projects that support the interconnection of generating facilities using energy derived from sunlight that are owned or contracted by eligible customer-generators, subject to the Commission finding those costs to be reasonable and prudent in accordance with existing law.
- Who sponsors HB 117?
- HB 117 is sponsored by Richard C. "Rip" Sullivan, Jr. and Alfonso H. Lopez.
- What is the current status of HB 117?
- This bill died with 2024 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
- Where can I track HB 117?
- Track HB 117 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on HB 117
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of HB 117
Last checked for changes 3 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →