Washington 2019-2020 Regular Session Status: Passed Senate

SB 5372 — Concerning local project review undertaken under chapter 36.70B RCW.

Last action — By resolution, reintroduced and retained in present status.

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. 3
    Passed Senate
  4. 4
    Passed House
  5. 5
    To Executive
  6. 6
    Enacted

This bill died with 2019-2020 Regular Session. It reached “Passed Senate” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Bill Text

What changed in the latest version

1 added · 1 removed

Plain-language change summary

The changes made to Bill SB 5372 simplify the process for determining if a project permit application is complete. Now, the application will be considered complete as soon as it is submitted, unless the local government responds within ten days saying otherwise. This streamlining is important because it could reduce delays for applicants looking to get their projects underway, making the permitting process more efficient.

→
Previous
Latest
S-1197.2SUBSTITUTE SENATE BILL 5372State of Washington66th Legislature2019 Regular SessionBySenate Local Government (originally sponsored by Senators Palumbo and Honeyford)READ FIRST TIME 02/06/19.AN ACT Relating to local project review undertaken under chapter 36.70B RCW;
S-0450.1SENATE BILL 5372State of Washington66th Legislature2019 Regular SessionBySenators Palumbo and HoneyfordAN ACT Relating to local project review undertaken under chapter 36.70B RCW;
RCW 36.70B.070 and 1995 c 347 s 408 are each amended to read as follows:(1) ((Within twenty-eight))A project permit application shall be deemed complete within five business days of submittal, except that within ten days after receiving a project permit application that is submitted online or in person without an appointment, a local government planning pursuant to RCW 36.70A.040 shall ((mail or)) provide ((in person)) a written determination to the applicant, stating either:(a) That the application is complete;
RCW 36.70B.070 and 1995 c 347 s 408 are each amended to read as follows:(1) ((Within twenty-eight))A project permit application shall be deemed procedurally complete upon submittal, except that within ten days after receiving a project permit application that is submitted online or in person without an appointment, a local government planning pursuant to RCW 36.70A.040 shall ((mail or)) provide ((in person)) a written determination to the applicant, stating either:(a) That the application is procedurally complete;
or(b) That the application is incomplete and what is necessary to make the application complete.To the extent known by the local government, the local government shall identify other agencies of local, state, or federal governments that may have jurisdiction over some aspect of the application.(2) A project permit application is complete for purposes of this section when it meets the procedural submission requirements of the local government and is sufficient for continued processing even though additional information may be required or project modifications may be undertaken subsequently.
or(b) That the application is procedurally incomplete and what is necessary to make the application procedurally complete.To the extent known by the local government, the local government shall identify other agencies of local, state, or federal governments that may have jurisdiction over some aspect of the application.(2) A project permit application is procedurally complete for purposes of this section when it meets the procedural submission requirements of the local government and is sufficient for continued processing even though additional information may be required or project modifications may be undertaken subsequently.
The determination of completeness shall not preclude the local government from requesting additional information or studies either at the time of the notice of completeness or subsequently if new information is required or substantial changes in the proposed action occur.(3) The determination of completeness may include the following as optional information:(a) A preliminary determination of those development regulations that will be used for project mitigation;(b) A preliminary determination of consistency, as provided under RCW 36.70B.040;
The determination of procedural completeness shall not preclude the local government from requesting additional information or studies either at the time of the notice of procedural completeness or subsequently if new information is required or substantial changes in the proposed action occur.(3) The determination of procedural completeness may include the following as optional information:(a) A preliminary determination of those development regulations that will be used for project mitigation;(b) A preliminary determination of consistency, as provided under RCW 36.70B.040;
or(c) Other information the local government chooses to include.(4)(a) An application shall be deemed complete under this section if the local government does not provide a written determination to the applicant that the application is incomplete as provided in subsection (1)(b) of this section.(b) Within ((fourteen))five days after an applicant has submitted to a local government additional information identified by the local government as being necessary for a complete application, the local government shall notify the applicant whether the application is complete or what additional information is necessary.--- END ---
or(c) Other information the local government chooses to include.(4)(a) An application shall be deemed procedurally complete under this section if the local government does not provide a written determination to the applicant that the application is procedurally incomplete as provided in subsection (1)(b) of this section.(b) Within ((fourteen))five days after an applicant has submitted to a local government additional information identified by the local government as being necessary for a procedurally complete application, the local government shall notify the applicant whether the application is procedurally complete or what additional information is necessary.--- END ---
View plain text versions (2)

Action History

  1. By resolution, reintroduced and retained in present status.

  2. By resolution, reintroduced and retained in present status.

  3. Senate Rules "X" file.

  4. Senate Rules "X" file.

  5. Passed to Rules Committee for second reading.

  6. Passed to Rules Committee for second reading.

  7. Scheduled for public hearing in the Senate Committee on Local Government at 08:00 AM

  8. Minority; without recommendation.

  9. LGOV - Majority; 1st substitute bill be substituted, do pass.

  10. Minority; without recommendation.

  11. LGOV - Majority; 1st substitute bill be substituted, do pass.

  12. Scheduled for public hearing in the Senate Committee on Local Government at 08:00 AM

  13. First reading, referred to Local Government.

Sponsors

  • Palumbo · Primary
  • Honeyford · Cosponsor

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 1 co-sponsors · 149 not signed on

Sponsors (1)

  • Palumbo

Co-sponsors (1)

  • Honeyford

Not signed on (149)

149 members have not signed on to this bill.

Show all 149 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors SB 5372?
SB 5372 is sponsored by Palumbo and Honeyford.
What is the current status of SB 5372?
This bill died with 2019-2020 Regular Session. It reached “Passed Senate” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track SB 5372?
Track SB 5372 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 5372

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 5372

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →