Virginia 2023 Regular Session Status: Enacted

SB 963 — South Central Wastewater Authority; watershed general permit for nutrients.

Last action — Acts of Assembly Chapter text (CHAP0178)

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. ✓
    Passed Senate
  4. ✓
    Passed House of Delegates
  5. ✓
    To Executive
  6. 6
    Enacted

This bill has been enacted into law. Introduced January 06, 2023. Enacted.

Signed by Governor Glenn Youngkin (Republican) on March 22, 2023.

Prognosis

Advancing 38% · moderate confidence

Where this bill stands today.

Odds of enactment

High

How often bills like it became law.

  • Enacted

    Current position in the legislative process.

  • 1 sponsor

    1 primary, 0 co-sponsors signed on.

  • Failed a recorded vote

    Failed 6 recorded votes so far — a real headwind.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Bill Text

What changed in the latest version

259 added · 253 removed

Plain-language change summary

The amendment to § 62.1-44.19:14 of the Code of Virginia clarifies that the Watershed General Virginia Pollutant Discharge Elimination System Permit will authorize point source discharges of total nitrogen and total phosphorus. It specifies that the general permit will take precedence over certain individual permit requirements unless stricter local water quality standards are necessary. This change aims to streamline the permitting process while still allowing for necessary local protections.

→
Previous
Latest
SESSION ENROLLED VIRGINIA ACTS OF ASSEMBLY –– CHAPTER E An Act to amend and reenact § 62.1-44.19:14 of the Code of Virginia, relating to South Central N Wastewater Authority;
VIRGINIA ACTS OF ASSEMBLY -- 2023 SESSION CHAPTER 178 An Act to amend and reenact § 62.1-44.19:14 of the Code of Virginia, relating to South Central Wastewater Authority;
R O [S 963] Approved L L Be it enacted by the General Assembly of Virginia:
[S 963] Approved March 22, 2023 Be it enacted by the General Assembly of Virginia:
E § 62.1-44.19:14.
§ 62.1-44.19:14.
D Permit, hereafter referred to as the general permit, authorizing point source discharges of total nitrogen and total phosphorus to the waters of the Chesapeake Bay and its tributaries.
A.
Except as otherwise provided in this article, the general permit shall control in lieu of technology-based, water quality-based, and best professional judgment, interim or final effluent limitations for total nitrogen and total phosphorus in individual Virginia Pollutant Discharge Elimination System permits for facilities covered by the general permit where the effluent limitations for total nitrogen and total phosphorus in the individual permits are based upon standards, criteria, waste load allocations, policy, or guidaBce established to restore or protect the water quality and beneficial uses of the Chesapeake Bay o6 its tidal triB.
The Board shall issue a Watershed General Virginia Pollutant Discharge Elimination System Permit, hereafter referred to as the general permit, authorizing point source discharges of total nitrogen and total phosphorus to the waters of the Chesapeake Bay and its tributaries.
This section shall not be construed to limit or otherwise affect the Board's authority toEestablish and enforce more stringent water quality-based effluent limitations for total nitrogen or total phosphorus in individual permits where those limitations are necessary to protect local water quality.
Except as otherwise provided in this article, the general permit shall control in lieu of technology-based, water quality-based, phosphorus in individual Virginia Pollutant Discharge Elimination System permits for facilities covered by the general permit where the effluent limitations for total nitrogen and total phosphorus in the individual permits are based upon standards, criteria, waste load allocations, policy, or guidance established to restore or protect the water quality and beneficial uses of the Chesapeake Bay or its tidal tributaries.
B.
This section shall not be construed to limit or otherwise affect the Board's authority to establish and enforce more stringent water quality-based effluent limitations for total nitrogen or total phosphorus in individual permits where those limitations are necessary to protect local water quality.
Waste load allocations for total nitrogen and total phosphorus for each permitted facility expressed as annual mass loads, including reduced waste load allocations where applicable under the ENRC quality-based total nitrogen and total phosphorus waste load allocations.
Waste load allocations for total nitrogen and total phosphorus for each permitted facility expressed as annual mass loads, including reduced waste load allocations where applicable under the ENRC Program.
The allocations for each permitted facility shall reflect the applicable individual water quality-based total nitrogen and total phosphorus waste load allocations.
(ii) the availability of required services and established in § 10.1-2128, the Virginia Water Facilities Revolving Fund as established in § 62.1-225, and other financing mechanisms;
(ii) the availability of required services and skilled labor;
(iii) the availability of funding from the Virginia Water Quality Improvement Fund as established in § 10.1-2128, the Virginia Water Facilities Revolving Fund as established in § 62.1-225, and other financing mechanisms;
The compliance plans shall contain, at a minimum, any capital projects and implementation schedules needed to achieve total nitrogen and phosphorus permittees in the tributary.
The compliance plans shall contain, at a minimum, any capital projects and implementation schedules needed to achieve total nitrogen and phosphorus reductions sufficient to comply with the individual and combined waste load allocations of all the permittees in the tributary.
Discharge Elimination System permit to discharge 100,000 gallons or more per day, or an equivalentlutant load, directly into tidal waters, or 500,000 gallons or more per day, or an equivalent load, directly into of 5 nontidal waters, to secure general permit coverage by filing a registration statement with the Department within a specified period after each effective date of the general permit.
5.
The procedure shall also require any owner or operator of a facility authorized by a Virginia Pollutant Discharge Elimination System permit to discharge 40,000 gallons or more per day, or an equivalent load, directly into tidal or nontidal waters to secure general permit coverage by filing a registration statement with the Department at the time he makes application with the Department for a new discharge or expansion that is subject to an offset or technology-based requirement in § 62.1-44.19:15, and thereafter within a specified period of time after each effective date of the general permit.
A procedure that requires every owner or operator of a facility authorized by a Virginia Pollutant Discharge Elimination System permit to discharge 100,000 gallons or more per day, or an equivalent load, directly into tidal waters, or 500,000 gallons or more per day, or an equivalent load, directly into nontidal waters, to secure general permit coverage by filing a registration statement with the Department within a specified period after each effective date of the general permit.
The procedure shall also require of 4 any owner or operator of a facility authorized by a Virginia Pollutant Discharge Elimination System permit to discharge 40,000 gallons or more per day, or an equivalent load, directly into tidal or nontidal waters to secure general permit coverage by filing a registration statement with the Department at the time he makes application with the Department for a new discharge or expansion that is subject to an offset or technology-based requirement in § 62.1-44.19:15, and thereafter within a specified period of time after each effective date of the general permit.
of 5 G.
G.
The Board shall adopt amendments to the Water Quality Management Planning Regulation and and implement the Phase III Watershed Implementation Plan Enhanced Nutrient Removal Certaintys Eo establish Program (ENRC Program) as provided in this subsection.
The Board shall adopt amendments to the Water Quality Management Planning Regulation and modifications to Virginia Pollutant Discharge Elimination System permits or registration lists to establish and implement the Phase III Watershed Implementation Plan Enhanced Nutrient Removal Certainty Program (ENRC Program) as provided in this subsection.
The ENRC Program shall consist of the N following projects and the following waste load allocation reductions and their respective schedules for compliance.
The ENRC Program shall consist of the following projects and the following waste load allocation reductions and their respective schedules for of 4 compliance.
R 1.
1.
Priority projects for additional nitrogen and phosphorus removal (schedule for complianceO:
Priority projects for additional nitrogen and phosphorus removal (schedule for compliance):
PROJECT NAME DESCRIPTION (COMPLIANCE SCHEDULE) HRSD-Chesapeake/ElizabethSTP Consolidate into regional system and close treatment L facility (1/1/2023) HRSD-Boat Harbor WWTP Convey by subaqueous crossing to Nansemond River L WWTP for nutrient removal (1/1/2026) E HRSD-Nansemond River WWTP Upgrade and expand with nutrient removal 0.30 mg/L total phosphorus (1/1/2032) (1/1/2026) and D HRSD-Nassawadox WWTP Convey to regional system for nutrient removal (1/1/2026) Fredericksburg WWTF Expand with nutrient removal technology of 3.0 mg/L total nitrogen and 0.22 mg/L total phosphorus (1/1/2026) Spotsylvania Co.-FMC WWTF facility (1/1/2026)x WWTF and close treatment Spotsylvania Co.-Massaponax WWTF Expand with nutrient removal technology of 4.0 B mg/L total nitrogen and 0.30 mg/L total phosphorus 9 to consolidate and close FMC WWTF (1/1/2026) 3 Spotsylvania Co.-Thornburg STP Upgrade with nutrient removal technology of 4.0 R mg/L total nitrogen and 0.30 mg/L total phosphorus (1/1/2026) HRRSA-North River WWTP (1/1/2026) removal tertiary filtration upgrade South Central Wastewater Authority Upgrade with nutrient removal technology of 4.0 mg/L total nitrogen and 0.30 mg/L total phosphorus (1/1/2026) HRSD-Williamsburg WWTP Upgrade with nutrient removal technology of 4.0 mg/L total nitrogen (1/1/2026) and 0.30 mg/L total phosphorus (1/1/2032) HRSD-VIP WWTP mg/L total nitrogen (1/1/2026) and 0.30 mg/L total phosphorus (1/1/2032) HRSD-James River WWTP Upgrade with nutrient removal technology of 4.0 mg/L total nitrogen (1/1/2026) and 0.30 mg/L total phosphorus (1/1/2028) HRSD-Army Base WWTP Convey to VIP WWTP for nutrient removal (1/1/2032) or upgrade with nutrient removal 0.30 mg/L total phosphorus (1/1/2032) (1/1/2026) and Each priority project and the associated schedule of compliance shall be incorporated into the applicable Virginia Pollutant Discharge Elimination System permit or registration list.
PROJECT NAME DESCRIPTION (COMPLIANCE SCHEDULE) HRSD-Chesapeake/ElizabethSTP Consolidate into regional system and close treatment facility (1/1/2023) HRSD-Boat Harbor WWTP Convey by subaqueous crossing to Nansemond River WWTP for nutrient removal (1/1/2026) HRSD-Nansemond River WWTP Upgrade and expand with nutrient removal technology of 4.0 mg/L total nitrogen (1/1/2026) and 0.30 mg/L total phosphorus (1/1/2032) HRSD-Nassawadox WWTP Convey to regional system for nutrient removal (1/1/2026) Fredericksburg WWTF Expand with nutrient removal technology of 3.0 mg/L total nitrogen and 0.22 mg/L total phosphorus (1/1/2026) Spotsylvania Co.-FMC WWTF Convey to Massaponax WWTF and close treatment facility (1/1/2026) Spotsylvania Co.-Massaponax WWTF Expand with nutrient removal technology of 4.0 mg/L total nitrogen and 0.30 mg/L total phosphorus to consolidate and close FMC WWTF (1/1/2026) Spotsylvania Co.-Thornburg STP Upgrade with nutrient removal technology of 4.0 mg/L total nitrogen and 0.30 mg/L total phosphorus (1/1/2026) HRRSA-North River WWTP Phosphorus removal tertiary filtration upgrade (1/1/2026) South Central Wastewater Authority WWTF Upgrade with nutrient removal technology of 4.0 mg/L total nitrogen and 0.30 mg/L total phosphorus (1/1/2026) HRSD-Williamsburg WWTP Upgrade with nutrient removal technology of 4.0 mg/L total nitrogen (1/1/2026) and 0.30 mg/L total phosphorus (1/1/2032) HRSD-VIP WWTP Upgrade with nutrient removal technology of 4.0 mg/L total nitrogen (1/1/2026) and 0.30 mg/L total phosphorus (1/1/2032) HRSD-James River WWTP Upgrade with nutrient removal technology of 4.0 mg/L total nitrogen (1/1/2026) and 0.30 mg/L total phosphorus (1/1/2028) HRSD-Army Base WWTP Convey to VIP WWTP for nutrient removal (1/1/2032) or upgrade with nutrient removal technology of 4.0 mg/L total nitrogen (1/1/2026) and 0.30 mg/L total phosphorus (1/1/2032) Each priority project and the associated schedule of compliance shall be incorporated into the applicable Virginia Pollutant Discharge Elimination System permit or registration list.
(c) by February 1, 2024, and annually thereafter, SCWWA shall submit a progress report to the Department describing its of 5 progress toward completing the phased construction program;
(c) by February 1, 2024, and annually thereafter, SCWWA shall submit a progress report to the Department describing its progress toward completing the phased construction program;
and (f) for each compliance year during the phased construction program that the facility does not achieve the nutrient removal technology concentration specified in this subsection, the SCWWA WWTF shall be responsible for acquiring sufficient point source credits to comply with its total nitrogen and total phosphorus waste load allocations applicable to that compliance year.
and (f) for each compliance year during the phased construction program that the facility does not achieve the nutrient removal technology concentration specified in this subsection, the SCWWA WWTF shall be of 4 responsible for acquiring sufficient point source credits to comply with its total nitrogen and total phosphorus waste load allocations applicable to that compliance year.
FACILITY NAME TOTAL NALLOCATIONSTELOAD (lbs/year) HRSD-Army Base WWTP 219,307 HRSD-Boat Harbor STP 304,593 HRSD-James River STP 243,674 HRSD-VIP WWTP 487,348 HRSD-Nansemond STP 365,511 HRSD-Williamsburg STP 274,133 Reduce total phosphorus waste load allocations for HRSD treatment works in the James River basin to the following allocations effective January 1, 2026:
FACILITY NAME TOTAL NITROGEN WASTELOAD ALLOCATION (lbs/year) HRSD-Army Base WWTP 219,307 HRSD-Boat Harbor STP 304,593 HRSD-James River STP 243,674 HRSD-VIP WWTP 487,348 HRSD-Nansemond STP 365,511 HRSD-Williamsburg STP 274,133 Reduce total phosphorus waste load allocations for HRSD treatment works in the James River basin to the following allocations effective January 1, 2026:
That the Department of Environmental Quality, concurrently with its approval of the phased of 5 Treatment Facility listed in subdivision G 1 of § 62.1-44.19:14 of the Code of Virginia, as ameEded by this act, shall execute corresponding amendments to the water quality improvement agreement approved phased construction program.f Virginia consistent with the scope and schedule of the N 3.
That the Department of Environmental Quality, concurrently with its approval of the phased construction program for the upgrade of the South Central Wastewater Authority Wastewater Treatment Facility listed in subdivision G 1 of § 62.1-44.19:14 of the Code of Virginia, as amended by this act, shall execute corresponding amendments to the water quality improvement agreement pursuant to § 10.1-2131 of the Code of Virginia consistent with the scope and schedule of the approved phased construction program.
That the Department of Environmental Quality, by December 31, 2023, or as soon as possible R thereafter, shall modify the Virginia Pollutant Discharge Elimination System permit for the SouOh § 62.1-44.19:14 of the Code of Virginia, as amended by this act, to include the requirements and compliance schedule established in this act.
3.
L E D B R
That the Department of Environmental Quality, by December 31, 2023, or as soon as possible thereafter, shall modify the Virginia Pollutant Discharge Elimination System permit for the South Central Wastewater Authority Wastewater Treatment Facility as listed in subdivision G 1 of § 62.1-44.19:14 of the Code of Virginia, as amended by this act, to include the requirements and compliance schedule established in this act.
View plain text versions (4)

Action History

  1. Acts of Assembly Chapter text (CHAP0178)

  2. Approved by Governor-Chapter 178 (effective 7/1/23)

  3. Governor's Action Deadline 11:59 p.m., March 27, 2023

  4. Enrolled Bill Communicated to Governor on February 27, 2023

  5. Signed by President

  6. Signed by Speaker

  7. Impact statement from DPB (SB963ER)

  8. Bill text as passed Senate and House (SB963ER)

  9. Enrolled

  10. VOTE: Block Vote Passage (99-Y 0-N)

  11. Passed House BLOCK VOTE (99-Y 0-N)

  12. Read third time

  13. Read second time

  14. Reported from Agriculture, Chesapeake and Natural Resources (22-Y 0-N)

  15. Referred to Committee on Agriculture, Chesapeake and Natural Resources

  16. Read first time

  17. Placed on Calendar

  18. Passed Senate (38-Y 0-N)

  19. Constitutional reading dispensed (39-Y 0-N)

  20. Engrossed by Senate - committee substitute SB963S1

  21. Committee substitute agreed to 23105670D-S1

  22. Reading of substitute waived

  23. Read second time

  24. Impact statement from DPB (SB963S1)

  25. Constitutional reading dispensed (40-Y 0-N)

  26. Impact statement from DPB (SB963)

  27. Committee substitute printed 23105670D-S1

  28. Reported from Agriculture, Conservation and Natural Resources with substitite (14-Y 0-N)

  29. Senate committee, floor amendments and substitutes offered

  30. Referred to Committee on Agriculture, Conservation and Natural Resources

  31. Prefiled and ordered printed; offered 01/11/23 23102843D

Sponsors

  • Morrissey · Primary

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 147 not signed on

Sponsors (1)

  • Morrissey

Co-sponsors (0)

None.

Not signed on (147)

147 members have not signed on to this bill.

Show all 147 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors SB 963?
SB 963 is sponsored by Morrissey.
What is the current status of SB 963?
This bill has been enacted into law. Introduced January 06, 2023. Enacted.
Where can I track SB 963?
Track SB 963 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 963

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 963

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →