Virginia 2023 Regular Session Status: Enacted

SB 1420 — Business park electric infrastructure program; makes permanent and amends certain provisions.

Last action — Acts of Assembly Chapter text (CHAP0705)

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. ✓
    Passed Senate
  4. ✓
    Passed House of Delegates
  5. ✓
    To Executive
  6. 6
    Enacted

This bill has been enacted into law. Introduced January 11, 2023. Enacted.

Signed by Governor Glenn Youngkin (Republican) on March 27, 2023.

Prognosis

Advancing 38% · moderate confidence

Where this bill stands today.

Odds of enactment

High

How often bills like it became law.

  • Enacted

    Current position in the legislative process.

  • 1 sponsor

    1 primary, 0 co-sponsors signed on.

  • Failed a recorded vote

    Failed 7 recorded votes so far — a real headwind.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Bill Text

What changed in the latest version

885 added · 844 removed

Plain-language change summary

The recent changes to Bill SB 1420 update specific sections of the Code of Virginia regarding electric utility rates. Notably, the bill now emphasizes that the commission must review the rates for both generation and distribution services, ensuring that they reflect fair returns on equity while still promoting customer service and operational efficiency. This matters because it aims to create a fairer, more competitive environment for electric utilities, potentially leading to better service and lower costs for consumers. Additionally, it repeals a previous provision from 2019 related to business park electric infrastructure, streamlining regulations in that area.

→
Previous
Latest
SESSION ENROLLED VIRGINIA ACTS OF ASSEMBLY –– CHAPTER E An Act to amend and reenact §§ 56-585.1 and 56-585.1:10 of the Code of Virginia and to repeal the infrastructure program.pter 535 of the Acts of Assembly of 2019, relating to business park eRectric O [S 1420] L Approved L Be it enacted by the General Assembly of Virginia:
VIRGINIA ACTS OF ASSEMBLY -- 2023 SESSION CHAPTER 705 An Act to amend and reenact §§ 56-585.1 and 56-585.1:10 of the Code of Virginia and to repeal the fourth enactment of Chapter 535 of the Acts of Assembly of 2019, relating to business park electric infrastructure program.
E 1.
[S 1420] Approved March 27, 2023 Be it enacted by the General Assembly of Virginia:
That §§ 56-585.1 and 56-585.1:10 of the Code of Virginia are amended and reenacted as followD:
1.
expire.-585.1.
That §§ 56-585.1 and 56-585.1:10 of the Code of Virginia are amended and reenacted as follows:
Generation, distribution, and transmission rates after capped rates terminate or A.
§ 56-585.1.
During the first six months of 2009, the Commission shall, after notice and opportunity for hearing, initiate proceedings to review the rates, terms and conditions for the provision of generation, distribution and transmission services of each investor-owned incumbent electric utility.
Generation, distribution, and transmission rates after capped rates terminate or expire.
Such proceedings shall be governed by the provisions of Chapter 10 (§ 56-232 et seq.), except as modified herein.
A.
During the first six months of 2009, the Commission shall, after notice and opportunity for hearing, initiate proceedings to review the rates, terms and conditions for the provision of generation, proceedings shall be governed by the provisions of Chapter 10 (§ 56-232 et seq.), except as modified herein.
In so doing, the CommissBon may use any methodology to determine such return it finds consistent with the public interest, but such4return Exchange Commission for the three most recent annual periods for which such data are available 0y notd less than a majority, selected by the Commission as specified in subdivision 2 b, of other E investor-owned electric utilities in the peer group of the utility, nor shall the Commission set such return more than 300 basis points higher than such average.
In so doing, the Commission may use any methodology to determine such return it finds consistent with the public interest, but such return shall not be set lower than the average of the returns on common equity reported to the Securities and Exchange Commission for the three most recent annual periods for which such data are available by not less than a majority, selected by the Commission as specified in subdivision 2 b, of other investor-owned electric utilities in the peer group of the utility, nor shall the Commission set such return more than 300 basis points higher than such average.
In such a proceeding, the Commission shall determine utility's combined rate of return on common equity is more than 50 basis points below the combinedthe rate of return as so determined, it shall be authorized to order increases to the utility's rates necessary to provide the opportunity to fully recover the costs of providing the utility's services and to earn not less than such combined rate of return.
In such a proceeding, the Commission shall determine the rates that the utility may charge until such rates are adjusted.
If the Commission finds that the utility's combined rate of return on common equity is more than 50 basis points above the combined rate of return as so determined, it shall be authorized either (i) to order reductions to the utility's rates it finds appropriate, provided that the Commission may not order such rate reduction unless it finds that the resulting rates will provide the utility with the opportunity to fully recover its costs of providing its services and to earn not less than direct that 60 percent of the amount of the utility's earnings that were more than 50 basis points above) to the fair combined rate of return for calendar year 2008 be credited to customers' bills, in which event such credits shall be amortized over a period of six to 12 months, as determined at the discretion of the Commission, following the effective date of the Commission's order and be allocated among customer classes such that the relationship between the specific customer class rates of return to the overall target rate of return will have the same relationship as the last approved allocation of revenues used to design base rates.
If the Commission finds that the utility's combined rate of return on common equity is more than 50 basis points below the combined rate of return as so determined, it shall be authorized to order increases to the utility's rates necessary to provide the opportunity to fully recover the costs of providing the utility's services and to earn not less than such combined rate of return.
Commencing in 2011, the Commission, after notice and opportunity for hearing, shall conduct reviews of the rates, terms and conditions for the provision of generation, distribution and provisions:n services by each investor-owned incumbent electric utility, subject to the following 1.
If the Commission finds that the utility's combined rate of return on common equity is more than 50 basis points above the combined rate of return as so determined, it shall be authorized either (i) to order reductions to the utility's rates it finds appropriate, provided that the Commission may not order such rate reduction unless it finds that the resulting rates will provide the utility with the opportunity to fully recover its costs of providing its services and to earn not less than the fair rates of return on common equity applicable to the generation and distribution services;
or (ii) to direct that 60 percent of the amount of the utility's earnings that were more than 50 basis points above the fair combined rate of return for calendar year 2008 be credited to customers' bills, in which event such credits shall be amortized over a period of six to 12 months, as determined at the discretion of the Commission, following the effective date of the Commission's order and be allocated among customer classes such that the relationship between the specific customer class rates of return to the overall target rate of return will have the same relationship as the last approved allocation of revenues used to design base rates.
Commencing in 2011, the Commission, after notice and opportunity for hearing, shall conduct reviews of the rates, terms and conditions for the provision of generation, distribution and transmission services by each investor-owned incumbent electric utility, subject to the following provisions:
1.
Pursuant to subsection A of § 56-585.1:1, the Commission shall conduct January 1, 2017, and ending December 31, 2020, with subsequent reviews on a triennial basis utilizingg the three successive 12-month test periods ending December 31 immediately preceding the year in which of 15 such review proceeding is conducted.
Pursuant to subsection A of § 56-585.1:1, the Commission shall conduct a review for a Phase II Utility in 2021, utilizing the four successive 12-month test periods beginning January 1, 2017, and ending December 31, 2020, with subsequent reviews on a triennial basis utilizing the three successive 12-month test periods ending December 31 immediately preceding the year in which such review proceeding is conducted.
For purposes of this section, a Phase I Utility is an investor-owned incumbent electric utility that was, as of July 1, 1999, not bound by a rate case settlement adopted by the Commission that extended in its application beyond January 1, 2002, and a Phase II Utility is an investor-owned incumbent electric utility that was bound by such a settlement.
For purposes of this section, a Phase I Utility is an investor-owned of 14 incumbent electric utility that was, as of July 1, 1999, not bound by a rate case settlement adopted by the Commission that extended in its application beyond January 1, 2002, and a Phase II Utility is an investor-owned incumbent electric utility that was bound by such a settlement.
of 15 "Current Return" means the minimum fair combined rate of return on common equity required for any Current Proceeding by the limitation regarding a utility's peer group specified in subdivisEon 2 a.
"Current Return" means the minimum fair combined rate of return on common equity required for any Current Proceeding by the limitation regarding a utility's peer group specified in subdivision 2 a.
R e.
of 14 e.
In addition to other considerations, in setting the return on equity within the range allowed by this with costs of retail electric energy provided by the other peer group investor-owned electric utilities.ve f.
In addition to other considerations, in setting the return on equity within the range allowed by this section, the Commission shall strive to maintain costs of retail electric energy that are cost competitive with costs of retail electric energy provided by the other peer group investor-owned electric utilities.
f.
L g.
g.
If the combined rate of return on common equity earned by the generation and distributionE services is no more than 50 basis points above or below the return as so determined or, for any test period commencing after December 31, 2012, for a Phase II Utility and after December 31, 2013, for a Phase I Utility, such return is no more than 70 basis points above or below the return as so determined, such combined return shall not be considered either excessive or insufficient, respectively.
If the combined rate of return on common equity earned by the generation and distribution services is no more than 50 basis points above or below the return as so determined or, for any test period commencing after December 31, 2012, for a Phase II Utility and after December 31, 2013, for a Phase I Utility, such return is no more than 70 basis points above or below the return as so determined, such combined return shall not be considered either excessive or insufficient, respectively.
However, for 2013, for a Phase I Utility, if the utility has, during the test period or periods under review, earned below the return as so determined, whether or not such combined return is within 70 basis points of the return as so determined, the utility may petition the Commission for approval of an increase in rates in accordance with the provisions of subdivision 8 a as if it had earned more than 70 basis pointsSbelow a fair combined rate of return, and such proceeding shall otherwise be conducted in accordance wi1h the provisions of this section.
However, for any test period commencing after December 31, 2012, for a Phase II Utility, and after December 31, 2013, for a Phase I Utility, if the utility has, during the test period or periods under review, earned below the return as so determined, whether or not such combined return is within 70 basis points of the return as so determined, the utility may petition the Commission for approval of an increase in rates in accordance with the provisions of subdivision 8 a as if it had earned more than 70 basis points below a fair combined rate of return, and such proceeding shall otherwise be conducted in accordance with the provisions of this section.
The provisions of this subdivision are subject to the provisions of2subdivision 8.
The provisions of this subdivision are subject to the provisions of subdivision 8.
E h.
h.
Any amount of a utility's earnings directed by the Commission to be credited to customersR bills pursuant to this section shall not be considered for the purpose of determining the utility's earnings in any subsequent triennial review.
Any amount of a utility's earnings directed by the Commission to be credited to customers' bills pursuant to this section shall not be considered for the purpose of determining the utility's earnings in any subsequent triennial review.
commencing for a Phase I Utility in 2020, and such filings commencing for a Phase II Utility in 2021,ngs consisting of the schedules contained in the Commission's rules governing utility rate increase applications.
3.
Such filing shall encompass the three successive 12-month test periods ending December 31 immediately preceding the year in which such proceeding is conducted, except that the filing for a Phase II Utility in 2021 shall encompass the four successive 12-month test periods ending December 31, 2020, and in every such case the filing for each year shall be identified separately and shall be segregated from any other year encompassed by the filing.
Each such utility shall make a triennial filing by March 31 of every third year, with such filings commencing for a Phase I Utility in 2020, and such filings commencing for a Phase II Utility in 2021, consisting of the schedules contained in the Commission's rules governing utility rate increase applications.
If the Commission determines that rates should be revised or credits be applied to customers' bills pursuant to subdivision 8 or 9, any rate adjustment clauses previously implemented related to facilities utilizing simple-cycle combustion turbines amounts that are the subject of such rate adjustment clauses are fully recovered.
Such filing shall encompass the three successive 12-month test periods ending December immediately preceding the year in which such proceeding is conducted, except that the filing for a Phase II Utility in 2021 shall encompass the four successive 12-month test periods ending December 31, 2020, and in every such case the filing for each year shall be identified separately and shall be segregated from any other year encompassed by the filing.
The Commission shall the combine such clauses with the utility's costs, revenues and investments only after it makes its initial determination with regard to necessary rate revisions or credits to customers' bills, and the amounts thereof, but after such clauses are combined as herein specified, they shall thereafter be considered part of the utility's costs, revenues, and investments for the purposes of future triennial review proceedings.
If the Commission determines that rates should be revised or credits be applied to customers' bills pursuant to subdivision 8 or 9, any rate adjustment clauses previously implemented related to facilities utilizing simple-cycle combustion turbines described in subdivision 6, shall be combined with the utility's costs, revenues and investments until the amounts that are the subject of such rate adjustment clauses are fully recovered.
The Commission shall combine such clauses with the utility's costs, revenues and investments only after it makes its initial determination with regard to necessary rate revisions or credits to customers' bills, and the amounts thereof, but after such clauses are combined as herein specified, they shall thereafter be considered part of the utility's costs, revenues, and investments for the purposes of future triennial review proceedings.
(i) costs for transmission services provided to the utility by the regional conditions approved by the Federal Energy Regulatory Commission;
(i) costs for transmission services provided to the utility by the regional transmission entity of which the utility is a member, as determined under applicable rates, terms and conditions approved by the Federal Energy Regulatory Commission;
and ancillary service charges designed to recover recover these costs shall be designed using the appropriate billing determinants in the retail rateo schedules.
and ancillary service charges designed to recover transmission costs, shall be recovered on a timely and current basis from customers.
of 15 4.
Retail rates to recover these costs shall be designed using the appropriate billing determinants in the retail rate schedules.
4.
Upon petition of a utility at any time after the expiration or termination of capped rates, but not more than once in any 12-month period, the Commission shall approve a rate adjustment clause under which such costs, including, without limitation, costs for transmission service, charges for new and existing transmission facilities, administrative charges, and ancillary service charges designed to recover transmission costs, shall be recovered on a timely and current basis from customers.
Upon petition of a utility at any time after the expiration or of 14 termination of capped rates, but not more than once in any 12-month period, the Commission shall approve a rate adjustment clause under which such costs, including, without limitation, costs for transmission service, charges for new and existing transmission facilities, administrative charges, and ancillary service charges designed to recover transmission costs, shall be recovered on a timely and current basis from customers.
The Commission shall also award an additional 20 basis points for each additional incremental 0.1 percent in annual savings in any year achieved by the utility's energy efficiency programs approved by the Commission pursuant to this subdivision, beyond the annual requirements set forth in § 56-596.2, provided that the total performance incentive awarded in any year shall not exceed 10 percent of that utility's total energy efficiency program spending in that same year.
The Commission shall also award an additional 20 basis points for each additional incremental 0.1 percent in annual savings in any year achieved by the utility's energy efficiency programs approved by the Commission pursuant to this subdivision, beyond the annual requirements set forth in § 56-596.2, provided that the total performance incentive awarded in any year shall not exceed percent of that utility's total energy efficiency program spending in that same year.
utility spending on each program, including any associated of 15 administrative costs;
utility spending on each program, including any associated administrative costs;
Notwithstanding any other provision of law, unless the Commission finds in its discretion anE after consideration of all in-state and regional transmission entity resources that there is a threat to the reliability or security of electric service to the utility's customers, the Commission shall not approve construction of any new utility-owned generating facilities that emit carbon dioxide as a by-prRduct of combusting fuel to generate electricity unless the utility has already met the energy savings goals than demand-side or energy storage resources.inds that supply-side resources are more cost-effeOtive As used in this subdivision, "large general service customer" means a customer that has a verifiable history of having used more than one megawatt of demand from a single site.
Notwithstanding any other provision of law, unless the Commission finds in its discretion and after consideration of all in-state and regional transmission entity resources that there is a threat to the reliability or security of electric service to the utility's customers, the Commission shall not approve construction of any new utility-owned generating facilities that emit carbon dioxide as a by-product of combusting fuel to generate electricity unless the utility has already met the energy savings goals identified in § 56-596.2 and the Commission finds that supply-side resources are more cost-effective than demand-side or energy storage resources.
Show all 120 changed rows (80 more)
Previous
Latest
Large general service customers shall be exempt from requirements that they participate in energy efficiency programs if the Commission finds that the large general service customer has, at theE customer's own expense, implemented energy efficiency programs that have produced or will produce measured and verified results consistent with industry standards and other regulatory criteria stated in this section.
As used in this subdivision, "large general service customer" means a customer that has a verifiable history of having used more than one megawatt of demand from a single site.
The Commission shall, no later than June 30, 2021, adopt rules or regulations (a) establishing the process for large general service customers to apply for such an exemption, (b) defining the standard criteria that shall be satisfied by an applicant in order to notify the utility,) including means of evaluation measurement and verification and confidentiality requirements.
Large general service customers shall be exempt from requirements that they participate in energy of 14 efficiency programs if the Commission finds that the large general service customer has, at the customer's own expense, implemented energy efficiency programs that have produced or will produce measured and verified results consistent with industry standards and other regulatory criteria stated in this section.
At a minimum, such rules and regulations shall require that each exempted large general service customer certify to the utility and Commission that its implemented energy efficiency programs have deliSered measured and verified savings within the prior five years.
The Commission shall, no later than June 30, 2021, adopt rules or regulations (a) establishing the process for large general service customers to apply for such an exemption, (b) establishing the administrative procedures by which eligible customers will notify the utility, and (c) defining the standard criteria that shall be satisfied by an applicant in order to notify the utility, including means of evaluation measurement and verification and confidentiality requirements.
In adopting such rules or regulation1, the Commission shall also specify the timing as to when a utility shall accept and act on such noti2e, taking into consideration the utility's integrated resource planning process, as well as its administrEtion of energy efficiency programs that are approved for cost recovery by the Commission.
At a minimum, such rules and regulations shall require that each exempted large general service customer certify to the utility and Commission that its implemented energy efficiency programs have delivered measured and verified savings within the prior five years.
Savings from Rarge general service customers shall be accounted for in utility reporting in the standards in § 56-596.2.
In adopting such rules or regulations, the Commission shall also specify the timing as to when a utility shall accept and act on such notice, taking into consideration the utility's integrated resource planning process, as well as its administration of energy efficiency programs that are approved for cost recovery by the Commission.
The notice of nonparticipation by a large general service customer shall be for the duration of the initiate steps necessary to verify such nonparticipant's achievement of energy efficiency if the Commission has a body of evidence that the nonparticipant has knowingly misrepresented its energy efficiency achievement.
Savings from large general service customers shall be accounted for in utility reporting in the standards in § 56-596.2.
The notice of nonparticipation by a large general service customer shall be for the duration of the service life of the customer's energy efficiency measures.
The Commission may on its own motion initiate steps necessary to verify such nonparticipant's achievement of energy efficiency if the Commission has a body of evidence that the nonparticipant has knowingly misrepresented its energy efficiency achievement.
pursuant to § 56-585.5 that are not recoverable under subdivision 6.
d.
Projected and actual costs of compliance with renewable energy portfolio standard requirements pursuant to § 56-585.5 that are not recoverable under subdivision 6.
The Commission shall approve such a petition if it finds that such costs are necessary to comply with such environmental laws or f.
The Commission shall approve such a petition if it finds that such costs are necessary to comply with such environmental laws or regulations;
f.
Projected and actual costs, not currently in rates, for the utility to design, implement, and operate programs approved by the Commission to provide incentives to (i) low-income, elderly, and disabled individuals or (ii) organizations providing residential services to low-income, elderly, and disabled individuals for the installation of, or access to, equipment to generate electric energy derived from residential services to low-income, elderly, and disabled individuals, first participate in incentive programs for the installation of measures that reduce heating or cooling costs.
Projected and actual costs, not currently in rates, for the utility to design, implement, and operate programs approved by the Commission to provide incentives to (i) low-income, elderly, and disabled individuals or (ii) organizations providing residential services to low-income, elderly, and disabled individuals for the installation of, or access to, equipment to generate electric energy derived from sunlight, provided the low-income, elderly, and disabled individuals, or organizations providing residential services to low-income, elderly, and disabled individuals, first participate in incentive programs for the installation of measures that reduce heating or cooling costs.
of 15 Any rate adjustment clause approved under subdivision 5 c by the Commission shall remain in effect until the utility exhausts the approved budget for the energy efficiency program.
Any rate adjustment clause approved under subdivision 5 c by the Commission shall remain in effect until the utility exhausts the approved budget for the energy efficiency program.
To ensure the generation and delivery of a reliable and adequate supply of electricity, to meet the utility's projected native load obligations and to promote economic development, a utility may at any time, after the expiration or termination of capped rates, petition the Commission for approval of a rate adjustment clause for recovery on a timely and current basis from customers of the costs of (i) a coal-fueled generation facility that utilizes Virginia coal and is located in the coalfield region of the Commonwealth as described in § 15.2-6002, regardless of whether such facility is located within or without the utility's service territory, (ii) one or more other generation facilities, (iii) one or more major unit modifications of generation facilities, including the costs of any system or equipment upgrade, system or equipment replacement, or other cost reasonably appropriate to extend the combined operating license for or the operating life of one or more generation facilities utilizing nuclear power, (iv) one or more new underground facilities to replace one or more existing overhead distribution facilities of 69 kilovolts or less located within the Commonwealth, (v) one or more pumped hydroelectricity generation and storage facilities that utilize on-site or off-site renewable energy resources as all or a portion of their power source and such facilities and associated resources are located in the coalfield region of the Commonwealth as described in § 15.2-6002, regardless of whether such facility is located within or without the utility's service territory, or (vi) one or more electric distribution grid transformation projects;
To ensure the generation and delivery of a reliable and adequate supply of electricity, to meet the utility's projected native load obligations and to promote economic development, a utility may at any time, after the expiration or termination of capped rates, petition the Commission for approval of a rate adjustment clause for recovery on a timely and current basis from customers of the costs of (i) a coal-fueled generation facility that utilizes Virginia coal and is located in the coalfield region of the Commonwealth as described in § 15.2-6002, regardless of whether such facility is located within or without the utility's service territory, (ii) one or more other generation facilities, (iii) one or more major unit modifications of generation facilities, including the costs of any system or equipment upgrade, system or equipment replacement, or other cost reasonably appropriate to extend the combined operating license for or the operating life of one or more generation facilities utilizing nuclear power, (iv) one or of 14 more new underground facilities to replace one or more existing overhead distribution facilities of 69 kilovolts or less located within the Commonwealth, (v) one or more pumped hydroelectricity generation and storage facilities that utilize on-site or off-site renewable energy resources as all or a portion of their power source and such facilities and associated resources are located in the coalfield region of the Commonwealth as described in § 15.2-6002, regardless of whether such facility is located within or without the utility's service territory, or (vi) one or more electric distribution grid transformation projects;
The costs of the facility, other than return on projected construction work in progress and allowance for funds used during construction, shall not be recovered prior to the date a facility constructed by the of 15 utility and described in clause (i), (ii), (iii) or (v) begins commercial operation, the date the utility becomes the owner of a purchased generation facility consisting of at least one megawatt of genErating capacity using energy derived from sunlight and located in the Commonwealth and that utilizes goods or services sourced, in whole or in part, from one or more Virginia businesses, or the date new N underground facilities are classified by the utility as plant in service.
The costs of the facility, other than return on projected construction work in progress and allowance for funds used during construction, shall not be recovered prior to the date a facility constructed by the utility and described in clause (i), (ii), (iii) or (v) begins commercial operation, the date the utility becomes the owner of a purchased generation facility consisting of at least one megawatt of generating capacity using energy derived from sunlight and located in the Commonwealth and that utilizes goods or services sourced, in whole or in part, from one or more Virginia businesses, or the date new underground facilities are classified by the utility as plant in service.
In any application toRconstruct a new generating facility, the utility shall include, and the Commission shall consider, the social cost of Commission shall ensure that the development of new, or expansion of existing, energy resources or facilities does not have a disproportionate adverse impact on historically economically disadvantaged communities.
In any application to construct a new generating facility, the utility shall include, and the Commission shall consider, the social cost of carbon, as determined by the Commission, as a benefit or cost, whichever is appropriate.
The Commission may adopt any rules it deems necessary to determine the social cost of carbon and shall use the best available science and technology, including the Technical SupportL Document:
The Commission shall ensure that the development of new, or expansion of existing, energy resources or facilities does not have a disproportionate adverse impact on historically economically disadvantaged communities.
Technical Update of the Social Cost of Carbon for Regulatory Impact Analysis Under E Executive Order 12866, published by the Interagency Working Group on Social Cost of Greenhouse Gases from the United States Government in August 2016, as guidance.
The Commission may adopt any rules it deems necessary to determine the social cost of carbon and shall use the best available science and technology, including the Technical Support Document:
Technical Update of the Social Cost of Carbon for Regulatory Impact Analysis Under Executive Order 12866, published by the Interagency Working Group on Social Cost of Greenhouse Gases from the United States Government in August 2016, as guidance.
Such enhanced rate of return on common equity shall be applied to allowance for funds used during thereafter be applied to the entire facility during the first portion of the service life of the facility.
Such enhanced rate of return on common equity shall be applied to allowance for funds used during construction and to construction work in progress during the construction phase of the facility and shall of 14 thereafter be applied to the entire facility during the first portion of the service life of the facility.
however, the Commission shall determine the duration of the first portion of the service life of any facility, within the range specified in the table below, which determination shall be consistent with the public interest and shall refSect the Commission's determinations regarding how critical the facility may be in meeting the energy ne1ds of the citizens of the Commonwealth and the risks involved in the development of the facility.
however, the Commission shall determine the duration of the first portion of the service life of any facility, within the range specified in the table below, which determination shall be consistent with the public interest and shall reflect the Commission's determinations regarding how critical the facility may be in meeting the energy needs of the citizens of the Commonwealth and the risks involved in the development of the facility.
Aft2r the first portion of the service life of the facility is concluded, the utility's general rate of rEturn shall be applied to such facility for the remainder of its service life.
After the first portion of the service life of the facility is concluded, the utility's general rate of return shall be applied to such facility for the remainder of its service life.
As used herein, the service lifR of the facility shall be deemed to begin on the date a facility constructed by the utility and described in clause (i), (ii), (iii) or (v) begins commercial operation, the date the utility becomes the owner of a purchased sunlight and located in the Commonwealth and that utilizes goods or services sourced, in whole or infrom part, from one or more Virginia businesses, or the date new underground facilities or new electric distribution grid transformation projects are classified by the utility as plant in service, and such service life shall be deemed equal in years to the life of that facility as used to calculate the utility's depreciation expense.
As used herein, the service life of the facility shall be deemed to begin on the date a facility constructed by the utility and described in clause (i), (ii), (iii) or (v) begins commercial operation, the date the utility becomes the owner of a purchased generation facility consisting of at least one megawatt of generating capacity using energy derived from sunlight and located in the Commonwealth and that utilizes goods or services sourced, in whole or in part, from one or more Virginia businesses, or the date new underground facilities or new electric distribution grid transformation projects are classified by the utility as plant in service, and such service life shall be deemed equal in years to the life of that facility as used to calculate the utility's depreciation expense.
Allowance for funds used during construction shall be calculated for any such facility utilizing the utility's actual capital structure and overall cost of capital, including an enhanced rate of return on common equity as The construction of any facility described in clause (i) or (v) is in the public interest, and in determining whether to approve such facility, the Commission shall liberally construe the provisions of this title.
Allowance for funds used during construction shall be calculated for any such facility utilizing the utility's actual capital structure and overall cost of capital, including an enhanced rate of return on common equity as determined pursuant to this subdivision, until such construction work in progress is included in rates.
The construction or purchase by a utility of one or more generation facilities with at least one megawatt of generating capacity, and with an aggregate rated capacity that does not exceed 16,100 megawatts, including rooftop solar installations with a capacity of not less than 50 kilowatts, and with an aggregate capacity of 100 megawatts, that use energy derived from sunlight or from onshore wind and are located in the Commonwealth or off the Commonwealth's Atlantic shoreline, regardless of whether any of such facilities are located within or without the utility's service territory, is in the public interest, and in determining whether to approve such facility, the Commission shall liberally construe the provisions of derived from sunlight generated by such generation facility prior to purchasing the generation facility.
The construction of any facility described in clause (i) or (v) is in the public interest, and in determining whether to approve such facility, the Commission shall liberally construe the provisions of this title.
The construction or purchase by a utility of one or more generation facilities with at least one megawatt of generating capacity, and with an aggregate rated capacity that does not exceed 16,100 megawatts, including rooftop solar installations with a capacity of not less than 50 kilowatts, and with an aggregate capacity of 100 megawatts, that use energy derived from sunlight or from onshore wind and are located in the Commonwealth or off the Commonwealth's Atlantic shoreline, regardless of whether any of such facilities are located within or without the utility's service territory, is in the public interest, and in determining whether to approve such facility, the Commission shall liberally construe the provisions of this title.
A utility may enter into short-term or long-term power purchase contracts for the power derived from sunlight generated by such generation facility prior to purchasing the generation facility.
The conversion of any such facilities on or after September 1, 2016, is deemed to provide local and system-wide benefits and to be cost beneficial, and the costs associated with such new underground facilities are deemed to be reasonably and prudently incurred and, notwithstanding the provisions of provided that the total costs associated with the replacement of any subset of existing overhead, distribution tap lines proposed by the utility with new underground facilities, exclusive of financing of 15 costs, shall not exceed an average cost per customer of $20,000, with such customers, including those served directly by or downline of the tap lines proposed for conversion, and, further, such total costs shall not exceed an average cost per mile of tap lines converted, exclusive of financing costs, of $750,000.
The conversion of any such facilities on or after September 1, 2016, is deemed to provide local and system-wide benefits and to be cost beneficial, and the costs associated with such new underground facilities are deemed to be reasonably and prudently incurred and, notwithstanding the provisions of subsection C or D, shall be approved for recovery by the Commission pursuant to this subdivision, provided that the total costs associated with the replacement of any subset of existing overhead distribution tap lines proposed by the utility with new underground facilities, exclusive of financing costs, shall not exceed an average cost per customer of $20,000, with such customers, including those served directly by or downline of the tap lines proposed for conversion, and, further, such total costs shall not exceed an average cost per mile of tap lines converted, exclusive of financing costs, of $750,000.
and without regard to whether such costs will be the subject of a customer credit offset, as applicable, pursuant to subdivision 8 d.
and without regard to whether such costs will be the subject of a customer credit offset, as applicable, pursuant to subdivision d.
The basis points to be added to the utility's general rate of return to calculate the enhanced rate of return on common equity, and the first portion of that facility's service life to which such enhanced rate of return shall be applied, shall vary by type of facility, as specified in the following table:
The basis points to be added to the utility's general rate of return to calculate the enhanced rate of 14 of return on common equity, and the first portion of that facility's service life to which such enhanced rate of return shall be applied, shall vary by type of facility, as specified in the following table:
Type of Generation Facility Basis Points First Portion of Service Life Nuclear-powered 200 Between 12 and 25 years Carbon capture compatible, clean-200l Between 10 and 20 years Renewable powered, other than 200 Between 5 and 15 years landfill gas powered Coalbed methane gas powered 150 Between 5 and 15 years Landfill gas powered 200 Between 5 and 15 years Conventional coal or combined-cyc100 Between 10 and 20 years combustion turbine Only those facilities as to which a rate adjustment clause under this subdivision has been previously approved by the Commission, or as to which a petition for approval of such rate adjustment clause was filed with the Commission, on or before January 1, 2013, shall be entitled to the enhanced rate of return on common equity as specified in the above table during the construction phase of the facility and the approved first portion of its service life.
Type of Generation Facility Basis Points First Portion of Service Life Nuclear-powered 200 Between 12 and 25 years Carbon capture compatible, clean-co200 Between 10 and 20 years powered Renewable powered, other than 200 Between 5 and 15 years landfill gas powered Landfill gas poweredpowered 200 Between 5 and 15 years Conventional coal or combined-cycle100 Between 10 and 20 years combustion turbine Only those facilities as to which a rate adjustment clause under this subdivision has been previously approved by the Commission, or as to which a petition for approval of such rate adjustment clause was filed with the Commission, on or before January 1, 2013, shall be entitled to the enhanced rate of return on common equity as specified in the above table during the construction phase of the facility and the approved first portion of its service life.
Notwithstanding any provision of Chapter 296 of the Acts of Assembly of 2018, construction, purchasing, or leasing activities for a new utility-owned and utility-operated generating facility or facilities utilizing energy derived from sunlight or from onshore wind with an aggregate capacity of 16,100 megawatts, including rooftop solar installations with a capacity of not less than 50 kilowatts, and of 15 with an aggregate capacity of 100 megawatts, together with a utility-owned and utility-operated generating facility or facilities utilizing energy derived from offshore wind with an aggregateEcapacity of not more than 3,000 megawatts, are in the public interest.
Notwithstanding any provision of Chapter 296 of the Acts of Assembly of 2018, construction, purchasing, or leasing activities for a new utility-owned and utility-operated generating facility or facilities utilizing energy derived from sunlight or from onshore wind with an aggregate capacity of 16,100 megawatts, including rooftop solar installations with a capacity of not less than 50 kilowatts, and with an aggregate capacity of 100 megawatts, together with a utility-owned and utility-operated generating facility or facilities utilizing energy derived from offshore wind with an aggregate capacity of not more than 3,000 megawatts, are in the public interest.
To the extent that a utility elects to recover the costs of any such new generation or energy storage facility or facilities through iRs rates for generation and distribution services and does not petition and receive approval from the Commission for upon the request of the utility in a triennial review proceeding, provide for a customer creditO shall, reinvestment offset, as applicable, pursuant to subdivision 8 d with respect to all costs deemed reasonable and prudent by the Commission in a proceeding pursuant to subsection D of § 56-580 or in a triennial review proceeding.
To the extent that a utility elects to recover the costs of any such new generation or energy storage facility or facilities through its rates for generation and distribution services and does not petition and receive approval from the Commission for recovery of such costs through a rate adjustment clause described in clause (ii), the Commission shall, upon the request of the utility in a triennial review proceeding, provide for a customer credit reinvestment offset, as applicable, pursuant to subdivision 8 d with respect to all costs deemed reasonable and prudent by the Commission in a proceeding pursuant to subsection D of § 56-580 or in a triennial review proceeding.
L Electric distribution grid transformation projects are in the public interest.
Electric distribution grid transformation projects are in the public interest.
To the extentEthat a utility elects to recover the costs of such electric distribution grid transformation projects through its rates for generation and distribution services, and does not petition and receive approval from the Commission for recovery of such costs through a rate adjustment clause described in clause (vi), the Commission shall, upon the request of the utility in a triennial review proceeding, provide for a customer credit reasonable and prudent by the Commission in a proceeding for approval of a plan for electricemed distribution grid transformation projects pursuant to subdivision 6 or in a triennial review proceeding.
To the extent that a utility elects to recover the costs of such electric distribution grid transformation projects through its rates for generation and distribution services, and does not petition and receive approval from the Commission for recovery of such costs through a rate adjustment clause described in clause (vi), the Commission shall, upon the request of the utility in a triennial review proceeding, provide for a customer credit reinvestment offset, as applicable, pursuant to subdivision 8 d with respect to all costs deemed reasonable and prudent by the Commission in a proceeding for approval of a plan for electric distribution grid transformation projects pursuant to subdivision 6 or in a triennial review proceeding.
Neither generation facilities described in clause (ii) that utilize simple-cycle combustion turbines nor new underground facilities shall receive an enhanced rate of return on common equity as describSd herein, but instead shall receive the utility's general rate of return during the construction 1hase of the facility and, thereafter, for the entire service life of the facility.
Neither generation facilities described in clause (ii) that utilize simple-cycle combustion turbines nor new underground facilities shall receive an enhanced rate of return on common equity as described herein, but instead shall receive the utility's general rate of return during the construction phase of the facility and, thereafter, for the entire service life of the facility.
No rate adjustment claus2 for new underground facilities shall allocate costs to, or provide for the recovery of costs from, custEmers that are served within the large power service rate class for a Phase I Utility and the large generaR service rate classes for a Phase II Utility.
No rate adjustment clause for new of 14 underground facilities shall allocate costs to, or provide for the recovery of costs from, customers that are served within the large power service rate class for a Phase I Utility and the large general service rate classes for a Phase II Utility.
is fired at least 50 percent by coalbed methane gas, as such term is defined in § 45.2-1600, producedility from wells located in the Commonwealth, and (2) "landfill gas powered" if the facility is fired by methane or other combustible gas produced by the anaerobic digestion or decomposition of biodegradable materials in a solid waste management facility licensed by the Waste Management Board.
As used in this subdivision, a generation facility is (1) "coalbed methane gas powered" if the facility is fired at least 50 percent by coalbed methane gas, as such term is defined in § 45.2-1600, produced from wells located in the Commonwealth, and (2) "landfill gas powered" if the facility is fired by methane or other combustible gas produced by the anaerobic digestion or decomposition of biodegradable materials in a solid waste management facility licensed by the Waste Management Board.
For purposes of this subdivision, "general rate of return" means the fair combined rate of return on comNotwithstanding any other provision of this subdivision, if the Commission finds during the triennial review conducted for a Phase II Utility in 2021 that such utility has not filed applications for all necessary federal and state regulatory approvals to construct one or more nuclear-powered or coal-fueled generation facilities that would add a total capacity of at least 1500 megawatts to the amount of the utility's generating resources as such resources existed on July 1, 2007, or that, if all such approvals have been received, that the utility has not made reasonable and good faith efforts to construct one or more such facilities that will provide such additional total capacity within a reasonable time after obtaining such approvals, then the Commission, if it finds it in the public interest, may reduce on a prospective basis any enhanced rate of return on common equity previously applied to any such facility rate of return to any such facility for which the utility seeks approval in the future under thisy's general subdivision.
For purposes of this subdivision, "general rate of return" means the fair combined rate of return on common equity as it is determined by the Commission for such utility pursuant to subdivision 2.
Notwithstanding any other provision of this subdivision, if a Phase II utility obtains approval from the Commission of a rate adjustment clause pursuant to subdivision 6 associated with a test or demonstration project involving a generation facility utilizing energy from offshore wind, and such utility has not, as of July 1, 2023, commenced construction as defined for federal income tax purposes of an offshore wind generation facility or facilities with a minimum aggregate capacity of 250 megawatts, then the Commission, if it finds it in the public interest, may direct that the costs associated with any such rate adjustment clause involving said test or demonstration project shall thereafter no longer be recovered through a rate adjustment clause pursuant to subdivision 6 and shall instead be for generation and distribution services as a result of the combination of such costs with the other costs,s revenues, and investments included in the utility's rates for generation and distribution services.
Notwithstanding any other provision of this subdivision, if the Commission finds during the triennial review conducted for a Phase II Utility in 2021 that such utility has not filed applications for all necessary federal and state regulatory approvals to construct one or more nuclear-powered or coal-fueled generation facilities that would add a total capacity of at least 1500 megawatts to the amount of the utility's generating resources as such resources existed on July 1, 2007, or that, if all such approvals have been received, that the utility has not made reasonable and good faith efforts to construct one or more such facilities that will provide such additional total capacity within a reasonable time after obtaining such approvals, then the Commission, if it finds it in the public interest, may reduce on a prospective basis any enhanced rate of return on common equity previously applied to any such facility to no less than the general rate of return for such utility and may apply no less than the utility's general rate of return to any such facility for which the utility seeks approval in the future under this subdivision.
Any of 15 such costs shall remain combined with the utility's other costs, revenues, and investments included in its rates for generation and distribution services until such costs are fully recovered.
Notwithstanding any other provision of this subdivision, if a Phase II utility obtains approval from the Commission of a rate adjustment clause pursuant to subdivision 6 associated with a test or demonstration project involving a generation facility utilizing energy from offshore wind, and such utility has not, as of July 1, 2023, commenced construction as defined for federal income tax purposes of an offshore wind generation facility or facilities with a minimum aggregate capacity of 250 megawatts, then the Commission, if it finds it in the public interest, may direct that the costs associated with any such rate adjustment clause involving said test or demonstration project shall thereafter no longer be recovered through a rate adjustment clause pursuant to subdivision 6 and shall instead be recovered through the utility's rates for generation and distribution services, with no change in such rates for generation and distribution services as a result of the combination of such costs with the other costs, revenues, and investments included in the utility's rates for generation and distribution services.
Any such costs shall remain combined with the utility's other costs, revenues, and investments included in its rates for generation and distribution services until such costs are fully recovered.
The utility shall amortize such deferred costs over the refueling cycle, but in no case more than 18 months, beginning with the month in which such plant resumes operation after such refueling.
The utility shall amortize such deferred costs over the refueling cycle, but in no case more than 18 months, beginning of 14 with the month in which such plant resumes operation after such refueling.
In such cases, the Commission shall, in such triennial review proceeding, authorize of 15 deferred recovery of such costs and allow the utility to amortize and recover such deferred costs over future periods as determined by the Commission.
In such cases, the Commission shall, in such triennial review proceeding, authorize deferred recovery of such costs and allow the utility to amortize and recover such deferred costs over future periods as determined by the Commission.
The aggregate amount of such deferred costs shaEl not exceed an amount that would, together with the utility's other costs, revenues, and investments to be recovered through rates for generation and distribution services, cause the utility's earned return on its generation and distribution services to exceed the fair rate of return authorized under subdiviRion 2, less 50 basis points, for the combined test periods under review or, for any test period commencing after the fair rate of return authorized under subdivision 2 less 70 basis points.
The aggregate amount of such deferred costs shall not exceed an amount that would, together with the utility's other costs, revenues, and investments to be recovered through rates for generation and distribution services, cause the utility's earned return on its generation and distribution services to exceed the fair rate of return authorized under subdivision 2, less basis points, for the combined test periods under review or, for any test period commencing after December 31, 2012, for a Phase II Utility and after December 31, 2013, for a Phase I Utility, to exceed the fair rate of return authorized under subdivision 2 less 70 basis points.
Nothing in this section shall limit the Commission's authority, pursuant to the provisions of Chapter 10 (§ 56-232 et seq.), including specifically § 56-235.2, following the review of combined test period earnings of the utility in a triennial review, for normalization of nonrecurring test period costs and annualized adjustments for future costs, in determining any appropriate increase or decrease in the utility's rates for generation and dEstribution services pursuant to subdivision 8 a or 8 c.
Nothing in this section shall limit the Commission's authority, pursuant to the provisions of Chapter 10 (§ 56-232 et seq.), including specifically § 56-235.2, following the review of combined test period earnings of the utility in a triennial review, for normalization of nonrecurring test period costs and annualized adjustments for future costs, in determining any appropriate increase or decrease in the utility's rates for generation and distribution services pursuant to subdivision 8 a or 8 c.
D a.
a.
Revenue reductions related to energy efficiency measures or programs approved and deployed since the utility's previous triennial review have caused the utility, as verified by the Commission, below a fair combined rate of return on its generation and distribution services or, for any test period commencing after December 31, 2012, for a Phase II Utility and after December 31, 2013, for a Phase I Utility, more than 70 basis points below a fair combined rate of return on its generation and distribution services, as determined in subdivision 2, without regard to any return on common equity or otheS matters determined with respect to facilities described in subdivision 6, the Commission shall 1rder increases to the utility's rates for generation and distribution services necessary to recover 2uch revenue reductions.
Revenue reductions related to energy efficiency measures or programs approved and deployed since the utility's previous triennial review have caused the utility, as verified by the Commission, during the test period or periods under review, considered as a whole, to earn more than 50 basis points below a fair combined rate of return on its generation and distribution services or, for any test period commencing after December 31, 2012, for a Phase II Utility and after December 31, 2013, for a Phase I Utility, more than 70 basis points below a fair combined rate of return on its generation and distribution services, as determined in subdivision 2, without regard to any return on common equity or other matters determined with respect to facilities described in subdivision 6, the Commission shall order increases to the utility's rates for generation and distribution services necessary to recover such revenue reductions.
If the Commission finds, for reasons other than revenue reductions related to energE efficiency measures, that the utility has, during the test period or periods under review, consRdered as a whole, earned more than 50 basis points below a fair combined rate of return on its generation and distribution services or, for any test period commencing after December 31, 2012, for a Phase II Utility rate of return on its generation and distribution services, as determined in subdivision 2, without regard to any return on common equity or other matters determined with respect to facilities described in subdivision 6, the Commission shall order increases to the utility's rates necessary to provide the opportunity to fully recover the costs of providing the utility's services and to earn not less than such fair combined rate of return, using the most recently ended 12-month test period as the basis for determining the amount of the rate increase necessary.
If the Commission finds, for reasons other than revenue reductions related to energy efficiency measures, that the utility has, during the test period or periods under review, considered as a whole, earned more than 50 basis points below a fair combined rate of return on its generation and distribution services or, for any test period commencing after December 31, 2012, for a Phase II Utility and after December 31, 2013, for a Phase I Utility, more than 70 basis points below a fair combined rate of return on its generation and distribution services, as determined in subdivision 2, without regard of 14 to any return on common equity or other matters determined with respect to facilities described in subdivision 6, the Commission shall order increases to the utility's rates necessary to provide the opportunity to fully recover the costs of providing the utility's services and to earn not less than such fair combined rate of return, using the most recently ended 12-month test period as the basis for determining the amount of the rate increase necessary.
However, in the first triennial review proceeding conducted after January 1, 2021, for a Phase II Utility, the Commission may not order a rate increase, and in all triennial reviews of a Phase I or Phase II utility, the Commission may not order such rate increase unless it finds that the resulting rates are necessary to provide the utility with the opportunity to on both its generation and distribution services, as determined in subdivision 2, without regard to anyurn return on common equity or other matters determined with respect to facilities described in subdivision 6, using the most recently ended 12-month test period as the basis for determining the permissibility of any rate increase under the standards of this sentence, and the amount thereof;
However, in the first triennial review proceeding conducted after January 1, 2021, for a Phase II Utility, the Commission may not order a rate increase, and in all triennial reviews of a Phase I or Phase II utility, the Commission may not order such rate increase unless it finds that the resulting rates are necessary to provide the utility with the opportunity to fully recover its costs of providing its services and to earn not less than a fair combined rate of return on both its generation and distribution services, as determined in subdivision 2, without regard to any return on common equity or other matters determined with respect to facilities described in subdivision 6, using the most recently ended 12-month test period as the basis for determining the permissibility of any rate increase under the standards of this sentence, and the amount thereof;
The utility has, during the test period or test periods under review, considered as a whole, earned services or, for any test period commencing after December 31, 2012, for a Phase II Utility and after December 31, 2013, for a Phase I Utility, more than 70 basis points above a fair combined rate of return on its generation and distribution services, as determined in subdivision 2, without regard to any return on common equity or other matters determined with respect to facilities described in subdivision 6, the Commission shall, subject to the provisions of subdivisions 8 d and 9, direct that 60 percent of the amount of such earnings that were more than 50 basis points, or, for any test period commencing after December 31, 2012, for a Phase II Utility and after December 31, 2013, for a Phase I Utility, that 70 percent of the amount of such earnings that were more than 70 basis points, above such fair combined rate of return for the test period or periods under review, considered as a whole, shall be credited to customers' bills.
The utility has, during the test period or test periods under review, considered as a whole, earned more than 50 basis points above a fair combined rate of return on its generation and distribution services or, for any test period commencing after December 31, 2012, for a Phase II Utility and after December 31, 2013, for a Phase I Utility, more than 70 basis points above a fair combined rate of return on its generation and distribution services, as determined in subdivision 2, without regard to any return on common equity or other matters determined with respect to facilities described in subdivision 6, the Commission shall, subject to the provisions of subdivisions 8 d and 9, direct that 60 percent of the amount of such earnings that were more than 50 basis points, or, for any test period commencing after December 31, 2012, for a Phase II Utility and after December 31, 2013, for a Phase I Utility, that percent of the amount of such earnings that were more than 70 basis points, above such fair combined rate of return for the test period or periods under review, considered as a whole, shall be credited to customers' bills.
Any such credits shall be amortized over a period of six to 12 months, as and shall be allocated among customer classes such that the relationship between the specific customer, class rates of return to the overall target rate of return will have the same relationship as the last of 15 approved allocation of revenues used to design base rates;
Any such credits shall be amortized over a period of six to 12 months, as determined at the discretion of the Commission, following the effective date of the Commission's order, and shall be allocated among customer classes such that the relationship between the specific customer class rates of return to the overall target rate of return will have the same relationship as the last approved allocation of revenues used to design base rates;
(Expires July 1, 2028) In any triennial review proceeding conducted after December 31, 2017, upon the request of the utility, the Commission shall determine, prior to directing that 70 percent of earnings that are more than 70 basis points above the utility's fair combined rate of return on its generation and distribution services for the test period or periods under review be credited to customer bills pursuant to subdivision 8 b, the aggregate level of prior capital investment that the Commission has approved other than those capital investments that the Commission has approved for recovery pursuant to a rate adjustment clause pursuant to subdivision 6 made by the utility during the test period or periods under review in both (i) new utility-owned generation facilities utilizing energy derived from sunlight, or from onshore or offshore wind, and (ii) electric distribution grid transformation projects, as determined by the utility's plant in service and construction work in progress balances related to such investments as recorded per books by the utility for financial reporting purposes as of the end of the most recent test period under review.
(Expires July 1, 2028) In any triennial review proceeding conducted after December 31, 2017, upon the request of the utility, the Commission shall determine, prior to directing that 70 percent of earnings that are more than 70 basis points above the utility's fair combined rate of return on its generation and distribution services for the test period or periods under review be credited to customer of 14 bills pursuant to subdivision 8 b, the aggregate level of prior capital investment that the Commission has approved other than those capital investments that the Commission has approved for recovery pursuant to a rate adjustment clause pursuant to subdivision 6 made by the utility during the test period or periods under review in both (i) new utility-owned generation facilities utilizing energy derived from sunlight, or from onshore or offshore wind, and (ii) electric distribution grid transformation projects, as determined by the utility's plant in service and construction work in progress balances related to such investments as recorded per books by the utility for financial reporting purposes as of the end of the most recent test period under review.
The portion of any costs associated with new utility-owned generation facilities utilizing energy derived from sunlight, or from wind, or electric distribution grid transformation projects that is the subject of any customer credit reinvestment offset pursuant to this subdivision shall not thereafter be recovered through the utility's rates for generation and distribution services over the service life of such facilities and shall not thereafter be included in the utility's costs, revenues, and investments in future triennial review proceedings conducted pursuant to subdivision 2 and shall not be the subject of a rate adjustment clause petition pursuant to of 15 subdivision 6.
The portion of any costs associated with new utility-owned generation facilities utilizing energy derived from sunlight, or from wind, or electric distribution grid transformation projects that is the subject of any customer credit reinvestment offset pursuant to this subdivision shall not thereafter be recovered through the utility's rates for generation and distribution services over the service life of such facilities and shall not thereafter be included in the utility's costs, revenues, and investments in future triennial review proceedings conducted pursuant to subdivision 2 and shall not be the subject of a rate adjustment clause petition pursuant to subdivision 6.
The portion of any costs associated with new utility-owned generation facilities utilizing energy derived from sunlight, or from wind, or electric distribution grid transformation projecEs that is not the subject of any customer credit reinvestment offset pursuant to this subdivision may be recovered through the utility's rates for generation and distribution services over the service life of such facilities and shall be included in the utility's costs, revenues, and investments in future triennial revRew proceedings conducted pursuant to subdivision 2 until such costs are fully recovered, and if such costs subject of a rate adjustment clause petition pursuant to subdivision 6.
The portion of any costs associated with new utility-owned generation facilities utilizing energy derived from sunlight, or from wind, or electric distribution grid transformation projects that is not the subject of any customer credit reinvestment offset pursuant to this subdivision may be recovered through the utility's rates for generation and distribution services over the service life of such facilities and shall be included in the utility's costs, revenues, and investments in future triennial review proceedings conducted pursuant to subdivision 2 until such costs are fully recovered, and if such costs are recovered through the utility's rates for generation and distribution services, they shall not be the subject of a rate adjustment clause petition pursuant to subdivision 6.
Only the portion of such costs of new utility-owned generation facilities utilizing energy derived from sunlight, or from wind, or electric distribution grid transformation projects that has not been included in any customer credit reinvestment offset pursuant to this subdivision, and not otherwise recovered through the utility's rates for generation and distribution services, may be the subject of a rate adjustment clause petition by the utiliEy pursuant to subdivision 6.
Only the portion of such costs of new utility-owned generation facilities utilizing energy derived from sunlight, or from wind, or electric distribution grid transformation projects that has not been included in any customer credit reinvestment offset pursuant to this subdivision, and not otherwise recovered through the utility's rates for generation and distribution services, may be the subject of a rate adjustment clause petition by the utility pursuant to subdivision 6.
The fair combined rate of return on common equity determined earnings on its rates for generation and distribution services, to the entire three successive 12-month test periods ending December 31 immediately preceding the year of the utility's subsequent triennial review filing under subdivision 3 and shall apply to applicable rate adjustment clauses under subdivisions 5 and 6 prospectively from the date the Commission's final order in the triennial review proceeding, Stilizing rate adjustment clause true-up protocols as the Commission in its discretion may determine.
The fair combined rate of return on common equity determined pursuant to subdivision 2 in such triennial review shall apply, for purposes of reviewing the utility's earnings on its rates for generation and distribution services, to the entire three successive 12-month test periods ending December 31 immediately preceding the year of the utility's subsequent triennial review filing under subdivision 3 and shall apply to applicable rate adjustment clauses under subdivisions 5 and prospectively from the date the Commission's final order in the triennial review proceeding, utilizing rate adjustment clause true-up protocols as the Commission in its discretion may determine.
1 9.
9.
If, as a result of a triennial review required under this subsection and conducted with r2spect to any test period or periods under review ending later than December 31, 2010 (or, if the CommissEon has elected to stagger its biennial reviews of utilities as provided in subdivision 1, under reviewRending later than December 31, 2010, for a Phase I Utility, or December 31, 2011, for a Phase II Utility), the Commission finds, with respect to such test period or periods considered as a whole, that (i) any utility points above a fair combined rate of return on its generation and distribution services or, for any test period commencing after December 31, 2012, for a Phase II Utility and after December 31, 2013, for a Phase I Utility, more than 70 basis points above a fair combined rate of return on its generation and distribution services, as determined in subdivision 2, without regard to any return on common equity or other matters determined with respect to facilities described in subdivision 6, and (ii) the total aggregate regulated rates of such utility at the end of the most recently ended 12-month test period exceeded the annual increases in the United States Average Consumer Price Index for all items, all urban consumers (CPI-U), as published by the Bureau of Labor Statistics of the United States Department of Labor, compounded annually, when compared to the total aggregate regulated rates of such utility as that such action is not in the public interest or that the provisions of subdivisions 8 b and c are more consistent with the public interest, direct that any or all earnings for such test period or periods under review, considered as a whole that were more than 50 basis points, or, for any test period commencing after December 31, 2012, for a Phase II Utility and after December 31, 2013, for a Phase I Utility, more than 70 basis points, above such fair combined rate of return shall be credited to customers' bills, in lieu of the provisions of subdivisions 8 b and c, provided that no credits shall be provided pursuant to this subdivision in connection with any triennial review unless such bill credits would be payable pursuant to the provisions of subdivision 8 d, and any credits under this subdivision shall be calculated net of any customer credit reinvestment offset amounts under subdivision 8 d.
If, as a result of a triennial review required under this subsection and conducted with respect to any test period or periods under review ending later than December 31, 2010 (or, if the Commission has elected to stagger its biennial reviews of utilities as provided in subdivision 1, under review ending later than December 31, 2010, for a Phase I Utility, or December 31, 2011, for a Phase II Utility), the Commission finds, with respect to such test period or periods considered as a whole, that (i) any utility has, during the test period or periods under review, considered as a whole, earned more than 50 basis points above a fair combined rate of return on its generation and distribution services or, for any test period commencing after December 31, 2012, for a Phase II Utility and after December 31, 2013, for a Phase I Utility, more than 70 basis points above a fair combined rate of return on its generation and distribution services, as determined in subdivision 2, without regard to any return on common equity or other matters determined with respect to facilities described in subdivision 6, and (ii) the total aggregate regulated rates of such utility at the end of the most recently ended 12-month test period exceeded the annual increases in the United States Average Consumer Price Index for all items, all urban consumers of 14 (CPI-U), as published by the Bureau of Labor Statistics of the United States Department of Labor, compounded annually, when compared to the total aggregate regulated rates of such utility as determined pursuant to the review conducted for the base period, the Commission shall, unless it finds that such action is not in the public interest or that the provisions of subdivisions 8 b and c are more consistent with the public interest, direct that any or all earnings for such test period or periods under review, considered as a whole that were more than 50 basis points, or, for any test period commencing after December 31, 2012, for a Phase II Utility and after December 31, 2013, for a Phase I Utility, more than 70 basis points, above such fair combined rate of return shall be credited to customers' bills, in lieu of the provisions of subdivisions 8 b and c, provided that no credits shall be provided pursuant to this subdivision in connection with any triennial review unless such bill credits would be payable pursuant to the provisions of subdivision 8 d, and any credits under this subdivision shall be calculated net of any customer credit reinvestment offset amounts under subdivision 8 d.
Any such credits shall be amortized subdivision:d among customer classes in the manner provided by subdivision 8 b.
Any such credits shall be amortized and allocated among customer classes in the manner provided by subdivision 8 b.
For purposes of this "Base period" means (i) the test period ending December 31, 2010 (or, if the Commission has elected to stagger its biennial reviews of utilities as provided in subdivision 1, the test period ending December 31, 2010, for a Phase I Utility, or December 31, 2011, for a Phase II Utility), or (ii) the most recent test period with respect to which credits have been applied to customers' bills under the provisions of this subdivision, whichever is later.
For purposes of this subdivision:
"Base period" means (i) the test period ending December 31, 2010 (or, if the Commission has elected to stagger its biennial reviews of utilities as provided in subdivision 1, the test period ending December 31, 2010, for a Phase I Utility, or December 31, 2011, for a Phase II Utility), or (ii) the most recent test period with respect to which credits have been applied to customers' bills under the provisions of this subdivision, whichever is later.
(iii) revisions to the utility's rates pursuant to subdivision 8 applications, as permitted by subsection B, occurring after July 1, 2009;
(iii) revisions to the utility's rates pursuant to subdivision 8 a;
and (v) base rates in effect asse of July 1, 2009.
(iv) revisions to the utility's rates pursuant to the Commission's rules governing utility rate increase applications, as permitted by subsection B, occurring after July 1, 2009;
of 15 10.
and (v) base rates in effect as of July 1, 2009.
10.
(ii) establish a recovery period that best serves ratepayers;
(ii) of 14 establish a recovery period that best serves ratepayers;
The costs incurred by the Pilot Utility a Phase I or Phase II Utility after January 1, 2019, to construct, operate, and maintain transmission lines and associated substations installed the business park electric infrastructure in order to provide service to a business park participating in the pilot program of 15 outlined by this section shall be recovered by the Pilot Utility utility pursuant to a rate adjustment clause approved by the Commission in subdivision A 4 of § 56-585.1.
The costs incurred by the Pilot Utility a Phase I or Phase II Utility after January 1, 2019, to construct, operate, and maintain transmission lines and associated substations installed the business park electric infrastructure in order to provide service to a business park participating in the pilot program outlined by this section shall be recovered by the Pilot Utility utility pursuant to a rate adjustment clause approved by the Commission in subdivision A 4 of § 56-585.1.
E 2.
2.
N outlined by this section is to certify that up to three two petitions per year for each Pilot Utility Phase I and Phase II utility address the eligibility criteria for participation in the pilot program seO forth in § 56-576 and in this section.
For construction of business park electric infrastructure, a utility shall either (i) obtain a an ordinary extension or improvement in the usual course of business or (ii) obtain approval pursuant is to the requirements of § 15.2-2232 and any applicable zoning ordinances by the locality or locaEities in which the business park electric infrastructure will be located.
3.
If the utility seeks a certificate pursuant to subdivision A 1 of § 56-265.2, the Commission shall issue its decision on the expedited certificate infrastructure shall be satisfied if the business park to be served is approved for the program by the Virginia Economic Development Partnership.
The role of the Virginia Economic Development Partnership in conducting the pilot program outlined by this section is to certify that up to three two petitions per year for each Pilot Utility Phase I and Phase II utility address the eligibility criteria for participation in the pilot program set forth in § 56-576 and in this section.
4.
For construction of business park electric infrastructure, a utility shall either (i) obtain a certificate from the Commission pursuant to subdivision A 1 of § 56-265.2, unless such infrastructure is an ordinary extension or improvement in the usual course of business or (ii) obtain approval pursuant to the requirements of § 15.2-2232 and any applicable zoning ordinances by the locality or localities in which the business park electric infrastructure will be located.
If the utility seeks a certificate pursuant to subdivision A 1 of § 56-265.2, the Commission shall issue its decision on the expedited certificate application no later than six months from the date of filing.
The need for any business park electric infrastructure shall be satisfied if the business park to be served is approved for the program by the Virginia Economic Development Partnership.
That the State Corporation Commission shall institute a rulemaking proceeding by September 1, 2023, to allow for the establishment of requirements for applications and expedited certificates are submitted for the construction of business park electric infrastructure pursuant toons thatS § 56-585.1:10 of the Code of Virginia, as amended by this act.
That the State Corporation Commission shall institute a rulemaking proceeding by September 1, 2023, to allow for the establishment of requirements for applications and expedited certificates and the timeline for Department of Environmental Quality staff to review such applications that are submitted for the construction of business park electric infrastructure pursuant to § 56-585.1:10 of the Code of Virginia, as amended by this act.
B 3.
3.
2 E R
View plain text versions (4)

Action History

  1. Acts of Assembly Chapter text (CHAP0705)

  2. Approved by Governor-Chapter 705 (effective 7/1/23)

  3. Governor's Action Deadline 11:59 p.m., March 27, 2023

  4. Enrolled Bill Communicated to Governor on March 2, 2023

  5. Impact statement from SCC (SB1420ER)

  6. Signed by President

  7. Signed by Speaker

  8. Bill text as passed Senate and House (SB1420ER)

  9. Enrolled

  10. VOTE: Block Vote Passage (99-Y 0-N)

  11. Passed House BLOCK VOTE (99-Y 0-N)

  12. Read third time

  13. Read second time

  14. Reported from Commerce and Energy (20-Y 0-N)

  15. Referred to Committee on Commerce and Energy

  16. Read first time

  17. Placed on Calendar

  18. Passed Senate (39-Y 0-N)

  19. Constitutional reading dispensed (39-Y 0-N)

  20. Engrossed by Senate - committee substitute SB1420S1

  21. Committee substitute agreed to 23104668D-S1

  22. Reading of substitute waived

  23. Read second time

  24. Constitutional reading dispensed (38-Y 0-N)

  25. Reported from Finance and Appropriations (16-Y 0-N)

  26. Committee substitute printed 23104668D-S1

  27. Rereferred to Finance and Appropriations

  28. Reported from Commerce and Labor with substitute (13-Y 0-N)

  29. Impact statement from SCC (SB1420)

  30. Senate subcommittee amendments and substitutes offered

  31. Senate subcommittee amendments and substitutes offered

  32. Assigned C&L sub: Energy

  33. Referred to Committee on Commerce and Labor

  34. Prefiled and ordered printed; offered 01/11/23 23102041D

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 147 not signed on

Sponsors (1)

Co-sponsors (0)

None.

Not signed on (147)

147 members have not signed on to this bill.

Show all 147 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors SB 1420?
SB 1420 is sponsored by Todd E. Pillion.
What is the current status of SB 1420?
This bill has been enacted into law. Introduced January 11, 2023. Enacted.
Where can I track SB 1420?
Track SB 1420 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 1420

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 1420

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →