Virginia 2022 Regular Session Status: Passed House Of Delegates

HB 74 — Va. Clean Economy Act; non-bypassable charges, energy-intensive trade-exposed (EITE) industries.

Last action — Passed by indefinitely in Commerce and Labor (12-Y 2-N)

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. 3
    Passed House of Delegates
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill died with 2022 Regular Session. It reached “Passed House of Delegates” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Summary

Virginia Clean Economy Act; non-bypassable charges; energy-intensive trade-exposed (EITE) industries. Defines EITE industries as companies that are constrained in their ability to pass through carbon costs due to international competition, companies that engage in importation of products that cause emission leakage, and critical infrastructure facilities identified by certain federal agencies. The bill directs the State Corporation Commission to establish an EITE customer exemption pilot program for non-bypassable charges in certain provisions of the Virginia Clean Economy Act related to generation of electricity from renewable and zero carbon sources and development of offshore wind capacity. The EITE Pilot Program shall commence no later than January 1, 2023, and shall have an initial aggregate customer load of 2,000 megawatts based on each participating customer's load during the previous calendar year. The State Corporation Commission shall also submit a report on the status of the EITE Pilot Program by March 31, 2024.

Bill Text

What changed in the latest version

714 added · 710 removed

Plain-language change summary

The latest version of Bill HB 74 has made some key amendments to the definitions related to electric utilities and aggregators. It replaces the term "affiliate" with a focus on "electric utility," while also clarifying what does not qualify a person as an aggregator. These changes are significant because they aim to refine the regulations governing the electric energy market, which could impact how companies buy and sell electricity, especially for businesses that are heavily reliant on energy resources. This clarification helps ensure that there is a clear understanding of roles in electricity transactions, potentially fostering a more competitive and fair marketplace.

→
Previous
Latest
SESSION INTRODUCED 22101105D I HOUSE BILL NO.
SESSION HOUSE SUBSTITUTE 22105904D HOUSE BILL NO.
74 Offered January 12, 2022 N Prefiled January 4, 2022 T A BVirginia Clean Economy Act;
74 AMENDMENT IN THE NATURE OF A SUBSTITUTE (Proposed by the House Committee on Commerce and Energy on February 8, 2022) (Patron Prior to Substitute––Delegate Ware) A BILL to amend and reenact §§ 56-576, 56-585.1:11, and 56-585.5 of the Code of Virginia, relating to Be it enacted by the General Assembly of Virginia:;
non-bypassable charges;
energy-intensive trade-exposed industries.
energy-intensive trade-exposed industrieR.g to –––––––––– Patron––Ware O –––––––––– D Referred to Committee on Commerce and Energy –––––––––– U Be it enacted by the General Assembly of Virginia:
1.
C 1.
That §§ 56-576, 56-585.1:11, and 56-585.5 of the Code of Virginia are amended and reenacted as follows:
That §§ 56-576, 56-585.1:11, and 56-585.5 of the Code of Virginia are amended and reenacted as fol§ 56-576.
§ 56-576.
E As used in this chapter:
As used in this chapter:
D "Affiliate" means any person that controls, is controlled by, or is under common control with an electric utility.
electric utility.ans any person that controls, is controlled by, or is under common control witH an "Aggregator" means a person that, as an agent or intermediary, (i) offers to purchase, or purchases, electric energy or (ii) offers to arrange for, or arranges for, the purchase of electric energy, for sale to, or on behalf of, two or more retail customers not controlled by or under common control with such person.
"Aggregator" means a person that, as an agent or intermediary, (i) offers to purchase, or purchases, electric energy or (ii) offers to arrange for, or arranges for, the purchase of electric energy, for sale to, or on behalf of, two or more retail customers not controlled by or under common control with such person.
The following activities shall not, in and of themselves, make a person an aggregator under this chapter:
The following activities shall not, in and of themselves, make a person an aggregator under this furnishing educational, informational, or analytical services to two or more retail customers, unless direct or indirect compensation for such services is paid by an aggregator or supplier of electric energy;
(i) furnishing legal services to two or more retail customers, suppliers or aggregators;
(iii) furnishing educational, informational, or analytical services to two or more suppliers or aggre4ators;
(ii) or indirect compensation for such services is paid by an aggregator or supplier of electric energy;
(iii)ect furnishing educational, informational, or analytical services to two or more suppliers or aggreEators;
and (vi) engaging in actions of a retail customer, in common with one or more other such retail customers, to issue a request for proposal or to negotiate a purchase of electric energy for consumption by such retail customers.
and (vi) engaging in actions of a retail customer, in common with one or more other such retail customers, to issue a request for proposal or to negotiate a purchase of electric energy for consumption by such retail custoSers.
(Expires December 31, 2023) "Business park" means a land development containing a minimum of Business Ready Sites Program that is developed and constructed by an industrial development authority, or a similar political subdivision of the Commonwealth created pursuant to § 15.2-4903 or other act of the General Assembly, in order to promote business development and that is located in an area of the Commonwealth designated as a qualified opportunity zone by the U.S.
100 contiguous acres classified as a Tier 4 site under the Virginia Economic Development Partnership's Business Ready Sites Program that is developed and constructed by an industrial development authority, or a similar political subdivision of the Commonwealth created pursuant to § 15.2-4903 or other act of the General Assembly, in order to promote business development and that is located in an area oS the Commonwealth designated as a qualified opportunity zone by the U.S.
Secretary of the Treasury via his :
Secretary of the Treasury vTa his del"Combined heat and power" means a method of using waste heat from electrical generation to offset traditional processes, space heating, air conditioning, or refrigeration.
35 delegation of authority to the Internal Revenue Service.
I 36 "Commission" means the State Corporation Commission.
36 "Combined heat and power" means a method of using waste heat from electrical generation to offset 37 traditional processes, space heating, air conditioning, or refrigeration.
T 37 "Community in which a majority of the population are people of color" means a U.S.
38 "Commission" means the State Corporation Commission.
Census tract 38 where more than 50 percent of the population comprises individuals who identify as belonging to one or 39 more of the following groups:
where more than 50 percent of the population comprises individuals who identify as belonging to one or more of the following groups:
Black, African American, Asian, Pacific Islander, Native AmericanT other non"Cooperative" means a utility formed under or subject to Chapter 9.1 (§ 56-231.15 et seq.).
Black, African American, Asian, Pacific Islander, Native American, other non-white race, mixed race, Hispanic, Latino, or linguistically isolated.
E "Covered entity" means a provider in the Commonwealth of an electric service not subject to competition but does not include default service providers.
"Cooperative" means a utility formed under or subject to Chapter 9.1 (§ 56-231.15 et seq.).
"Covered entity" means a provider in the Commonwealth of an electric service not subject to competition but does not include default service providers.
"Customer choice" means the opportunity for a retail customer in the Commonwealth to purchase electric energy from any supplier licensed and seeking to sell electric energy to that customer.
"Customer choice" means the opportunity for a retail customer in the Commonwealth to purchasH electric energy from any supplier licensed and seeking to sell electric energy to that customerB "Demand response" means measures aimed at shifting time of use of electricity from peak-use 4 periods to times of lower demand by inducing retail customers to curtail electricity usage duri1g periods of "Distribute," "distributing," or "distribution of" electric energy means the transfer of electric energy through a retail distribution system to a retail customer.
"Demand response" means measures aimed at shifting time of use of electricity from peak-use periods to times of lower demand by inducing retail customers to curtail electricity usage during periods of congestion and higher prices in the electrical grid.
"Distributor" means a person owning, controlling, or operating a retail distribution system to provide electric energy directly to retail customers.
"Distribute," "distributing," or "distribution of" electric energy means the transfer of electric energy thr"Distributor" means a person owning, controlling, or operating a retail distribution system to provide HB74 2 of 13 electric energy directly to retail customers.
"Electric distribution grid transformation project" means a project associated with electric distribution infrastructure, including related data analytics equipment, that is designed to accommodate or facilitate HB74H1 2 of 13 the integration of utility-owned or customer-owned renewable electric generation resources with the utility's electric distribution grid or to otherwise enhance electric distribution grid reliability, electric distribution grid security, customer service, or energy efficiency and conservation, including advanced metering infrastructure;
"Electric distribution grid transformation project" means a project associated with electric distribution infrastructure, including related data analytics equipment, that is designed to accommodate or facilitate the integration of utility-owned or customer-owned renewable electric generation resources with the utility's electric distribution grid or to otherwise enhance electric distribution grid reliability, electric distribution grid security, customer service, or energy efficiency and conservation, including advanced metering infrastructure;
Such determination shall include an analysis of all four tests, and a program or portfolio of programs shall be approved if the net present value of the benefits exceeds the net present value of the costs as determined by not less than any three of 13 of the four tests.
Such determination shall include an analysis of all four tests, and a program or portfolio of programs shall be approved if the net present value of the benefits exceeds the net present value of the costs as determined by not less than any three of the four tests.
If the Commission determines that an energy efficiency program or portfolio of programs is not in the public interest, its final order shall include all work product and analIsis conducted by the Commission's staff in relation to that program, including testimony relied upoN by the proposed budget for a program or portfolio of programs, its final order shall include an analysis of the impact such budget reduction has upon the cost-effectiveness of such program or portfolio of programs.
If the Commission determines that an energy efficiency program or portfolio of programs is not in the public interest, its final order shall include all work product and analysis conducted by the Commission's staff in relation to that program, including testimony relied upon by the of 13 proposed budget for a program or portfolio of programs, its final order shall include an analysis of the impact such budget reduction has upon the cost-effectiveness of such program or portfolio of programs.
An order by the Commission (a) finding that a program or portfolio of programs is not in the puRlic interest or (b) reducing the proposed budget for any program or portfolio of programs shall adhere to existing protocols for extraordinarily sensitive information.
An order by the Commission (a) finding that a program or portfolio of programs is not in the public interest or (b) reducing the proposed budget for any program or portfolio of programs shall adhere to existing protocols for extraordinarily sensitive information.
In addition, an energy efficiency program may be deemed to be "in the public interest" if the program (1) provides measurable and verifiaDle energy savings to low-income customers or elderly customers or (2) is a pilot program of limited scope, technology would be cost-effective.d to determine whether a new or substantially revised prograU or "Low-income geographic area" means any locality, or community within a locality, that has a median household income that is not greater than 80 percent of the local median household income, or aEy area in the Commonwealth designated as a qualified opportunity zone by the U.S.
In addition, an energy efficiency program energy savings to low-income customers or elderly customers or (2) is a pilot program of limited scope, cost, and duration, that is intended to determine whether a new or substantially revised program or technology would be cost-effective.
Secretary of the Treasury via his delegation of authority to the Internal Revenue Service.
"Low-income geographic area" means any locality, or community within a locality, that has a median household income that is not greater than 80 percent of the local median household income, or any area via his delegation of authority to the Internal Revenue Service.y the U.S.
D "Low-income utility customer" means any person or household whose income is no more than 80 percent of the median income of the locality in which the customer resides.
Secretary of the Treasury "Low-income utility customer" means any person or household whose income is no more than 80 percent of the median income of the locality in which the customer resides.
The median income of the loc"Measured and verified" means a process determined pursuant to methods accepted for use by utilities and industries to measure, verify, and validate energy savings and peak demand savings.
The median income of the locality is determined by the U.S.
This may include the protocol established by the United States Department of Energy, Office of Federal Energy Management Programs, Measurement and Verification Guidance for Federal Energy Projects, measurement and verification standards developed by the American Society of Heating, RefrigeratHon and Air Conditioning Engineers (ASHRAE), or engineering-based estimates of energy and demand 7 savings associated with specific energy efficiency measures, as determined by the Commission.
Department of Housing and Urban Development.
4 Commonwealth.ity" means a city, county, town, authority, or other political subdivision of the "New underground facilities" means facilities to provide underground distribution service.
"Measured and verified" means a process determined pursuant to methods accepted for use by O may include the protocol established by the United States Department of Energy, Office of FederUl This Energy Management Programs, Measurement and Verification Guidance for Federal Energy Projects, measurement and verification standards developed by the American Society of Heating, RefrigeratSon and Air Conditioning Engineers (ASHRAE), or engineering-based estimates of energy and demand savings associated with specific energy efficiency measures, as determined by the Commission.
"New underground facilities" includes underground cables with voltages of 69 kilovolts or less, pad-mounted devices, connections at customer meters, and transition terminations from existing overhead distribution sources.
E Commonwealth.ity" means a city, county, town, authority, or other political subdivision of the "New underground facilities" means facilities to provide underground distribution service.
"Peak-shaving" means measures aimed solely at shifting time of use of electricity from peak-use periods to times of lower demand by inducing retail customers to curtail electricity usage during periods of "Percentage of Income Payment Program (PIPP) eligible utility customer" means any person or household whose income does not exceed 150 percent of the federal poverty level.
"New underground facilities" includes underground cables with voltages of 69 kilovolts or less, pad-Sounted devices, connections at customer meters, and transition terminations from existing overhead distribution sources.
"Person" means any individual, corporation, partnership, association, company, business, trust, joint venture, or other private legal entity, and the Commonwealth or any municipality.
U periods to times of lower demand by inducing retail customers to curtail electricity usage during periods of congestion and higher prices in the electrical grid.
"Previously developed project site" means any property, including related buffer areas, if any, that has been previously disturbed or developed for non-single-family residential, non-agricultural, or non-silvicultural use, regardless of whether such property currently is being used for any purpose.
S "Percentage of Income Payment Program (PIPP) eligible utility customer" means any person or household whose income does not exceed 150 percent of the federal poverty level.
has been previously used (i) for a retail, commercial, or industrial purpose;
T "Person" means any individual, corporation, partnership, association, company, business, truIt, joint ven"Previously developed project site" means any property, including related buffer areas, if any, that has been previously disturbed or developed for non-single-family residential, non-agricultural, or non-silvicultural use, regardless of whether such property currently is being used for any purpose.
Show all 128 changed rows (88 more)
Previous
Latest
"Previously developed project site" includes a brownfield as defined in § 10.1-1230 or any parcTl that has been previously used (i) for a retail, commercial, or industrial purpose;
(iii) as the site of a parking lot canopy or structure;
(iii) as that took place before August 3, 1977, or any lands upon which extraction activities have been permittedng by the Department of Energy under Title 45.2;
(iv) for mining, which is any lands affected by coal mining that took place before August 3, 1977, or any lands upon which extraction activities have been permitted by the Department of Energy under Title 45.2;
"Renewable energy" also includes the proportion of the thermal or electric energy from a facility that results from the co-firing of biomass.
"Renewable energy" also includes the proportion Bf the thermal or electric energy from a facility that results from the co-firing of biomass.
"Renewable energy" does not include waste heat from fossil-fired facilities or electricity generated from pumped storage but includes run-of-river generation from a combined pumped-storage and run-of-river facility.
"Renewab4e energy" does not include waste heat from fossil-fired facilities or electricity generated from pumped s1orage but inc"Renewable thermal energy" means the thermal energy output from (i) a renewable-fueled combined heat and power generation facility that is (a) constructed, or renovated and improved, after January 1, 2012, (b) located in the Commonwealth, and (c) utilized in industrial processes other than the combined heat and power generation facility or (ii) a solar energy system, certified to the OG-100 standard of the Solar Ratings and Certification Corporation or an equivalent certification body, that (a) is constructed, or renovated and improved, after January 1, 2013, (b) is located in the Commonwealth, and (c) heats water HB74H1 4 of 13 or air for residential, commercial, institutional, or industrial purposes.
"Renewable thermal energy" means the thermal energy output from (i) a renewable-fueled combined 2012, (b) located in the Commonwealth, and (c) utilized in industrial processes other than the combined HB74 4 of 13 heat and power generation facility or (ii) a solar energy system, certified to the OG-100 standard of the Solar Ratings and Certification Corporation or an equivalent certification body, that (a) is constructed, or renovated and improved, after January 1, 2013, (b) is located in the Commonwealth, and (c) heats water or air for residential, commercial, institutional, or industrial purposes.
"Control" means the legal right, directly or indirectly, to direct or cause the direction of the of 13 management, actions, or policies of an affiliated entity, whether through the ability to exercise voting power, by contract, or otherwise.
"Control" means the legal right, directly or indirectly, to direct or cause the direction of the management, actions, or policies of an affiliated entity, whether through the ability to exercise voting power, by contract, or otherwise.
"Control" does not include control of an entity through a fraIchise or similar contractual agreement.
"Control" does not include control of an entity through a franchise or similar contractual agreement.
N general supplier, (i) whose peak demand during the most recent calendar year exceeded five megawattsof and (ii) that contracts with the utility to directly procure electric supply and environmental attributes associated with the offshore wind facility in amounts commensurate with the customer's electricRusage for a contract period of 15 years or more.
of 13 general supplier, (i) whose peak demand during the most recent calendar year exceeded five megawattsof and (ii) that contracts with the utility to directly procure electric supply and environmental attributes associated with the offshore wind facility in amounts commensurate with the customer's electric usage for a contract period of 15 years or more.
In order to meet the Commonwealth's clean energy goals, prior to December 31, 2034, the O construction or purchase by a public utility of one or more offshore wind generation facilitiesDlocated off the Commonwealth's Atlantic shoreline or in federal waters and interconnected directly into the Commission shall so find, provided that no customers of the utility shall be responsible for costs of any such facility in a proportion greater than the utility's share of the facility.
In order to meet the Commonwealth's clean energy goals, prior to December 31, 2034, the the Commonwealth's Atlantic shoreline or in federal waters and interconnected directly into the located off Commonwealth, with an aggregate capacity of up to 5,200 megawatts, is in the public interest and the Commission shall so find, provided that no customers of the utility shall be responsible for costs of any such facility in a proportion greater than the utility's share of the facility.
C C.
C.
Pursuant to subsection B, construction by a Phase II Utility of one or more new utilitE-owned and utility-operated generating facilities utilizing energy derived from offshore wind and located off the Commonwealth's Atlantic shoreline, with an aggregate rated capacity of not less than 2,500 megawatts and not more than 3,000 megawatts, along with electrical transmission or distribution facilities associated therewith for interconnection is in the public interest.
Pursuant to subsection B, construction by a Phase II Utility of one or more new utility-owned Commonwealth's Atlantic shoreline, with an aggregate rated capacity of not less than 2,500 megawattsff the and not more than 3,000 megawatts, along with electrical transmission or distribution facilities associated therewith for interconnection is in the public interest.
In acting upon any request for cost recovery by a reasonableness and prudence of any such costs, provided that such costs shall be presumed to be reasonably and prudently incurred if the Commission determines that (i) the utility has complied with the competitive solicitation and procurement requirements pursuant to subsection E;
In acting upon any request for cost recovery by a Phase II Utility for costs associated with such a facility, the Commission shall determine the reasonableness and prudence of any such costs, provided that such costs shall be presumed to beO the competitive solicitation and procurement requirements pursuant to subsection E;
(ii) the project's projected total levelized cost of energy, including any tax credit, on a cost per megawatt hour basis, inclusive of the costs of transmission and distribution facilities associated with the facilityHs interconnection, does not exceed 1.4 times the comparable cost, on an unweighted average basis,7of a conventional simple cycle combustion turbine generating facility as estimated by the U.S.
(ii) the prUject's projected total levelized cost of energy, including any tax credit, on a cost per megawatt hour basis, inclusive of the costs of transmission and distribution facilities associated with the facilitySs interconnection, does not exceed 1.4 times the comparable cost, on an unweighted average basis, of a conventional simple cycle combustion turbine generating facility as estimated by the U.S.
Energ4 construction of such facilities for U.S.
EnergE construction of such facilities for U.S.
The Commission shall disallow costs, or any portion thereof, only if they are otherwise unreasonably and imprudently incurred.
The Commission shall disallow costs, or any portion thereof, only if they are otherwise unreasonably and imprudently incurredS In its review, the Commission shall give due consideration to (a) the Commonwealth's renewable portfolio standards and carbon reduction requirements, (b) the promotion of new renewable generation resoUrces, investments and job creation.ent benefits of the project for the Commonwealth, including capitaB 2.
In its review, the Commission shall give due consideration to (a) the Commonwealth's renewable portfolio standards and carbon reduction requirements, (b) the promotion of new renewable generation resources, and (c) the economic development benefits of the project for the Commonwealth, including capital investments and job creation.
Notwithstanding the provisions of § 56-585.1, the Commission shall not grant an enhanced Sate of return to a Phase II Utility for the construction of one or more new utility-owned and utility-operated generating facilities utilizing energy derived from offshore wind and located off the Commonwealth's Atlantic shoreline pursuant to this section.
return to a Phase II Utility for the construction of one or more new utility-owned and utility-operated generating facilities utilizing energy derived from offshore wind and located off the Commonwealth's Atlantic shoreline pursuant to this section.
I 6 of § 56-585.1 shall be allocated to all customers of the utility in the Commonwealth as adivision A non-bypassable charge, regardless of the generation supplier of any such customer, other than (i) PIPP eligible utility customers, (ii) advanced clean energy buyers, (iii) energy-intensive trade-exposed industries, and (iii) (iv) qualifying large general service customers.
3.
No electric cooperative Tustomer of the utility shall be assigned, nor shall the utility collect from any such cooperative, any of the costs of interconnection.
Any such costs proposed for recovery through a rate adjustment clause pursuant to subdivision A 6 of § 56-585.1 shall be allocated to all customers of the utility in the Commonwealth as a non-bypassable charge, regardless of the generation supplier of any such customer, other than (i) PIPP eligible utility customers, (ii) advanced clean energy buyers, (iii) energy-intensive trade-exposed the utility shall be assigned, nor shall the utility collect from any such cooperative, any of the costs of such facilities, including electrical transmission or distribution facilities associated therewith for interconnection.
The Commission may promulgate such rules, regulations, or other directives necessaryr to administer the eligibility for these exemptions.
The Commission may promulgate such rules, regulations, or other directives necessary to administer the eligibility for these exemptions.
The Commission shall permit a portion of the nameplate capacity of any such facility, in the aggregate, to be allocated to (i) advanced clean energy buyers or (ii) qualifying large general service customers, provided that no more than 10 percent of the offshore wind facility's capacity is allocated to of a special contract with any advanced clean energy buyer, or any special rate applicable to qualifyingl large general service customers, pursuant to § 56-235.2, no later than 15 months prior to the projected commercial operation date of the facility, and all customer enrollments associated with such special contracts or rates shall be completed prior to commercial operation of the facility.
The Commission shall permit a portion of the nameplate capacity of any such facility, in the aggregate, to be allocated to (i) advanced clean energy buyers or (ii) qualifying large general service customers, provided that no more than 10 percent of the offshore wind facility's capacity is allocated to of a special contract with any advanced clean energy buyer, or any special rate applicable to qualifyingl large general service customers, pursuant to § 56-235.2, no later than 15 months prior to the projected commercial operation date of the facility, and all customer enrollments associated with such spBcial contracts or rates shall be completed prior to commercial operation of the facility.
Any such special contract or rate may include provisions for levelized rates of service over the duration of the customer's contracted agreement with the utility, and the Commission shall determine that such special contract or rate is designed to hold nonparticipating customers harmless over its term in connection with any rates in connection with any petition for approval of a rate adjustment clause pursuant to subdivision A HB74 6 of 13 6 of § 56-585.1 to recover the costs of the facility, and the Commission shall rule upon any such petitions in its final order in such proceeding within nine months from the date of filing.
Any such s4ecial contract or rate may include provisions for levelized rates of service over the duration of the1customer's rate is designed to hold nonparticipating customers harmless over its term in connection with anyact or petition for approval by the utility.
The utility may petition for approval of such special contracts or rates in connection with any petition for approval of a rate adjustment clause pursuant to subdivision A 6 of § 56-585.1 to recover the costs of the facility, and the Commission shall rule upon any such petitions in its final order in such proceeding within nine months from the date of filing.
In constructing any such facility contemplated in subsection B, the utility shall develop and submit a plan to the Commission for review that includes the following considerations:
In constructing any such facility contemplated in subsection B, the utility shall develop and HB74H1 6 of 13 submit a plan to the Commission for review that includes the following considerations:
of 13 "Zero-carbon electricity" means electricity generated by any generating unit that does not emit carbon dioxide as a by-product of combusting fuel to generate electricity.
"Zero-carbon electricity" means electricity generated by any generating unit that does not emit carbon dioxide as a by-product of combusting fuel to generate electricity.
I B.
B.
By December 31, 2024, except for any coal-fired electric generating units (i) jointly Nwned of the Commonwealth that co-fires with biomass, any Phase I and Phase II Utility shall retire alleld region generating units principally fueled by oil with a rated capacity in excess of 500 megawatts and all coal-fired electric generating units operating in the Commonwealth.
By December 31, 2024, except for any coal-fired electric generating units (i) jointly owned of 13 of the Commonwealth that co-fires with biomass, any Phase I and Phase II Utility shall retire alleld region generating units principally fueled by oil with a rated capacity in excess of 500 megawatts and all coal-fired electric generating units operating in the Commonwealth.
R 2.
2.
O 3.
located in the Commonwealth that emit carbon as a by-product of combusting fuel to generateerating units electricity.
By December 31, 2045, each Phase I and II Utility shall retire all other electric generatDng units located in the Commonwealth that emit carbon as a by-product of combusting fuel to generate ele4.
4.
The Commission shall consider in-state and regional transmission entity resourcesEand shall evaluate the reliability of each proposed retirement on a case-by-case basis in ruling upon any such petition.
The Commission shall consider in-state and regional transmission entity resources and petition.luate the reliability of each proposed retirement on a case-by-case basis in ruling upon any such C.
D C.
Each Phase I and Phase II Utility shall participate in a renewable energy portfolio standard program (RPS Program) that establishes annual goals for the sale of renewable energy to all retail customers in the utility's service territory, other than accelerated renewable energy buyers pursuant to subsection G, regardless of whether such customers purchase electric supply service from the utility or Utility shall procure and retire Renewable Energy Certificates (RECs) originating from renewablU energy standard eligible sources (RPS eligible sources).
Each Phase I and Phase II Utility shall participate in a renewable energy portfolio standard program (RPS Program) that establishes annual goals for the sale of renewable energy to all retail subsection G, regardless of whether such customers purchase electric supply service from the utility oro from suppliers other than the utility.
For purposes of complying with the RPS Program from 2021 to 2024, a Phase I and Phase II Utility may use RECs from any renewable energy facility, aS defined in § 56-576, provided that such facilities are located in the Commonwealth or are physically located within the PJM Interconnection, LLC (PJM) region.
To comply with the RPS Program, each Phase I and Phase II Utility shall procure and retire Renewable Energy Certificates (RECs) originating from renewable energy standard eligible sources (RPS eligible sources).
However, at no time during this perioE or renewable thermal energy equivalent, (iii) biomass-fired facilities that are outside the Commonwealth, or (iv) biomass-fired facilities operating in the Commonwealth as of January 1, 2020, that supply 10 percent or more of their annual net electrical generation to the electric grid or more than 15 Sercent of their annual total useful energy to any entity other than the manufacturing facility to which the generating source is interconnected.
For purposes of complying with the RPS Program from 2021 to 2024, a Phase I and Phase II Utility may use RECs from any renewable energy facility, aH defined in § 56-576, provided that such facilities are located in the Commonwealth or are physi7ally located within the PJM Interconnection, LLC (PJM) region.
From compliance year 2025 and all years after, each Phase U and PhaIn order to qualify as RPS eligible sources, such sources must be (a) electric-generating resources that generate electric energy derived from solar or wind located in the Commonwealth or off theS Commonwealth's Atlantic shoreline or in federal waters and interconnected directly into the Commonwealth or physically located within the PJM region;
However, at no time during this perio4 or renewable thermal energy equivalent, (iii) biomass-fired facilities that are outside the Commonwealth, or (iv) biomass-fired facilities operating in the Commonwealth as of January 1, 2020, that supply 10 percent or more of their annual net electrical generation to the electric grid or more than 15 percent of their annual total useful energy to any entity other than the manufacturing facility to which the generating source is interconnected.
(b) falling water resources located in the Commonwealth or physically located within the PJM region that were in operation as of January 1I entered into a contract prior to January 1, 2020, to purchase the energy, capacity, and renewablehas attributes of such falling water resources;
From compliance year 2025 and all years after, each Phase I and Phase II Utility may only use RECs from RPS eligible sources for compliance with the RPS Program.
(c) non-utility-owned resources from falling water that (1) are less than 65 megawatts, (2) began commercial operation after December 31, 1979, or (3) added U incremental generation representing greater than 50 percent of the original nameplate capacity Tfter December 31, 1979, provided that such resources are located in the Commonwealth or are physically the Commonwealth and in operation as of January 1, 2020, provided that such resources do not usecated in waste heat from fossil fuel combustion or forest or woody biomass as fuel;
In order to qualify as RPS eligible sources, such sources must be (a) electric-generating resources Commonwealth's Atlantic shoreline or in federal waters and interconnected directly into the the Commonwealth or physically located within the PJM region;
(b) falling water resources located in the Commonwealth or physically located within the PJM region that were in operation as of January 1, 2020, that are owned by a Phase I or Phase II Utility or for which a Phase I or Phase II Utility has entered into a contract prior to January 1, 2020, to purchase the energy, capacity, and renewable attributes of such falling water resources;
(c) non-utility-owned resources from falling water that (1) are less than 65 megawatts, (2) began commercial operation after December 31, 1979, or (3) added December 31, 1979, provided that such resources are located in the Commonwealth or are physicallyter located within the PJM region;
(d) waste-to-energy or landfill gas-fired generating resources located in the Commonwealth and in operation as of January 1, 2020, provided that such resources do not use waste heat from fossil fuel combustion or forest or woody biomass as fuel;
however, in no year may any RPS eligible source using biomass sell RECs in excess of the actual megawatt-hours of electricity generated by such facility that year.
however, in no year may any RPS eligible source using biomass sell RECs in excess of the actualB megawatt-hours of electricity generated by such facility that year.
In order to comply with the RPS Program, each Phase I and Phase II Utility may use and retire the environmental attributes associated with any existing owned or contracted solar, wind, or falling water electric generating resources in operation, or proposed for operation, in the Commonwealth or physically located within the PJM region, January 1, 2020, provided such renewable attributes are verified as RECs consistent with the PJM-EIS of HB74 8 of 13 Generation Attribute Tracking System.
In order to comply with the4RPS Program, each Phase I and Phase II Utility may use and retire the environmental attributes asso1iated operation, or proposed for operation, in the Commonwealth or physically located within the PJM region, with such resource qualifying as a Commonwealth-located resource for purposes of this subsection, as of January 1, 2020, provided such renewable attributes are verified as RECs consistent with the PJM-EIS Generation Attribute Tracking System.
Phase I Utilities Phase II Utilities Year RPS Program Year RPS Program Requirement Requirement 2021 6% 2021 14% 2022 7% 2022 17% 2023 8% 2023 20% 2024 10% 2024 23% 2025 14% 2025 26% 2026 17% 2026 29% 2027 20% 2027 32% 2028 24% 2028 35% 2029 27% 2029 38% 2030 30% 2030 41% 2031 33% 2031 45% 2032 36% 2032 49% 2033 39% 2033 52% 2034 42% 2034 55% 2035 45% 2035 59% 2036 53% 2036 63% 2037 53% 2037 67% 2038 57% 2038 71% 2039 61% 2039 75% 2040 65% 2040 79% 2041 68% 2041 83% 2042 71% 2042 87% 2043 74% 2043 91% 2044 77% 2044 95% 2045 80% 2045 and thereafter 100% 2046 84% 2047 88% 2048 92% 2049 96% 2050 and thereafter 100% A Phase II Utility shall meet one percent of the RPS Program requirements in any given compliance year with solar, wind, or anaerobic digestion resources of one megawatt or less located in the Commonwealth, with not more than 3,000 kilowatts at any single location or at contiguous locations owned by the same entity or affiliated entities and, to the extent that low-income qualifying projects are available, then no less than 25 percent of such one percent shall be composed of low-income qualifying projects.
HB74H1 8 of 13 Phase I Utilities Phase II Utilities Year RPS Program Year RPS Program Requirement Requirement 2021 6% 2021 14% 2022 7% 2022 17% 2023 8% 2023 20% 2024 10% 2024 23% 2025 14% 2025 26% 2026 17% 2026 29% 2027 20% 2027 32% 2028 24% 2028 35% 2029 27% 2029 38% 2030 30% 2030 41% 2031 33% 2031 45% 2032 36% 2032 49% 2033 39% 2033 52% 2034 42% 2034 55% 2035 45% 2035 59% 2036 53% 2036 63% 2037 53% 2037 67% 2038 57% 2038 71% 2039 61% 2039 75% 2040 65% 2040 79% 2041 68% 2041 83% 2042 71% 2042 87% 2043 74% 2043 91% 2044 77% 2044 95% 2045 80% 2045 and thereafter 100% 2046 84% 2047 88% 2048 92% 2049 96% 2050 and thereafter 100% A Phase II Utility shall meet one percent of the RPS Program requirements in any given compliance year with solar, wind, or anaerobic digestion resources of one megawatt or less located in the Commonwealth, with not more than 3,000 kilowatts at any single location or at contiguous locations owned by the same entity or affiliated entities and, to the extent that low-income qualifying projects are available, then no less than 25 percent of such one percent shall be composed of low-income qualifying projects.
Costs associated with the purchase of energy, capacity, or environmental attributes from facilities owned by the persons other than the utility required by this subsection shall be recovered by the utility either through its rates for generation and distribution services or pursuant to § of 13 56-249.6.
Costs associated with the purchase of energy, capacity, or environmental attributes from facilities owned by the persons other than the utility required by this subsection shall be recovered by the utility either through its rates for generation and distribution services or pursuant to § 56-249.6.
Each Phase I Utility shall petition the Commission for necessary approvals to construct, Icquire, or enter into agreements to purchase the energy, capacity, and environmental attributes of 600 Negawatts of a.
Each Phase I Utility shall petition the Commission for necessary approvals to construct, acquire, or enter into agreements to purchase the energy, capacity, and environmental attributes of 600 megawatts of 13 of a.
By December 31, 2023, each Phase I Utility shall petition the Commission for necessary approvals to construct, acquire, or enter into agreements to purchase the energy, capacity, and environmental attributes of at least 200 megawatts of generating capacity located in the Commonwealth using eRergy derived from sunlight or onshore wind, and 35 percent of such generating capacity procured shall be from the purchase of energy, capacity, and environmental attributes from solar or onshore wind facilities owned by persons other than the utility, with the remainder, in the aggregate, being from constDuction or acquisition by such Phase I Utility.
By December 31, 2023, each Phase I Utility shall petition the Commission for necessary approvals to construct, acquire, or enter into agreements to purchase the energy, capacity, and environmental attributes of at least 200 megawatts of generating capacity located in the Commonwealth using energy derived from sunlight or onshore wind, and 35 percent of such generating capacity procured shall be from the purchase of energy, capacity, and environmental attributes from solar or onshore wind facilities acquisition by such Phase I Utility.ity, with the remainder, in the aggregate, being from construction or b.
to construct, acquire, or enter into agreements to purchase the energy, capacity, and environmentalals attributes of at least 200 megawatts of additional generating capacity located in the Commonwealth using energy derived from sunlight or onshore wind, and 35 percent of such generating capacity E procured shall be from the purchase of energy, capacity, and environmental attributes from solar or onshore wind facilities owned by persons other than the utility, with the remainder, in the aggregate, being from construction or acquisition by such Phase I Utility.
By December 31, 2027, each Phase I Utility shall petition the Commission for necessary approvals to construct, acquire, or enter into agreements to purchase the energy, capacity, and environmental attributes of at least 200 megawatts of additional generating capacity located in the Commonwealth using energy derived from sunlight or onshore wind, and 35 percent of such generating capacity onshore wind facilities owned by persons other than the utility, with the remainder, in the aggregate, being from construction or acquisition by such Phase I Utility.
By December 31, 2030, each Phase I Utility shall petition the Commission for necessary approvals attributes of at least 200 megawatts of additional generating capacity located in the Commonwealthl using energy derived from sunlight or onshore wind, and 35 percent of such generating capacity procured shall be from the purchase of energy, capacity, and environmental attributes from solar or onshore wind facilities owned by persons other than the utility, with the remainder, in the aggregate, being from construction or acquisition by such Phase I Utility.
By December 31, 2030, each Phase I Utility shall petition the Commission for necessary approvals to construct, acquire, or enter into agreements to purchase the energy, capacity, and environmental attributes of at least 200 megawatts of additional generating capacity located in the Commonwealth procured shall be from the purchase of energy, capacity, and environmental attributes from solaU or onshore wind facilities owned by persons other than the utility, with the remainder, in the aggregate, being from construction or acquisition by such Phase I Utility.
H d.
S d.
Nothing in this subdivision 1 shall prohibit such Phase I Utility from constructing, acqu7ring, or entering into agreements to purchase the energy, capacity, and environmental attributes of more4than 600 onshore wind, provided the utility receives approval from the Commission pursuant to §§ 56-580 and 56-585.1.
Nothing in this subdivision 1 shall prohibit such Phase I Utility from constructing, acquiring, or entering into agreements to purchase the energy, capacity, and environmental attributes of moreEthan 600 onshore wind, provided the utility receives approval from the Commission pursuant to §§ 56-580 and 56-585.1.
By December 31, 2035, each Phase II Utility shall petition the Commission for necessary approvals to (i) construct, acquire, or enter into agreements to purchase the energy, capacity, and environmental attributes of 16,100 megawatts of generating capacity located in the Commonwealth using energy derived from sunlight or onshore wind, which shall include 1,100 megawatts of solar generation of a nameplate capacity not to exceed three megawatts per individual project and 35 percent of such from solar facilities owned by persons other than a utility, including utility affiliates and deregulated affiliates and (ii) pursuant to § 56-585.1:11, construct or purchase one or more offshore wind generation facilities located off the Commonwealth's Atlantic shoreline or in federal waters and interconnected directly into the Commonwealth with an aggregate capacity of up to 5,200 megawatts.
By December 31, 2035, each Phase II Utility shall petition the Commission for necessary S approvals to (i) construct, acquire, or enter into agreements to purchase the energy, capacity, and environmental attributes of 16,100 megawatts of generating capacity located in the CommonwealthUusing of a nameplate capacity not to exceed three megawatts per individual project and 35 percent of suchon generating capacity procured shall be from the purchase of energy, capacity, and environmental Sttributes from solar facilities owned by persons other than a utility, including utility affiliates and deregulated affiliates and (ii) pursuant to § 56-585.1:11, construct or purchase one or more offshore wind generation facilities located off the Commonwealth's Atlantic shoreline or in federal waters and interconnIcted megawatts of the 16,100 megawatts shall be placed on previously developed project sites.east 200 a.
At least 200 megawatts of the 16,100 megawatts shall be placed on previously developed project sites.
By December 31, 2024, each Phase II Utility shall petition the Commission for necessary T approvals to construct, acquire, or enter into agreements to purchase the energy, capacity, andU environmental attributes of at least 3,000 megawatts of generating capacity located in the T Commonwealth using energy derived from sunlight or onshore wind, and 35 percent of such generating solar or onshore wind facilities owned by persons other than the utility, with the remainder, in the aggregate, being from construction or acquisition by such Phase II Utility.
a.
By December 31, 2024, each Phase II Utility shall petition the Commission for necessary approvals to construct, acquire, or enter into agreements to purchase the energy, capacity, and Commonwealth using energy derived from sunlight or onshore wind, and 35 percent of such generating capacity procured shall be from the purchase of energy, capacity, and environmental attributes from solar or onshore wind facilities owned by persons other than the utility, with the remainder, in the aggregate, being from construction or acquisition by such Phase II Utility.
c.
B c.
By December 31, 2030, each Phase II Utility shall petition the Commission for necessary approvals to construct, acquire, or enter into agreements to purchase the energy, capacity, and environmental attributes of at least 4,000 megawatts of additional generating capacity located in the Commonwealth using energy derived from sunlight or onshore wind, and 35 percent of such generating solar or onshore wind facilities owned by persons other than the utility, with the remainder, in the HB74 10 of 13 aggregate, being from construction or acquisition by such Phase II Utility.
By December 31, 2030, each Phase II Utility shall petition the Commission for necessary 4 approvals to construct, acquire, or enter into agreements to purchase the energy, capacity, and1 Commonwealth using energy derived from sunlight or onshore wind, and 35 percent of such generatingthe capacity procured shall be from the purchase of energy, capacity, and environmental attributes from solar or onshore wind facilities owned by persons other than the utility, with the remainder, in the aggregate, being from construction or acquisition by such Phase II Utility.
By December 31, 2035, each Phase II Utility shall petition the Commission for necessary approvals to construct, acquire, or enter into agreements to purchase the energy, capacity, and environmental attributes of at least 6,100 megawatts of additional generating capacity located in the Commonwealth using energy derived from sunlight or onshore wind, and 35 percent of such generating capacity procured shall be from the purchase of energy, capacity, and environmental attributes from solar or onshore wind facilities owned by persons other than the utility, with the remainder, in the aggregate, being from construction or acquisition by such Phase II Utility.
By December 31, 2035, each Phase II Utility shall petition the Commission for necessary approvals to construct, acquire, or enter into agreements to purchase the energy, capacity, and HB74H1 10 of 13 environmental attributes of at least 6,100 megawatts of additional generating capacity located in the Commonwealth using energy derived from sunlight or onshore wind, and 35 percent of such generating capacity procured shall be from the purchase of energy, capacity, and environmental attributes from solar or onshore wind facilities owned by persons other than the utility, with the remainder, in the aggregate, being from construction or acquisition by such Phase II Utility.
If, in any year, a Phase I or Phase II Utility is unable to meet the compliance obligation of the RPS Program requirements or if the cost of RECs necessary to comply with RPS Program requirements exceeds $45 per megawatt hour, such supplier shall be obligated to make a deficiency payment equal to $45 for each megawatt-hour shortfall for the year of noncompliance, except that the deficiency payment for any shortfall in procuring RECs for solar, wind, or anaerobic digesters located in the Commonwealth of 13 shall be $75 per megawatts hour for resources one megawatt and lower.
If, in any year, a Phase I or Phase II Utility is unable to meet the compliance obligation of the RPS Program requirements or if the cost of RECs necessary to comply with RPS Program requirements exceeds $45 per megawatt hour, such supplier shall be obligated to make a deficiency payment equal to $45 for each megawatt-hour shortfall for the year of noncompliance, except that the deficiency payment for any shortfall in procuring RECs for solar, wind, or anaerobic digesters located in the Commonwealth shall be $75 per megawatts hour for resources one megawatt and lower.
A Phase I or Phase II Utility shall Ie entitled to recover the costs of such payments as a cost of compliance with the requirements of this subNection deposited into an interest-bearing account administered by the Department of Energy.
A Phase I or Phase II Utility shall be entitled to recover the costs of such payments as a cost of compliance with the requirements of this subsection of 13 deposited into an interest-bearing account administered by the Department of Energy.
(i) 50 percent of total revenue shall be directed to job training programs in historically economically disadvantaged R communities;
(i) 50 percent of total revenue shall be directed to job training programs in historically economically disadvantaged communities;
(iii) 30 percent of total revenue shall be directed to renewable energy programs located in historically economically disadvantaged communities;
(iii) 30 percent of total revenue shall be directed to renewable energy programs located in directed to administrative costs.ntaged communities;
and (iv) four percent of total revenue shaDl be directed to administrative costs.
and (iv) four percent of total revenue shall be For any project constructed pursuant to this subsection or subsection E, a utility shall, subject to a competitive procurement process, procure equipment from a Virginia-based or United States-based manufacturer using materials or product components made in Virginia or the United States, if reasonably available and competitively priced.
competitive procurement process, procure equipment from a Virginia-based or United States-basedUject to a manufacturer using materials or product components made in Virginia or the United States, if reasonably available and competitively priced.
Phase I and Phase II Utility shall petition the Commission for necessary approvals to construct oreach acquire new, utility-owned energy storage resources.
E E.
To enhance reliability and performance of the utility's generation and distribution system, each Phase I and Phase II Utility shall petition the Commission for necessary approvals to construct or acquire new, utility-owned energy storage resources.
By December 31, 2035, each Phase I Utility shall petition the Commission for necessary approvals prohibit a Phase I Utility from constructing or acquiring more than 400 megawatts of energy storage, provided that the utility receives approval from the Commission pursuant to §§ 56-580 and 56-585.1.
By December 31, 2035, each Phase I Utility shall petition the Commission for necessary approvals to construct or acquire 400 megawatts of energy storage capacity.
2.
Nothing in this subdivision shall prohibit a Phase I Utility from constructing or acquiring more than 400 megawatts of energy storage, pro2.
By December 31, 2035, each Phase II Utility shall petition the Commission for necessary approvals to construct or acquire 2,700 megawatts of energy storage capacity.
By December 31, 2035, each Phase II Utility shall petition the Commission for necessary58U.1.
Nothing in this subdivision shall prohibit a Phase II Utility from constructing or acquiring more than 2,700 meHawatts of energy storage, provided that the utility receives approval from the Commission pursuant to 7 §§ 56-580 and 56-585.1.
approvals to construct or acquire 2,700 megawatts of energy storage capacity.
4 may procure a single energy storage project up to 800 megawatts.s in size, except that a Phase II Utility 4.
Nothing in this subdivision shall prohibit a Phase II Utility from constructing or acquiring more than 2,700 meSawatts of energy storage, provided that the utility receives approval from the Commission pursuant to §§ 56-580 and 56-585.1.
E may procure a single energy storage project up to 800 megawatts.s in size, except that a Phase II Utility 4.
5.
S 5.
After July 1, 2020, at least 35 percent of the energy storage facilities placed into service shall be (i) purchased by the public utility from a party other than the public utility or (ii) owned by a party other than a public utility, with the capacity from such facilities sold to the public utility.
After July 1, 2020, at least 35 percent of the energy storage facilities placed into service shall be (i) purchased by the public utility from a party other than the public utility or (ii) owned byUa party 2021, the Commission shall adopt regulations to achieve the deployment of energy storage for theBy January 1, Commonwealth required in subdivisions 1 and 2, including regulations that set interim targets aSd update existing utility planning and procurement rules.
By January 1, 2021, the Commission shall adopt regulations to achieve the deployment of energy storage for the update existing utility planning and procurement rules.
F.
I this section or pursuant to § 56-585.1:11, including (i) costs of generation facilities powered by sunlight or onshore or offshore wind, or energy storage facilities, that are constructed or acquired by a Phase I or Phase II Utility after July 1, 2020, (ii) costs of capacity, energy, or environmental attributes from generation facilities powered by sunlight or onshore or offshore wind, or falling water, or eneTgy storage facilities purchased by the utility from persons other than the utility through agreements after July 1, associated with RPS Program requirements pursuant to this section shall be recovered from all retail customers in the service territory of a Phase I or Phase II Utility as a non-bypassable charge, irrespective of the generation supplier of such customer, except (a) as provided in subsection G for an accelerated renewable energy buyer or, (b) as provided in subsection H for energy-intensive trade-exposed industries, or (c) as provided in subdivision C 3 of § 56-585.1:11, with respect to the energy buyer or qualifying large general service customer, as those terms are defined in § 56-585.1:11.n If a Phase I or Phase II Utility serves customers in more than one jurisdiction, such utility shall recover all of the costs of compliance with the RPS Program requirements from its Virginia customers thBough the applicable cost recovery mechanism, and all associated energy, capacity, and environmental 4ttributes shall be assigned to Virginia to the extent that such costs are requested but not recovered fro1 any sysBy September 1, 2020, the Commission shall direct the initiation of a proceeding for each Phase I and Phase II Utility to review and determine the amount of such costs, net of benefits, that should be allocated to retail customers within the utility's service territory which have elected to receive electric supply service from a supplier of electric energy other than the utility, and shall direct that tariff provisions be implemented to recover those costs from such customers beginning no later than January 1, 2021.
All costs incurred by a Phase I or Phase II Utility related to compliance with the requirements of this section or pursuant to § 56-585.1:11, including (i) costs of generation facilities powered by sunlight or onshore or offshore wind, or energy storage facilities, that are constructed or acquired by a Phase I or Phase II Utility after July 1, 2020, (ii) costs of capacity, energy, or environmental attributes from facilities purchased by the utility from persons other than the utility through agreements after July 1,ge 2020, and (iii) all other costs of compliance, including costs associated with the purchase of RECs associated with RPS Program requirements pursuant to this section shall be recovered from all retail customers in the service territory of a Phase I or Phase II Utility as a non-bypassable charge, irrespective of the generation supplier of such customer, except (a) as provided in subsection G for an accelerated renewable energy buyer or, (b) as provided in subsection H for energy-intensive trade-exposed industries, or (c) as provided in subdivision C 3 of § 56-585.1:11, with respect to the energy buyer or qualifying large general service customer, as those terms are defined in § 56-585.1:11.n If a Phase I or Phase II Utility serves customers in more than one jurisdiction, such utility shall recover all of the costs of compliance with the RPS Program requirements from its Virginia customers through the applicable cost recovery mechanism, and all associated energy, capacity, and environmental attributes shall be assigned to Virginia to the extent that such costs are requested but not recovered from any system customers outside the Commonwealth.
Thereafter, such charges and tariff provisions shall be updated and trued up by the utility on an HB74H1 12 of 13 annual basis, subject to continuing review and approval by the Commission.
By September 1, 2020, the Commission shall direct the initiation of a proceeding for each Phase I allocated to retail customers within the utility's service territory which have elected to receive electric HB74 12 of 13 supply service from a supplier of electric energy other than the utility, and shall direct that tariff provisions be implemented to recover those costs from such customers beginning no later than January 1, 2021.
Thereafter, such charges and tariff provisions shall be updated and trued up by the utility on an annual basis, subject to continuing review and approval by the Commission.
of 13 energy-intensive trade-exposed customer exemption program for EITE industries, as defined in § 56-576, as amended by this act, from the non-bypassable charges incurred by a Phase I or Phase Virginia, as amended by this act.
2.
The program shall consider the California Public Utility Code of Commission's California Industry Assistance program and the American Clean Energy and T Security Act of 2009 as guidance.
That the State Corporation Commission shall establish, implement, and manage an energy-intensive trade-exposed (EITE) customer exemption program for EITE industries, as defined in § 56-576 of the Code of Virginia, as amended by this act, from the non-bypassable of 13 § 56-585.1:11 or 56-585.5 of the Code of Virginia, as amended by this act, as a pilot program of designated as the EITE Pilot Program.
R O D U C E D B 4
The State Corporation Commission may consider the establishing the parameters for the EITE Pilot Program.r relevant programs as guidance in 3.
That the EITE Pilot Program created by the second enactment of this act shall commence no later than January 1, 2023, and the initial aggregate customer load pursuant to such Pilot preceding the date at which the customer is accepted into the EITE Pilot Program.
calendar year 4.
That on or before March 31, 2024, and annually thereafter, the State Corporation Commission House Committee on Commerce and Energy and the Senate Committee on Commerce and Labor,the or to the Chairmen of any successor committees, regarding the status of the EITE Pilot Program, updates on the extent to which the initial aggregate customer load cap has been met, and whether objectives of the EITE Pilot Program.nitial aggregate customer load cap in order to meet the H 5.
That any customer served by a competitive service provider pursuant to § 56-577 of the Code of enactment of this act.
However, the parameters of the EITE Pilot Program shall provide that thend State Corporation Commission may waive any advance notice requirements for any such customer U customer shall be eligible to participate in the EITE Pilot Program.ity, and upon such return, the S E S U B S T I T U T E H H 1
View plain text versions (2)

Action History

  1. Passed by indefinitely in Commerce and Labor (12-Y 2-N)

  2. Assigned C&L sub: Energy

  3. Referred to Committee on Commerce and Labor

  4. Constitutional reading dispensed

  5. Impact statement from SCC (HB74H1)

  6. VOTE: Passage (53-Y 47-N)

  7. Read third time and passed House (53-Y 47-N)

  8. Engrossed by House - committee substitute HB74H1

  9. Committee substitute agreed to 22105904D-H1

  10. Read second time

  11. Read first time

  12. Committee substitute printed 22105904D-H1

  13. Reported from Commerce and Energy with substitute (12-Y 10-N)

  14. Subcommittee recommends reporting with substitute (6-Y 4-N)

  15. House subcommittee amendments and substitutes offered

  16. Assigned sub: Subcommittee #2

  17. Impact statement from SCC (HB74)

  18. Referred to Committee on Commerce and Energy

  19. Prefiled and ordered printed; offered 01/12/22 22101105D

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 147 not signed on · 50 voted No

Sponsors (1)

Co-sponsors (0)

None.

Not signed on (147)

147 members have not signed on to this bill.

Show all 147 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Passed 12 Yea · 2 Nay
Party YeaNayPresentNot Voting
Unaffiliated 12200
Total 12200
% of votes cast 86%14%0%0%
How each member voted (14)
Member Party Vote
Spruill, Lionell, Sr. — Yea
Barker, George L. — Yea
Bell, John J. — Yea
David W. Marsden — Yea
Ebbin, Adam P. — Yea
Edwards, John S. — Yea
L. Louise Lucas — Yea
Lewis, Lynwood W., Jr. — Yea
Mark D. Obenshain — Nay
Mason, T. Montgomery "Monty" — Yea
Newman, Stephen D. — Nay
R. Creigh Deeds — Yea
Saslaw, Richard L. — Yea
Scott A. Surovell — Yea

Official roll call →

VOTE: Passage (53-Y 47-N)

Passed 52 Yea · 47 Nay
Party YeaNayPresentNot Voting
Unaffiliated 524700
Total 524700
% of votes cast 53%47%0%0%
How each member voted (99)
Member Party Vote
Greenhalgh, Karen S. — Yea
March, Marie E. — Yea
Adams, Dawn M. — Nay
Adams, Les R. — Yea
Alfonso H. Lopez — Nay
Angelia Williams Graves — Nay
Anne Ferrell Tata — Yea
Avoli, G. "John" — Yea
Batten, Amanda E. — Yea
Bell, Robert B. — Yea
Betsy B. Carr — Nay
Bill Wiley — Yea
Bourne, Jeffrey M. — Nay
Briana D. Sewell — Nay
Bulova, David L. — Nay
Byron, Kathy J. — Yea
C.E. Cliff Hayes, Jr. — Nay
Campbell, Jeffrey L. — Yea
Campbell, Ronnie R. — Yea
Charniele L. Herring — Nay
Chris S. Runion — Yea
Christopher T. Head — Yea
Convirs-Fowler, Kelly K. — Nay
Cordoza, A.C. — Yea
Coyner, Carrie E. — Yea
Dan I. Helmer — Nay
Danica A. Roem — Nay
David A. Reid — Nay
Davis, Glenn R. — Yea
Delores L. McQuinn — Nay
Don Scott — Nay
Edmunds, James E., II — Yea
Elizabeth B. Bennett-Parker — Nay
Emily M. Jordan — Yea
Fariss, C. Matthew — Yea
Filler-Corn, Eileen — Nay
Fowler, Hyland F."Buddy," Jr. — Yea
Freitas, Nicholas J. — Yea
Gooditis, Wendy W. — Nay
Guzman, Elizabeth R. — Nay
H. Otto Wachsmann, Jr. — Yea
Hudson, Sally L. — Nay
Irene Shin — Nay
Israel D. O'Quinn — Yea
Jackie H. Glass — Nay
James A. "Jay" Leftwich — Yea
James W. Morefield — Yea
Jason S. Ballard — Yea
Jeion A. Ward — Nay
Jenkins, Clinton L. — Nay
Jessica L. Anderson — Yea
Joseph P. McNamara — Yea
Karrie K. Delaney — Nay
Kathy K.L. Tran — Nay
Keam, Mark L. — Nay
Knight, Barry D. — Yea
Kory, Kaye — Yea
LaRock, Dave A. — Yea
Lamont Bagby — Nay
Luke E. Torian — Nay
M. Keith Hodges — Yea
Maldonado, Michelle Lopes — Nay
Marcia S. "Cia" Price — Nay
Marcus B. Simon — Nay
Marshall, Daniel W., III — Yea
McGuire, John J., III — Yea
Michael J. Webert — Yea
Mike A. Cherry — Yea
Mullin, Michael P. — Nay
Mundon King, Candi — Nay
Murphy, Kathleen — Nay
Nadarius E. Clark — Nay
Orrock, Robert D., Sr. — Yea
Patrick A. Hope — Nay
Paul E. Krizek — Nay
Phillip A. Scott — Yea
Plum, Kenneth R. — Nay
R. Lee Ware — Yea
Ransone, Margaret B. — Yea
Richard C. "Rip" Sullivan, Jr. — Nay
Robert S. Bloxom, Jr. — Yea
Robinson, Roxann L. — Yea
Rodney T. Willett — Nay
Sam Rasoul — Nay
Schuyler T. VanValkenburg — Nay
Scott A. Wyatt — Yea
Shelly A. Simonds — Nay
Sickles, Mark D. — Nay
Subramanyam, Suhas — Nay
Tara A. Durant — Yea
Taylor, Kim A. — Yea
Terry G. Kilgore — Yea
Terry L. Austin — Yea
Thomas C. Wright, Jr. — Yea
Tony O. Wilt — Yea
Vivian E. Watts — Nay
Wampler, William C., III — Yea
Wendell S. Walker — Yea
Wren M. Williams — Yea

Official roll call →

Passed 12 Yea · 10 Nay
Party YeaNayPresentNot Voting
Unaffiliated 121000
Total 121000
% of votes cast 55%45%0%0%
How each member voted (22)

Official roll call →

Passed 6 Yea · 4 Nay · 1 Other
Party YeaNayPresentNot Voting
Unaffiliated 6401
Total 6401
% of votes cast 55%36%0%9%
How each member voted (11)
Member Party Vote
Adams, Les R. — Yea
Byron, Kathy J. — Not Voting
Christopher T. Head — Yea
Gooditis, Wendy W. — Nay
Jeion A. Ward — Nay
Joseph P. McNamara — Yea
Lamont Bagby — Nay
Michael J. Webert — Yea
R. Lee Ware — Yea
Ransone, Margaret B. — Yea
Richard C. "Rip" Sullivan, Jr. — Nay

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does HB 74 do?
Virginia Clean Economy Act; non-bypassable charges; energy-intensive trade-exposed (EITE) industries. Defines EITE industries as companies that are constrained in their ability to pass through carbon costs due to international competition, companies that engage in importation of products that cause emission leakage, and critical infrastructure facilities identified by certain federal agencies. The bill directs the State Corporation Commission to establish an EITE customer exemption pilot program for non-bypassable charges in certain provisions of the Virginia Clean Economy Act related to generation of electricity from renewable and zero carbon sources and development of offshore wind capacity. The EITE Pilot Program shall commence no later than January 1, 2023, and shall have an initial aggregate customer load of 2,000 megawatts based on each participating customer's load during the previous calendar year. The State Corporation Commission shall also submit a report on the status of the EITE Pilot Program by March 31, 2024.
Who sponsors HB 74?
HB 74 is sponsored by R. Lee Ware.
What is the current status of HB 74?
This bill died with 2022 Regular Session. It reached “Passed House of Delegates” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track HB 74?
Track HB 74 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HB 74

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HB 74

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.