State agencies and localities; solar-ready roof requirements, etc.
Do you support it?
Want to know if it passes?
We'll email you when SB 290 moves — a committee vote, a floor vote, or a signature. Nothing else.
Free forever · unsubscribe in one click.
Your answer was recorded either way.
Which district are you in?
Your ZIP is all we need to match you to your own representatives — so we can tell you how they voted on SB 290.
You're tracking SB 290
We'll email you the moment it moves.
SB 290 — State agencies and localities; solar-ready roof requirements, etc.
Last action — Failed to report (defeated) in General Laws (10-Y 12-N)
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
✓In Committee
-
3Passed Senate
-
4Passed House of Delegates
-
5To Executive
-
6Enacted
This bill died with 2022 Regular Session. It reached “Passed Senate” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.
Summary
Solar-ready roofs for certain government buildings; net-zero energy consumption building design for schools. Requires any executive branch agency or institution and any locality entering the design phase for the construction of a new building greater than 5,000 gross square feet in size, or the renovation of a building where the cost of the renovation exceeds 50 percent of the value of the building, to ensure that such building includes a solar-ready, cool, or energy-efficient roof, defined in the bill. However, the provisions of the bill do not apply to localities with a population of less than 100,000 until July 1, 2023. The bill also requires new public school buildings and facilities and improvements and renovations to existing public school buildings and facilities where the cost of the renovation exceeds 50 percent of the value of the building to, after notice is given to the governing body, be designed, constructed, maintained, and operated to generate more electricity than consumed. The provisions of this bill only apply to projects entering the design phase on or after January 1, 2023.
Bill Text
What changed in the latest version
102 added · 96 removedPlain-language change summary
The amendment replaces references to "energy-positive building design for schools" with provisions that focus on "net-zero energy consumption building design for certain government buildings." Additionally, it specifies the requirements for "solar-ready, cool, or energy-efficient roofs" with more detailed criteria regarding insulation and solar panel installations. This change broadens the scope of energy efficiency requirements while providing specific guidelines for solar-ready roofs, influencing how government buildings are designed and constructed for energy efficiency.
SESSION INTRODUCEDSENATE 22103777DSUBSTITUTE I22106369D SENATE BILL NO.
290 OfferedAMENDMENT JanuaryIN 12,THE 2022NATURE NOF PrefiledA JanuarySUBSTITUTE 11,(Proposed 2022by Tthe Senate Committee on General Laws and Technology on February 9, 2022) (Patron Prior to Substitute––Senator Favola) A Bsolar-readyBILL to amend and reenact §§ 2.2-1183 and 15.2-1804.1 of the Code of Virginia, relating to schools.ady roofs for certain government buildings;
energy-positivenet-zero energy consumption building design for schoRls.Be it enacted by the General Assembly of Virginia:
––––––––––1. Patrons––Favola;
Delegate:
Murphy O –––––––––– D Referred to Committee on General Laws and Technology –––––––––– U Be it enacted by the General Assembly of Virginia:
C 1.
§ 2.2-1183.
Building standards;
exemption;
report.
Any executive branch agency or institution entering the design phase for the construction of a new building greater than 5,000 gross square feet in size, or the renovation of a building where the cost of the renovation exceeds 50 percent of the value of the building, shall ensure that such building:building:e cost 1.
1.
E 2.
Includes a solar-readysolar-ready, cool, or energy-efficient roof, defined as havinga roof with (i) the structuralstTuctural capability to accept the increased load from solar panels, proper sizing of the electrical panel, installation of conduit and wire from the roof to the electrical panel, use of solar-appropriatesolar-appropriatE roof membranes and other roofing materials, and clustering of vents and non-solar equipment to maximize available space for solar panels.panels;
B.(ii) if the governing body of the locality determines that solar panels maximum solar reflectance and reliability criteria along with a minimum of R-38 insulation;
Any executive branch agency or institution(iii) maya exceedballasted theEPDM designroof andsystem constructionwith standardsa requiredminimum by subsection A, provided that such agency or institution obtains prior written approval from the Director of theR-38 Department.insulation.
standardsS requiredB. by subsection A upon a finding that special circumstances make the construction or renovation to the standards impracticable.
SuchAny exemptionexecutive shallbranch beagency madeor ininstitution writingmay exceed the design and shallconstruction explainstandarUs therequired basisby forsubsection grantingA, provided that such exemption.agency or institution obtains prior written approvBl from the Director of the Department.
If the Director cites cost as a factor in granting an exemption, the Director shall include a comparison of the cost the agency or institution will incur over the next 20 35 years if the agency does not comply with the standards required by subsection A versusupon thea costsfinding tothat thespecial 36circumstances agencymake or institution if the agencyconstruction or institution35 wererenovation to complythe withstandards suchimpracticable. standards.
37Such D.exemption shall be made in writing and shall explain the :
Each36 agencybasis or institution shall submit an annual report to the Governor by January 1 of each 38 year detailing the energy-efficiency and associated carbon emissions metrics for eachgranting buildingsuch builtexemption. or completed during the prior fiscal year.
andIf constructionthe Director cites cost as a factor in granting an exemption, the 37 Director shall include a comparison of the cost the agency or institution will incur over the next 20 38 years if the agency does not comply with the standards required by subsection A andversus §the 15.2-1804.1.costT to the 39 agency or institution if the agency or institution were to comply with such standards.
U year detailing the energy-efficiency and associated carbon emissions metrics for each building built or renovated in accordance with the design and construction standards required by subsection A andT completed during the prior fiscal year.
E § 15.2-1804.1.
A.
As used in this section:
"High performance building certification program" means a public building design, construction, and Energyrenovation andprogram Environmentalthat Designachieves (LEED)certification greenusing building rating standard or the GreenU.S. Buildingership in Initiative's "Green Globes" building standard, or meets the requirements of VEES.
"Solar-ready"Green meansBuilding havingCouncil's LeadershSp in Energy and Environmental Design (LEED) green building rating standard or the Green Building 2 Ini"Solar-ready, cool, or energy-efficient roof" means a roof with (i) the structural capability to accept the increased load from solar panels, proper sizing of the electrical panel, installation of conduit and wire from the roof to the electrical panel, use of solar-appropriate roof membranes and other roofing materials, and clustering of vents and non-solar equipment to maximize available space for solar panels.panels;
"Sufficient(ii) ZEVif chargingthe andgoverning fuelingbody infrastructure"of means the provisionlocality ofdetermines ZEVthat chargingsolar orpanels fuelingare infrastructure,impractical includingor EV-readynot chargingcost-effective, electricalroofing capacitymaterials andwith pre-wiring,the (i)ENERGY sufficientSTAR tolabel supportthat located at such building upon full occupancy, meet projectedmaximum demandsolar forreflectance suchand infrastructureSB290S1 during the SB290 2 of 2 firstreliability 10criteria yearsalong followingwith building occupancy, or (ii) that achieves the current ZEV or EV charging credit for a highminimum performanceof buildingR-38 certificationinsulation; program.
or (iii) a ballasted EPDM roof system with a minimum of R-38 insulation.
"Sufficient ZEV charging and fueling infrastructure" means the provision of ZEV charging or fueling infrastructure, including EV-ready charging electrical capacity and pre-wiring, (i) sufficient to support every passenger-type vehicle owned by the locality and available for use by the locality that will be located at such building upon full occupancy, meet projected demand for such infrastructure during the first 10 years following building occupancy, or (ii) that achieves the current ZEV or EV charging credit for a high performance building certification program.
Incorporates appropriate resilience and distributed energy features, including a solar-readysolar-ready, cool, or energy-efficient roof.
New public school buildings and facilities,facilities and improvements and renovations to existing public school buildings and facilities where the cost of the renovation exceeds 50 percent of the value of the building,building shallshall, beafter designed,notice constructed,to maintained,the governing body, be designed and operatedconstructed to generatemeet morenet-zero electricityenergy thanconsumption consumed.standards.
SuchThe energy-positivegoverning buildingbody designmay shallgrant bean basedexemption onfrom (i)such industry standards containedpursuant into thesubsection designD guideor ofif the Americanbuilding Societyhas ofbeen Heating,declared Refrigeratinga andhistoric Air-Conditioninglandmark Engineersby (ASHRAE),the entitledBoard "Achievingof ZeroHistoric Energy:Resources.
Advanced2. Energy Design Guide for K-12 School Buildings," dated February 1, 2018, and any subsequent updates or (ii) similar industry standards.
That the provisions of this act shall apply to projects entering the design phase on or after January 1, 2023.
View plain text versions (2)
- Committee Substitute Committee substitute printed 22106369D-S1 Current pdf February 09, 2022
- Prefiled Prefiled and ordered printed; offered 01/12/22 22103777D pdf January 11, 2022
Action History
-
Failed to report (defeated) in General Laws (10-Y 12-N)
-
Failed to refer to Committee on Appropriations
-
Referred to Committee on General Laws
-
Read first time
-
Placed on Calendar
-
Read third time and passed Senate (22-Y 18-N)
-
Engrossed by Senate - committee substitute SB290S1
-
Committee substitute agreed to 22106369D-S1
-
Reading of substitute waived
-
Read second time
-
Impact statement from DPB (SB290S1)
-
Constitutional reading dispensed (40-Y 0-N)
-
Committee substitute printed 22106369D-S1
-
Reported from General Laws and Technology with substitute (8-Y 6-N)
-
Senate committee, floor amendments and substitutes offered
-
Impact statement from DPB (SB290)
-
Impact statement from DHCD/CLG (SB290)
-
Referred to Committee on General Laws and Technology
-
Prefiled and ordered printed; offered 01/12/22 22103777D
Sponsors
- Barbara A. Favola · Primary
- Kathleen Murphy · Cosponsor
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 1 co-sponsors · 146 not signed on · 30 voted No
Sponsors (1)
Co-sponsors (1)
Not signed on (146)
146 members have not signed on to this bill.
Show all 146 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Votes
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Unaffiliated | 10 | 12 | 0 | 0 |
| Total | 10 | 12 | 0 | 0 |
| % of votes cast | 45% | 55% | 0% | 0% |
How each member voted (22)
| Member | Party | Vote |
|---|---|---|
| Adams, Dawn M. | — | Yea |
| Betsy B. Carr | — | Yea |
| Bulova, David L. | — | Yea |
| Campbell, Jeffrey L. | — | Nay |
| Chris S. Runion | — | Nay |
| Coyner, Carrie E. | — | Nay |
| Danica A. Roem | — | Yea |
| Emily M. Jordan | — | Nay |
| Fowler, Hyland F."Buddy," Jr. | — | Nay |
| James A. "Jay" Leftwich | — | Nay |
| James W. Morefield | — | Nay |
| Jenkins, Clinton L. | — | Yea |
| Knight, Barry D. | — | Nay |
| Luke E. Torian | — | Yea |
| Marcia S. "Cia" Price | — | Yea |
| Murphy, Kathleen | — | Yea |
| Paul E. Krizek | — | Yea |
| Robinson, Roxann L. | — | Nay |
| Schuyler T. VanValkenburg | — | Yea |
| Thomas C. Wright, Jr. | — | Nay |
| Wampler, William C., III | — | Nay |
| Wendell S. Walker | — | Nay |
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Unaffiliated | 22 | 18 | 0 | 0 |
| Total | 22 | 18 | 0 | 0 |
| % of votes cast | 55% | 45% | 0% | 0% |
How each member voted (40)
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Unaffiliated | 40 | 0 | 0 | 0 |
| Total | 40 | 0 | 0 | 0 |
| % of votes cast | 100% | 0% | 0% | 0% |
How each member voted (40)
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Unaffiliated | 8 | 6 | 0 | 0 |
| Total | 8 | 6 | 0 | 0 |
| % of votes cast | 57% | 43% | 0% | 0% |
How each member voted (14)
| Member | Party | Vote |
|---|---|---|
| Barker, George L. | — | Yea |
| Bell, John J. | — | Yea |
| Bryce E. Reeves | — | Nay |
| Dunnavant, Siobhan S. | — | Nay |
| Ebbin, Adam P. | — | Yea |
| Hashmi, Ghazala F. | — | Yea |
| Jennifer B. Boysko | — | Yea |
| Kiggans, Jennifer A. | — | Nay |
| Mamie E. Locke | — | Yea |
| Mason, T. Montgomery "Monty" | — | Yea |
| Richard H. Stuart | — | Nay |
| Ruff, Frank M., Jr. | — | Nay |
| Todd E. Pillion | — | Nay |
| Vogel, Jill Holtzman | — | Yea |
Subjects
Frequently asked questions
- What does SB 290 do?
- Solar-ready roofs for certain government buildings; net-zero energy consumption building design for schools. Requires any executive branch agency or institution and any locality entering the design phase for the construction of a new building greater than 5,000 gross square feet in size, or the renovation of a building where the cost of the renovation exceeds 50 percent of the value of the building, to ensure that such building includes a solar-ready, cool, or energy-efficient roof, defined in the bill. However, the provisions of the bill do not apply to localities with a population of less than 100,000 until July 1, 2023. The bill also requires new public school buildings and facilities and improvements and renovations to existing public school buildings and facilities where the cost of the renovation exceeds 50 percent of the value of the building to, after notice is given to the governing body, be designed, constructed, maintained, and operated to generate more electricity than consumed. The provisions of this bill only apply to projects entering the design phase on or after January 1, 2023.
- Who sponsors SB 290?
- SB 290 is sponsored by Barbara A. Favola and Murphy, Kathleen.
- What is the current status of SB 290?
- This bill died with 2022 Regular Session. It reached “Passed Senate” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
- Where can I track SB 290?
- Track SB 290 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on SB 290
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of SB 290
Last checked for changes 3 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →