Virginia 2022 Regular Session Status: Enacted

SB 684 — Certified pollution control equipment; certification by subdivisions.

Last action — Approved by Governor-Chapter 501 (effective 7/1/22)

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. ✓
    Passed Senate
  4. ✓
    Passed House of Delegates
  5. ✓
    To Executive
  6. 6
    Enacted

This bill has been enacted into law. Introduced January 20, 2022. Enacted.

Signed by Governor Glenn Youngkin (Republican) on April 11, 2022.

Prognosis

Likely to advance 70% · moderate confidence

Where this bill stands today.

Odds of enactment

High

How often bills like it became law.

  • Enacted

    Current position in the legislative process.

  • 1 sponsor

    1 primary, 0 co-sponsors signed on.

  • Cleared a recorded vote

    Passed 5 recorded votes so far.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Summary

Certified pollution control equipment; certification by subdivisions. Provides that for pollution control equipment to be used as part of a political subdivision's water, wastewater, stormwater, or solid waste management facilities or systems, such equipment may be certified by the political subdivision itself instead of by the state certifying authority. This bill is identical to HB 148.

Bill Text

What changed in the latest version

307 added · 294 removed

Plain-language change summary

The recent amendment to SB 684 clarifies the exemptions from tax for commercial and industrial equipment in Virginia. Notably, it specifically details the types of personal property that are exempt from sales tax, including industrial materials and machinery used for production. This change is significant because it aims to support businesses by reducing their tax burden on essential equipment, helping them to operate more efficiently and possibly encouraging investment in local industries.

→
Previous
Latest
SESSION ENROLLED VIRGINIA ACTS OF ASSEMBLY –– CHAPTER E An Act to amend and reenact §§ 58.1-609.3 and 58.1-3660 of the Code of Virginia, relating to certified pollution control equipment;
VIRGINIA ACTS OF ASSEMBLY -- 2022 SESSION CHAPTER 501 An Act to amend and reenact §§ 58.1-609.3 and 58.1-3660 of the Code of Virginia, relating to certified pollution control equipment;
R O [S 684] Approved L L Be it enacted by the General Assembly of Virginia:
[S 684] Approved April 11, 2022 Be it enacted by the General Assembly of Virginia:
That §§ 58.1-609.3 and 58.1-3660 of the Code of Virginia are amended and reenacted as followE:
That §§ 58.1-609.3 and 58.1-3660 of the Code of Virginia are amended and reenacted as follows:
D shall not apply to the following:r or pursuant to the authority granted in §§ 58.1-605 and 58.1-606 1.
The tax imposed by this chapter or pursuant to the authority granted in §§ 58.1-605 and 58.1-606 shall not apply to the following:
Personal property purchased by a contractor which is used solely in another state or in a foreign country, which could be purchased by such contractor for such use free from sales tax in such other state or foreign country, and which is stored temporarily in Virginia pending shipment to such state or country.
1.
2.
Personal property purchased by a contractor which is used solely in another state or in a foreign country, which could be purchased by such contractor for such use free from sales tax in such other country.
(i) Industrial materials for future processing, manufacturing, refining, or conversion into articles of tangible personal property for resale where such industrial materials either enter into the proBuction of or become a component part of the finished product;
foreign country, and which is stored temporarily in Virginia pending shipment to such state or 2.
(ii) industrial materials that are coated upon8or resale;
(i) Industrial materials for future processing, manufacturing, refining, or conversion into articles of tangible personal property for resale where such industrial materials either enter into the production of or become a component part of the finished product;
(iii) machinery or tools or repair parts therefor or replacements thereof, fuel, power,Eenergy, or supplies, used directly in processing, manufacturing, refining, mining or converting products for sale or resale;
(ii) industrial materials that are coated upon or impregnated into the product at any stage of its being processed, manufactured, refined, or converted for resale;
(iii) machinery or tools or repair parts therefor or replacements thereof, fuel, power, energy, or supplies, used directly in processing, manufacturing, refining, mining or converting products for sale or resale;
The provisions of this addition, the exemption provided herein shall not be applicable to any machinery, tools, and equipment, In or any other tangible personal property used by a public service corporation in the generation of electric power, except for raw materials that are inputs to production of electricity, including fuel, or for machinery, tools, and equipment used to generate energy derived from sunlight or wind.
The provisions of this subsection do not apply to the drilling or extraction of oil, gas, natural gas and coalbed methane gas.
In addition, the exemption provided herein shall not be applicable to any machinery, tools, and equipment, or any other tangible personal property used by a public service corporation in the generation of electric power, except for raw materials that are inputs to production of electricity, including fuel, or for machinery, tools, and equipment used to generate energy derived from sunlight or wind.
Tangible personal property sold or leased to a public service corporation engaged in business as a common carrier of property or passengers by railway, for use or consumption by such common carrier dir4.
Tangible personal property sold or leased to a public service corporation engaged in business as a common carrier of property or passengers by railway, for use or consumption by such common carrier directly in the rendition of its public service.
4.
This exemption shall include dredges, their supporting equipment, attendant vessels, and fuel and supplies for use or consumption aboard such vessels, provided the dredges are used exc5.
This exemption shall include dredges, their supporting equipment, attendant vessels, and fuel and supplies for use or consumption aboard such vessels, provided the dredges are used exclusively or principally in interstate or foreign commerce.
5.
Tangible personal property including machinery and tools, repair parts or replacements thereof, leasing by an industrial processor engaged in the commercial leasing or renting of laundered textile products.
Tangible personal property including machinery and tools, repair parts or replacements thereof, and supplies and materials used directly in maintaining and preparing textile products for rental or leasing by an industrial processor engaged in the commercial leasing or renting of laundered textile products.
of 6 9.
9.
Certified pollution control equipment and facilities as defined in § 58.1-3660, except for any equipment that has not been certified to the Department of Taxation by a state certifying authority or subdivision certifying authority pursuant to such section.
Certified pollution control equipment and facilities as defined in § 58.1-3660, except for any equipment that has not been certified to the Department of Taxation by a state certifying authority or of 5 subdivision certifying authority pursuant to such section.
Computer equipment purchased or leased on or before June 30, 2011, used in data centers located in a Virginia locality having an unemployment rate above 4.9 percent for the calendar quarter ending November 2007, for the processing, storage, retrieval, or communication of data, including but not limited to servers, routers, connections, and other enabling hardware when part of a new investment of at least $75 million in such exempt property, when such investment results in the creation of at least 100 new jobs paying at least twice the prevailing average wage in that locality, so long as such investment was made in accordance with a memorandum of understanding with the Virginia Economic Development Partnership Authority entered into or amended between January 1, 2008, and December 31, 2008.
Computer equipment purchased or leased on or before June 30, 2011, used in data centers located in a Virginia locality having an unemployment rate above 4.9 percent for the calendar quarter ending November 2007, for the processing, storage, retrieval, or communication of data, including but not limited to servers, routers, connections, and other enabling hardware when part of a new investment of at least $75 million in such exempt property, when such investment results in the creation of at least new jobs paying at least twice the prevailing average wage in that locality, so long as such investment was made in accordance with a memorandum of understanding with the Virginia Economic Development Partnership Authority entered into or amended between January 1, 2008, and December 31, 2008.
Beginning July 1, 2010, and ending June 30, 2035, computer equipment or enabling software of 6 purchased or leased for the processing, storage, retrieval, or communication of data, including but not limited to servers, routers, connections, and other enabling hardware, including chillers and bEckup generators used or to be used in the operation of the equipment exempted in this paragraph, provided that such computer equipment or enabling software is purchased or leased for use in a data center, which includes any data center facilities located in the same locality as the data center that Rre under common ownership or affiliation of the data center operator, that (i) is located in a Virginia locality;
Beginning July 1, 2010, and ending June 30, 2035, computer equipment or enabling software purchased or leased for the processing, storage, retrieval, or communication of data, including but not limited to servers, routers, connections, and other enabling hardware, including chillers and backup generators used or to be used in the operation of the equipment exempted in this paragraph, provided that such computer equipment or enabling software is purchased or leased for use in a data center, which includes any data center facilities located in the same locality as the data center that are under of 5 common ownership or affiliation of the data center operator, that (i) is located in a Virginia locality;
(ii) in the creation on or after July 1, 2009, of at least 50 new jobs by the data center operator and theresults tenants of the data center, collectively, associated with the operation or maintenance of the data center provided that such jobs pay at least one and one-half times the prevailing average wage in that locality.
(ii) results in a new capital investment on or after January 1, 2009, of at least $150 million;
The requirement of at least 50 new jobs is reduced to 10 new jobs if the data center is located in a distressed locality at the time of the execution of a memorandum of understanding with the VirgEnia Economic Development Partnership Authority.
and (iii) results in the creation on or after July 1, 2009, of at least 50 new jobs by the data center operator and the tenants of the data center, collectively, associated with the operation or maintenance of the data center provided that such jobs pay at least one and one-half times the prevailing average wage in that locality.
The requirement of at least 50 new jobs is reduced to 10 new jobs if the data center is located in a distressed locality at the time of the execution of a memorandum of understanding with the Virginia Economic Development Partnership Authority.
Prior to claiming such exemption, any tenants, must enter into a memorandum of understanding with the Virginia Economic Developmentf and its Partnership Authority that at a minimum provides the details for determining the amount of capital investment made and the number of new jobs created, the timeline for achieving the capital investment and new job goals, the repayment obligations should those goals not be achieved, and any conditSons under which repayment by the qualifying data center or data center tenant claiming the exemptio6 may be required.
Prior to claiming such exemption, any qualifying person claiming the exemption, including a data center operator on behalf of itself and its tenants, must enter into a memorandum of understanding with the Virginia Economic Development Partnership Authority that at a minimum provides the details for determining the amount of capital investment made and the number of new jobs created, the timeline for achieving the capital investment and new job goals, the repayment obligations should those goals not be achieved, and any conditions under which repayment by the qualifying data center or data center tenant claiming the exemption may be required.
In addition, the exemption shall apply to any such computer equipment or enabling 4oftware purchased or leased to upgrade, supplement, or replace computer equipment or enabling software R purchased or leased in the initial investment.
In addition, the exemption shall apply to any such computer equipment or enabling software purchased or leased to upgrade, supplement, or replace computer equipment or enabling software purchased or leased in the initial investment.
b.
For purposes of this subdivision 18, "distressed locality" means:
For so long as a data center operator is claiming an exemption pursuant to this subdivision 18, Partnership Authority on behalf of itself and, if applicable, its participating tenants that includes their employment levels, capital investments, average annual wages, qualifying expenses, and tax benefit, and such other information as the Virginia Economic Development Partnership Authority determines is relevant, pursuant to procedures developed by the Virginia Economic Development Partnership Authority.
For so long as a data center operator is claiming an exemption pursuant to this subdivision 18, such operator shall be required to submit an annual report to the Virginia Economic Development Partnership Authority on behalf of itself and, if applicable, its participating tenants that includes their employment levels, capital investments, average annual wages, qualifying expenses, and tax benefit, and such other information as the Virginia Economic Development Partnership Authority determines is relevant, pursuant to procedures developed by the Virginia Economic Development Partnership Authority.
The Department, in collaboration with the Virginia Economic Development Partnership Authority, shall publish a biennial report on the exemption that shall include aggregate information on qualifying that includes direct and indirect jobs created by data center investment, state and local tax revenuesysis generated, and any other information the Department and the Virginia Economic Development Partnership Authority deem appropriate to demonstrate the costs and benefits of the exemption.
The Department, in collaboration with the Virginia Economic Development Partnership Authority, shall publish a biennial report on the exemption that shall include aggregate information on qualifying expenses claimed under this exemption, the total value of the tax benefit, a return on investment analysis that includes direct and indirect jobs created by data center investment, state and local tax revenues generated, and any other information the Department and the Virginia Economic Development Partnership Authority deem appropriate to demonstrate the costs and benefits of the exemption.
The Virginia Economic Development Partnership Authority may publish on its website and distribute annual information indicating the job creation and ranges of capital investments made by a data center operator and, if applicable, its participating tenants, in a format to be dev19.
The Virginia Economic Development Partnership Authority may publish on its website and distribute annual information indicating the job creation and ranges of capital investments made by a data center operator and, if applicable, its participating tenants, in a format to be developed in consultation with data center operators.
(Effective until January 1, 2022) If the preponderance of their use is in the manufacture of beer by a brewer licensed pursuant to subdivision 1 or 2 of § 4.1-208, (i) machinery, tools, and equipment, or of 6 repair parts therefor or replacements thereof, fuel, power, energy, or supplies;
19.
(Effective until January 1, 2022) If the preponderance of their use is in the manufacture of beer by a brewer licensed pursuant to subdivision 1 or 2 of § 4.1-208, (i) machinery, tools, and equipment, or repair parts therefor or replacements thereof, fuel, power, energy, or supplies;
(ii) materials for future processing, manufacturing, or conversion into beer where such materials either enter into the production of or become a component part of the beer;
(ii) materials for future processing, manufacturing, or conversion into beer where such materials either enter into the production of 5 of or become a component part of the beer;
A subdivision certifying authority may only certify property pursuant to this section if the property being certified is equipment, facilities, devices, or other property intended for use by the political subdivision in conjunction with the operation of its water, wastewater, stormwater, or solid of 6 waste management facilities or systems.
A subdivision certifying authority may only certify property pursuant to this section if the property being certified is equipment, facilities, devices, or other property intended for use by the political subdivision in conjunction with the operation of its water, wastewater, stormwater, or solid waste management facilities or systems.
E C.
C.
For solar photovoltaic (electric energy) systems, this exemption applies only to (i) projects equaling 20 megawatts or less, as measured in alternating current (AC) generation capacity, for which an initial interconnection request form has been filed with an electric utility or a regional tranRmission organization on or before December 31, 2018;
For solar photovoltaic (electric energy) systems, this exemption applies only to (i) projects equaling 20 megawatts or less, as measured in alternating current (AC) generation capacity, for which an initial interconnection request form has been filed with an electric utility or a regional transmission organization on or before December 31, 2018;
(ii) projects equaling 20 megawatts or less, as measured education listed in § 23.1-100 or any private college as defined in § 23.1-105;
(ii) projects equaling 20 megawatts or less, as measured in alternating current (AC) generation capacity, that serve any of the public institutions of higher education listed in § 23.1-100 or any private college as defined in § 23.1-105;
(iii) 80 percent of the assessed value of projects for which an initial interconnection request form has been filed with an electric utility or a regional transmission organization (a) between January 1, 2015, and June 30, 2018, for projects greater than 20 megawatts or (b) on or after July 1, 2018, for projects greater than 20 megawatts and less than 150 megawatts, as measured in alternating current (AC) generation capacEty, and that are first in service on or after January 1, 2017;
(iii) 80 percent of the assessed value of projects for which an initial interconnection request form has been filed with an electric utility or a regional transmission organization (a) between January 1, 2015, and June 30, 2018, for projects greater than 20 megawatts or (b) on or after July 1, 2018, for projects greater than 20 of 5 megawatts and less than 150 megawatts, as measured in alternating current (AC) generation capacity, and that are first in service on or after January 1, 2017;
and (v) 80 percent of the assessed value of all other projects equaling more than five megawatts initial interconnection request form has been filed with an electric utility or a regional transmission organization on or after January 1, 2019.
and (v) 80 percent of the assessed value of all other projects equaling more than five megawatts and less than 150 megawatts, as measured in alternating current (AC) generation capacity for which an initial interconnection request form has been filed with an electric utility or a regional transmission organization on or after January 1, 2019.
Show all 50 changed rows (10 more)
Previous
Latest
The exemption for solar photovoltaic (electric energy) projects greater than five megawatts, as measured in alternating current (AC) generation capacity, shall not apply to any such project uSless an application has been filed with the locality for the project before July 1, 2030, regardless of6whether a locality assesses a revenue share on such project pursuant to the provisions of § 58.1-2636.
The exemption for solar photovoltaic (electric energy) projects greater than five megawatts, as measured in alternating current (AC) generation capacity, shall not apply to any such project unless an application has been filed with the locality for the project before July 1, 2030, regardless of whether a locality assesses a revenue share on such project pursuant to the provisions of § 58.1-2636.
If4a locality adopts an energy revenue share ordinance under § 58.1-2636, the exemption for solar photovoltaiR (electric energy) projects greater than five megawatts, as measured in alternating current (AC) generation capacity, shall be 100 percent of the assessed value.
If a locality adopts an energy revenue share ordinance under § 58.1-2636, the exemption for solar photovoltaic (electric energy) projects greater than five megawatts, as measured in alternating current (AC) generation capacity, shall be 100 percent of the assessed value.
If a locality does not adopt an energy revenue share ordinance under § 58.1-2636, the exemption for solar photovoltaic (electric energy) projects greater than interconnection request form has been filed with an electric utility or a regional transmissional organization, shall be 80 percent of the assessed value when an application has been filed with the locality prior to July 1, 2030.
If a locality does not adopt an energy revenue share ordinance under § 58.1-2636, the exemption for solar photovoltaic (electric energy) projects greater than five megawatts, as measured in alternating current (AC) generation capacity, for which an initial interconnection request form has been filed with an electric utility or a regional transmission organization, shall be 80 percent of the assessed value when an application has been filed with the locality prior to July 1, 2030.
For pollution control equipment and facilities certified by the Virginia Department of Health, this exemption applies only to onsite sewage systems that serve 10 or more households, use nitF.
For pollution control equipment and facilities certified by the Virginia Department of Health, this exemption applies only to onsite sewage systems that serve 10 or more households, use nitrogen-reducing processes and technology, and are constructed, wholly or partially, with public funds.
Notwithstanding any provision to the contrary, for any solar photovoltaic project described innds.
F.
clauses (iii) and (v) of subsection C for which an initial interconnection request form has been filed with an electric utility or a regional transmission organization on or after January 1, 2019, the amount of the exemption shall be as follows:
Notwithstanding any provision to the contrary, for any solar photovoltaic project described in clauses (iii) and (v) of subsection C for which an initial interconnection request form has been filed with an electric utility or a regional transmission organization on or after January 1, 2019, the amount of the exemption shall be as follows:
Notwithstanding any provision to the contrary, the exemption for energy storage systems provided under this section (i) shall apply only to projects greater than five megawatts and less than 150 megawatts, as measured in alternating current (AC) storage capacity, and (ii) shall be in the following commercial operation, 70 percent of the assessed value in the second five years in service, and 60 percent of the assessed value for all remaining years in service.
Notwithstanding any provision to the contrary, the exemption for energy storage systems provided under this section (i) shall apply only to projects greater than five megawatts and less than 150 megawatts, as measured in alternating current (AC) storage capacity, and (ii) shall be in the following amounts:
80 percent of the assessed value in the first five years of service after commencement of commercial operation, 70 percent of the assessed value in the second five years in service, and 60 percent of the assessed value for all remaining years in service.
If a locality does not adopt an energy revenue share ordinance under § 58.1-2636, the exemption for energy storage systems greater than five megawatts, as measured in alternating current locality prior to July 1, 2030.
If a locality does not adopt an energy revenue share ordinance under § 58.1-2636, the exemption for energy storage systems greater than five megawatts, as measured in alternating current (AC) storage capacity, shall be as set out in subsection G when an application has been filed with the locality prior to July 1, 2030.
For the purposes of this subsection, "application has been filed with the locality" means an applicant has filed an application for a zoning confirmation from the locality for a of 6 by-right use or an application for land use approval under the locality's zoning ordinance to include an application for a conditional use permit, special use permit, special exception, or other application as set out in the locality's zoning ordinance.
For the purposes of this subsection, "application has been filed with the locality" means an applicant has filed an application for a zoning confirmation from the locality for a by-right use or an application for land use approval under the locality's zoning ordinance to include an application for a conditional use permit, special use permit, special exception, or other application as set out in the locality's zoning ordinance.
View plain text versions (3)
  • CHAP0501 View text Current pdf April 11, 2022
  • SB684ER View text pdf March 02, 2022
  • Presented and ordered printed 22103538D View text pdf January 20, 2022

Action History

  1. Approved by Governor-Chapter 501 (effective 7/1/22)

  2. Governor's Action Deadline 11:59 p.m., April 11, 2022

  3. Enrolled Bill Communicated to Governor on March 11, 2022

  4. Impact statement from TAX (SB684ER)

  5. Signed by President

  6. Signed by Speaker

  7. Enrolled

  8. VOTE: Block Vote Passage (99-Y 0-N)

  9. Passed House BLOCK VOTE (99-Y 0-N)

  10. Read third time

  11. Read second time

  12. Reported from Finance (21-Y 0-N)

  13. Referred to Committee on Finance

  14. Read first time

  15. Placed on Calendar

  16. Read third time and passed Senate (40-Y 0-N)

  17. Read second time and engrossed

  18. Constitutional reading dispensed (40-Y 0-N)

  19. Reported from Agriculture, Conservation and Natural Resources (15-Y 0-N)

  20. Impact statement from TAX (SB684)

  21. Referred to Committee on Agriculture, Conservation and Natural Resources

  22. Presented and ordered printed 22103538D

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 147 not signed on

Co-sponsors (0)

None.

Not signed on (147)

147 members have not signed on to this bill.

Show all 147 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Passed 98 Yea · 0 Nay · 1 Other
Party YeaNayPresentNot Voting
Unaffiliated 98001
Total 98001
% of votes cast 99%0%0%1%
How each member voted (99)
Member Party Vote
Greenhalgh, Karen S. — Yea
March, Marie E. — Yea
Adams, Dawn M. — Yea
Adams, Les R. — Yea
Alfonso H. Lopez — Yea
Angelia Williams Graves — Yea
Anne Ferrell Tata — Yea
Avoli, G. "John" — Yea
Batten, Amanda E. — Yea
Bell, Robert B. — Yea
Betsy B. Carr — Yea
Bill Wiley — Yea
Bourne, Jeffrey M. — Yea
Briana D. Sewell — Yea
Bulova, David L. — Yea
Byron, Kathy J. — Yea
C.E. Cliff Hayes, Jr. — Yea
Campbell, Jeffrey L. — Yea
Campbell, Ronnie R. — Yea
Charniele L. Herring — Yea
Chris S. Runion — Yea
Christopher T. Head — Yea
Convirs-Fowler, Kelly K. — Not Voting
Cordoza, A.C. — Yea
Coyner, Carrie E. — Yea
Dan I. Helmer — Yea
Danica A. Roem — Yea
David A. Reid — Yea
Davis, Glenn R. — Yea
Delores L. McQuinn — Yea
Don Scott — Yea
Edmunds, James E., II — Yea
Elizabeth B. Bennett-Parker — Yea
Emily M. Jordan — Yea
Fariss, C. Matthew — Yea
Filler-Corn, Eileen — Yea
Fowler, Hyland F."Buddy," Jr. — Yea
Freitas, Nicholas J. — Yea
Gooditis, Wendy W. — Yea
Guzman, Elizabeth R. — Yea
H. Otto Wachsmann, Jr. — Yea
Hudson, Sally L. — Yea
Irene Shin — Yea
Israel D. O'Quinn — Yea
Jackie H. Glass — Yea
James A. "Jay" Leftwich — Yea
James W. Morefield — Yea
Jason S. Ballard — Yea
Jeion A. Ward — Yea
Jenkins, Clinton L. — Yea
Jessica L. Anderson — Yea
Joseph P. McNamara — Yea
Karrie K. Delaney — Yea
Kathy K.L. Tran — Yea
Keam, Mark L. — Yea
Knight, Barry D. — Yea
Kory, Kaye — Yea
LaRock, Dave A. — Yea
Lamont Bagby — Yea
Luke E. Torian — Yea
M. Keith Hodges — Yea
Maldonado, Michelle Lopes — Yea
Marcia S. "Cia" Price — Yea
Marcus B. Simon — Yea
Marshall, Daniel W., III — Yea
McGuire, John J., III — Yea
Michael J. Webert — Yea
Mike A. Cherry — Yea
Mullin, Michael P. — Yea
Mundon King, Candi — Yea
Murphy, Kathleen — Yea
Nadarius E. Clark — Yea
Orrock, Robert D., Sr. — Yea
Patrick A. Hope — Yea
Paul E. Krizek — Yea
Phillip A. Scott — Yea
Plum, Kenneth R. — Yea
R. Lee Ware — Yea
Ransone, Margaret B. — Yea
Richard C. "Rip" Sullivan, Jr. — Yea
Robert S. Bloxom, Jr. — Yea
Robinson, Roxann L. — Yea
Rodney T. Willett — Yea
Sam Rasoul — Yea
Schuyler T. VanValkenburg — Yea
Scott A. Wyatt — Yea
Shelly A. Simonds — Yea
Sickles, Mark D. — Yea
Subramanyam, Suhas — Yea
Tara A. Durant — Yea
Taylor, Kim A. — Yea
Terry G. Kilgore — Yea
Terry L. Austin — Yea
Thomas C. Wright, Jr. — Yea
Tony O. Wilt — Yea
Vivian E. Watts — Yea
Wampler, William C., III — Yea
Wendell S. Walker — Yea
Wren M. Williams — Yea

Official roll call →

Passed 21 Yea · 0 Nay · 1 Other
Party YeaNayPresentNot Voting
Unaffiliated 21001
Total 21001
% of votes cast 95%0%0%5%
How each member voted (22)

Official roll call →

Passed 40 Yea · 0 Nay
Party YeaNayPresentNot Voting
Unaffiliated 40000
Total 40000
% of votes cast 100%0%0%0%
How each member voted (40)
Member Party Vote
McClellan, Jennifer L. — Yea
Morrissey, Joseph D. — Yea
Spruill, Lionell, Sr. — Yea
Barbara A. Favola — Yea
Barker, George L. — Yea
Bell, John J. — Yea
Bill DeSteph — Yea
Bryce E. Reeves — Yea
Chase, Amanda F. — Yea
Cosgrove, John A., Jr. — Yea
David R. Suetterlein — Yea
David W. Marsden — Yea
Dunnavant, Siobhan S. — Yea
Ebbin, Adam P. — Yea
Edwards, John S. — Yea
Hanger, Emmett W., Jr. — Yea
Hashmi, Ghazala F. — Yea
Howell, Janet D. — Yea
Jennifer B. Boysko — Yea
Jeremy S. McPike — Yea
Kiggans, Jennifer A. — Yea
L. Louise Lucas — Yea
Lewis, Lynwood W., Jr. — Yea
Mamie E. Locke — Yea
Mark D. Obenshain — Yea
Mark J. Peake — Yea
Mason, T. Montgomery "Monty" — Yea
Newman, Stephen D. — Yea
Norment, Thomas K., Jr. — Yea
Petersen, J. Chapman — Yea
R. Creigh Deeds — Yea
Richard H. Stuart — Yea
Ruff, Frank M., Jr. — Yea
Ryan T. McDougle — Yea
Saslaw, Richard L. — Yea
Scott A. Surovell — Yea
T. Travis Hackworth — Yea
Todd E. Pillion — Yea
Vogel, Jill Holtzman — Yea
William M. Stanley, Jr. — Yea

Official roll call →

Passed 40 Yea · 0 Nay
Party YeaNayPresentNot Voting
Unaffiliated 40000
Total 40000
% of votes cast 100%0%0%0%
How each member voted (40)
Member Party Vote
McClellan, Jennifer L. — Yea
Morrissey, Joseph D. — Yea
Spruill, Lionell, Sr. — Yea
Barbara A. Favola — Yea
Barker, George L. — Yea
Bell, John J. — Yea
Bill DeSteph — Yea
Bryce E. Reeves — Yea
Chase, Amanda F. — Yea
Cosgrove, John A., Jr. — Yea
David R. Suetterlein — Yea
David W. Marsden — Yea
Dunnavant, Siobhan S. — Yea
Ebbin, Adam P. — Yea
Edwards, John S. — Yea
Hanger, Emmett W., Jr. — Yea
Hashmi, Ghazala F. — Yea
Howell, Janet D. — Yea
Jennifer B. Boysko — Yea
Jeremy S. McPike — Yea
Kiggans, Jennifer A. — Yea
L. Louise Lucas — Yea
Lewis, Lynwood W., Jr. — Yea
Mamie E. Locke — Yea
Mark D. Obenshain — Yea
Mark J. Peake — Yea
Mason, T. Montgomery "Monty" — Yea
Newman, Stephen D. — Yea
Norment, Thomas K., Jr. — Yea
Petersen, J. Chapman — Yea
R. Creigh Deeds — Yea
Richard H. Stuart — Yea
Ruff, Frank M., Jr. — Yea
Ryan T. McDougle — Yea
Saslaw, Richard L. — Yea
Scott A. Surovell — Yea
T. Travis Hackworth — Yea
Todd E. Pillion — Yea
Vogel, Jill Holtzman — Yea
William M. Stanley, Jr. — Yea

Official roll call →

Passed 15 Yea · 0 Nay
Party YeaNayPresentNot Voting
Unaffiliated 15000
Total 15000
% of votes cast 100%0%0%0%
How each member voted (15)
Member Party Vote
McClellan, Jennifer L. — Yea
Morrissey, Joseph D. — Yea
Barbara A. Favola — Yea
David R. Suetterlein — Yea
David W. Marsden — Yea
Hanger, Emmett W., Jr. — Yea
Hashmi, Ghazala F. — Yea
Lewis, Lynwood W., Jr. — Yea
Mark D. Obenshain — Yea
Mason, T. Montgomery "Monty" — Yea
Petersen, J. Chapman — Yea
Richard H. Stuart — Yea
Ruff, Frank M., Jr. — Yea
T. Travis Hackworth — Yea
William M. Stanley, Jr. — Yea

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does SB 684 do?
Certified pollution control equipment; certification by subdivisions. Provides that for pollution control equipment to be used as part of a political subdivision's water, wastewater, stormwater, or solid waste management facilities or systems, such equipment may be certified by the political subdivision itself instead of by the state certifying authority. This bill is identical to HB 148.
Who sponsors SB 684?
SB 684 is sponsored by Mason, T. Montgomery "Monty".
What is the current status of SB 684?
This bill has been enacted into law. Introduced January 20, 2022. Enacted.
Where can I track SB 684?
Track SB 684 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 684

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 684

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →