S 3939 — Permits dual-use solar energy projects to participate in community solar program.*
Last action — APP
-
1Introduced
-
2In Committee
-
3Passed Senate
-
4Passed General Assembly
-
5To Executive
-
6Enacted
This bill has been introduced in the Senate. Introduced March 12, 2026. It must pass committee before a floor vote.
Next likely step: a committee referral and hearing.
Odds of enactment
Low chanceBased on the sponsor, cosponsors, and committee posture, this bill has a low chance of becoming law.
Upgrade to see the exact probability and what's driving it.
A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.
Prognosis
-
Introduced
Current position in the legislative process.
-
11 sponsors
5 primary, 6 co-sponsors signed on.
-
Single-party support
Sponsorship is currently within one party (3 D).
-
Cleared a recorded vote
Passed 3 recorded votes so far.
Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.
In plain language
The bill allows dual-use solar energy projects to join the community solar program.
This legislation permits dual-use solar energy facilities, which utilize land for both agriculture and solar energy production, to participate in community solar programs. The aim is to promote the integration of renewable energy while maintaining agricultural activity.
What this means for you
- Environment: This bill supports environmentally friendly solar energy projects that also preserve agricultural land.
Summary
Dual-use solar facilities-participate in community solar program
Bill Text
What changed in the latest version
268 added · 38 removedPlain-language change summary
The amendment allows dual-use solar energy projects to participate in the community solar program. This change expands the types of solar facilities that can engage in the program, potentially increasing the availability of solar energy options for communities. Additionally, the amendment includes a reference to another piece of legislation (P.L.2021, c.170), indicating a wider regulatory context for solar energy initiatives.
S3939 1R2R [First[Second Reprint] SENATE, No.
GREENSTEIN District 14 (Mercer and Middlesex) Assemblyman Co-SponsoredWILLIAM by:W.
SenatorSPEARMAN DiegnanDistrict 5 (Camden and Gloucester) SYNOPSISAssemblyman CLINTON PermitsCALABRESE dual-useDistrict solar36 energy(Bergen projectsand toPassaic) participateAssemblywoman inHEATHER communitySIMMONS solarDistrict program.3 (Cumberland, Gloucester and Salem) Co-Sponsored by:
Senator CURRENTDiegnan, VERSIONAssemblywoman OFKatz, TEXTAssemblymen Karabinchak, AsKearney, reportedAssemblywomen byBrennan theand SenateBagolie Environment and Energy Committee onSYNOPSIS June 8,Permits 2026,dual-use withsolar amendments.energy projects to participate in community solar program.
AnCURRENT ActVERSION concerningOF theTEXT community solarAs energyreported programby the Senate Budget and amendingAppropriations P.L.2018,Committee c.17.on June 28, 2026, with amendments.
An Act concerning the community solar energy program 2and dual-use solar energy projects,2 and amending P.L.2018, c.17 2and P.L.2021, c.1702.
(1) (1) a capacity limit for individual solar energy projects to a maximum of five megawatts per project;
(2) (2) an annual capacity limit for all solar energy projects under the pilot program;
(3) (3) geographic limitations for solar energy projects and participating customers;
(4) (4) a minimum number of participating customers for each solar energy project;
(5) (5) the value of the credit on each participating customer's bill;
(6) (6) standards to limit the land use impact of a solar energy project as required in subsection r.
(7) (7) the provision of access to solar energy projects for low and moderate income customers;
(8) (8) standards to ensure the ability of residential and commercial customers to participate in solar energy projects, including residential customers in multifamily housing;
(9) (9) standards for connection to the distribution system of an electric public utility;
c. c. The board shall make available on its Internet website information on solar energy projects whose owners are seeking participants.
e. e. Subject to review by the board, an electric public utility shall be entitled to full and timely cost recovery for all costs incurred in implementation and compliance with this section.
(1) (1) limit the capacity of each solar energy project to a maximum of five megawatts;
and (b) (b) stipulate that the board shall open registration, by October 1, 2025, for 3,000 megawatts of solar energy projects in addition to the conditional registration goals already established pursuant to this paragraph. The board shall accept and approve registrations pursuant to this subparagraph until the earlier of December 31, or such time as the 3,000 megawatts of solar energy projects are completely registered. The board shall set SREC-II levels and guaranteed bill credit discount levels as appropriate to enable the complete registration of 3,000 megawatts of solar energy projects by December 31, 2029;
(3) (3) set geographic limitations for solar energy projects and participating customers;
(4) (4) provide for a minimum number of participating customers for each solar energy project;
(5) (5) require the provision of access to solar energy projects for low and moderate income customers;
(6) (6) establish standards to ensure the ability of residential and commercial customers to participate in solar energy projects, including residential customers in multifamily housing;
(7) (7) establish a method for determining the value of the credit on each participating customer's bill;
(8) (8) establish timeframes for the credit available to the customer;
(9) (9) establish standards and methods to verify solar electric energy generation on a monthly basis for a solar energy project;
and2[and]2 (17) allow, in a form and manner to be determined by the board, low- and moderate-income residential customers to self-attest to the customer's income as an acceptable income verification method for participation in a solar energy project.project2;
and g. (18) Asnotwithstanding usedsubsection ind. this section:
of this section and paragraph (10) of this subsection, after the effective date of P.L. , c. (C. ) (pending before the Legislature as this bill) allow the participation of dual-use solar energy projects with a maximum capacity of five megawatts that are approved by the board as part of the dual-use solar energy pilot program or the successor dual-use solar energy permanent program established by the board pursuant to section 1 of P.L.2021, c.170 (C.48:3-87.13), provided that the board may specify certain categories or types of dual-use solar energy projects that are not eligible for participation in the community solar energy program2.
g. 2(1) Only dual-use solar energy projects that apply after the effective date of P.L. , c. (C. ) (pending before the Legislature as this bill) for participation in the dual-use solar energy pilot program or a successor dual-use solar energy permanent program established by the board pursuant to section 1 of P.L.2021, c.170 (C.48:3-87.13) and are approved to participate in either program shall be eligible to participate in the permanent community solar energy program.
(2) A dual-use solar energy project participating in the community solar energy program shall be required to comply with all requirements of both the applicable dual-use solar energy program and the community solar energy program that are in effect at the time of the dual-use solar energy project’s registration in the respective programs.
h. The board may, in its discretion, establish different incentive levels within the community solar energy program for different categories of solar energy projects based on project characteristics including, but not limited to, the project size and the pre-existing land use and land cover of the property on which the solar energy project is sited.
i.2 As used in this section:
h. 2[h. Notwithstanding the provisions of this section or any other law, rule, regulation, or order to the contrary, 1a1 dual-use 1[or agrivoltaics solar facilities] solar energy project1 shall be eligible for participation in the community solar energy program and shall be admitted, upon registration, into the community solar market segment of the small solar facilities incentive program established pursuant to section 3 of P.L.2021, c.169 (C.48:3-116).
Notwithstanding the provisions of this section or any other law, rule, regulation, or order to the contrary, 1a1 dual-use 1[or agrivoltaics solar facilities] solar energy project1 shall be eligible for participation in the community solar energy program and shall be admitted, upon registration, into the community solar market segment of the small solar facilities incentive program established pursuant to section 3 of P.L.2021, c.169 (C.48:3-116).]2 (cf:
P.L.2025, c.135, 1[s.5] s.11) 2. 22. ThisSection actof shallP.L.2021, takec.170 effect(C.48:3-87.13) immediately.is amended to read as follows:
1.
a.
No later than 180 days after the date of enactment of P.L.2021, c.170 (C.48:3-87.13 et al.), the Board of Public Utilities, in consultation with the Secretary of Agriculture, shall adopt, pursuant to the "Administrative Procedure Act," P.L.1968, c.410 (C.52:14B-1 et seq.), rules and regulations establishing a "Dual-Use Solar Energy Pilot Program" to permit the construction, installation, and operation of dual-use solar energy projects that are connected to the distribution or transmission system owned or operated by a New Jersey public utility or local government unit and located on unpreserved farmland, while maintaining the affected land in active agricultural or horticultural use.
b. The rules and regulations developed by the board, in consultation with the Secretary of Agriculture, for the Dual-Use Solar Energy Pilot Program shall establish:
Show all 95 changed lines (55 more)
(1) a 10 megawatt, as measured in direct current, capacity limit for each individual dual-use solar energy project;
(2) [annual] pilot program application period capacity targets, such that the total capacity of all dual-use solar energy projects approved under the pilot program shall not exceed 200 megawatts, as measured in direct current, for all dual-use solar energy projects approved under the pilot program, except as otherwise provided pursuant to subsection e.
of this section;
(3) financial incentives available to dual-use solar energy projects approved pursuant to the pilot program, which financial incentives may be designed to stack with any incentives available in the board’s other solar energy programs, provided that any financial incentives designed to stack are set at a level that takes into account both the additional costs associated with being a dual-use solar energy project and all the revenue streams available to the dual-use solar energy project in the board’s other solar energy programs;
(4) a prohibition on siting a dual-use solar energy project on prime agricultural soils and soils of Statewide importance, as identified by the United States Department of Agriculture's Natural Resources Conservation Service, which are located in Agricultural Development Areas certified by the State Agriculture Development Committee, unless the project is in association with a research study undertaken in coordination with a New Jersey public research institution of higher education, as approved by the board in consultation with the Secretary of Agriculture;
(5) a prohibition on siting a dual-use solar energy project on any of the following unless the board, in consultation with the Department of Environmental Protection and the Secretary of Agriculture, grants a waiver based on unique factors that make the project consistent with the character of the specific parcel:
(a) land located within the preservation area of the pinelands area, as designated in subsection b.
of section 10 of P.L.1979, c.111 (C.13:18A-11);
(b) land designated as forest area in the pinelands comprehensive management plan adopted pursuant to P.L.1979, c.111 (C.13:18A-1 et seq.);
(c) land designated as freshwater wetlands, as defined pursuant to P.L.1987, c.156 (C.13:9B-1 et seq.), or coastal wetlands, as defined pursuant to P.L.1970, c.272 (C.13:9A-1 et seq.);
or (d) land located within the Highlands preservation area as designated in subsection b.
of section 7 of P.L.2004, c.120 (C.13:20-7);
(6) the requirement that the land on which the dual-use solar energy project is installed continues to be actively devoted to agricultural or horticultural use;
(7) the requirement that the project comply with all applicable federal, State, or local laws, rules, regulations, or ordinances;
(8) an application process for owners who wish to develop a dual-use solar energy project as part of the pilot program, including such fees or deposits as shall be determined by the board;
and (9) criteria, consistent with the provisions of paragraph (1) of subsection c.
of this section, for evaluating and scoring proposed projects to determine which projects should be allowed to participate in the pilot program and be awarded incentives pursuant to paragraph (3) of this subsection.
c.
(1) An owner proposing a dual-use solar energy project shall submit an application to the board before constructing, installing, or operating the project. The board shall consult with the Secretary of Agriculture in the review and approval of all dual-use solar energy projects under the Dual-Use Solar Energy Pilot Program. In reviewing and making decisions on dual-use solar energy projects, the board and secretary shall give consideration to criteria including, but not limited to:
(a) proposals for monitoring the quality of agricultural or horticultural use of the land;
(b) the incentive level sought by the applicant;
(c) geographic location;
(d) interconnection planning;
(e) proposals for minimizing negative impacts to farmland;
(f) proposals to address decommissioning;
(g) proposals for addressing stormwater runoff and other environmental issues;
(h) technical feasibility;
(i) technical innovation;
(j) the quality of any research committed to during the evaluation period;
and (k) any other criteria as may be deemed advisable by the board.
The review shall also consider whether the selected projects are of varying sizes, and, collectively, involve diverse types of agricultural and horticultural production. The board, in consultation with the Secretary of Agriculture, shall, within 180 days after receipt, approve, disapprove, or approve with conditions an application submitted pursuant to this section.
(2) An owner who receives approval from the board pursuant to this section shall obtain all necessary permits and other approvals as may be required pursuant to federal, State, or local law, rule, regulation, or ordinance, prior to the construction of the dual-use solar energy project.
d. The Secretary of Agriculture may request that the board suspend or revoke an approval issued pursuant to this section for a violation of any term or condition of the approval or any provision of this section.
e. The Dual-Use Solar Energy Pilot Program shall continue for 36 months after the adoption of the rules and regulations required pursuant to subsection a.
of this section, except that the board may extend the pilot program by no more than two additional 12-month periods if the board, in consultation with the Secretary of Agriculture, determines that such extensions are necessary to adequately evaluate the performance of the projects selected for construction as part of the Dual-Use Solar Energy Pilot Program. If the board extends the Dual-Use Solar Energy Pilot Program, it may increase the total capacity limit of all projects under the program by no more than 50 megawatts, as measured in direct current, per additional 12-month period.
f. Notwithstanding any law, ordinance, rule, or regulation to the contrary, a dual-use solar energy project approved pursuant to this section shall be a permitted use within every municipality.
g. No later than 36 months, or no later than 48 or 60 months if applicable due to extensions of the Dual-Use Solar Energy Pilot Program pursuant to subsection e.
of this section, after adoption of the rules and regulations required pursuant to subsection a.
of this section, the board, in consultation with the Secretary of Agriculture, shall adopt rules and regulations, pursuant to the "Administrative Procedure Act," P.L.1968, c.410 (C.52:14B-1 et seq.), to convert the Dual-Use Solar Energy Pilot Program to a permanent program as part of the permanent successor to the solar incentive program established pursuant to P.L.2021, c.169 (C.48:3-114 et al.). The rules and regulations for the permanent program shall set forth standards for dual-use solar energy projects that take into account the results of the pilot program and any research studies on the efficacy of dual-use solar energy in New Jersey, and shall include, but not be limited to:
(1) a capacity limit for individual dual-use solar energy projects;
(2) [a] total [annual] capacity [limit] limits to be set on an annual or other periodic basis;
(3) provisions to protect New Jersey's prime agricultural soils and soils of Statewide importance, as identified by the United States Department of Agriculture's Natural Resources Conservation Service, which are located in Agricultural Development Areas certified by the State Agriculture Development Committee, and provisions to protect the State's agricultural and horticultural diversity;
(4) standards for: installation and decommissioning techniques that minimize negative impacts to farmland, which may include the posting of a performance bond for decommissioning;
impervious coverage;
and water management, including, but not limited to, water recapture and filtration;
(5) provisions to ensure the continued active agricultural or horticultural use of land on which dual-use solar energy projects are installed;
(6) siting criteria and restrictions, which may differ from those established pursuant to section 6 of P.L.2021, c.169 (C.48:3-119) to the extent necessary to accomplish the purposes of the dual-use solar energy program;
[and] (7) an application process, including such fees, escrows, or deposits as shall be determined by the board;
and (8) an incentive structure designed to support the development of dual-use solar energy projects in New Jersey, taking into account the benefits and costs to ratepayers and the State’s electric transmission and distribution system, and the costs and revenue streams associated with different project types.
h. As used in this section:
"Dual-use solar energy project" means the energy generation facilities, structures, and equipment for the production of electric power from solar photovoltaic panels located on unpreserved farmland in agricultural or horticultural production that ensures the continued simultaneous use of the land below and adjacent to the panels for agricultural or horticultural production.
"Owner" means the owner of the unpreserved farmland, the owner of the dual-use solar energy project, or a representative duly authorized to act on the owner's behalf.
"Preserved farmland" means the same as the term is defined in section 4 of P.L.2009, c.213 (C.54:4-23.3c).
"Unpreserved farmland" means any land that is valued, assessed, and taxed pursuant to the "Farmland Assessment Act of 1964," P.L.1964, c.48 (C.54:4-23.1 et seq.), and is not preserved farmland.2 (cf:
P.L.2021, c.170, s.1) 2[2.] 3.2 This act shall take effect immediately.
Show all 95 changed rows (55 more)
AI-generated reading aid from the bill's amendatory text — verify against the official bill.
This bill amends 2 section(s) of the New Jersey statutes: N.J.S.A. 48:3-87.11; N.J.S.A. 48:3-87.13.
-
N.J.S.A. 48:3-87.11
and ⟦INS⟧or agrivoltaics solar facilities"⟦/INS⟧ ⟦INS⟧energy generation facilities that produce electric power from solar photovoltaic panels located on unpreserved farmland in agricultural or horticultural production that ensures the continued simultaneous use of the land below and adjacent to the panels for agricultural or horticultural production⟦/INS⟧ ⟦INS⟧or agrivoltaics solar facilities⟦/INS⟧ s.5→ ; and (18) notwithstanding subsection d. of this section and paragraph (10) of this subsection, after the effective date of P.L. , c. (C. ) (pending before the Legislature as this bill) allow the participation of dual-use solar energy projects with a maximum capacity of five megawatts that are approved by the board as part of the dual-use solar energy pilot program or the successor dual-use solar energy permanent program established by the board pursuant to section 1 of P.L.2021, c.170 (C.48:3-87.13), provided that the board may specify certain categories or types of dual-use solar energy projects that are not eligible for participation in the community solar energy program (1) Only dual-use solar energy projects that apply after the effective date of P.L. , c. (C. ) (pending before the Legislature as this bill) for participation in the dual-use solar energy pilot program or a successor dual-use solar energy permanent program established by the board pursuant to section 1 of P.L.2021, c.170 (C.48:3-87.13) and are approved to participate in either program shall be eligible to participate in the permanent community solar energy program. (2) A dual-use solar energy project participating in the community solar energy program shall be required to comply with all requirements of both the applicable dual-use solar energy program and the community solar energy program that are in effect at the time of the dual-use solar energy project's registration in the respective programs. h. The board may, in its discretion, establish different incentive levels within the community solar energy program for different categories of solar energy projects based on project characteristics including, but not limited to, the project size and the pre-existing land use and land cover of the property on which the solar energy project is sited. i. "Dual-use or agrivoltaics solar facilities" solar energy project" means energy generation facilities that produce electric power from solar photovoltaic panels located on unpreserved farmland in agricultural or horticultural production that ensures the continued simultaneous use of the land below and adjacent to the panels for agricultural or horticultural production the same as that term is defined in section 1 of P.L.2021, c.170 (C.48:3-87.13) . h. Notwithstanding the provisions of this section or any other law, rule, regulation, or order to the contrary, a dual-use or agrivoltaics solar facilities solar energy project shall be eligible for participation in the community solar energy program and shall be admitted, upon registration, into the community solar market segment of the small solar facilities incentive program established pursuant to section 3 of P.L.2021, c.169 (C.48:3-116). s.1amended
-
N.J.S.A. 48:3-87.13
annual a annual limit and 2.→ pilot program application period , which financial incentives may be designed to stack with any incentives available in the board's other solar energy programs, provided that any financial incentives designed to stack are set at a level that takes into account both the additional costs associated with being a dual-use solar energy project and all the revenue streams available to the dual-use solar energy project in the board's other solar energy programs limits to be set on an annual or other periodic basis ; and (8) an incentive structure designed to support the development of dual-use solar energy projects in New Jersey, taking into account the benefits and costs to ratepayers and the State's electric transmission and distribution system, and the costs and revenue streams associated with different project types 3.amended
Action History
-
APP
-
PA PBH
-
SUB FOR
-
R/A AWR 2RA
-
PS
-
REP/SCA 2RS
-
REF SBA
-
REP/SCA 2RS
-
INT 1RS REF SEN
Sponsors
- William W. Spearman · Primary
- Clinton Calabrese · Primary
- Heather Simmons · Primary
- Andrea Katz · Cosponsor
- Robert J. Karabinchak · Cosponsor
- Vincent M. Kearney · Cosponsor
- Katie Brennan · Cosponsor
- Rosaura Bagolie · Cosponsor
- Andrew Zwicker · Primary
- Linda R. Greenstein · Primary
- Patrick J. Diegnan Jr. · Cosponsor
Sponsorship breakdown
Export CSV (upgrade) →5 sponsors · 6 co-sponsors · 109 not signed on · 1 voted No
Sponsors (5)
- Spearman, William W.
- Calabrese, Clinton
- Simmons, Heather
- Zwicker, Andrew Democrat
- Greenstein, Linda R. Democrat
Co-sponsors (6)
- Katz, Andrea
- Karabinchak, Robert J.
- Kearney, Vincent M.
- Brennan, Katie
- Bagolie, Rosaura
- Diegnan Jr., Patrick J. Democrat
Not signed on (109)
109 members have not signed on to this bill.
Show all 109 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Votes
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Democrat | 9 | 0 | 0 | 0 |
| Republican | 4 | 0 | 0 | 0 |
| Total | 13 | 0 | 0 | 0 |
| % of votes cast | 100% | 0% | 0% | 0% |
How each member voted (13)
| Member | Party | Vote |
|---|---|---|
| Burgess, Renee C. | Democrat | Yea |
| Burzichelli, John J. | Democrat | Yea |
| Cruz-Perez, Nilsa I. | Democrat | Yea |
| Diegnan Jr., Patrick J. | Democrat | Yea |
| Greenstein, Linda R. | Democrat | Yea |
| Johnson, Gordon M. | Democrat | Yea |
| Ruiz, M. Teresa | Democrat | Yea |
| Sarlo, Paul A. | Democrat | Yea |
| Zwicker, Andrew | Democrat | Yea |
| Amato Jr., Carmen F. | Republican | Yea |
| O'Scanlon Jr., Declan J. | Republican | Yea |
| Steinhardt, Douglas J. | Republican | Yea |
| Testa Jr., Michael L. | Republican | Yea |
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Democrat | 56 | 0 | 0 | 0 |
| Republican | 20 | 1 | 0 | 1 |
| Unaffiliated | 2 | 0 | 0 | 0 |
| Total | 78 | 1 | 0 | 1 |
| % of votes cast | 98% | 1% | 0% | 1% |
How each member voted (80)
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Democrat | 3 | 0 | 0 | 0 |
| Republican | 2 | 0 | 0 | 0 |
| Total | 5 | 0 | 0 | 0 |
| % of votes cast | 100% | 0% | 0% | 0% |
How each member voted (5)
| Member | Party | Vote |
|---|---|---|
| Greenstein, Linda R. | Democrat | Yea |
| McKeon, John F. | Democrat | Yea |
| Smith, Bob | Democrat | Yea |
| Space, Parker | Republican | Yea |
| Tiver, Latham | Republican | Yea |
Subjects
Frequently asked questions
- What does S 3939 do?
- Dual-use solar facilities-participate in community solar program
- Who sponsors S 3939?
- S 3939 is sponsored by Spearman, William W., Calabrese, Clinton, Simmons, Heather, Katz, Andrea, Karabinchak, Robert J., Kearney, Vincent M., Brennan, Katie, Bagolie, Rosaura, Zwicker, Andrew (Democrat), Greenstein, Linda R. (Democrat), and Diegnan Jr., Patrick J. (Democrat).
- What is the current status of S 3939?
- This bill has been introduced in the Senate. Introduced March 12, 2026. It must pass committee before a floor vote.
- Where can I track S 3939?
- Track S 3939 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on S 3939
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.