A10830 — Relates to the siting of new electric transmission facilities
Last action — In Assembly Committee
-
1Introduced
-
2In Committee
-
3Passed Assembly
-
4Passed Senate
-
5To Executive
-
6Enacted
This bill has been introduced in the Assembly. Introduced April 01, 2026. It must pass committee before a floor vote.
Next likely step: a committee referral and hearing.
Odds of enactment
Low chanceBased on the sponsor, cosponsors, and committee posture, this bill has a low chance of becoming law.
Upgrade to see the exact probability and what's driving it.
A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.
Prognosis
Not enough signal yet to read this bill's trajectory — we surface a likelihood only once there's real movement (stage, sponsorship, committee, or votes) to point to.
Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.
In plain language
The bill prioritizes electric transmission facilities in existing rights-of-way for siting.
This bill aims to prioritize new electric transmission facilities that are proposed to be located in existing rights-of-way. It is designed to streamline the siting process by focusing on areas already designated for utility use.
Summary
Provides that in the siting of new electric transmission facilities, priority shall be given to major electric transmission facilities that are proposed to be sited in existing rights-of-way including those owned by an electric corporation or distribution utility, or by the state, including any subdivision thereof, or a state public authority, for state highway or transportation purposes, and railroad corridors.
Bill Text
- Full text View text Current
Action History
-
REPORTED REFERRED TO RULES
-
PRINT NUMBER 10830A
-
AMEND (T) AND RECOMMIT TO ENERGY
-
REFERRED TO ENERGY
Sponsors
- Karen McMahon · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 218 not signed on
Sponsors (1)
Co-sponsors (0)
None.
Not signed on (218)
218 members have not signed on to this bill.
Show all 218 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Subjects
Frequently asked questions
- What does A10830 do?
- Provides that in the siting of new electric transmission facilities, priority shall be given to major electric transmission facilities that are proposed to be sited in existing rights-of-way including those owned by an electric corporation or distribution utility, or by the state, including any subdivision thereof, or a state public authority, for state highway or transportation purposes, and railroad corridors.
- Who sponsors A10830?
- A10830 is sponsored by Karen McMahon.
- What is the current status of A10830?
- This bill has been introduced in the Assembly. Introduced April 01, 2026. It must pass committee before a floor vote.
- Where can I track A10830?
- Track A10830 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on A10830
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of A10830
Last checked for changes 3 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →