New York 2025 Session Status: Introduced

A9136 — Requires new data centers to incorporate thermal energy networks

Last action — In Assembly Committee

  1. 1
    Introduced
  2. 2
    In Committee
  3. 3
    Passed Assembly
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill has been introduced in the Assembly. Introduced October 17, 2025. It must pass committee before a floor vote.

Next likely step: a committee referral and hearing.

Prognosis

Not enough signal yet

Where this bill stands today.

Odds of enactment

Low

How often bills like it became law.

Not enough signal yet to read this bill's trajectory — we surface a likelihood only once there's real movement (stage, sponsorship, committee, or votes) to point to.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Summary

Requires the owner or operator of a new data center to submit to the Public Service Commission a thermal energy network feasibility assessment that identifies potential off-site thermal loads within one mile of the facility; requires that new data centers be designed, constructed, and operated to capture and reuse waste heat generated by computing equipment through a thermal energy network.

Bill Text

Action History

  1. REFERRED TO ENERGY

  2. REFERRED TO ENERGY

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 218 not signed on

Sponsors (1)

Co-sponsors (0)

None.

Not signed on (218)

218 members have not signed on to this bill.

Show all 218 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does A9136 do?
Requires the owner or operator of a new data center to submit to the Public Service Commission a thermal energy network feasibility assessment that identifies potential off-site thermal loads within one mile of the facility; requires that new data centers be designed, constructed, and operated to capture and reuse waste heat generated by computing equipment through a thermal energy network.
Who sponsors A9136?
A9136 is sponsored by Michaelle C. Solages.
What is the current status of A9136?
This bill has been introduced in the Assembly. Introduced October 17, 2025. It must pass committee before a floor vote.
Where can I track A9136?
Track A9136 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on A9136

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of A9136

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →