Electric/public contracts
Do you support it?
Want to know if it passes?
We'll email you when SB 6004 moves — a committee vote, a floor vote, or a signature. Nothing else.
Free forever · unsubscribe in one click.
Your answer was recorded either way.
Which district are you in?
Your ZIP is all we need to match you to your own representatives — so we can tell you how they voted on SB 6004.
You're tracking SB 6004
We'll email you the moment it moves.
SB 6004 — Electric/public contracts
Last action — First reading, referred to Environment, Energy & Technology.
No card. One bill, free forever — alerts when it moves.
-
1Introduced
-
2In Committee
-
3Passed Senate
-
4Passed House
-
5To Executive
-
6Enacted
This bill has been introduced in the Senate. Introduced January 12, 2026. It must pass committee before a floor vote.
Next likely step: a committee referral and hearing.
Prognosis
Where this bill stands today.
Odds of enactment
LowHow often bills like it became law.
Not enough signal yet to read this bill's trajectory — we surface a likelihood only once there's real movement (stage, sponsorship, committee, or votes) to point to.
Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.
Summary
Authorizing certain public entities to contract for the capability of renewable or nonemitting electric generation projects.
Bill Text
We don't have the full text on file for this bill yet.
Read SB 6004 on the official Washington source →Compared against the Revised Code of Washington as published AI-generated reading aid — verify against the official bill.
This bill amends 9 section(s) of the Revised Code of Washington: RCW 35.22.705; RCW 35.23.705; RCW 35.27.610; RCW 35.92.420; RCW 35A.80.020; RCW 35A.80.050.
-
RCW 35.22.705
the output of which is limited to qualified alternative energy resources as defined by RCW 19.29A.090(3)→ read as follows: A city of the first class may contract to purchase from a joint operating agency electric power and energy required for its present or future requirements. For projects using a renewable resource or nonemitting electric generation as defined in RCW 19.405.020, the contract may include the purchase of capability of the projects to produce electricity in addition to the actual output of the projects. The contract may provide that the city must make the payments required by the contract whether or not a project is completed, operable, or operating and notwithstanding the suspension, interruption, interference, reduction, or curtailment of the output of a project or the power and energy contracted for. The contract may also provide that payments under the contract are not subject to reduction, whether by offset or otherwise, and shall not be conditioned upon the performance or nonperformance of the joint operating agency or a city, town, or public utility district under the contract or other instrument.amended
-
RCW 35.23.705
the output of which is limited to qualified alternative energy resources as defined by RCW 19.29A.090(3)→ read as follows: A city of the second class may contract to purchase from a joint operating agency electric power and energy required for its present or future requirements. For projects using a renewable resource or nonemitting electric generation as defined in RCW 19.405.020amended
-
RCW 35.27.610
the output of which is limited to qualified alternative energy resources as defined by RCW 19.29A.090(3)→ read as follows: A town may contract to purchase from a joint operating agency electric power and energy required for its present or future requirements. For projects using a renewable resource or nonemitting electric generation as defined in RCW 19.405.020, the contract may include the purchase of capability of the projects to produce electricity in addition to the actual output of the projects. The contract may provide that the town must make the payments required by the contract whether or not a project is completed, operable, or operating and notwithstanding the suspension, interruption, interference, reduction, or curtailment of the output of a project or the power and energy contracted for. The contract may also provide that payments under the contract are not subject to reduction, whether by offset or otherwise, and shall not be conditioned upon the performance or nonperformance of the joint operating agency or a city, town, or public utility district under the contract or other instrument.amended
-
RCW 35.92.420
the output of which is limited to qualified alternative energy resources as defined by RCW 19.29A.090(3)→ read as follows: A city or town may contract to purchase from a joint operating agency electric power and energy required for its present or future requirements. For projects using a renewable resource or nonemitting electric generation as defined in RCW 19.405.020amended
-
RCW 35A.80.020
each amended to read as follows: Any code city is authorized to enter into contracts or compacts with any commission or any operating agency, public or private project owner, or publicly or privately owned utility for the purchase and sale of electric energy or falling waters, or the purchase of capability of a project to produce electricity in addition to the actual output of the project where the project is limited to using a renewable resource or nonemitting electric generation as defined in RCW 19.405.020, as provided in RCW 43.52.410 and chapter 35.84 RCW and to exercise any other authority granted to cities as provided in chapter 43.52 RCW.
amended
-
RCW 35A.80.050
the output of which is limited to qualified alternative energy resources as defined by RCW 19.29A.090(3)→ read as follows: A code city may contract to purchase from a joint operating agency electric power and energy required for its present or future requirements. For projects using a renewable resource or nonemitting electric generation as defined in RCW 19.405.020, the contract m lude the purchase of capability of rojects to produce city in addition to the actual o of the projects. The act may provide that the code cit make the payments r by the contract whether or not oject is completed, ble, or operating and notwiths the suspension, ruption, interference, reduction, o lment of the output o oject or the power and energy cont for. The contract ma provide that payments under the ct are not subject duction, whether by offset or other nd shall not be condit upon the performance or nonperform the joint operating cy or a city, town, or public uti strict under the con or other instrument.amended
-
RCW 43.52.41
or : PROVIDED, That no city or district may enter into a contract or compact with an operating agency to purchase electric energy, or to purchase or participate in a portion of an electrical generating project, that commits the city or district to pay an amount in excess of an express dollar amount or in excess of an express rate per unit of electrical energy received→ 983 c 308 s 1 are e ended to read as follows: (1) Any city , d , or operating agency thorized to enter into contracts or , public or private project owner, waters , or the purchase of capability of a project to produce electricity in addition to the actual output of the project where the project is limited to using a renewable resource or nonemitting electric generation as defined in RCW 19.405.020. (2) For the purposes of this section, the purchase of capability of a project to produce electricity in addition to the actual output of the project means that the contract may provide that the city, district, or operating agency must make the payments required by the contract whether or not the project is completed, operable, or operating and notwithstanding the suspension, interruption, interference, reduction, or curtailment of the output of the project or the power and energy contracted for. Such contract may also provide that payments under the contract are not subject to reduction, whether by offset or otherwise, and may not be conditioned upon the performance or nonperformance of the operating agency, public or private project owner, or publicly or privately owned public utility, or a city, district, or operating agency under the contract or other instrument.amended
-
RCW 43.52.595
the output of which is limited to qualified alternative energy resources as defined by RCW 19.29A.090(3)→ read as follows: A city or district may contract to purchase from an operating agency electric power and energy required for its present or future requirements. For projects using a renewable resource or nonemitting electric generation as defined in RCW 19.405.020 that payments under the contract are not subject to reduction, whether by offset or otherwise, and shall not be conditioned upon the performance or nonperformance of the operating agency or a city or district under the contract or other instrument.amended
-
RCW 54.16.370
the output of which is limited to qualified alternative energy resources as defined by RCW 19.29A.090(3)→ read as follows: A district may contract to purchase from a joint operating agency electric power and energy required for its present or future requirements. For projects using a renewable resource or nonemitting electric generation as defined in RCW 19.405.020 --- END ---amended
Action History
-
First reading, referred to Environment, Energy & Technology.
Sponsors
- (Boehnke) · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 150 not signed on
Sponsors (1)
- (Boehnke)
Co-sponsors (0)
None.
Not signed on (150)
150 members have not signed on to this bill.
Show all 150 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Subjects
Frequently asked questions
- What does SB 6004 do?
- Authorizing certain public entities to contract for the capability of renewable or nonemitting electric generation projects.
- Who sponsors SB 6004?
- SB 6004 is sponsored by (Boehnke).
- What is the current status of SB 6004?
- This bill has been introduced in the Senate. Introduced January 12, 2026. It must pass committee before a floor vote.
- Where can I track SB 6004?
- Track SB 6004 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on SB 6004
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of SB 6004
Last checked for changes 4 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →