New Mexico 2025 Regular Session Status: In Committee Bipartisan · 3 D · 1 R cosponsors

SB 281 — RURAL ELECTRIC CO-OP WILDFIRE LIABILITY ACT

Last action — action postponed indefinitely

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. 2
    In Committee
  3. 3
    Passed Senate
  4. 4
    Passed House
  5. 5
    To Executive
  6. 6
    Enacted

This bill died with 2025 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Bill Text

What changed in the latest version

461 added · 363 removed

Plain-language change summary

The updated version of Senate Bill 281 now removes a clause that established a two-year deadline for filing claims related to wildfire damages. This change means that individuals may have more time to seek compensation if they are affected by wildfires caused by rural electric cooperatives. By allowing a longer timeframe for claims, the amendment aims to provide greater access to justice for those impacted by these wildfires.

→
Previous
Latest
SENATE BILL 281 57TH LEGISLATURE -STATEOFNEWMEXICO- FIRST SESSION, 2025 INTRODUCED BY Pat Woods and Pete Campos and Leo Jaramillo and Roberto "Bobby" J.
SENATE BILL 281 57TH LEGISLATURE - STATE OF NEW MEXICO - FIRST SESSION, 2025 INTRODUCED BY Pat Woods This document may incorporate amendments proposed by a committee, but not yet adopted, as well as amendments that have been adopted during the current legislative session.
Gonzales 7 9 AN ACT RELATING TO LIABILITY;
The document is a tool to show amendments in context and cannot be used for the purpose of adding amendments to legislation.
ENACTING THE RURAL ELECTRIC COOPERATIVE WILDFIRE LIABILITY ACT;
h AN ACT g o RELATING TO LIABILITY;
ENACTING THE RURAL ELECTRIC COOPERATIVE t hr g e i k WILDFIRE LIABILITY ACT;
PROVIDING FOR A REVIEW BY THE FORESTRY DIVISION OF THE ENERGY, MINERALS AND NATURAL RESOURCES DEPARTMENT;
h r i s PROVIDING FOR A REVIEW BY THE FORESTRY DIVISION OF THE ENERGY, h , t, MINERALS AND NATURAL RESOURCES DEPARTMENT;
PROVIDING FOR APPROVAL BY THE PUBLIC REGULATION COMMISSION;
PROVIDING FOR e u g e b l e e h APPROVAL BY THE PUBLIC REGULATION COMMISSION;
REQUIRING PUBLIC NOTICE;
REQUIRING PUBLIC n d d i = = o h NOTICE;
e t 17 ESTABLISHING A TWO-YEAR LIMITATION ON THE FILING OF CLAIMS;
l ] b ,d i a º e ESTABLISHING A TWO-YEAR LIMITATION ON THE FILING OF CLAIMS;
w l n d 18 AMENDING SECTION 30-32-4 NMSA 1978 (BEING LAWS 1882, CHAPTER = = 19 a l 61, SECTION 7, AS AMENDED) AND SECTION 37-1-4 NMSA 1978 (BEING i a e r 20 LAWS 1880, CHAPTER 5, SECTION 4).
r i = r t e w d m a n o AMENDING SECTION 30-32-4 NMSA 1978 (BEING LAWS 1882, CHAPTER d m :
a t m m 21 d r e 22 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF NEW MEXICO:
b e d s º o t n = .229722.3AIC February 19, 2025 (9:26pm) s k m e e a n e d r e l u [ A d 61, SECTION 7, AS AMENDED) AND SECTION 37-1-4 NMSA 1978 (BEING LAWS 1880, CHAPTER 5, SECTION 4).
c e s k 23 SECTION 1.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF NEW MEXICO:
[NEW MATERIAL] SHORT TITLE.--Sections 1 e a n b 24 through 8 of this act may be cited as the "Rural Electric u [ Cooperative Wildfire Liability Act".
SECTION 1.
.229722.3 SECTION 2.
[NEW MATERIAL ] SHORT TITLE.--Sections 1 through 8 of this act may be cited as the "Rural Electric Cooperative Wildfire Liability Act".
SECTION 2.
"Economic loss" includes the monetary cost of a replacement service and to the extent allowed under law a burial;
"Economic loss" includes the monetary cost of a replacement service and to the extent h g allowed under law a burial;
D.
o t hr D.
(1) a cooperative nonprofit membership corporation as defined in Section 62-15-2 NMSA 1978;
g e i k (1) a cooperative nonprofit membership h r i s h corporation as defined in Section 62-15-2 NMSA 1978;
or (2) a person, other than an investor-owned public utility or a public utility owned by an investment fund, e t 17 with electric generation and transmission facilities organized w l n d 18 in this state or in another state, independent power producers = = 19 a l or developers providing wholesale electric power to a i a e r 20 cooperative nonprofit membership corporation organized pursuant a t m m 21 to the Rural Electric Cooperative Act;
or , t, e u g (2) a person, other than an investor-owned e b l e e h public utility or a public utility owned by an investment fund, n d d i = = o h with electric generation and transmission facilities organized l ] b ,d i a º e r i = r in this state or in another state, independent power producers t e w d m a n o or developers providing wholesale electric power to a d m :
d r e 22 E.
b e d s º o t n = .229722.3AIC February 19, 2025 (9:26pm) s k m e - 2 - e a n e d r e l u [ A d cooperative nonprofit membership corporation organized pursuant to the Rural Electric Cooperative Act;
"noneconomic loss" means discomfort, c e s k 23 disfigurement, future pain and emotional distress, loss of e a n b 24 consortium, loss due to death, loss of enjoyment of life, loss u [ of use, mental anguish, pain and suffering and the value of .229722.3 - 2 - life itself;
E.
"noneconomic loss" means discomfort, disfigurement, future pain and emotional distress, loss of consortium, loss due to death, loss of enjoyment of life, loss of use, mental anguish, pain and suffering and the value of life itself;
[NEW MATERIAL] ELECTRIC COOPERATIVE WILDFIRE MITIGATION PLAN--REQUIREMENTS.-- A.
[NEW MATERIAL ] ELECTRIC COOPERATIVE WILDFIRE MITIGATION PLAN--REQUIREMENTS.-- A.
To receive the benefits under the Rural Electric Cooperative Wildfire Liability Act, an electric cooperative shall prepare a plan that includes the:
To receive the benefits under the Rural Electric h Cooperative Wildfire Liability Act, an electric cooperative g o t hr shall prepare a plan that includes the:
(1) electric cooperative's size and a detailed description and map of the electric cooperative's:
g e i k (1) electric cooperative's size and a detailed h r i s description and map of the electric cooperative's:
(a) service area;
h , t, (a) service area;
and (b) electric system within the electric e t 17 cooperative's service area;
and e u g e b l e e h (b) electric system within the electric n d d i = = o h cooperative's service area;
w l n d 18 (2) methods that the electric cooperative uses = = 19 a l to assess wildfire risk within the electric cooperative's i a e r 20 service area;
l ] b ,d i a º e (2) methods that the electric cooperative uses r i = r t e w d m a n o to assess wildfire risk within the electric cooperative's d m :
a t m m 21 (3) procedures and standards that the electric d r e 22 cooperative uses to perform vegetation management;
b e d s º o t n = .229722.3AIC February 19, 2025 (9:26pm) s k m e - 3 - e a n e d r e l u [ A d service area;
c e s k 23 (4) electric cooperative's inspection and e a n b 24 maintenance procedures for the electric cooperative's electric u [ system;
(3) procedures and standards that the electric cooperative uses to perform vegetation management;
.229722.3 - 3 - (5) electric cooperative's design and construction procedures and standards for the electric cooperative's electric system;
(4) electric cooperative's inspection and maintenance procedures for the electric cooperative's electric system;
(5) electric cooperative's design and construction procedures and standards for the electric cooperative's electric system;
(7) electric cooperative's emergency response procedures in the event of a wildfire;
(7) electric cooperative's emergency response procedures in the event of a wildfire SCONCº ;»SCONC SCONCº, including:
(8) electric cooperative's operational procedures during wildfire conditions, including red flag warning protocols and alternate recloser settings procedures;
(a) emergency contacts for the h cooperative during a wildfire emergency;
and (9) electric cooperative's procedures to restore the electric cooperative's electrical system in the event of a wildfire.
g o t hr (b) communication procedures to contact g e i k federal and state agencies responsible for fire suppression, h r i s fire departments, first responders and local governments;
and h , t, e u g (c) emergency contact email addresses, e b l e e h phone numbers and applicable radio frequencies;»SCONC n d d i = = o h (8) electric cooperative's operational l ] b ,d i a º e r i = r procedures during wildfire conditions, including red flag t e w d m a n o warning protocols and alternate recloser settings procedures;
d m :
b e d s º o t n = .229722.3AIC February 19, 2025 (9:26pm) s k m e - 4 - e a n e d r e l u [ A d and (9) electric cooperative's procedures to restore the electric cooperative's electrical system in the event of a wildfire.
An electric cooperative's plan shall also e t 17 include:
An electric cooperative's plan shall also include:
w l n d 18 (1) a description of the electric = = 19 a l cooperative's awareness efforts regarding the electric i a e r 20 cooperative's wildfire mitigation efforts, including vegetation a t m m 21 management and operational controls;
(1) a description of the electric cooperative's awareness efforts regarding the electric cooperative's wildfire mitigation efforts, including vegetation management and operational controls;
d r e 22 (2) confirmation that the electric c e s k 23 cooperative's plan and annual reports are made publicly e a n b 24 available;
(2) confirmation that the electric cooperative's plan and annual reports are made publicly available;
Show all 92 changed rows (52 more)
Previous
Latest
u [ (3) a description of the plan's mitigation .229722.3 - 4 - measures, including modifications to facilities, and preventative programs that the electric cooperative is implementing to reduce the risk of the electric cooperative's equipment igniting a wildfire, including pole and right-of-way inspections;
(3) a description of the plan's mitigation measures, including modifications to facilities, and preventative programs that the electric cooperative is h implementing to reduce the risk of the electric cooperative's u » r equipment igniting a wildfire, including pole and right-of-way t h g e l i inspections;
(4) the factors that the electric cooperative considered to balance the components of the plan with the need to provide continuous electricity service to the electric cooperative's service area and the costs and feasibility;
h r i s (4) the factors that the electric cooperative h , e h considered to balance the components of the plan with the need t u g e b l e e , gh to provide continuous electricity service to the electric n d d i = = o h cooperative's service area and the costs and feasibility;
and (5) the potential impact of the plan's mitigation measures on public safety, first responders and health and communication infrastructure.
and l ] b ,d i a º r (5) the potential impact of the plan's e r = t e w d m a n o mitigation measures on public safety, first responders and d m :
b r e t º o t n = .229722.3AIC February 19, 2025 (9:26pm) s k m e - 5 - e a n e d r e l u [ A d health and communication infrastructure.
[NEW MATERIAL] WILDFIRE MITIGATION PLAN-- REVIEW--APPROVAL.-- A.
[NEW MATERIAL ] WILDFIRE MITIGATION PLAN-- REVIEW--APPROVAL.-- A.
An electric cooperative's plan shall be effective for five years upon the date of approval by the e t 17 commission.
An electric cooperative's plan shall be effective for SCONCº five»SCONC SCONCºthree»SCONC years upon the date of approval by the commission.
An electric cooperative shall update and resubmit w l n d 18 its plan for approval by the commission at the end of each = = 19 a l subsequent five-year period following the initial approval by i a e r 20 the commission.
An electric cooperative shall update and resubmit its plan for approval by the commission at the end of each subsequent SCONCº five- year»SCONC SCONCºthree-year»SCONC period following the initial approval by the commission.
a t m m 21 B.
B.
An electric cooperative shall submit its plan to d r e 22 the division for review and recommendations prior to submitting c e s k 23 the plan to the commission for approval.
An electric cooperative shall submit its plan to the division for review and recommendations SCONCº during a period starting on November 1 of each year and ending on February 28 of the following year and»SCONC prior to submitting the plan to the commission for approval.
e a n b 24 C.
C.
An electric cooperative shall include the review u [ and recommendations of its plan from the division in its .229722.3 - 5 - submission of the plan to the commission;
An electric cooperative shall include the review h and recommendations of its plan from the division in its g o t hr submission of the plan to the commission;
provided that, when the electric cooperative has not received a response from the division within forty-five days of submitting its plan for review, the electric cooperative may submit the plan to the commission without the division's review.
provided that, when g e i k the electric cooperative has not received a response from the h r i s division within SCONCº forty-five»SCONC SCONCºsixty»SCONC days h , t, e u g of submitting its plan for review, the electric cooperative may e b l e e h submit the plan to the commission without the division's n d d i = = o h review.
D.
l ] b ,d i a º e r i = r D.
The commission shall approve or reject a plan within forty-five days of submission of a plan pursuant to this section.
The commission shall approve or reject a plan t e w d m a n o within SCONCº forty-five»SCONC SCONCºsixty»SCONC days of d m :
b e d s º o t n = .229722.3AIC February 19, 2025 (9:26pm) s k m e - 6 - e a n e d r e l u [ A d submission of a plan pursuant to this section.
Within thirty days of receiving approval of a plan, an electric cooperative shall post a non-confidential e t 17 version of the plan that excludes elements that would w l n d 18 compromise the security of its electric system on its website = = 19 a l in a clearly identifiable and accessible manner.
Within thirty days of receiving approval of a plan, an electric cooperative shall post a non-confidential version of the plan that excludes elements that would compromise the security of its electric system on its website in a clearly identifiable and accessible manner.
i a e r 20 SECTION 5.
SECTION 5.
[NEW MATERIAL] ANNUAL REPORT--PUBLIC NOTICE.-- a t m m 21 On July 1, 2026 and on July 1 of each subsequent year, an d r e 22 electric cooperative shall post a report on the electric c e s k 23 cooperative's plan on the electric cooperative's website in a e a n b 24 clearly identifiable and accessible manner.
[NEW MATERIAL ] ANNUAL REPORT--PUBLIC NOTICE.-- On July 1, 2026 and on July 1 of each subsequent year, an electric cooperative shall post a report on the electric cooperative's plan on the electric cooperative's website in a h clearly identifiable and accessible manner.
The report shall u [ include a description of the electric cooperative's compliance .229722.3 - 6 - with the plan, modifications or updates that have been made to the plan and the plan's approval status pursuant to the Rural Electric Cooperative Wildfire Liability Act.
The report shall g o t hr include a description of the electric cooperative's compliance g e i k with the plan, modifications or updates that have been made to h r i s the plan and the plan's approval status pursuant to the Rural h , t, Electric Cooperative Wildfire Liability Act.
SECTION 6.
e u g e b l e e h SECTION 6.
[NEW MATERIAL] WILDFIRE MITIGATION PLAN APPROVAL--EFFECT ON LIABILITY--RECOVERY FOR LOSS.-- A.
[NEW MATERIAL ] WILDFIRE MITIGATION PLAN n d d i = = o h APPROVAL--EFFECT ON LIABILITY--RECOVERY FOR LOSS.-- l ] b ,d i a º e A.
In a civil action or claim made against an electric cooperative, upon providing proof that the electric cooperative's plan has been approved by the commission and that its annual reports adhere to the requirements as set forth in Section 5 of the Rural Electric Cooperative Wildfire Liability Act, or that the electric cooperative was denied the ability to comply with an approved plan by a federal agency, landowner, member of the electric cooperative, state or tribal government, the electric cooperative is:
In a civil action or claim made against an r i = r t e w d m a n o electric cooperative, upon providing proof that the electric d m :
(1) presumed to have reasonably and prudently prepared for and mitigated the risk of wildfire for the e t 17 electric cooperative's electric system and operations;
b e d s º o t n = .229722.3AIC February 19, 2025 (9:26pm) s k m e - 7 - e a n e d r e l u [ A d cooperative's plan has been approved by the commission and that its annual reports adhere to the requirements as set forth in Section 5 of the Rural Electric Cooperative Wildfire Liability Act, or that the electric cooperative was denied the ability to comply with an approved plan by a federal agency, landowner, member of the electric cooperative, state or tribal government, the electric cooperative is:
w l n d 18 (2) exempt from liability for losses resulting = = 19 a l from a wildfire;
(1) presumed to have reasonably and prudently prepared for and mitigated the risk of wildfire for the electric cooperative's electric system and operations;
and i a e r 20 (3) not liable for failure to implement a a t m m 21 public safety power shutoff policy unless one is mandated by d r e 22 the commission.
(2) exempt from liability for losses resulting from a wildfire;
c e s k 23 B.
and (3) not liable for failure to implement a public safety power shutoff policy unless one is mandated by the commission.
A plaintiff may recover economic losses or e a n b 24 noneconomic losses from an electric cooperative as a result of u [ a wildfire when the plaintiff demonstrates, by a showing of .229722.3 - 7 - clear and convincing evidence, that an origin and cause investigation conducted by a national wildfire coordination group or wildland fire investigator certified pursuant to federal law has determined that:
B.
(1) the cause of the wildfire is a powerline or related in any way to the electric cooperative's equipment or operations;
A plaintiff may recover economic losses or h noneconomic losses from an electric cooperative as a result of u » r a wildfire when the plaintiff demonstrates, by a showing of t h g e l i clear and convincing evidence, that an origin and cause h r i s investigation conducted by a national wildfire coordination h , e h group or wildland fire investigator certified pursuant to t u g e b l e e , gh federal law has determined that:
(2) the electric cooperative's conduct intentionally set the wildfire or intentionally caused the wildfire to be set while knowing that to do so was wrong and that harm to others might be the result;
n d d i = = o h (1) the cause of the wildfire is a powerline l ] b ,d i a º r or related in any way to the electric cooperative's equipment e r = t e w d m a n o or operations;
d m :
b r e t º o t n = .229722.3AIC February 19, 2025 (9:26pm) s k m e - 8 - e a n e d r e l u [ A d (2) the electric cooperative's conduct intentionally set the wildfire or intentionally caused the wildfire to be set while knowing that to do so was wrong and that harm to others might be the result;
[NEW MATERIAL] LIMITATIONS--FILING CLAIMS-- DAMAGE AWARDS.-- e t 17 A.
[NEW MATERIAL ] LIMITATIONS--FILING CLAIMS-- DAMAGE AWARDS.-- A.
A claim against an electric cooperative for loss w l n d 18 resulting from a wildfire shall be filed in district court = = 19 a l within two years after the date of ignition of the fire or it i a e r 20 shall be forever barred.
A claim against an electric cooperative for loss resulting from a wildfire shall be filed in district court within two years after the date of ignition of the fire or it shall be forever barred.
a t m m 21 B.
B.
A plaintiff in a civil action against an d r e 22 electric cooperative for loss due to a wildfire, or the estate c e s k 23 thereof, may recover for:
A plaintiff in a civil action against an electric cooperative for loss due to a wildfire, or the estate thereof, may recover for:
e a n b 24 (1) economic loss;
h (1) economic loss;
and u [ (2) noneconomic loss to the extent that the .229722.3 - 8 - noneconomic loss is due to death or bodily injury resulting from a burn.
and g o t hr (2) noneconomic loss to the extent that the g e i k noneconomic loss is due to death or bodily injury resulting h r i s from a burn.
A claim for noneconomic loss resulting from a burn shall be denied unless the plaintiff submits to the court a diagnosis in writing by a medical provider that the burn is the result of the wildfire that serves as the basis of claim.
A claim for noneconomic loss resulting from a h , t, burn shall be denied unless the plaintiff submits to the court e u g e b l e e h a diagnosis in writing by a medical provider that the burn is n d d i = = o h the result of the wildfire that serves as the basis of claim.
C.
l ] b ,d i a º e C.
A state agency or a fire response agency that incurs costs to suppress a wildfire may file a suit in district court to reclaim the incurred costs pursuant to the limitations on liability in the Rural Electric Cooperative Wildfire Liability Act.
A state agency or a fire response agency that r i = r t e w d m a n o incurs costs to suppress a wildfire may file a suit in district d m :
b e d s º o t n = .229722.3AIC February 19, 2025 (9:26pm) s k m e - 9 - e a n e d r e l u [ A d court to reclaim the incurred costs pursuant to the limitations on liability in the Rural Electric Cooperative Wildfire Liability Act.
[NEW MATERIAL] NO LIMIT ON DEFENSES.--Nothing e t 17 in the Rural Electric Cooperative Wildfire Liability Act shall w l n d 18 limit the defenses that an electric cooperative may be entitled = = 19 a l to raise in an action for damages caused by wildfire.
[NEW MATERIAL ] NO LIMIT ON DEFENSES.--Nothing in the Rural Electric Cooperative Wildfire Liability Act shall limit the defenses that an electric cooperative may be entitled to raise in an action for damages caused by wildfire.
i a e r 20 SECTION 9.
SECTION 9.
Section 30-32-4 NMSA 1978 (being Laws 1882, a t m m 21 Chapter 61, Section 7, as amended) is amended to read:
Section 30-32-4 NMSA 1978 (being Laws 1882, Chapter 61, Section 7, as amended) is amended to read:
d r e 22 "30-32-4.
"30-32-4.
DAMAGES TO PERSON INJURED.--Except for an c e s k 23 electric cooperative operating pursuant to a wildfire e a n b 24 mitigation plan approved pursuant to the Rural Electric u [ Cooperative Wildfire Liability Act, if a person sets on fire .229722.3 - 9 - any woods, marshes or prairies, whether the person's own or not, so as thereby to occasion damage to another person or that person's property, the person shall make satisfaction in double damages to the party injured to be recovered by civil action, unless the person is conducting a prescribed burn pursuant to the Prescribed Burning Act." SECTION 10.
DAMAGES TO PERSON INJURED.--Except for an electric cooperative operating pursuant to a wildfire h mitigation plan approved pursuant to the Rural Electric u » r Cooperative Wildfire Liability Act, if a person sets on fire t h g e l i any woods, marshes or prairies, whether the person's own or h r i s not, so as thereby to occasion damage to another person or that h , e h person's property, the person shall make satisfaction in double t u g e b l e e , gh damages to the party injured to be recovered by civil action, n d d i = = o h unless the person is conducting a prescribed burn pursuant to l ] b ,d i a º r the Prescribed Burning Act." e r = t e w d m a n o SECTION 10.
Section 37-1-4 NMSA 1978 (being Laws 1880, Chapter 5, Section 4, as amended) is amended to read:
Section 37-1-4 NMSA 1978 (being Laws 1880, d m :
b r e t º o t n = .229722.3AIC February 19, 2025 (9:26pm) s k m e - 10 - e a n e d r e l u [ A d Chapter 5, Section 4, as amended) is amended to read:
Those] Excepting actions brought against an electric cooperative for damages due to wildfire pursuant to the Rural Electric Cooperative Wildfire Liability Act, actions founded upon accounts and unwritten contracts, [those] actions brought for injuries to property or for the conversion of personal property or for relief upon the ground of fraud and all other actions not [herein] otherwise provided e t 17 for in Chapter 37, Article 1 NMSA 1978 and specified shall be w l n d 18 brought within four years." = = 19 a l SECTION 11.
Those] Excepting actions brought against an electric cooperative for damages due to wildfire pursuant to the Rural Electric Cooperative Wildfire Liability Act, actions founded upon accounts and unwritten contracts, [those ] actions brought for injuries to property or for the conversion of personal property or for relief upon the ground of fraud and all other actions not [herein ] otherwise provided for in Chapter 37, Article 1 NMSA 1978 and specified shall be brought within four years." SECTION 11.
EFFECTIVE DATE.--The effective date of the i a e r 20 provisions of this act is July 1, 2025.
EFFECTIVE DATE.--The effective date of the provisions of this act is July 1, 2025.
a t m m 21 - 10 - d r e 22 c e s k 23 e a n b 24 u [ .229722.3
- 11 - h u » r t h g e l i h r i s h , e h t u g e b l e e , gh n d d i = = o h l ] b ,d i a º r e r = t e w d m a n o d m :
b r e t º o t n = .229722.3AIC February 19, 2025 (9:26pm) s k m e e a n e d r e l u [ A d
View plain text versions (2)

Action History

  1. action postponed indefinitely

  2. DO PASS, as amended, committee report adopted

  3. Sent to Senate Conservation Committee & Senate Judiciary Committee

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

4 sponsors · 0 co-sponsors · 108 not signed on

Sponsors (4)

Co-sponsors (0)

None.

Not signed on (108)

108 members have not signed on to this bill.

Show all 108 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors SB 281?
SB 281 is sponsored by Roberto "Bobby" J. Gonzales (Democrat), Leo Jaramillo (Democrat), Pete Campos (Democrat), and Pat Woods (Republican).
What is the current status of SB 281?
This bill died with 2025 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track SB 281?
Track SB 281 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 281

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 281

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →