S8062 — Requires certain utility corporations and the Long Island power authority to establish a meter usage monitor program
Last action — In Senate Committee
-
1Introduced
-
2In Committee
-
3Passed Senate
-
4Passed Assembly
-
5To Executive
-
6Enacted
This bill has been introduced in the Senate. Introduced May 15, 2025. It must pass committee before a floor vote.
Next likely step: a committee referral and hearing.
Prognosis
Where this bill stands today.
Odds of enactment
LowHow often bills like it became law.
Not enough signal yet to read this bill's trajectory — we surface a likelihood only once there's real movement (stage, sponsorship, committee, or votes) to point to.
Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.
In plain language
The bill requires utilities to notify customers about their energy usage.
This legislation mandates utility companies to create a program that alerts residential customers when their energy consumption exceeds a specified threshold. This helps customers manage their energy usage and costs.
What this means for you
- Consumers: This means you will receive alerts about your energy usage, helping you control your energy bills.
Summary
Requires certain utility corporations and the Long Island power authority to establish a meter usage monitor program for the purposes of notifying residential customers when energy usage exceeds a cost or usage threshold in a given billing period determined by the residential customer.
Bill Text
- Full text View text Current
Action History
-
COMMITTED TO RULES
-
AMENDED ON THIRD READING (T) 8062B
-
VOTE RECONSIDERED - RESTORED TO THIRD READING
-
RETURNED TO SENATE
-
RECALLED FROM ASSEMBLY
-
REFERRED TO CORPORATIONS, AUTHORITIES AND COMMISSIONS
-
DELIVERED TO ASSEMBLY
-
PASSED SENATE
-
ADVANCED TO THIRD READING
-
AMENDED 8062A
-
2ND REPORT CAL.
-
1ST REPORT CAL.399
-
REFERRED TO ENERGY AND TELECOMMUNICATIONS
-
RETURNED TO SENATE
-
DIED IN ASSEMBLY
-
REFERRED TO CORPORATIONS, AUTHORITIES AND COMMISSIONS
-
DELIVERED TO ASSEMBLY
-
PASSED SENATE
-
ORDERED TO THIRD READING CAL.1566
-
COMMITTEE DISCHARGED AND COMMITTED TO RULES
-
REFERRED TO ENERGY AND TELECOMMUNICATIONS
Sponsors
- Lea Webb · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 218 not signed on
Sponsors (1)
Co-sponsors (0)
None.
Not signed on (218)
218 members have not signed on to this bill.
Show all 218 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Subjects
Frequently asked questions
- What does S8062 do?
- Requires certain utility corporations and the Long Island power authority to establish a meter usage monitor program for the purposes of notifying residential customers when energy usage exceeds a cost or usage threshold in a given billing period determined by the residential customer.
- Who sponsors S8062?
- S8062 is sponsored by Lea Webb.
- What is the current status of S8062?
- This bill has been introduced in the Senate. Introduced May 15, 2025. It must pass committee before a floor vote.
- Where can I track S8062?
- Track S8062 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on S8062
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of S8062
Last checked for changes 3 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →