Virginia 2020 Regular Session Status: In Committee

SB 784 — Transmission lines; relocation and undergrounding.

Last action — Left in Commerce and Labor

  1. ✓
    Introduced
  2. 2
    In Committee
  3. 3
    Passed Senate
  4. 4
    Passed House of Delegates
  5. 5
    To Executive
  6. 6
    Enacted

This bill died with 2020 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Summary

Transmission lines; relocation and undergrounding. Requires that any transmission line of 230 kilovolts or less thatis proposed to connect to a proposed new substation that has receivedlocal final development plan approval be placed underground if (i)such line would extend from an existing substation that will be poweredby a transmission line of 230 kilovolts or less, (ii) such line receiveda certificate of public convenience and necessity from the Commissionto be placed underground prior to December 31, 2018; (iii) the portionof such line between the existing substation and the proposed newsubstation is not more than 4,500 linear feet; and (iv) the totalcost of undergrounding the proposed relocated transmission line doesnot exceed $40 million. The bill requires that existing overheadtransmission lines that meet such criteria be replaced and relocated with a new underground transmission line and that the location ofthe new underground transmission line be consistent with the comprehensiveplan and the economic development priorities of the governing bodyof the locality in which the new underground transmission line isto be placed. The bill has an expiration date of December 31, 2021.

Bill Text

  • Impact statement from SCC (SB784) View text Current html January 08, 2020

Action History

  1. Left in Commerce and Labor

  2. Impact statement from SCC (SB784)

  3. Assigned C&L sub: Energy

  4. Referred to Committee on Commerce and Labor

  5. Prefiled and ordered printed; offered 01/08/20 20102022D

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 147 not signed on

Sponsors (1)

Co-sponsors (0)

None.

Not signed on (147)

147 members have not signed on to this bill.

Show all 147 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does SB 784 do?
Transmission lines; relocation and undergrounding. Requires that any transmission line of 230 kilovolts or less thatis proposed to connect to a proposed new substation that has receivedlocal final development plan approval be placed underground if (i)such line would extend from an existing substation that will be poweredby a transmission line of 230 kilovolts or less, (ii) such line receiveda certificate of public convenience and necessity from the Commissionto be placed underground prior to December 31, 2018; (iii) the portionof such line between the existing substation and the proposed newsubstation is not more than 4,500 linear feet; and (iv) the totalcost of undergrounding the proposed relocated transmission line doesnot exceed $40 million. The bill requires that existing overheadtransmission lines that meet such criteria be replaced and relocated with a new underground transmission line and that the location ofthe new underground transmission line be consistent with the comprehensiveplan and the economic development priorities of the governing bodyof the locality in which the new underground transmission line isto be placed. The bill has an expiration date of December 31, 2021.
Who sponsors SB 784?
SB 784 is sponsored by Saslaw, Richard L..
What is the current status of SB 784?
This bill died with 2020 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track SB 784?
Track SB 784 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 784

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 784

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →