Virginia 2020 Regular Session Status: Enacted

SB 851 — Electric utility regulation; environmental goals.

Last action — Approved by Governor-Chapter 1194 (effective 7/1/20)

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. ✓
    Passed Senate
  4. ✓
    Passed House of Delegates
  5. ✓
    To Executive
  6. 6
    Enacted

This bill has been enacted into law. Introduced January 08, 2020. Enacted.

Prognosis

Likely to advance 64% · moderate confidence

Where this bill stands today.

Odds of enactment

High

How often bills like it became law.

  • Enacted

    Current position in the legislative process.

  • 8 sponsors

    1 primary, 7 co-sponsors signed on.

  • Mixed recorded votes

    8 passed, 3 failed in recorded votes so far.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Summary

Virginia Clean Economy Act. Establishes a schedule by which Dominion Energy Virginia and American Electric Power are required to retire electric generating units located in the Commonwealth that emit carbon as a by-product of combusting fuel to generate electricity and by which they are required to construct, acquire, or enter into agreements to purchase generating capacity located in the Commonwealth using energy derived from sunlight or onshore wind. The measure replaces the existing voluntary renewable energy portfolio standard program (RPS Program) with a mandatory RPS Program. Under the mandatory RPS Program, Dominion Energy Virginia and American Electric Power are required to produce their electricity from 100 percent renewable sources by 2045 and 2050, respectively. A utility that does not meet its targets is required to pay a specific deficiency payment or purchase renewable energy certificates. The proceeds from the deficiency payments are to be deposited into an account administered by the Department of Mines, Minerals and Energy, which is directed to distribute specific percentages of the moneys to job training and renewable energy programs in historically economically disadvantaged communities, energy efficiency measures, and administrative costs. The measure requires the State Air Pollution Control Board to adopt regulations to reduce the carbon dioxide emissions from certain electricity generating units in the Commonwealth and authorizes the Board to establish, implement, and manage an auction program to sell allowances to carry out the purposes of such regulations and to utilize its existing regulations to reduce carbon dioxide emissions from electric power generating facilities. Among other things, the measure also (i) requires, by 2035, American Electric Power and Dominion Energy Virginia to construct or acquire 400 and 2,700 megawatts of energy storage capacity, respectively; (ii) establishes an energy efficiency standard under which each investor-owned incumbent electric utility is required to achieve incremental annual energy efficiency savings that start in 2022 at 0.5 percent for American Electric Power and 1.25 percent for Dominion Energy Virginia of the average annual energy retail sales by that utility in 2019 and increase those savings annually; (iii) exempts large general service customers from energy savings requirements; (iv) revises the incentive for electric utility energy efficiency programs; (v) provides that if the Commission finds in any triennial review that revenue reductions related to energy efficiency measures or programs approved and deployed since the utility's previous triennial review have caused the utility to earn more than 50 basis points below a fair combined rate of return on its generation and distribution services or, for any test period commencing after December 31, 2012, for Dominion Energy Virginia and after December 31, 2013, for American Electric Power, more than 70 basis points below a fair combined rate of return on its generation and distribution services, the Commission shall order increases to the utility's rates for generation and distribution services necessary to recover such revenue reductions; (vi) establishes requirements regarding the development by Dominion Energy Virginia of qualified offshore wind projects having an aggregate rated capacity of not less than 5,200 megawatts by January 1, 2034, and provides that in constructing any such facility, the utility shall (a) identify options for utilizing local workers; (b) identify the economic development benefits of the project for the Commonwealth, including capital investments and job creation; (c) consult with relevant governmental entities, including the Commonwealth's Chief Workforce Development Officer and the Virginia Economic Development Partnership, on opportunities to advance the Commonwealth's workforce and economic development goals, including furtherance of apprenticeship and other workforce training programs; and (d) give priority to the hiring, apprenticeship, and training of veterans, local workers, and workers from historically economically disadvantaged communities; (vii) requires each utility to include, and the Commission to consider, in any application to construct a new generating facility the social cost of carbon, as determined by the Commission, as a benefit or cost, whichever is appropriate; (viii) removes provisions that authorize nuclear and offshore wind generating facilities to continue to be eligible for an enhanced rate of return on common equity during the construction phase of the facility and the approved first portion of its service life of between 12 and 25 years in the case of a facility utilizing nuclear power and for a service life of between five and 15 years in the case of a facility utilizing energy derived from offshore wind; (ix) removes a provision that declares that planning and development activities for new nuclear generation facilities are in the public interest; (x) increases the limit from 5,000 megawatts to 16,100 megawatts on those solar and onshore wind generation facilities that are declared to be in the public interest and increases the limit from 16 megawatts to 3,000 megawatts on those offshore wind generation facilities that are declared to be in the public interest; (xi) amends the net energy metering program by increasing the maximum capacity of renewable generation facilities of participating nonresidential eligible customer-generators from one to three megawatts, increases the cap on the capacity of generation from facilities from the customer's expected annual energy consumption to 150 percent of such amount for customers in Dominion Energy Virginia's service territory, increases each utility's systemwide cap from one percent of its adjusted Virginia peak-load forecast for the previous year to six percent of such amount, five percent of which is available to all customers and one percent of which is available only to low-income utility customers; (xii) establishes the Percentage of Income Payment Program (PIPP), which caps the monthly electric utility payment of low-income participants at six percent, or, if the participant's home uses electric heat, 10 percent, of the participant's household income, requires the Commission to issue its final order regarding the PIPP by December 31, 2020, and requires the Department of Housing and Community Development and the Department of Social Services to convene a stakeholder group to develop recommendations for implementing the PIPP and to submit the stakeholder recommendations to the Chairs of the House Committee on Labor and Commerce and the Senate Committee on Commerce and Labor by December 1, 2020; (xiii) increases the cap on third party power purchase agreements to 500 megawatts for jurisdictional customers and 500 megawatts for nonjurisdictional customers of Dominion Energy Virginia and to 40 megawatts for customers of American Electric Power; (xiv) requires each investor-owned utility to consult with the Clean Energy Advisory Board in how best to inform low-income customers of opportunities to lower electric bills through access to solar energy; (xv) requires the Department of Mines, Minerals and Energy, in consultation with the Council on Environmental Justice, to prepare a report to the Chairs of the House Committee on Labor and Commerce and the Senate Committee on Commerce and Labor that determines if the implementation of the measure imposes a disproportionate burden on historically economically disadvantaged communities; (xvi) requires the Secretary of Natural Resources and the Secretary of Commerce and Trade, in consultation with the State Corporation Commission and the Council on Environmental Justice and appropriate stakeholders, to report to the General Assembly by January 1, 2022, any recommendations on how to achieve 100 percent carbon-free electric energy generation by 2045 at least cost for ratepayers; and (xvii) provides that it is the policy of the Commonwealth that the State Corporation Commission, Department of Environmental Quality, Department of Mines, Minerals and Energy, Virginia Council on Environmental Justice, and other applicable state agencies, in the development of energy programs, job training programs, and placement of renewable energy facilities, shall consider those facilities and programs being to the benefit of low-income geographic areas and historically economically disadvantaged communities that are located near previously and presently permitted fossil fuel facilities or coal mines. This bill is identical to HB 1526.

Bill Text

What changed in the latest version

119 added · 115 removed

Plain-language change summary

The recent amendment to Bill SB 851 includes new sections that outline specific regulations about utility companies and their energy generation practices. Key changes include the addition of provisions aimed at protecting wildlife in offshore wind areas and refining how biomass energy sources can participate in the Renewable Portfolio Standards (RPS) Program. These updates matter because they reinforce environmental protections while ensuring that energy producers operate fairly and transparently within the state's energy framework. Overall, these revisions help align Virginia's energy policies with broader sustainability goals.

→
Previous
Latest
Code of Virginia Administrative Code Bills & Resolutions Summaries OTHER SESSIONS   - - - - - - - - - - - - - - Session Special Session I Session Special Session I Session Special Session I Special Session II Session Special Session I Session Special Session I Session Special Session I Special Session II Session Session Session Special Session I Session Special Session I Session Special Session I Session Special Session I Session Special Session I Session Session Special Session I Session Special Session I Special Session II Session Session Special Session I Session Session Special Session I Special Session II Session Session Session Special Session I Session Session Session Special Session I Session Session Session Session Special Session I Special Session II VIRGINIA LAW PORTALCode of VirginiaVirginia Administrative Code Constitution of VirginiaChartersAuthoritiesCompacts Uncodified ActsRIS Users (account required) SEARCHABLE DATABASESBills & Resolutionssession legislationBill Summariessession summaries Reports to the General AssemblyHouse and Senate documents Legislative LiaisonsState agency contactsACROSS SESSIONS Subject Index:
Code of Virginia Administrative Code Bills & Resolutions Summaries OTHER SESSIONS   - - - - - - - - - - - - - - Session Special Session I Session Special Session I Session Special Session I Session Special Session I Special Session II Session Special Session I Session Special Session I Session Special Session I Special Session II Session Session Session Special Session I Session Special Session I Session Special Session I Session Special Session I Session Special Session I Session Session Special Session I Session Special Session I Special Session II Session Session Special Session I Session Session Special Session I Special Session II Session Session Session Special Session I Session Session Session Special Session I Session Session Session Session Special Session I Special Session II VIRGINIA LAW PORTALCode of VirginiaVirginia Administrative Code Constitution of VirginiaChartersAuthoritiesCompacts Uncodified ActsRIS Users (account required) SEARCHABLE DATABASESBills & Resolutionssession legislationBill Summariessession summaries Reports to the General AssemblyHouse and Senate documents Legislative LiaisonsState agency contactsACROSS SESSIONS Subject Index:
SESSION history | hilite | pdf | print version VIRGINIA ACTS OF ASSEMBLY -- CHAPTER An Act to amend and reenact §§ 10.1-1308, 56-576, 56-585.1, 56-585.1:4, 56-594, and 56-596.2 of the Code of Virginia and § 1 of the first enactment of Chapters 358 and 382 of the Acts of Assembly of 2013, as amended by Chapter 803 of the Acts of Assembly of 2017;
SESSION history | hilite | pdf | print version CHAPTER 1194 An Act to amend and reenact §§ 10.1-1308, 56-576, 56-585.1, 56-585.1:4, 56-594, and 56-596.2 of the Code of Virginia and § 1 of the first enactment of Chapters 358 and 382 of the Acts of Assembly of 2013, as amended by Chapter 803 of the Acts of Assembly of 2017;
[S 851] Approved   Be it enacted by the General Assembly of Virginia:
[S 851] Approved April 11, 2020   Be it enacted by the General Assembly of Virginia:
Secretary of the Treasury, via his delegation of authority to the Internal Revenue Service.
Secretary of the Treasury via his delegation of authority to the Internal Revenue Service.
“Total annual energy savings” means (i) the total combined kilowatt-hour savings achieved by electric utility energy efficiency and demand response programs and measures installed in that program year, as well as savings still being achieved by measures and programs implemented in prior years, or (ii) savings attributable to newly-installed combined heat and power facilities, including waste heat-to-power facilities, and any associated reduction in transmission line losses, provided that biomass is not a fuel and the total efficiency, including the use of thermal energy, for eligible combined heat and power facilitates must meet or exceed 65 percent and have a nameplate capacity rating of less than 25 megawatts.
“Total annual energy savings” means (i) the total combined kilowatt-hour savings achieved by electric utility energy efficiency and demand response programs and measures installed in that program year, as well as savings still being achieved by measures and programs implemented in prior years, or (ii) savings attributable to newly installed combined heat and power facilities, including waste heat-to-power facilities, and any associated reduction in transmission line losses, provided that biomass is not a fuel and the total efficiency, including the use of thermal energy, for eligible combined heat and power facilitates must meet or exceed 65 percent and have a nameplate capacity rating of less than 25 megawatts.
Notwithstanding any other provision of law, unless the Commission finds in its discretion and after consideration of all in-state and regional transmission entity resources that there is a threat to the reliability or security of electric service to the utility's customers, the Commission shall not approve construction of any new utility-owned, generating facilities that emit carbon dioxide as a by-product of combusting fuel to generate electricity unless the utility has already met the energy savings goals identified in 56-596.2 and the Commission finds that supply-side resources are more cost-effective than demand-side or energy storage resources.
Notwithstanding any other provision of law, unless the Commission finds in its discretion and after consideration of all in-state and regional transmission entity resources that there is a threat to the reliability or security of electric service to the utility's customers, the Commission shall not approve construction of any new utility-owned generating facilities that emit carbon dioxide as a by-product of combusting fuel to generate electricity unless the utility has already met the energy savings goals identified in § 56-596.2 and the Commission finds that supply-side resources are more cost-effective than demand-side or energy storage resources.
(iii) consultation with the Commonwealth's Chief Workforce Development Officer, the Chief Diversity, Equity, and Inclusion Officer, and the Virginia Economic Development Partnership, on opportunities to advance the Commonwealth's workforce and economic development goals, including furtherance of apprenticeship and other workforce training programs;
(iii) consultation with the Commonwealth's Chief Workforce Development Officer, the Chief Diversity, Equity, and Inclusion Officer, and the Virginia Economic Development Partnership on opportunities to advance the Commonwealth's workforce and economic development goals, including furtherance of apprenticeship and other workforce training programs;
The plan shall include a summary of pre-construction assessment activities, consistent with federal requirements, to determine the spatial and temporal presence and abundance of marine mammals, sea turtles, birds, and bats, in the offshore wind lease area.
The plan shall include a summary of pre-construction assessment activities, consistent with federal requirements, to determine the spatial and temporal presence and abundance of marine mammals, sea turtles, birds, and bats in the offshore wind lease area.
"Falling water" does not include electricity generated from pumped storage facilities.
"Falling water" does not include electricity generated from pumped-storage facilities.
or (e) biomass-fired facilities in operation in the Commonwealth in operation as of January 1, 2020, that supply no more than 10 percent of their annual net electrical generation to the electric grid or no more than 15 percent of their annual total useful energy to any entity other than the manufacturing facility to which the generating source is interconnected.
or (e) biomass-fired facilities in operation in the Commonwealth and in operation as of January 1, 2020, that supply no more than percent of their annual net electrical generation to the electric grid or no more than 15 percent of their annual total useful energy to any entity other than the manufacturing facility to which the generating source is interconnected.
To the extent that a Phase I or Phase II Utility procures RECs for RPS Program compliance from resources the utility does not own, the utility shall be entitled to recover the costs of such certificates, at its election pursuant to § 56-249.6 or subdivision A 5 d of § 56-585.1.
To the extent that a Phase I or Phase II Utility procures RECs for RPS Program compliance from resources the utility does not own, the utility shall be entitled to recover the costs of such certificates at its election pursuant to § 56-249.6 or subdivision A 5 d of § 56-585.1.
Costs associated with the purchase of energy, capacity, or environmental attributes from facilities owned by the persons other than the utility required by the subsection shall be recovered by the utility either through its rates for generation and distribution services or pursuant to § 56-249.6.
Costs associated with the purchase of energy, capacity, or environmental attributes from facilities owned by the persons other than the utility required by this subsection shall be recovered by the utility either through its rates for generation and distribution services or pursuant to § 56-249.6.
In determining whether to approve the utility's plan and any associated petition requests, the Commission shall determine whether they are reasonable and prudent, and shall give due consideration to (i) the RPS and carbon dioxide reduction requirements in this section, (ii) the promotion of new renewable generation and energy storage resources within the Commonwealth, and associated economic development, and (iii) fuel savings projected to be achieved by the plan.
In determining whether to approve the utility's plan and any associated petition requests, the Commission shall determine whether they are reasonable and prudent and shall give due consideration to (i) the RPS and carbon dioxide reduction requirements in this section, (ii) the promotion of new renewable generation and energy storage resources within the Commonwealth, and associated economic development, and (iii) fuel savings projected to be achieved by the plan.
By January 1, 2021, the Commission shall adopt regulations to achieve the deployment of energy storage for the Commonwealth required in subdivisions E 1 and 2, including regulations that set interim targets and update existing utility planning and procurement rules.
By January 1, 2021, the Commission shall adopt regulations to achieve the deployment of energy storage for the Commonwealth required in subdivisions 1 and 2, including regulations that set interim targets and update existing utility planning and procurement rules.
Such universal service fee shall be allocated to retail electric customers of a Phase I and Phase II Utility on the basis of the amount of kilowatt-hours used and be established at such level to adequately address the PIPP's objectives to (i) reduce the energy burden of eligible participants by limiting electric bill payments directly to no more than six percent of the eligible participant's annual household income if the household's heating source is anything other than electricity, and to no more than ten percent of an eligible participant's annual household income on electricity costs if the household's heating source is electricity, and (ii) reduce the amount of electricity used by the eligible participant's household through participation in weatherization or energy efficiency programs and energy conservation education programs.
Such universal service fee shall be allocated to retail electric customers of a Phase I and Phase II Utility on the basis of the amount of kilowatt-hours used and be established at such level to adequately address the PIPP's objectives to (i) reduce the energy burden of eligible participants by limiting electric bill payments directly to no more than six percent of the eligible participant's annual household income if the household's heating source is anything other than electricity, and to no more than 10 percent of an eligible participant's annual household income on electricity costs if the household's heating source is electricity, and (ii) reduce the amount of electricity used by the eligible participant's household through participation in weatherization or energy efficiency programs and energy conservation education programs.
(iii) recommended policy reforms by which the General Assembly or the Commission can ensure maximum and cost-effective deployment of energy efficiency technology across the Commonwealth, and (iv) best practices for evaluation, measurement, and verification for the purposes of assessing compliance with the total annual energy savings set forth in subsection B.
(iii) recommended policy reforms by which the General Assembly or the Commission can ensure maximum and cost-effective deployment of energy efficiency technology across the Commonwealth;
and (iv) best practices for evaluation, measurement, and verification for the purposes of assessing compliance with the total annual energy savings set forth in subsection B.
however, if the customer under such agreement is a low-income utility customer, as defined in § 56-576 of the Code of Virginia or is an entity with tax-exempt status in accordance with § 501(c) of the Internal Revenue Code of 1954, as amended, then such facility is eligible for the pilot program even if it does not meet the 50 kilowatts minimum size requirement.
however, if the customer under such agreement is a low-income utility customer, as defined in § 56-576 of the Code of Virginia, or is an entity with tax-exempt status in accordance with § 501(c) of the Internal Revenue Code of 1954, as amended, then such facility is eligible for the pilot program even if it does not meet the 50 kilowatts minimum size requirement.
That in developing a plan to reduce carbon dioxide emissions from covered units described in § 10.1-1308 of the Code of Virginia, as amended by this act, the Secretary of Natural Resources and the Secretary of Commerce and Trade, in consultation with the State Corporation Commission and the Council on Environmental Justice and appropriate stakeholders, shall report to the General Assembly by January 1, 2022, any recommendations on how to achieve percent carbon-free electric energy generation by 2045 at least cost for ratepayers.
That in developing a plan to reduce carbon dioxide emissions from covered units described in § 10.1-1308 of the Code of Virginia, as amended by this act, the Secretary of Natural Resources and the Secretary of Commerce and Trade, in consultation with the State Corporation Commission and the Council on Environmental Justice and appropriate stakeholders, shall report to the General Assembly by January 1, 2022, any recommendations on how to achieve 100 percent carbon-free electric energy generation by 2045 at least cost for ratepayers.
View plain text versions (6)

Action History

  1. Approved by Governor-Chapter 1194 (effective 7/1/20)

  2. Governor's Action Deadline 11:59 p.m., April 11, 2020

  3. Enrolled Bill Communicated to Governor on March 20, 2020

  4. Impact statement from SCC (SB851ER)

  5. Signed by Speaker

  6. Signed by President

  7. Enrolled

  8. Impact statement from SCC (SB851H2)

  9. Title replaced 20109629D-H2

  10. House substitute agreed to by Senate (22-Y 17-N)

  11. VOTE: Passage (51-Y 45-N 1-A)

  12. Passed House with substitute (51-Y 45-N 1-A)

  13. Engrossed by House - floor substitute SB851H2

  14. Pending question ordered

  15. VOTE: REJECTED #2 (39-Y 54-N 1-A)

  16. Amendments by Delegate Rasoul rejected (39-Y 54-N 1-A)

  17. VOTE: Reconsider (49-Y 48-N)

  18. Amendments by Delegate Rasoul reconsidered

  19. VOTE: Adoption (50-Y 45-N)

  20. Amendments by Delegate Rasoul agreed to (50-Y 45-N)

  21. VOTE: Pass By REJECTED (38-Y 58-N)

  22. Motion to pass by floor amenments offered by Delegate Rasoul rejected (38-Y 58-N)

  23. Substitute by Delegate Sullivan agreed to 20109629D-H2

  24. Committee substitute rejected 20109076D-H1

  25. Floor substitute printed 20109629D-H2 (Sullivan)

  26. Passed by temporarily

  27. Read third time

  28. Passed by for the day

  29. Impact statement from SCC (SB851H1)

  30. Passed by for the day

  31. Committee substitute reconsidered 20109076D-H1

  32. Motion to reconsider pass by for the day agreed to

  33. Passed by for the day

  34. Passed by for the day

  35. Passed by for the day

  36. Pending question ordered

  37. Committee substitute agreed to 20109076D-H1

  38. Passed by temporarily

  39. Read third time

  40. Read second time

  41. Committee substitute printed 20109076D-H1

  42. Reported from Labor and Commerce with substitute (13-Y 9-N)

  43. House committee, floor amendments and substitutes offered

  44. Impact statement from SCC (SB851S1)

  45. Referred to Committee on Labor and Commerce

  46. Read first time

  47. Placed on Calendar

  48. Passed Senate (21-Y 19-N)

  49. Constitutional reading dispensed (40-Y 0-N)

  50. Engrossed by Senate - committee substitute SB851S1

  51. Committee substitute agreed to 20107977D-S1

  52. Reading of substitute waived

  53. Read second time

  54. Constitutional reading dispensed (39-Y 0-N)

  55. Substitute bill reprinted 20107977D-S1

  56. Committee substitute printed 20107977D-S1

  57. Incorporates SB876 (Marsden)

  58. Incorporates SB532 (Edwards)

  59. Reported from Commerce and Labor with substitute (12-Y 3-N)

  60. Assigned C&L sub: Energy

  61. Impact statement from SCC (SB851)

  62. Referred to Committee on Commerce and Labor

  63. Prefiled and ordered printed; offered 01/08/20 20105040D

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 7 co-sponsors · 140 not signed on · 113 voted No

Sponsors (1)

  • Jennifer L. McClellan

Not signed on (140)

140 members have not signed on to this bill.

Show all 140 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Failed 37 Yea · 58 Nay · 4 Other
Party YeaNayPresentNot Voting
Unaffiliated 375804
Total 375804
% of votes cast 37%59%0%4%
How each member voted (99)
Member Party Vote
Brewer, Emily M. — Nay
Collins, Christopher E. — Nay
Lindsey, Joseph C. — Yea
Adams, Dawn M. — Not Voting
Adams, Les R. — Nay
Aird, Lashrecse D. — Nay
Alfonso H. Lopez — Yea
Askew, Alex Q. — Yea
Avoli, G. "John" — Nay
Ayala, Hala S. — Yea
Batten, Amanda E. — Nay
Bell, Robert B. — Nay
Betsy B. Carr — Yea
Bourne, Jeffrey M. — Yea
Bulova, David L. — Yea
Byron, Kathy J. — Nay
C.E. Cliff Hayes, Jr. — Yea
Campbell, Jeffrey L. — Nay
Campbell, Ronnie R. — Nay
Carroll Foy, Jennifer D. — Nay
Carter, Lee J. — Nay
Charniele L. Herring — Yea
Chris S. Runion — Nay
Christopher T. Head — Nay
Cole, Mark L. — Nay
Convirs-Fowler, Kelly K. — Not Voting
Cox, M. Kirkland — Nay
Coyner, Carrie E. — Nay
Dan I. Helmer — Yea
Danica A. Roem — Nay
David A. Reid — Yea
Davis, Glenn R. — Nay
Delores L. McQuinn — Yea
Don Scott — Yea
Edmunds, James E., II — Nay
Fariss, C. Matthew — Nay
Fowler, Hyland F."Buddy," Jr. — Nay
Freitas, Nicholas J. — Nay
Gilbert, C. Todd — Nay
Gooditis, Wendy W. — Yea
Guy, Nancy D. — Yea
Guzman, Elizabeth R. — Nay
Heretick, Steve E. — Yea
Hudson, Sally L. — Yea
Hurst, Chris L. — Nay
Israel D. O'Quinn — Nay
James A. "Jay" Leftwich — Nay
James W. Morefield — Nay
Jeion A. Ward — Yea
Jenkins, Clinton L. — Yea
Jones, Jerrauld C. "Jay" — Yea
Joseph P. McNamara — Nay
Joshua G. Cole — Nay
Karrie K. Delaney — Yea
Kathy K.L. Tran — Nay
Keam, Mark L. — Nay
Knight, Barry D. — Nay
Kory, Kaye — Yea
LaRock, Dave A. — Nay
Lamont Bagby — Not Voting
Levine, Mark H. — Yea
Luke E. Torian — Yea
M. Keith Hodges — Nay
Marcia S. "Cia" Price — Nay
Marcus B. Simon — Yea
Marshall, Daniel W., III — Nay
McGuire, John J., III — Nay
Michael J. Webert — Nay
Miyares, Jason S. — Nay
Mugler, Martha M. — Yea
Mullin, Michael P. — Yea
Murphy, Kathleen — Yea
Orrock, Robert D., Sr. — Nay
Patrick A. Hope — Yea
Paul E. Krizek — Yea
Plum, Kenneth R. — Nay
Poindexter, Charles D. — Nay
R. Lee Ware — Nay
Ransone, Margaret B. — Nay
Richard C. "Rip" Sullivan, Jr. — Yea
Robert S. Bloxom, Jr. — Nay
Robinson, Roxann L. — Nay
Rodney T. Willett — Yea
Rush, Nick — Nay
Sam Rasoul — Nay
Samirah, Ibraheem S. — Nay
Schuyler T. VanValkenburg — Yea
Scott A. Wyatt — Nay
Shelly A. Simonds — Yea
Sickles, Mark D. — Yea
Subramanyam, Suhas — Not Voting
Terry G. Kilgore — Yea
Terry L. Austin — Nay
Thomas C. Wright, Jr. — Nay
Tony O. Wilt — Nay
Tyler, Roslyn C. — Yea
Vivian E. Watts — Nay
Wampler, William C., III — Nay
Wendell S. Walker — Nay

Official roll call →

Passed 50 Yea · 45 Nay · 4 Other
Party YeaNayPresentNot Voting
Unaffiliated 504504
Total 504504
% of votes cast 51%45%0%4%
How each member voted (99)
Member Party Vote
Brewer, Emily M. — Nay
Collins, Christopher E. — Nay
Lindsey, Joseph C. — Yea
Adams, Dawn M. — Yea
Adams, Les R. — Nay
Aird, Lashrecse D. — Yea
Alfonso H. Lopez — Yea
Askew, Alex Q. — Yea
Avoli, G. "John" — Nay
Ayala, Hala S. — Yea
Batten, Amanda E. — Nay
Bell, Robert B. — Nay
Betsy B. Carr — Yea
Bourne, Jeffrey M. — Yea
Bulova, David L. — Yea
Byron, Kathy J. — Nay
C.E. Cliff Hayes, Jr. — Yea
Campbell, Jeffrey L. — Nay
Campbell, Ronnie R. — Nay
Carroll Foy, Jennifer D. — Yea
Carter, Lee J. — Nay
Charniele L. Herring — Yea
Chris S. Runion — Nay
Christopher T. Head — Nay
Cole, Mark L. — Nay
Convirs-Fowler, Kelly K. — Not Voting
Cox, M. Kirkland — Nay
Coyner, Carrie E. — Nay
Dan I. Helmer — Yea
Danica A. Roem — Yea
David A. Reid — Yea
Davis, Glenn R. — Nay
Delores L. McQuinn — Yea
Don Scott — Yea
Edmunds, James E., II — Not Voting
Fariss, C. Matthew — Nay
Fowler, Hyland F."Buddy," Jr. — Nay
Freitas, Nicholas J. — Nay
Gilbert, C. Todd — Nay
Gooditis, Wendy W. — Yea
Guy, Nancy D. — Yea
Guzman, Elizabeth R. — Yea
Heretick, Steve E. — Yea
Hudson, Sally L. — Yea
Hurst, Chris L. — Yea
Israel D. O'Quinn — Nay
James A. "Jay" Leftwich — Nay
James W. Morefield — Nay
Jeion A. Ward — Yea
Jenkins, Clinton L. — Yea
Jones, Jerrauld C. "Jay" — Yea
Joseph P. McNamara — Nay
Joshua G. Cole — Yea
Karrie K. Delaney — Yea
Kathy K.L. Tran — Yea
Keam, Mark L. — Not Voting
Knight, Barry D. — Nay
Kory, Kaye — Yea
LaRock, Dave A. — Nay
Lamont Bagby — Yea
Levine, Mark H. — Yea
Luke E. Torian — Not Voting
M. Keith Hodges — Nay
Marcia S. "Cia" Price — Yea
Marcus B. Simon — Yea
Marshall, Daniel W., III — Nay
McGuire, John J., III — Nay
Michael J. Webert — Nay
Miyares, Jason S. — Nay
Mugler, Martha M. — Yea
Mullin, Michael P. — Yea
Murphy, Kathleen — Yea
Orrock, Robert D., Sr. — Nay
Patrick A. Hope — Yea
Paul E. Krizek — Yea
Plum, Kenneth R. — Yea
Poindexter, Charles D. — Nay
R. Lee Ware — Nay
Ransone, Margaret B. — Nay
Richard C. "Rip" Sullivan, Jr. — Yea
Robert S. Bloxom, Jr. — Nay
Robinson, Roxann L. — Nay
Rodney T. Willett — Yea
Rush, Nick — Nay
Sam Rasoul — Nay
Samirah, Ibraheem S. — Yea
Schuyler T. VanValkenburg — Yea
Scott A. Wyatt — Nay
Shelly A. Simonds — Yea
Sickles, Mark D. — Yea
Subramanyam, Suhas — Yea
Terry G. Kilgore — Yea
Terry L. Austin — Nay
Thomas C. Wright, Jr. — Nay
Tony O. Wilt — Nay
Tyler, Roslyn C. — Yea
Vivian E. Watts — Yea
Wampler, William C., III — Nay
Wendell S. Walker — Nay

Official roll call →

Passed 22 Yea · 17 Nay · 1 Other
Party YeaNayPresentNot Voting
Unaffiliated 221701
Total 221701
% of votes cast 55%43%0%3%
How each member voted (40)
Member Party Vote
Chafin, A. Benton "Ben" — Nay
McClellan, Jennifer L. — Yea
Morrissey, Joseph D. — Yea
Spruill, Lionell, Sr. — Yea
Barbara A. Favola — Yea
Barker, George L. — Yea
Bell, John J. — Yea
Bill DeSteph — Nay
Bryce E. Reeves — Nay
Chase, Amanda F. — Nay
Cosgrove, John A., Jr. — Nay
David R. Suetterlein — Nay
David W. Marsden — Yea
Dunnavant, Siobhan S. — Nay
Ebbin, Adam P. — Yea
Edwards, John S. — Yea
Hanger, Emmett W., Jr. — Nay
Hashmi, Ghazala F. — Yea
Howell, Janet D. — Yea
Jennifer B. Boysko — Yea
Jeremy S. McPike — Yea
Kiggans, Jennifer A. — Nay
L. Louise Lucas — Yea
Lewis, Lynwood W., Jr. — Yea
Mamie E. Locke — Yea
Mark D. Obenshain — Nay
Mark J. Peake — Nay
Mason, T. Montgomery "Monty" — Yea
Newman, Stephen D. — Nay
Norment, Thomas K., Jr. — Nay
Petersen, J. Chapman — Yea
R. Creigh Deeds — Yea
Richard H. Stuart — Not Voting
Ruff, Frank M., Jr. — Nay
Ryan T. McDougle — Nay
Saslaw, Richard L. — Yea
Scott A. Surovell — Yea
Todd E. Pillion — Nay
Vogel, Jill Holtzman — Yea
William M. Stanley, Jr. — Nay

Official roll call →

Failed 39 Yea · 53 Nay · 7 Other
Party YeaNayPresentNot Voting
Unaffiliated 395307
Total 395307
% of votes cast 39%54%0%7%
How each member voted (99)
Member Party Vote
Brewer, Emily M. — Yea
Collins, Christopher E. — Yea
Lindsey, Joseph C. — Nay
Adams, Dawn M. — Nay
Adams, Les R. — Yea
Aird, Lashrecse D. — Not Voting
Alfonso H. Lopez — Nay
Askew, Alex Q. — Nay
Avoli, G. "John" — Yea
Ayala, Hala S. — Nay
Batten, Amanda E. — Yea
Bell, Robert B. — Yea
Betsy B. Carr — Nay
Bourne, Jeffrey M. — Nay
Bulova, David L. — Nay
Byron, Kathy J. — Yea
C.E. Cliff Hayes, Jr. — Nay
Campbell, Jeffrey L. — Yea
Campbell, Ronnie R. — Yea
Carroll Foy, Jennifer D. — Nay
Carter, Lee J. — Yea
Charniele L. Herring — Nay
Chris S. Runion — Yea
Christopher T. Head — Yea
Cole, Mark L. — Yea
Convirs-Fowler, Kelly K. — Not Voting
Cox, M. Kirkland — Yea
Coyner, Carrie E. — Yea
Dan I. Helmer — Nay
Danica A. Roem — Not Voting
David A. Reid — Nay
Davis, Glenn R. — Nay
Delores L. McQuinn — Nay
Don Scott — Nay
Edmunds, James E., II — Not Voting
Fariss, C. Matthew — Yea
Fowler, Hyland F."Buddy," Jr. — Yea
Freitas, Nicholas J. — Yea
Gilbert, C. Todd — Yea
Gooditis, Wendy W. — Nay
Guy, Nancy D. — Nay
Guzman, Elizabeth R. — Nay
Heretick, Steve E. — Nay
Hudson, Sally L. — Nay
Hurst, Chris L. — Nay
Israel D. O'Quinn — Yea
James A. "Jay" Leftwich — Yea
James W. Morefield — Yea
Jeion A. Ward — Nay
Jenkins, Clinton L. — Nay
Jones, Jerrauld C. "Jay" — Nay
Joseph P. McNamara — Yea
Joshua G. Cole — Nay
Karrie K. Delaney — Nay
Kathy K.L. Tran — Nay
Keam, Mark L. — Not Voting
Knight, Barry D. — Yea
Kory, Kaye — Nay
LaRock, Dave A. — Yea
Lamont Bagby — Nay
Levine, Mark H. — Nay
Luke E. Torian — Nay
M. Keith Hodges — Yea
Marcia S. "Cia" Price — Nay
Marcus B. Simon — Nay
Marshall, Daniel W., III — Not Voting
McGuire, John J., III — Nay
Michael J. Webert — Not Voting
Miyares, Jason S. — Nay
Mugler, Martha M. — Nay
Mullin, Michael P. — Nay
Murphy, Kathleen — Nay
Orrock, Robert D., Sr. — Yea
Patrick A. Hope — Nay
Paul E. Krizek — Nay
Plum, Kenneth R. — Nay
Poindexter, Charles D. — Yea
R. Lee Ware — Nay
Ransone, Margaret B. — Yea
Richard C. "Rip" Sullivan, Jr. — Nay
Robert S. Bloxom, Jr. — Yea
Robinson, Roxann L. — Yea
Rodney T. Willett — Nay
Rush, Nick — Yea
Sam Rasoul — Yea
Samirah, Ibraheem S. — Yea
Schuyler T. VanValkenburg — Nay
Scott A. Wyatt — Yea
Shelly A. Simonds — Nay
Sickles, Mark D. — Nay
Subramanyam, Suhas — Nay
Terry G. Kilgore — Nay
Terry L. Austin — Yea
Thomas C. Wright, Jr. — Yea
Tony O. Wilt — Yea
Tyler, Roslyn C. — Nay
Vivian E. Watts — Nay
Wampler, William C., III — Nay
Wendell S. Walker — Yea

Official roll call →

Failed 48 Yea · 48 Nay · 3 Other
Party YeaNayPresentNot Voting
Unaffiliated 484803
Total 484803
% of votes cast 48%48%0%3%
How each member voted (99)
Member Party Vote
Brewer, Emily M. — Nay
Collins, Christopher E. — Nay
Lindsey, Joseph C. — Yea
Adams, Dawn M. — Yea
Adams, Les R. — Nay
Aird, Lashrecse D. — Nay
Alfonso H. Lopez — Yea
Askew, Alex Q. — Yea
Avoli, G. "John" — Nay
Ayala, Hala S. — Yea
Batten, Amanda E. — Nay
Bell, Robert B. — Nay
Betsy B. Carr — Yea
Bourne, Jeffrey M. — Yea
Bulova, David L. — Yea
Byron, Kathy J. — Nay
C.E. Cliff Hayes, Jr. — Yea
Campbell, Jeffrey L. — Nay
Campbell, Ronnie R. — Nay
Carroll Foy, Jennifer D. — Yea
Carter, Lee J. — Nay
Charniele L. Herring — Yea
Chris S. Runion — Nay
Christopher T. Head — Nay
Cole, Mark L. — Nay
Convirs-Fowler, Kelly K. — Not Voting
Cox, M. Kirkland — Nay
Coyner, Carrie E. — Nay
Dan I. Helmer — Yea
Danica A. Roem — Yea
David A. Reid — Yea
Davis, Glenn R. — Nay
Delores L. McQuinn — Yea
Don Scott — Yea
Edmunds, James E., II — Nay
Fariss, C. Matthew — Nay
Fowler, Hyland F."Buddy," Jr. — Nay
Freitas, Nicholas J. — Nay
Gilbert, C. Todd — Nay
Gooditis, Wendy W. — Yea
Guy, Nancy D. — Yea
Guzman, Elizabeth R. — Yea
Heretick, Steve E. — Yea
Hudson, Sally L. — Yea
Hurst, Chris L. — Yea
Israel D. O'Quinn — Nay
James A. "Jay" Leftwich — Nay
James W. Morefield — Nay
Jeion A. Ward — Yea
Jenkins, Clinton L. — Yea
Jones, Jerrauld C. "Jay" — Yea
Joseph P. McNamara — Nay
Joshua G. Cole — Yea
Karrie K. Delaney — Yea
Kathy K.L. Tran — Yea
Keam, Mark L. — Not Voting
Knight, Barry D. — Nay
Kory, Kaye — Yea
LaRock, Dave A. — Nay
Lamont Bagby — Yea
Levine, Mark H. — Yea
Luke E. Torian — Yea
M. Keith Hodges — Nay
Marcia S. "Cia" Price — Yea
Marcus B. Simon — Yea
Marshall, Daniel W., III — Nay
McGuire, John J., III — Nay
Michael J. Webert — Nay
Miyares, Jason S. — Nay
Mugler, Martha M. — Yea
Mullin, Michael P. — Yea
Murphy, Kathleen — Yea
Orrock, Robert D., Sr. — Nay
Patrick A. Hope — Yea
Paul E. Krizek — Yea
Plum, Kenneth R. — Yea
Poindexter, Charles D. — Nay
R. Lee Ware — Nay
Ransone, Margaret B. — Nay
Richard C. "Rip" Sullivan, Jr. — Yea
Robert S. Bloxom, Jr. — Nay
Robinson, Roxann L. — Nay
Rodney T. Willett — Yea
Rush, Nick — Nay
Sam Rasoul — Nay
Samirah, Ibraheem S. — Nay
Schuyler T. VanValkenburg — Yea
Scott A. Wyatt — Nay
Shelly A. Simonds — Yea
Sickles, Mark D. — Yea
Subramanyam, Suhas — Yea
Terry G. Kilgore — Not Voting
Terry L. Austin — Nay
Thomas C. Wright, Jr. — Nay
Tony O. Wilt — Nay
Tyler, Roslyn C. — Yea
Vivian E. Watts — Yea
Wampler, William C., III — Nay
Wendell S. Walker — Nay

Official roll call →

Passed 50 Yea · 44 Nay · 5 Other
Party YeaNayPresentNot Voting
Unaffiliated 504405
Total 504405
% of votes cast 51%44%0%5%
How each member voted (99)
Member Party Vote
Brewer, Emily M. — Nay
Collins, Christopher E. — Yea
Lindsey, Joseph C. — Nay
Adams, Dawn M. — Not Voting
Adams, Les R. — Yea
Aird, Lashrecse D. — Yea
Alfonso H. Lopez — Nay
Askew, Alex Q. — Nay
Avoli, G. "John" — Yea
Ayala, Hala S. — Nay
Batten, Amanda E. — Yea
Bell, Robert B. — Yea
Betsy B. Carr — Nay
Bourne, Jeffrey M. — Nay
Bulova, David L. — Nay
Byron, Kathy J. — Yea
C.E. Cliff Hayes, Jr. — Nay
Campbell, Jeffrey L. — Yea
Campbell, Ronnie R. — Yea
Carroll Foy, Jennifer D. — Not Voting
Carter, Lee J. — Yea
Charniele L. Herring — Nay
Chris S. Runion — Yea
Christopher T. Head — Yea
Cole, Mark L. — Yea
Convirs-Fowler, Kelly K. — Not Voting
Cox, M. Kirkland — Yea
Coyner, Carrie E. — Yea
Dan I. Helmer — Nay
Danica A. Roem — Yea
David A. Reid — Nay
Davis, Glenn R. — Yea
Delores L. McQuinn — Nay
Don Scott — Nay
Edmunds, James E., II — Yea
Fariss, C. Matthew — Yea
Fowler, Hyland F."Buddy," Jr. — Yea
Freitas, Nicholas J. — Yea
Gilbert, C. Todd — Yea
Gooditis, Wendy W. — Nay
Guy, Nancy D. — Nay
Guzman, Elizabeth R. — Nay
Heretick, Steve E. — Nay
Hudson, Sally L. — Nay
Hurst, Chris L. — Nay
Israel D. O'Quinn — Yea
James A. "Jay" Leftwich — Yea
James W. Morefield — Yea
Jeion A. Ward — Nay
Jenkins, Clinton L. — Not Voting
Jones, Jerrauld C. "Jay" — Nay
Joseph P. McNamara — Yea
Joshua G. Cole — Yea
Karrie K. Delaney — Nay
Kathy K.L. Tran — Nay
Keam, Mark L. — Yea
Knight, Barry D. — Yea
Kory, Kaye — Nay
LaRock, Dave A. — Yea
Lamont Bagby — Not Voting
Levine, Mark H. — Nay
Luke E. Torian — Nay
M. Keith Hodges — Yea
Marcia S. "Cia" Price — Yea
Marcus B. Simon — Nay
Marshall, Daniel W., III — Yea
McGuire, John J., III — Yea
Michael J. Webert — Yea
Miyares, Jason S. — Yea
Mugler, Martha M. — Nay
Mullin, Michael P. — Nay
Murphy, Kathleen — Nay
Orrock, Robert D., Sr. — Yea
Patrick A. Hope — Nay
Paul E. Krizek — Nay
Plum, Kenneth R. — Nay
Poindexter, Charles D. — Yea
R. Lee Ware — Yea
Ransone, Margaret B. — Yea
Richard C. "Rip" Sullivan, Jr. — Nay
Robert S. Bloxom, Jr. — Nay
Robinson, Roxann L. — Yea
Rodney T. Willett — Nay
Rush, Nick — Yea
Sam Rasoul — Yea
Samirah, Ibraheem S. — Yea
Schuyler T. VanValkenburg — Yea
Scott A. Wyatt — Yea
Shelly A. Simonds — Nay
Sickles, Mark D. — Nay
Subramanyam, Suhas — Nay
Terry G. Kilgore — Nay
Terry L. Austin — Yea
Thomas C. Wright, Jr. — Yea
Tony O. Wilt — Yea
Tyler, Roslyn C. — Nay
Vivian E. Watts — Nay
Wampler, William C., III — Nay
Wendell S. Walker — Yea

Official roll call →

Passed 13 Yea · 9 Nay
Party YeaNayPresentNot Voting
Unaffiliated 13900
Total 13900
% of votes cast 59%41%0%0%
How each member voted (22)
Member Party Vote
Lindsey, Joseph C. — Yea
Alfonso H. Lopez — Yea
Ayala, Hala S. — Yea
Bourne, Jeffrey M. — Yea
Byron, Kathy J. — Nay
Christopher T. Head — Nay
Gooditis, Wendy W. — Yea
Guzman, Elizabeth R. — Yea
Heretick, Steve E. — Yea
Israel D. O'Quinn — Nay
Jeion A. Ward — Yea
Keam, Mark L. — Yea
Kory, Kaye — Yea
Lamont Bagby — Yea
Marshall, Daniel W., III — Nay
Michael J. Webert — Nay
Mullin, Michael P. — Yea
R. Lee Ware — Nay
Ransone, Margaret B. — Nay
Richard C. "Rip" Sullivan, Jr. — Yea
Terry G. Kilgore — Nay
Tony O. Wilt — Nay

Official roll call →

Passed Senate (21-Y 19-N)

Passed 21 Yea · 19 Nay
Party YeaNayPresentNot Voting
Unaffiliated 211900
Total 211900
% of votes cast 53%48%0%0%
How each member voted (40)
Member Party Vote
Chafin, A. Benton "Ben" — Nay
McClellan, Jennifer L. — Yea
Morrissey, Joseph D. — Yea
Spruill, Lionell, Sr. — Yea
Barbara A. Favola — Yea
Barker, George L. — Yea
Bell, John J. — Yea
Bill DeSteph — Nay
Bryce E. Reeves — Nay
Chase, Amanda F. — Nay
Cosgrove, John A., Jr. — Nay
David R. Suetterlein — Nay
David W. Marsden — Yea
Dunnavant, Siobhan S. — Nay
Ebbin, Adam P. — Yea
Edwards, John S. — Yea
Hanger, Emmett W., Jr. — Nay
Hashmi, Ghazala F. — Yea
Howell, Janet D. — Yea
Jennifer B. Boysko — Yea
Jeremy S. McPike — Yea
Kiggans, Jennifer A. — Nay
L. Louise Lucas — Yea
Lewis, Lynwood W., Jr. — Yea
Mamie E. Locke — Yea
Mark D. Obenshain — Nay
Mark J. Peake — Nay
Mason, T. Montgomery "Monty" — Yea
Newman, Stephen D. — Nay
Norment, Thomas K., Jr. — Nay
Petersen, J. Chapman — Yea
R. Creigh Deeds — Yea
Richard H. Stuart — Nay
Ruff, Frank M., Jr. — Nay
Ryan T. McDougle — Nay
Saslaw, Richard L. — Yea
Scott A. Surovell — Yea
Todd E. Pillion — Nay
Vogel, Jill Holtzman — Nay
William M. Stanley, Jr. — Nay

Official roll call →

Passed 40 Yea · 0 Nay
Party YeaNayPresentNot Voting
Unaffiliated 40000
Total 40000
% of votes cast 100%0%0%0%
How each member voted (40)
Member Party Vote
Chafin, A. Benton "Ben" — Yea
McClellan, Jennifer L. — Yea
Morrissey, Joseph D. — Yea
Spruill, Lionell, Sr. — Yea
Barbara A. Favola — Yea
Barker, George L. — Yea
Bell, John J. — Yea
Bill DeSteph — Yea
Bryce E. Reeves — Yea
Chase, Amanda F. — Yea
Cosgrove, John A., Jr. — Yea
David R. Suetterlein — Yea
David W. Marsden — Yea
Dunnavant, Siobhan S. — Yea
Ebbin, Adam P. — Yea
Edwards, John S. — Yea
Hanger, Emmett W., Jr. — Yea
Hashmi, Ghazala F. — Yea
Howell, Janet D. — Yea
Jennifer B. Boysko — Yea
Jeremy S. McPike — Yea
Kiggans, Jennifer A. — Yea
L. Louise Lucas — Yea
Lewis, Lynwood W., Jr. — Yea
Mamie E. Locke — Yea
Mark D. Obenshain — Yea
Mark J. Peake — Yea
Mason, T. Montgomery "Monty" — Yea
Newman, Stephen D. — Yea
Norment, Thomas K., Jr. — Yea
Petersen, J. Chapman — Yea
R. Creigh Deeds — Yea
Richard H. Stuart — Yea
Ruff, Frank M., Jr. — Yea
Ryan T. McDougle — Yea
Saslaw, Richard L. — Yea
Scott A. Surovell — Yea
Todd E. Pillion — Yea
Vogel, Jill Holtzman — Yea
William M. Stanley, Jr. — Yea

Official roll call →

Passed 39 Yea · 0 Nay · 1 Other
Party YeaNayPresentNot Voting
Unaffiliated 39001
Total 39001
% of votes cast 98%0%0%3%
How each member voted (40)
Member Party Vote
Chafin, A. Benton "Ben" — Yea
McClellan, Jennifer L. — Yea
Morrissey, Joseph D. — Yea
Spruill, Lionell, Sr. — Yea
Barbara A. Favola — Yea
Barker, George L. — Yea
Bell, John J. — Yea
Bill DeSteph — Yea
Bryce E. Reeves — Yea
Chase, Amanda F. — Yea
Cosgrove, John A., Jr. — Yea
David R. Suetterlein — Yea
David W. Marsden — Yea
Dunnavant, Siobhan S. — Yea
Ebbin, Adam P. — Yea
Edwards, John S. — Yea
Hanger, Emmett W., Jr. — Yea
Hashmi, Ghazala F. — Yea
Howell, Janet D. — Yea
Jennifer B. Boysko — Not Voting
Jeremy S. McPike — Yea
Kiggans, Jennifer A. — Yea
L. Louise Lucas — Yea
Lewis, Lynwood W., Jr. — Yea
Mamie E. Locke — Yea
Mark D. Obenshain — Yea
Mark J. Peake — Yea
Mason, T. Montgomery "Monty" — Yea
Newman, Stephen D. — Yea
Norment, Thomas K., Jr. — Yea
Petersen, J. Chapman — Yea
R. Creigh Deeds — Yea
Richard H. Stuart — Yea
Ruff, Frank M., Jr. — Yea
Ryan T. McDougle — Yea
Saslaw, Richard L. — Yea
Scott A. Surovell — Yea
Todd E. Pillion — Yea
Vogel, Jill Holtzman — Yea
William M. Stanley, Jr. — Yea

Official roll call →

Passed 12 Yea · 3 Nay
Party YeaNayPresentNot Voting
Unaffiliated 12300
Total 12300
% of votes cast 80%20%0%0%
How each member voted (15)
Member Party Vote
Spruill, Lionell, Sr. — Yea
Barker, George L. — Yea
Bell, John J. — Yea
David W. Marsden — Yea
Ebbin, Adam P. — Yea
Edwards, John S. — Yea
L. Louise Lucas — Yea
Lewis, Lynwood W., Jr. — Yea
Mark D. Obenshain — Nay
Mason, T. Montgomery "Monty" — Yea
Newman, Stephen D. — Nay
Norment, Thomas K., Jr. — Nay
R. Creigh Deeds — Yea
Saslaw, Richard L. — Yea
Scott A. Surovell — Yea

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does SB 851 do?
Virginia Clean Economy Act. Establishes a schedule by which Dominion Energy Virginia and American Electric Power are required to retire electric generating units located in the Commonwealth that emit carbon as a by-product of combusting fuel to generate electricity and by which they are required to construct, acquire, or enter into agreements to purchase generating capacity located in the Commonwealth using energy derived from sunlight or onshore wind. The measure replaces the existing voluntary renewable energy portfolio standard program (RPS Program) with a mandatory RPS Program. Under the mandatory RPS Program, Dominion Energy Virginia and American Electric Power are required to produce their electricity from 100 percent renewable sources by 2045 and 2050, respectively. A utility that does not meet its targets is required to pay a specific deficiency payment or purchase renewable energy certificates. The proceeds from the deficiency payments are to be deposited into an account administered by the Department of Mines, Minerals and Energy, which is directed to distribute specific percentages of the moneys to job training and renewable energy programs in historically economically disadvantaged communities, energy efficiency measures, and administrative costs. The measure requires the State Air Pollution Control Board to adopt regulations to reduce the carbon dioxide emissions from certain electricity generating units in the Commonwealth and authorizes the Board to establish, implement, and manage an auction program to sell allowances to carry out the purposes of such regulations and to utilize its existing regulations to reduce carbon dioxide emissions from electric power generating facilities. Among other things, the measure also (i) requires, by 2035, American Electric Power and Dominion Energy Virginia to construct or acquire 400 and 2,700 megawatts of energy storage capacity, respectively; (ii) establishes an energy efficiency standard under which each investor-owned incumbent electric utility is required to achieve incremental annual energy efficiency savings that start in 2022 at 0.5 percent for American Electric Power and 1.25 percent for Dominion Energy Virginia of the average annual energy retail sales by that utility in 2019 and increase those savings annually; (iii) exempts large general service customers from energy savings requirements; (iv) revises the incentive for electric utility energy efficiency programs; (v) provides that if the Commission finds in any triennial review that revenue reductions related to energy efficiency measures or programs approved and deployed since the utility's previous triennial review have caused the utility to earn more than 50 basis points below a fair combined rate of return on its generation and distribution services or, for any test period commencing after December 31, 2012, for Dominion Energy Virginia and after December 31, 2013, for American Electric Power, more than 70 basis points below a fair combined rate of return on its generation and distribution services, the Commission shall order increases to the utility's rates for generation and distribution services necessary to recover such revenue reductions; (vi) establishes requirements regarding the development by Dominion Energy Virginia of qualified offshore wind projects having an aggregate rated capacity of not less than 5,200 megawatts by January 1, 2034, and provides that in constructing any such facility, the utility shall (a) identify options for utilizing local workers; (b) identify the economic development benefits of the project for the Commonwealth, including capital investments and job creation; (c) consult with relevant governmental entities, including the Commonwealth's Chief Workforce Development Officer and the Virginia Economic Development Partnership, on opportunities to advance the Commonwealth's workforce and economic development goals, including furtherance of apprenticeship and other workforce training programs; and (d) give priority to the hiring, apprenticeship, and training of veterans, local workers, and workers from historically economically disadvantaged communities; (vii) requires each utility to include, and the Commission to consider, in any application to construct a new generating facility the social cost of carbon, as determined by the Commission, as a benefit or cost, whichever is appropriate; (viii) removes provisions that authorize nuclear and offshore wind generating facilities to continue to be eligible for an enhanced rate of return on common equity during the construction phase of the facility and the approved first portion of its service life of between 12 and 25 years in the case of a facility utilizing nuclear power and for a service life of between five and 15 years in the case of a facility utilizing energy derived from offshore wind; (ix) removes a provision that declares that planning and development activities for new nuclear generation facilities are in the public interest; (x) increases the limit from 5,000 megawatts to 16,100 megawatts on those solar and onshore wind generation facilities that are declared to be in the public interest and increases the limit from 16 megawatts to 3,000 megawatts on those offshore wind generation facilities that are declared to be in the public interest; (xi) amends the net energy metering program by increasing the maximum capacity of renewable generation facilities of participating nonresidential eligible customer-generators from one to three megawatts, increases the cap on the capacity of generation from facilities from the customer's expected annual energy consumption to 150 percent of such amount for customers in Dominion Energy Virginia's service territory, increases each utility's systemwide cap from one percent of its adjusted Virginia peak-load forecast for the previous year to six percent of such amount, five percent of which is available to all customers and one percent of which is available only to low-income utility customers; (xii) establishes the Percentage of Income Payment Program (PIPP), which caps the monthly electric utility payment of low-income participants at six percent, or, if the participant's home uses electric heat, 10 percent, of the participant's household income, requires the Commission to issue its final order regarding the PIPP by December 31, 2020, and requires the Department of Housing and Community Development and the Department of Social Services to convene a stakeholder group to develop recommendations for implementing the PIPP and to submit the stakeholder recommendations to the Chairs of the House Committee on Labor and Commerce and the Senate Committee on Commerce and Labor by December 1, 2020; (xiii) increases the cap on third party power purchase agreements to 500 megawatts for jurisdictional customers and 500 megawatts for nonjurisdictional customers of Dominion Energy Virginia and to 40 megawatts for customers of American Electric Power; (xiv) requires each investor-owned utility to consult with the Clean Energy Advisory Board in how best to inform low-income customers of opportunities to lower electric bills through access to solar energy; (xv) requires the Department of Mines, Minerals and Energy, in consultation with the Council on Environmental Justice, to prepare a report to the Chairs of the House Committee on Labor and Commerce and the Senate Committee on Commerce and Labor that determines if the implementation of the measure imposes a disproportionate burden on historically economically disadvantaged communities; (xvi) requires the Secretary of Natural Resources and the Secretary of Commerce and Trade, in consultation with the State Corporation Commission and the Council on Environmental Justice and appropriate stakeholders, to report to the General Assembly by January 1, 2022, any recommendations on how to achieve 100 percent carbon-free electric energy generation by 2045 at least cost for ratepayers; and (xvii) provides that it is the policy of the Commonwealth that the State Corporation Commission, Department of Environmental Quality, Department of Mines, Minerals and Energy, Virginia Council on Environmental Justice, and other applicable state agencies, in the development of energy programs, job training programs, and placement of renewable energy facilities, shall consider those facilities and programs being to the benefit of low-income geographic areas and historically economically disadvantaged communities that are located near previously and presently permitted fossil fuel facilities or coal mines. This bill is identical to HB 1526.
Who sponsors SB 851?
SB 851 is sponsored by Jennifer L. McClellan, David W. Marsden, Jennifer B. Boysko, Barbara A. Favola, Ghazala F. Hashmi, Adam P. Ebbin, Lewis, Lynwood W., Jr., and Edwards, John S..
What is the current status of SB 851?
This bill has been enacted into law. Introduced January 08, 2020. Enacted.
Where can I track SB 851?
Track SB 851 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 851

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 851

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.