→
Previous
Latest
HB0016S02 compared with HB0016 {Omitted text} shows text that was in HB0016 but was omitted in HB0016S02 inserted text shows text that was not in HB0016 but was inserted into HB0016S02 DISCLAIMER:
Enrolled Copy H.B.
This document is provided to assist you in your comparison of the two bills.
16 Solar Power Plant Amendments GENERAL SESSION STATE OF UTAH Chief Sponsor:
Sometimes this automated comparison will NOT be completely accurate.
Therefore, you need to read the actual bills.
This automatically generated document could contain inaccuracies caused by:
limitations of the compare program;
bad input data;
or other causes.
Solar Power Plant Amendments GENERAL SESSION STATE OF UTAH Chief Sponsor:
Jack Senate Sponsor:David P.
Jack Senate Sponsor:
David P.
H ▸ creates a permitting process for solar power plants;
▸ creates a permitting process for solar power plants;
B ▸ requires submission and approval of site and development plans {for solar power plants} before permit approval;
▸ requires submission and approval of site and development plans before permit approval;
and 1 HB0016 compared with HB0016S02 ▸ provides for severability.
and ▸ provides for severability.
54-17-1201 , Utah Code Annotated 1953 54-17-1202 , Utah Code Annotated 1953 54-17-1203 , Utah Code Annotated 1953 54-17-1204 , Utah Code Annotated 1953 54-17-1205 , Utah Code Annotated 1953 54-17-1206 , Utah Code Annotated 1953 Be it enacted by the Legislature of the state of Utah:
54-17-1201, Utah Code Annotated 1953 H.B.
16 Enrolled Copy 54-17-1202, Utah Code Annotated 1953 54-17-1203, Utah Code Annotated 1953 54-17-1204, Utah Code Annotated 1953 54-17-1205, Utah Code Annotated 1953 54-17-1206, Utah Code Annotated 1953 Be it enacted by the Legislature of the state of Utah:
Section 1 is enacted to read:
Section 54-17-1201 is enacted to read:
54-17-1201.
54-17-1201 .
(1) "Agriculture protection area" means the same as that term is defined in Section 17-41-101.
(1) "Agriculture protection area" means the same as that term is defined in Section 17-81-101.
(1)(2) "Solar power plant" means a utility-scale commercial facility that:
(2) "Solar power plant" means a utility-scale commercial facility that:
(2)(3) (a) "State incentive" means a tax credit, grant, subsidy, loan, or other form of financial support provided by the state or a state agency to promote or support the development or operation of a solar power plant.
(3)(a) "State incentive" means a tax credit, grant, subsidy, loan, or other form of financial support provided by the state or a state agency to promote or support the development or operation of a solar power plant.
and (iii) an alternative energy development tax credit under Section 79-6-5.
and (iii) an alternative energy development tax credit under Section 79-6-503.
- 2 - HB0016 compared with HB0016S02 Section 2.
Section 2.
Section 2 is enacted to read:
Section 54-17-1202 is enacted to read:
54-17-1202.
54-17-1202 .
(1) A solar power plant {that } for which a conditional use permit is {permitted } issued after May 6, 2026, is not eligible to receive state incentives if the soil where the project is located is:
(1) A solar power plant for which a conditional use permit is issued after May 6, 2026, is not eligible to receive state incentives if the soil where the project is located is:
(a) prime farmland, farmland of statewide importance, farmland of local importance, or farmland of unique importance, as designated by the Natural Resource Conservation Service;
(a) prime farmland, farmland of statewide importance, farmland of local importance, or farmland of unique importance, as designated by the Natural Resources Conservation Service;
or (c) non-irrigated cropland of a capability class one through four, as designated by the Natural Resources Conservation Service.
or (c) non-irrigated cropland of a capability class one through four, as designated by the - 2 - Enrolled Copy H.B.
16 Natural Resources Conservation Service.
(3) A proposed solar power plant located on grazing land is not eligible to receive state incentives if the land produces greater than {[1,000]} 250 pounds of vegetative production per acre in a normal year, according to the Web Soil Survey produced by the Natural Resources Conservation Service.
(3) A proposed solar power plant located on grazing land is not eligible to receive state incentives if the land produces greater than 250 pounds of vegetative production per acre in a normal year, according to the Web Soil Survey produced by the Natural Resources Conservation Service.
(4) A proposed solar power plant located on grazing land may receive half of an eligible state incentive if the land produces between {[500]} 125 and {[1,000]} 250 pounds of vegetative production per acre in a normal year, according to the Web Soil Survey produced by the Natural Resources Conservation Service.
(4) A proposed solar power plant located on grazing land may receive half of an eligible state incentive if the land produces between 125 and 250 pounds of vegetative production per acre in a normal year, according to the Web Soil Survey produced by the Natural Resources Conservation Service.
(a) holds a position in an interconnection queue {prior to } before January 1, 2026;
(a) holds a position in an interconnection queue before January 1, 2026;
(b) is subject to a signed commercial agreement to provide power that was executed {prior to } before January 1, 2026;
(b) is subject to a signed commercial agreement to provide power that was executed before January 1, 2026;
or (c) meets the requirements for, or is receiving, a state incentive {prior to } before May 6, 2026.
or (c) meets the requirements for, or is receiving, a state incentive before May 6, 2026.
Section 3 is enacted to read:
Section 54-17-1203 is enacted to read:
- 3 - HB0016 compared with HB0016S02 54-17-1203.
54-17-1203 .
Section 4 is enacted to read:
Section 54-17-1204 is enacted to read:
54-17-1204.
54-17-1204 .
(1) An owner of a solar power plant {that } for which a conditional use permit is {permitted } issued after May 6, 2026, shall:
(1) An owner of a solar power plant for which a conditional use permit is issued after May 6, 2026, shall:
(a) place financial assurance with the appropriate local jurisdiction, state entity, or land owner in accordance with Section 11-17-12 in the form of:
(a) place financial assurance with the appropriate local jurisdiction, state entity, or land - 3 - H.B.
Show all 55 changed rows (15 more)
Previous
Latest
16 Enrolled Copy owner in accordance with Section 11-17-12 in the form of:
- 4 - HB0016 compared with HB0016S02 (i) rectify any deficiency within 90 days after receiving written notice from the appropriate local jurisdiction by certified mail;
(i) rectify any deficiency within 90 days after receiving written notice from the appropriate local jurisdiction by certified mail;
and (e) if seeking to repower the solar power plant at the end of the {initial permitted use} useful life of the solar power plant:
and (e) if seeking to repower the solar power plant at the end of the useful life of the solar power plant:
(2) As a condition of the conditional use permit, the decommissioning plan shall be approved by the appropriate local jurisdiction's governing body before an owner commences construction on the solar power plant project site.
- 4 - Enrolled Copy H.B.
16 (2) As a condition of the conditional use permit, the decommissioning plan shall be approved by the appropriate local jurisdiction's governing body before an owner commences construction on the solar power plant project site.
Section 5 is enacted to read:
Section 54-17-1205 is enacted to read:
54-17-1205.
54-17-1205 .
(3) {After } Before receiving the permits required under Subsection (1), {but before commencing construction of a solar power plant, the } an owner shall submit to the appropriate local jurisdiction for review and approval:
(3) Before receiving the permits required under Subsection (1), an owner shall submit to the appropriate local jurisdiction for review and approval:
{and} - 5 - HB0016 compared with HB0016S02 (vi) areas of existing vegetation and proposed vegetation removal;
(vi) areas of existing vegetation and proposed vegetation removal;
{and} (vii) irrigation and water conveyances, and service areas;
(vii) irrigation and water conveyances, and service areas;
(4) {The } A local jurisdiction may not unreasonably withhold approval of the plans and documentation required under Subsection (3).
(4) A local jurisdiction may not unreasonably withhold approval of the plans and documentation required under Subsection (3).
Section 6 is enacted to read:
Section 54-17-1206 is enacted to read:
54-17-1206.
54-17-1206 .
Effective date.
2-6-26 4:17 PM - 6 -
- 5 -
⬇ Download PDF