- 2026 LEGISLATURE LRBa0774/1LRB-4829/1 EHS:cdcEHS:ajk ASSEMBLY AMENDMENTBILL 1,751 TODecember ASSEMBLY8, BILL2025 751- JanuaryIntroduced 15,by 2026Representatives -S OfferedUMMERFIELD , O'CONNOR , SORTWELL , WEARINGEN and W ITTKE , cosponsored by RepresentatUMMERFIELDSenators OMCZYK and FEYEN .
AtReferred theto locationsCommittee indicated,on amendEnergy theand billUtilities. as follows:
1.A N A CT to amend 196.20 (4) (c) 1.;
Pageto 2,create line196.20 11:(4) (a) 3.
afterof thatthe linestatutes; insert:
“SECTIONrelating 3c.to:
Initialcalculation applicability.of fuel costs for an electric public utility’s fuel cost plan.
(1)Analysis Thisby actthe firstLegislative appliesReference toBureau Under current Public Service Commission administrative code, a public utility must file with PSC a proposed fuel cost plan filedfor ona January12-month 1,period 2027.”.as part of an application to open or reopen a general rate case proceeding or as part of a proceeding limited in scope to fuel cost.
ENDCurrent )PSC administrative code requires a public utility to calculate fuel cost as the net of the costs and credits during that period for items such as fuel, energy market purchases, energy market sales, renewable resource credits, and emission allowances.
If PSC approves a fuel cost plan, it must establish the public utility’s rates in accordance with the approved plan.
Under current law, if an electric public utility has an approved fuel cost plan, PSC must defer any under-collection or over-collection of fuel costs that are outside of the utility’s symmetrical fuel cost annual tolerance for subsequent rate recovery or refund.
This bill specifies that fuel costs must be calculated to account for the cost of purchasing and the revenue earned in selling electricity generation capacity that meets the requirements for capacity as established by the Midcontinent Independent System Operator.
- 2026 Legislature - 2 - LRB-4829/1 EHS:ajk ASSEMBLY BILL 751 SECTION 1 The people of the state of Wisconsin, represented in senate and assembly, do enact as follows:
S ECTION 1.
196.20 (4) (a) 3.
of the statutes is created to read:
196.20 (4) (a) 3.
“Midcontinent independent system operation” has the meaning given to “Midwest independent system operator” in s.
196.485 (1) (ds).
S ECTION 2.
196.20 (4) (c) 1.
of the statutes is amended to read:
196.20 (4) (c) 1.
If an electric public utility has an approved fuel cost plan, the commission shall defer any under-collection or over-collection of fuel costs that are outside of the utility’s symmetrical fuel cost annual tolerance, as established by the commission, for subsequent rate recovery or refund.Fuel costs under this paragraph shall be calculated to account for the cost of purchasing and the revenue earned in selling electricity generation capacity that meets the requirements for capacity as established by the midcontinent independent system operator.
(END)