House File 704 -H-1246 IntroducedAmend HOUSEHouse FILEFile 704 BYas COMMITTEEfollows: ON WAYS AND MEANS (SUCCESSOR TO HSB 238) A BILL FOR An Act providing for the transportation of biogas using a gathering line system constructed within a secondary road right-of-way, providing fees, and including effective date provisions.
BE IT ENACTED BY THE GENERAL ASSEMBLY OF THE STATE OF IOWA:
TLSB 2548HV (1) 90 da/ns H.F.
704 Section 1.
NEW SECTION.
306E.1 Finding and declaration.
The state of Iowa finds and declares that the establishment and expansion of the biogas and renewable natural gas industry promises to be a vital part of Iowa’s future economy.
Sec.
2.
NEW SECTION.
306E.2 Definitions.
As used in this chapter, unless the context otherwise requires:
“AnaerobicPage digester1, system”by meansstriking thelines same23 asthrough defined26 inand sectioninserting: 459.102.
<5.
“Secondary road right-of-way” means a public road right-of-way that is under county jurisdiction as a secondary road.> 2.
Page 1, line 30, by striking <comply with> and inserting <do> 3.
By striking page 1, line 31, through page 2, line 4, and inserting:
<1.
Comply with any permitting requirements of, including the payment of any applicable fees to, the county which has jurisdiction over the secondary road right-of-way, as necessary to construct the gathering line system.
“Construct”As meanspart of a county permitting process, send a written notice of the pending permit application by certified mail to install,the expand,last maintain,known oraddress repair.of each owner of the real property where the gathering line system is proposed to be constructed.
“Gathering line system” or “system” means those gathering lines, as defined in 49 C.F.R.
§192.3, that operate at or under one hundred twenty-five pounds per square inch gauge and that transport biogas from an anaerobic digester system to a facility for further processing to produce renewable natural gas.
4.
“OwnerAcquire orthe operator”,requisite exceptproperty asinterest providedfrom inthe paragraphowner “b”,of meansthe areal personproperty thatwhere ownsthe orgathering operatesline asystem gatheringis lineproposed system.to be constructed.
A written agreement including a description of the real property and the interest acquired shall be filed in the office of the county recorder of the county where the real property is located.
“OwnerThis orsubsection operator” does not meanapply aif personthe owningcounty orhas operatingacquired atitle publicto utility,the asreal definedproperty in sectionfee 476.1.simple or if the owner of the gathering line system is also the owner of the real property where the gathering line system is proposed to be constructed.> 4.
Page 2, line 5, by striking <2.> and inserting <4.> 5.
“SecondaryPage road2, right-of-way”line means5, aby publicstriking road<Applicable> right-of-wayand theinserting possession<Comply ofwith whichapplicable> is______________________________ securedGOLDING orof reservedLinn byHF a704.1714 county(2) as90 part-1- ofda/ns the1/2 county’s______________________________ jurisdictionM. over a secondary road.
Sec.THOMPSON of Wright ______________________________ THOMSON of Floyd ______________________________ CISNEROS of Muscatine HF 704.1714 (2) 90 -2- da/ns 2/2
3.
NEW SECTION.
306E.3 Construction requirements.
Prior to constructing a gathering line system to be located in a secondary road right-of-way, an owner or operator shall comply with all of the following:
1.
Any permitting requirements of, including the payment of any applicable fees to, the county which has secured or reserved the right to possession of the secondary road right-of-way, as necessary to construct the gathering line system.
As part of a county permitting process, a county may LSB 2548HV (1) 90 -1- da/ns 1/3 H.F.
704 require the owner or operator to send a written notice of the construction to the last known address of each present owner of the secondary road right-of-way where the gathering line system will be constructed.
2.
Applicable requirements of chapter 480.
Sec.
4.
NEW SECTION.
306E.4 Construction and operation.
An owner or operator complying with the requirements of section 306E.3 may construct and operate a gathering line system in a secondary road right-of-way.
The owner or operator shall not construct or operate the system in a manner that causes permanent interference with the public use of a secondary road or secondary road right-of-way.
Sec.
5.
EFFECTIVE DATE.
This Act, being deemed of immediate importance, takes effect upon enactment.
EXPLANATION The inclusion of this explanation does not constitute agreement with the explanation’s substance by the members of the general assembly.
GENERAL.
This bill declares that the establishment and expansion of a biogas and renewable natural gas industry in this state promises to be a vital part of Iowa’s future economy (new Code section 306E.1).
The bill regulates the transportation of biogas from an anaerobic digester system (ADS) to a processing facility for the production of renewable natural gas.
TERMINOLOGY.
An ADS is connected to a confinement feeding operation housing livestock that stores liquid manure on site using a storage structure (Code section 459.206).
The ADS processes liquid manure by utilizing bacteria to break down organic matter in the absence of oxygen for purposes of producing, collecting, and transporting biogas (Code section 459.102).
A gathering line as a type of pipeline used to transport gas from its point of production to another facility for processing (i.e., refinement).
The bill defines a “gathering line system” (GLS) as gathering lines of a certain capacity used to transport biogas from an ADS to a facility LSB 2548HV (1) 90 -2- da/ns 2/3 H.F.
704 used to produce natural gas (new Code section 306E.2).
The bill allows the owner or operator of a GLS to install, expand, maintain, or repair (construct) or operate a GLS within the public road right-of-way of a secondary road possessed by a county (secondary road right-of-way) (Code section 306.4).
An owner or operator of a GLS does not include a public utility (regulated under Code chapter 476).
AUTHORIZATION TO CONSTRUCT GATHERING LINE SYSTEMS WITHIN A SECONDARY ROAD RIGHT-OF-WAY —— REQUIREMENTS.
The bill requires the owner or operator to comply with certain requirements prior to constructing or operating the GLS within a secondary road right-of-way (new Code section 306E.3).
The owner or operator must comply with any permitting requirements of, including the payment of any applicable fees to, the county possessing the secondary road right-of-way.
In addition, the county may require the owner or operator to send a written notice of the construction to the last-known address of the owner of the secondary road right-of-way.
The owner or operator must also notify the statewide notification center of any planned excavation (Code chapter 480).
Finally, the owner or operator cannot construct or operate a GLS in a manner that causes permanent interference with public use of the secondary road or secondary road right-of-way (new Code section 306E.4).
The bill takes effect upon enactment.