S-0176.2ENGROSSED SENATE BILL 5202 State of Washington 67th Legislature 2021 Regular Session By Senators Schoesler, Dozier, Honeyford, Keiser, King, and Warnick Read first time 01/13/21.
and reenacting and amending RCW 28A.320.330.
RCW 28A.320.330 and 20192021 c 411332 s 37045 and 2019 c 410 s 3 are each reenacted and amended to read as follows:
1 SBESB 5202 allocation under RCW 28A.150.250.
2 SBESB 5202 (xiii) All other costs not otherwise identified in other line items.
3 SBESB 5202 Money legally deposited into the capital projects fund from other sources may be used for the purposes described in RCW 28A.530.010, and for the purposes of:
4 SBESB 5202 (ii) Costs associated with the application and modernization of technology systems for operations and instruction including, but not limited to, the ongoing fees for online applications, subscriptions, or software licenses, including upgrades and incidental services, and ongoing training related to the installation and integration of these products and services.
(h) During the 2019-20212021-2023 fiscal biennium, renovation and replacement of facilities and systems, purchase or installation of items of equipment and furniture, including maintenance vehicles and machinery, and other preventative maintenance or infrastructure improvement purposes.
5 SBESB 5202 (5) Advance refunding bond funds and refunded bond funds to provide for the proceeds and disbursements as authorized in chapter 39.53 RCW.
6 SBESB 5202